Work Breakdown Structures for Projects, Programs, and Enterprises
()
About this ebook
The basic concept and use of the work breakdown structure (WBS) are fundamental in project management. In Work Breakdown Structures for Projects, Programs, and Enterprises, author Gregory T. Haugan, originator of the widely accepted 100 percent rule, offers an expanded understanding of the WBS concept, illustrating its principles and applications for planning programs as well as its use as an organizing framework at the enterprise level. Through specific examples, this book will help you understand how the WBS aids in the planning and management of all functional areas of project management.
With this valuable resource you will be able to:
• Tailor WBSs to your organization's unique requirements using provided checklists and principles
• Develop and use several types of WBS
• Use WBS software to gain a competitive edge
• Apply the 100 percent rule when developing a WBS for a project or program
• Establish a WBS for a major construction project using included templates
• Understand portfolio management and establish an enterprise-standard WBS
Gregory T. Haugan PhD, PMP
Gregory T. Haugan, PhD, PMP, is vice president of GLH Incorporated, which specializes in project management consulting and training. He has more than 40 years of experience as a government sector official and a private sector consultant in the planning, scheduling, management, and operation of projects of all sizes and in the development and implementation of project management and information systems.
Read more from Gregory T. Haugan Ph D, Pmp
Project Planning and Scheduling Rating: 5 out of 5 stars5/5Effective Work Breakdown Structures Rating: 5 out of 5 stars5/5The Government Manager's Guide to the Work Breakdown Structure Rating: 5 out of 5 stars5/5
Related to Work Breakdown Structures for Projects, Programs, and Enterprises
Related ebooks
Practice Standard for Work Breakdown Structures - Third Edition Rating: 5 out of 5 stars5/5Earned Value Project Management (Fourth Edition) Rating: 1 out of 5 stars1/5Project Management Casebook Rating: 4 out of 5 stars4/5Contextualization of Project Management Practice and Best Practice Rating: 0 out of 5 stars0 ratingsMetrics for Project Management: Formalized Approaches Rating: 5 out of 5 stars5/5The Triple Constraints in Project Management Rating: 0 out of 5 stars0 ratingsRequirements Management: A Practice Guide Rating: 4 out of 5 stars4/5Managing Project Delivery: Maintaining Control and Achieving Success Rating: 0 out of 5 stars0 ratingsProject Management Casebook: Instructor's Manual Rating: 0 out of 5 stars0 ratingsGovernance of Portfolios, Programs, and Projects: A Practice Guide Rating: 5 out of 5 stars5/5Performance-Based Project Management: Increasing the Probablility of Project Success Rating: 0 out of 5 stars0 ratingsProject Estimating and Cost Management Rating: 5 out of 5 stars5/5Challenges and Best Practices of Managing Government Projects and Programs Rating: 0 out of 5 stars0 ratingsGovernance Frameworks for Public Project Development and Estimation Rating: 0 out of 5 stars0 ratingsProject Management for Small Projects Rating: 0 out of 5 stars0 ratingsProject Management for Small Projects, Third Edition Rating: 4 out of 5 stars4/5Managing Projects With PMBOK 7: Connecting New Principles With Old Standards Rating: 0 out of 5 stars0 ratings9 Habits of Project Leaders: Experience- and Data-Driven Practical Advice in Project Execution Rating: 5 out of 5 stars5/5Project Management Fundamentals: Key Concepts and Methodology Rating: 5 out of 5 stars5/5Microsoft Project 2016: Up To Speed Rating: 5 out of 5 stars5/5Government Extension to the PMBOK® Guide Third Edition Rating: 5 out of 5 stars5/5Managing Complex Projects: A New Model Rating: 0 out of 5 stars0 ratingsGetting Started with Project Management: Managing Projects in Small Bites Rating: 0 out of 5 stars0 ratingsTime-Cost Optimization of Building Projects Rating: 0 out of 5 stars0 ratingsFundamentals of Project Management Rating: 0 out of 5 stars0 ratingsThe AMA Handbook of Project Management Rating: 0 out of 5 stars0 ratingsProject Planning Techniques Book Rating: 3 out of 5 stars3/5Effectiveness in Project Portfolio Management Rating: 5 out of 5 stars5/5Managing Project Budgets: Shortcuts to success Rating: 0 out of 5 stars0 ratings
