ITEM
1
XIII
2
3
4
5
6
7
ETAPA
ITEM
XIV
2
4
5
6
14
15
16
DESCRIPCION
CAJAS DE ENTREGA
VEREDA CONC.PREMEZC.FC=140 Kg/cm2 E=0.10m.
ACABADO C:A 1:2 (DE 1 SARDINEL)
VEREDA CONC.PREMEZC.FC=140 Kg/cm2 E=0.10m.
ACABADO C:A 1:2 (DE 2 SARDINEL)
RAMPA PARA MINUSVALIDOS
JARDINERAS (REDONDELAS)
BANCAS DE CONCRETO
MARTILLO CON ADOQUINES DE 21cm x 10cm x 4cm
DESCRIPCION
UND METRADO
AVANCE % DE AVANCE
SEMANAL ACUMULADO
und
3.00
1.00
33.33%
m2
5,341.46
24.60
101.59%
m2
1,600.89
30.20
83.68%
m2
und
und
m2
154.98
216.00
14.00
228.82
36.72
41.00
45.00
4.00
105.92%
81.94%
92.86%
98.25%
UND METRADO
AVANCE % DE AVANCE
SEMANAL ACUMULADO
3,628.80
320.00
45.17%
und
354.00
40.00
57.91%
und
354.00
59.00
48.02%
m
m
und
und
2,100.05
2,100.05
68.00
12.00
528.00
570.00
6.00
1.00
27.14%
27.14%
8.82%
8.33%