Cable and Rib Vest
YARN
• 6 (6, 7, 8, 9, 10) balls 100g ASPIRE 8 Ply/DK, 70% NZ wool, 30% alpaca, in shade 1053
• 1 button
NEEDLES AND TOOLS
• 4mm knitting needles
• 4.5mm knitting needles
• 4.5mm circular needle 40.5cm long
• Cable needle
MEASUREMENTS
S, M, L, XL, 2X, 3X Bust cm: 82.5, 94, 107, 117, 129.5, 141 Length to shoulder cm: 66, 68.5, 68.5, 71, 71, 74
SPECIAL ABBREVIATIONS
T4B: Slip next 2 sts onto CN and hold at back of work, k2 from left needle, p2 from CN.
T4F: Slip next 2 sts onto CN and hold at front of work, p2 from left needle, k2 from CN.
Seed St: Row 1: (K1, p1) to end. Row 2: (P1, k1) to end.
TENSION
28 sts by 30 rows to 10cm over cable pattern on larger needles 28 sts by 26 rows to 10cm over rib pattern on smaller needles
GETTING STARTED CABLE PATTERN
(Instructions for 16 st patt rep only)
Row 1: (RS) – T4F, p2, k4, p2, T4B.
(WS) – K2, p2, k2, p4, k2, p2,
You’re reading a preview, subscribe to read more.
Start your free 30 days