Business For You
Emotional Intelligence: Exploring the Most Powerful Intelligence Ever Discovered Rating: 5 out of 5 stars5/5The Intelligent Investor, Rev. Ed: The Definitive Book on Value Investing Rating: 4 out of 5 stars4/5The Richest Man in Babylon: The most inspiring book on wealth ever written Rating: 5 out of 5 stars5/5The Catalyst: How to Change Anyone's Mind Rating: 4 out of 5 stars4/5The Book of Beautiful Questions: The Powerful Questions That Will Help You Decide, Create, Connect, and Lead Rating: 4 out of 5 stars4/5Your Next Five Moves: Master the Art of Business Strategy Rating: 5 out of 5 stars5/5Becoming Bulletproof: Protect Yourself, Read People, Influence Situations, and Live Fearlessly Rating: 4 out of 5 stars4/5Law of Connection: Lesson 10 from The 21 Irrefutable Laws of Leadership Rating: 4 out of 5 stars4/5Set for Life: An All-Out Approach to Early Financial Freedom Rating: 4 out of 5 stars4/5Tools Of Titans: The Tactics, Routines, and Habits of Billionaires, Icons, and World-Class Performers Rating: 4 out of 5 stars4/5Suddenly Frugal: How to Live Happier and Healthier for Less Rating: 3 out of 5 stars3/5How to Write a Grant: Become a Grant Writing Unicorn Rating: 5 out of 5 stars5/5Crucial Conversations Tools for Talking When Stakes Are High, Second Edition Rating: 4 out of 5 stars4/5Robert's Rules Of Order Rating: 5 out of 5 stars5/5Grant Writing For Dummies Rating: 5 out of 5 stars5/5Limited Liability Companies For Dummies Rating: 5 out of 5 stars5/5The Five Dysfunctions of a Team: A Leadership Fable, 20th Anniversary Edition Rating: 4 out of 5 stars4/5Confessions of an Economic Hit Man, 3rd Edition Rating: 5 out of 5 stars5/5How to Grow Your Small Business: A 6-Step Plan to Help Your Business Take Off Rating: 0 out of 5 stars0 ratingsNickel and Dimed: On (Not) Getting By in America Rating: 4 out of 5 stars4/5Crucial Conversations: Tools for Talking When Stakes are High, Third Edition Rating: 4 out of 5 stars4/5Collaborating with the Enemy: How to Work with People You Don’t Agree with or Like or Trust Rating: 4 out of 5 stars4/5How to Get Ideas Rating: 5 out of 5 stars5/5Capitalism and Freedom Rating: 4 out of 5 stars4/5
Reviews for Work Breakdown Structures for Projects, Programs, and Enterprises
0 ratings0 reviews
Book preview
Work Breakdown Structures for Projects, Programs, and Enterprises - Gregory T. Haugan PhD, PMP
WORK BREAKDOWN STRUCTURES FOR PROJECTS, PROGRAMS, AND ENTERPRISES
WORK BREAKDOWN STRUCTURES FOR PROJECTS, PROGRAMS, AND ENTERPRISES
Gregory T. Haugan, PMP
8230 Leesburg Pike, Suite 800
Vienna, VA 22182
(703) 790-9595
Fax: (703) 790-1371
www.managementconcepts.com
Copyright © 2008 by Management Concepts, Inc.
All rights reserved. No part of this book may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying, recording, or by an information storage and retrieval system, without permission in writing from the publisher, except for brief quotations in review articles.
Printed in the United States of America
Library of Congress Cataloging-in-Publication Data
Haugan, Gregory T., 1931–
Work breakdown structures for projects, programs, and enterprises / Gregory T. Haugan.
p. cm.
Revised edition of: Effective work breakdown structures / Gregory T. Haugan. Published in 2002.
ISBN 978-1-56726-228-5
1. Project management. 2. Work breakdown structure. I. Haugan, Gregory T., 1931–Effective work breakdown structures. II. Title.
HD69.P75H377 2008
658.4’04—dc22
2008018484
10 9 8 7 6 5 4 3 2 1
About the Author
Gregory T. Haugan, Ph.D., PMP, has been a vice president with GLH Incorporated for the past 20 years, specializing in project management consulting and training. He has more than 40 years experience as a consultant and as a government and private-sector official in the planning, scheduling, management, and operation of projects of all sizes, as well as in the development and implementation of project management systems.
Dr. Haugan is an expert in the application and implementation of project management systems. He participated in the early development of the work breakdown structure (WBS) and C/SCS (earned value) concepts with the U.S. Department of Defense and in the initial development of PERT cost software. He was the Martin Marietta representative on the Joint Army-Navy-NASA Committee developing the initial C/SCS concepts. He is particularly knowledgeable about scope management, cost management, and schedule management and about setting up new projects and preparing proposals. He continues to perform hands-on work as a consultant in these areas, and most of the examples in this book are from his projects.
Dr. Haugan has developed WBSs as a government employee and has specified their use on contracts. He has also developed WBSs as a government contractor in response to contract requirements, and he regards WBSs as fundamental building blocks in project management.
He has written four books published by Management Concepts: Effective Work Breakdown Structures (2002), Project Planning and Scheduling (2002), The Work Breakdown Structure in Government Contracting (2003), and Project Management Fundamentals (2006). Effective Work Breakdown Structures and Project Planning and Scheduling were translated into Japanese and Chinese in 2005.
Dr. Haugan received his Ph.D. in business administration from the American University, his MBA from St. Louis University, and his B.S. in mechanical engineering/aeronautical engineering from the Illinois Institute of Technology.
To my wife Susan, whose love and support made this book possible.
Contents
Preface
Acknowledgments
PART I WBS Fundamentals
Chapter 1 Introduction to the Work Breakdown Structure
Project Management Terms and Definitions
The Project Problem and Solution
The WBS in the Project Management Process
Background of the WBS Concept
Early U.S. Government Activities
Recent U.S. Government Activities
The Project Management Institute and the PMBOK® Guide
The WBS in the Government Sector versus the WBS in the Private Sector
Chapter 2 Work Breakdown Structure Fundamentals
The 100 Percent Rule
Anatomy of a WBS
Product Breakdown Elements
Service Breakdown Elements
Results Breakdown Elements—Generic Projects
Results Breakdown Elements—Information Technology Projects
Cross-Cutting Elements
Project Management Element
WBS Element Descriptions
WBS Dictionary
Control Account: EVMS
Work Packages
Appropriate Level of Detail
Use of the WBS to Develop Activities
The WBS and Activities
Activity Definition
Inputs versus Outputs—Resources versus Deliverables
Input versus Output Elements
Deliverables versus Intermediate Outputs
Numbering the WBS
Alternate Structure Concepts
Other Categorizations
Chapter 3 WBS Software and the WBS in Software
Software to Help Develop the WBS
WBS Chart Pro
Visio WBS Modeler
WBS Director
Software Using the WBS
Project Management Software
Cost-Estimating Software
Chapter 4 WBS Principles, Steps, and Checklist
WBS Principles
Product Projects
Service Projects
Results Projects—Generic or Information Technology
Common Principles
Steps in Developing a Project WBS
Checklist
PART II WBS Applications
Chapter 5 Project Management Methodology and Operations
Generic Methodology
Scope Management
Project Charter
Statement of Work
Time Management
Cost Management
Bottom-Up Cost Estimation
Collection of Historical Data
Chart of Accounts Linkages
Earned Value Management System Implementation
Budgeting and Work Authorizations
Communications
Procurement Management
Quality and Technical Performance Management
Human Resource Management
Team Building
Integrated Product Teams
Risk Management
Project Integration Management
Project Plan
Configuration Management
Systems Engineering
Chapter 6 Life Cycle Planning: Programs and Phases
Life Cycle Concepts
Generic Life Cycle
Generic Consumer Product Life Cycle
U.S. Department of Defense Life Cycle for Acquisition of Major Products
Typical Construction Project Life Cycle
Museum Program Life Cycle
Information Technology Program Life Cycle
U.S. Government Office of Management and Budget Life Cycle Planning
Life Cycle WBS Concepts
Phases within Projects
Chapter 7 Portfolio Management and a Standard WBS
Introduction
WBS Roles
Planning a Portfolio Management System
Establishing an Enterprise Standard WBS
Category A—Enterprise-Level WBS Standard
Category B—Family of Standard WBSs or Templates
Category C—Life Cycle Framework
Category D—Standard for WBS Development
Category E—No Existing Standard
Concept for a Standard Enterprise WBS
Outsourcing—WBS Requirements Placed on Contractors
Chapter 8 Government Performance Management and the WBS
Government Performance Management Policy: History and Status
Background of Government Performance Management
Government Policies for Performance Management
Industry Activities
Professional Association Activities
Program/Project Structure Requirements
Chapter 9 The WBS in Construction Management
Construction Classification Systems
Background
Construction Specifications Institute, CSI MasterFormat™
OmniClass™ Construction Classification System
Relation to a Project WBS
Highway Construction—Caltrans
Caltrans WBS Development
Purpose of the Caltrans Standard and Guide
Standard Template—Levels of the WBS
What Would a Generic, Universal Construction WBS Template Look Like?
Use of a WBS Template—A Case Study
GSA Enterprise WBS
WBS Elements
Application to an Existing Program—A Third Case Study
CSI MasterFormat™ 2004 Structure
PART III WBS Examples and Descriptions
Chapter 10 WBS Examples and Descriptions
1. Implementation of Enterprise Resource Planning—Version 1
2. Implementation of Enterprise Resource Planning—Version 2
3. Book-Writing Project
4. Dinner Party Project
5. Museum Project—Project Definition Phase
6. WBS for a Planning Phase
7. WBS for a Major Department of Energy Program
8. Information Technology Program
Project Initiation Stage
Design Stage
Implementation Stage
Closeout Stage
9. NASA Standard Base Maintenance Service Contract
10. Sewage Treatment Plant
11. The Rural Meat Company, ERP Implementation—Class Project
WBS Approach
12. Roaming To Win Project at National Wireless, Inc.—Class Project
WBS Analysis
Appendix A FAA Standard Work Breakdown Structure
Appendix B CSI Division List—1995 Version
Appendix C The OmniClass™ Development Committee
Appendix D OmniClass™ Tables Edition 1.0
Appendix E OmniClass™ 2004 and 1995 Divisions
Appendix F Sample Page OmniClass™ Table 22
Appendix G Caltrans WBS
Appendix H The International Infrastructure Project Work Breakdown Structure (WBS)
Bibliography
Index
Preface
The basic concept and use of the work breakdown structure (WBS) are fundamental in project management. When Effective Work Breakdown Structures was published in 2002 as part of the Project Management Essential Library series, that book received wide acclaim for its clear and logical explanation of the WBS concept and the seminal role of the WBS in project management. The 100 percent rule, as first postulated and explained in the 2002 book, has been widely adopted by project management practitioners and is now included as a key component of the latest revision of the Project Management Institute’s (PMI®) Practice Standard for Work Breakdown Structures.¹
The original book was followed by a related book in 2003, The Work Breakdown Structure in Government Contracting, which expanded upon the material presented in the first book with additional chapters focusing on the unique aspects of government contracting and government organizations.
This book, Work Breakdown Structures for Projects, Programs, and Enterprises, clarifies some of the advanced WBS concepts and addresses the unique concerns of the private sector. The book offers numerous examples, and it takes into account the latest materials published on the WBS by PMI and the U.S. Department of Defense.
Work Breakdown Structures for Projects, Programs, and Enterprises Work Breakdown Structures for Projects, Programs, and Enterprises contains three parts: Part I explains basic principles and concepts; Part II focuses on applications of WBS concepts; and Part III provides specific examples of WBSs along with related comments.
Key new material in this book appears in the following chapters:
Chapter 3: WBS Software and the WBS in Software—Describes the use of software to develop a WBS and the use of the WBS in project management software.
Chapter 7: Portfolio Management and a Standard WBS—Describes portfolio management, including the establishment of an enterprise standard WBS.
Chapter 9: The WBS in Construction Management—Describes the use of the WBS in construction management, including the use of the CSI MasterFormat™² and the OmniClass™³ classification systems and the development of a universal construction WBS template.
Chapter 5 includes enhanced sections about the use of the WBS in risk management, and Chapter 6 expands on life cycle management. New appendixes offer sample CSI MasterFormat™ and OmniClass™ breakdowns and additional WBSs used in the construction industry.
Gregory T. Haugan
Heathsville, Virginia
NOTES
1. Project Management Institute, Practice Standard for Work Breakdown Structures, 2nd ed. (Newtown Square, PA: Project Management Institute, 2006).
2. The Construction Specifications Institute, MasterFormat™ 2004 Edition.
Online at http://www.csinet.org (accessed February 2008).
3. OCCS Development Committee Secretariat, OmniClass™—A Strategy 3. for Classifying the Built Environment,
OCCS Development Committee. Online at http://www.omniclass.org/index.asp (accessed February 2008).
Acknowledgments
I’d like to acknowledge several people who helped me write this book by providing new material and advice: Paul Hewitt, Arnold Hill, Stanley Kirkwood, Jim Boughey, Jim Spiller, Stewart Meny, and Kris Athey. And as in my other books, thanks goes to my long-time friend, Ginger Levin, for her assistance and advice, and to Myra Strauss, Editorial Director at Management Concepts.
PART I
WBS Fundamentals
This book is divided into three parts. The first focuses on basic principles and concepts, the second focuses on applications of these WBS concepts, and the third focuses on specific examples.
Part I covers the fundamentals and principles of the WBS and other related material and ends with a summary of recommended steps in developing a WBS and a checklist. Part I includes the following chapters:
Chapter 1: Introduction to the Work Breakdown Structure
Chapter 2: Work Breakdown Structure Fundamentals
Chapter 3: WBS Software and the WBS in Software
Chapter 4: WBS Principles, Steps, and Checklist
CHAPTER 1
Introduction to the Work Breakdown Structure
This chapter provides basic information about the work breakdown structure (WBS), including the background of the concept and its place and role in the project management process. Specifically, the chapter first discusses project management terms and definitions and explains why—on a very basic level—a work breakdown is needed. The chapter next illustrates where the WBS fits in the overall project management process and gives a history of the evolution of the WBS concept. Finally, the chapter briefly describes the role of the WBS in the private and public sectors.
PROJECT MANAGEMENT TERMS AND DEFINITIONS
Project management as a field of study has a set of acknowledged terms and definitions. The following segment presents key project management terms used frequently in this book. Although these terms are in common usage in the project management field, they are presented for reference and establish a terminology baseline.
KEY PROJECT MANAGEMENT TERMS
Activity: A defined unit of work performed during the course of a project that is described using a verb. An activity normally has a work description and an expected duration, an expected cost, and expected resource requirements. Activities and tasks are terms that are often used interchangeably.
Control account (CA): Formerly known as a cost account in earned value management systems, the control account identifies a specific WBS work element at the intersection of the WBS and the organizational breakdown structure (OBS), where functional responsibility for the work in a work package is assigned and actual direct labor, material, and other direct cost data can be collected.
Cross-cutting element: A WBS element that relates to work performed in other branches of the WBS. For example, the work performed in project management relates to other work in the project yet has its own unique identity.
Deliverable: Any tangible, verifiable product, service, or result that must be produced to complete a project or part of a project. The term is often used narrowly to refer to hardware or equipment, a facility, software, data, or other items that are subject to approval by the project sponsor or customer.
End items: A general term that represents the hardware, services, equipment, facilities, data, and so on that are deliverable to the customer or that constitute a commitment on the part of the project manager to the customer.
Organizational breakdown structure (OBS): A graphic representation of the work of a project in terms of organizational units.
Portfolio: A collection of related projects or programs and other work that groups projects or programs together in order to support effective management of the total work effort in a way that meets strategic business or organizational objectives.
Program: A long-term undertaking consisting of a group of related projects that are managed in a harmonized way. Programs often include an element of ongoing work or work related to the program deliverables.
Project: A temporary endeavor undertaken to create a unique product, service, or result.
Project element: A component of the work to be performed in a project derived from the logical decomposition of the total work (top down) or synthesis of a logical grouping of required activities or work elements (bottom up).
Responsibility assignment matrix (RAM): A graphic structure that correlates the work required by a WBS element to the organizational division that is responsible for the assigned task. A RAM is created by intersecting the WBS with the OBS. The control account is established at the intersection.
Risk breakdown structure (RBS): A hierarchical arrangement of the actual risks that have been identified in a project, or a hierarchical framework presenting possible sources of risk, either generic or project-specific.
Subproject: A logical major component of a project. A subproject is usually a WBS element that can be managed as a semi-independent element of the project and is the responsibility of one person or organization.
Task: A generic term for the defined unit of effort on a project; often used interchangeably with activity, but could be a further breakdown of an activity. A task, like an activity, has an action component and is defined using a verb.
Work breakdown structure (WBS): A product-oriented family tree or grouping of project elements that organizes and defines the total work scope of the project. Each descending level represents an increasingly detailed definition of the project work.
WBS dictionary: A document that describes in brief narrative format what work is performed in each WBS element.
WBS element: An entry in the WBS that can be at any level and is described by a noun or a noun and an adjective.
WBS level: The relative rank of a WBS element in a WBS hierarchy. Customarily the top rank, the total project, is level 1.
Work element: Same as WBS element.
Work package: The lowest-level element in each branch of the WBS. A work package provides a logical basis for defining activities or assigning responsibility to a specific person or organization. Also, the work required to complete a specific job or process such as a report, a design, a documentation requirement or portion thereof, a piece of hardware, or a service.¹
Selected terms are illustrated in Figure 1-1.
FIGURE 1-1 Generic Work Breakdown Structure to Level 3
THE PROJECT PROBLEM AND SOLUTION
Starting a new project is like starting to write a book—you have an idea of what you want to do but are not sure how to start. Many writers, like many project planners and managers, find that outlining is frequently the most effective way to start writing.²
An outline is both a method for organizing material as well as a plan for the book itself. But when you start outlining a book, especially a book based on research, you realize there are many ways to do it. In general, you need to plan your research or data gathering; decide what goes in each chapter, including appendices; and take into account drafting chapters, getting reviews, and the other steps involved in reviewing proofs and publishing the document. A sample outline for a book is included in the form of a WBS in Chapter 10.
A frequently used analogy for any large project is the old question, How do you eat an elephant?
The answer is, One bite at a time.
So the first step in preparing an outline or planning a project is to start defining and categorizing the bites
(activities). The bites are important because they are where the useful work is accomplished. For a project, brainstorming can help define the bites from the bottom up, or a process of decomposition can be used, starting from the top, that subdivides the elephant into major sections working downward, as shown in Figure 1-2. In either approach, the objective is to develop a structure of the work that needs to be done for your project. This structure is the topic of this book.
FIGURE 1-2 Elephant Breakdown Structure—Top Level
The parts of the elephant can clearly be broken down (or subdivided) further. For example, the head is made up of a face, ears, tusks, and trunk; the four legs could be individually identified; other body parts could also be identified, as could the tail and tuft. A WBS for a project follows the concept just shown. The WBS is an outline of the work; it is not the work itself. The work itself is the sum of the many activities that make up the project.
A WBS may be started either as an informal list of activities or in a very structured way, depending on the project and the constraints, and can end wherever the planner wants it to end. The goal is to have a useful framework that helps define and organize the work.
In developing an outline for a book, some things happen almost automatically, growing out of the discipline of the process. The first is that you limit the contents of the book. Preparing an outline forces you to define the topics, sections, chapters, and parts of the book. The same thing happens when you develop a WBS of the project. You consider assumptions and constraints often without focusing on them directly.
When you complete the outline of a book, you have also defined the scope of the book, especially when the outline is annotated. The same thing happens in a project. An annotated WBS becomes an initial scope description. This is logical and elementary: If the outline (WBS) addresses all the work, then all the items described in the outline delineate all the work or the scope of the project.
Developing the WBS is a four-step process:
Step 1. Specify the project objectives, focusing on the products, services, or results that are to be provided to the customer.
Step 2. Identify specifically the products, services, or results (deliverables or end items) to be provided to the customer to meet the project objectives.
Step 3. Identify other work that needs to be performed in the project, to make sure that 100 percent of the work is covered; identify work that (a) either cuts across deliverables or is common to the deliverables (cross-cutting elements), (b) represents intermediate outputs, or (c) complements the deliverables.
Step 4. Subdivide each of the work elements identified in the previous steps into successive logical subcategories until the complexity and dollar value of the elements become manageable units (work packages) for planning and control purposes.
A typical WBS is shown in Figure 1-3.
FIGURE 1-3 Typical WBS: Elephant Gourmet Project