Price List

Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

Mark

Supp

Last

Up %

Code

Updated

P - Plant Rates
JADUAL KADAR SEWA LOJI 2003

21/07/2011

P001

Air Compressor

Day

295.00

05/07/2005

P002

Pneumatic Jackhammers

Day

290.00

05/07/2005

P003

Excavator with face shovel

Day

655.00

05/07/2005

P004

Backhoe Excavator (bucket 0.35 m3)

Day

300.00

05/07/2005

P005

Welding Machine and accessories

Day

200.00

05/07/2005

P006

Lorry ( 5 tonne)

Day

300.00

05/07/2005

P007

Concrete mixer (10/7)

Day

200.00

05/07/2005

P008

Road Roller (under 6 tonnes)

Day

430.00

05/07/2005

P009

Road Roller ( 6 tonnes and over )

Day

500.00

05/07/2005

P010

Mobile Crane (10 tonnes)

Day

350.00

05/07/2005

P011

Mobile Crane (5 tonnes)

Day

300.00

05/07/2005

P012

Piling Frame (precast concrete)

Day

1,200.00

05/07/2005

P013

Piling Frame (timber)

Day

300.00

05/07/2005

P014

Bulldozer (CAT D6)

Day

650.00

05/07/2005

P015

Grader

Day

600.00

05/07/2005

P016

Pneumatic Cutter

Day

200.00

05/07/2005

P017

Lorry (10 ton)

Day

300.00

05/07/2005

P018

20 KVA Generator Set

month

700.00

26/04/2011

P019

Compressor 175 CFM

month

1,800.00

26/04/2011

P020

Vibrator 38mm

buy

270.00

26/04/2011

Backhoe (Case)
P021

Monthly rental w/o diesel

no

6,000.00

15/05/2008

P022

Monthly rental with diesel

no

7,000.00

15/05/2008

Excavator EX-400
P023

Monthly rental w/o diesel

mth

16,500.00

26/02/2009

P024

Mobilization fee

no

1,200.00

26/02/2009

Excavator EX-400 c/w Breaker (40)


P025

Monthly rental w/o diesel

mth

21,000.00

26/02/2009

P026

Mobilization fee

no

1,200.00

26/02/2009

P027

Daily

no

1,150.00

26/02/2009

CHEW FU KEONG

Page :

of

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

P - Plant Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

Excavator EX-300 c/w Breaker (35)


P028

Monthly rental w/o diesel

mth

16,500.00

26/02/2009

P029

Mobilization fee

no

1,000.00

26/02/2009

P030

Daily

no

900.00

26/02/2009

P031

Paver

day

800.00

04/03/2009

P032

Tandem roller

day

600.00

04/03/2009

P033

Tyre roller

day

600.00

04/03/2009

P034

Colpave pump

day

80.00

26/11/2008

P035

Colpave oil

drum

320.00

26/11/2008

Crawler crane, 80 tonnes


P036

Monthly rental with operator but w/o diesel

mth

30,000.00

07/03/2009

P037

Diesel consumption per month

mth

1,800.00

07/03/2009

P038

Mobilization & demobilization costs

LS

30,000.00

07/03/2009

P039

Overtime & public holiday charges

hr

145.00

07/03/2009

Crawler crane, 100 tonnes


P040

Monthly rental with operator but w/o diesel

mth

45,000.00

07/03/2009

P041

Diesel consumption per month

mth

1,800.00

07/03/2009

P042

Mobilization & demobilization costs

LS

30,000.00

07/03/2009

P043

Overtime & public holiday charges

hr

145.00

07/03/2009

Mobile crane, 45 tonnes


P044

Monthly rental with diesel

mth

21,000.00

18/12/2008

P045

Daily

day

1,500.00

18/12/2008

P046

Overtime rate

hr

220.00

18/12/2008

P047

Sunday

day

1,800.00

18/12/2008

P048

Public holiday

day

1,850.00

18/12/2008

P049

Monthly rental w/o diesel

mth

18,500.00

18/12/2008

P050

Daily

day

1,300.00

18/12/2008

P051

Overtime rate

hr

180.00

18/12/2008

P052

Sunday

day

1,500.00

18/12/2008

P053

Public holiday

day

1,600.00

18/12/2008

CHEW FU KEONG

Page :

of

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

P - Plant Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

Mobile crane, 35 tonnes


P054

Monthly rental with diesel

mth

15,000.00

18/12/2008

P055

Daily

day

1,200.00

18/12/2008

P056

Overtime rate

hr

170.00

18/12/2008

P057

Sunday

day

1,300.00

18/12/2008

P058

Public holiday

day

1,350.00

18/12/2008

P059

Monthly rental w/o diesel

mth

13,000.00

18/12/2008

P060

Daily

day

1,000.00

18/12/2008

P061

Overtime rate

hr

120.00

18/12/2008

P062

Sunday

day

900.00

18/12/2008

P063

Public holiday

day

950.00

18/12/2008

Mobile crane, 25 tonnes


P064

Monthly rental with diesel

mth

12,000.00

18/12/2008

P065

Daily

day

550.00

18/12/2008

P066

Overtime rate

hr

70.00

18/12/2008

P067

Sunday

day

600.00

18/12/2008

P068

Public holiday

day

650.00

18/12/2008

P069

Monthly rental w/o diesel

no

10,800.00

18/12/2008

P070

Daily

day

690.00

18/12/2008

P071

Overtime rate

hr

77.92

18/12/2008

P072

Sunday

day

500.00

18/12/2008

P073

Public holiday

day

600.00

18/12/2008

Mobile crane, 20 tonnes


P074

Monthly rental with diesel

mth

9,800.00

17/12/2008

P075

Daily

day

450.00

18/12/2008

P076

Overtime rate

hr

60.00

17/12/2008

P077

Sunday

day

500.00

18/12/2008

P078

Public holiday

day

550.00

18/12/2008

P079

Monthly rental w/o diesel

mth

8,000.00

18/12/2008

P080

Daily

day

532.86

18/12/2008

P081

Overtime rate

hr

68.33

18/12/2008

P082

Sunday

day

400.00

18/12/2008

P083

Public holiday

day

500.00

18/12/2008

CHEW FU KEONG

Page :

of

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

P - Plant Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

Mobile crane, 16 tonnes


P084

Monthly rental w/o diesel

mth

7,000.00

17/12/2008

P085

Daily

day

492.50

17/12/2008

P086

Overtime rate

hr

66.25

17/12/2008

Schwing BP2000 mobile concrete pump


P087

Minimum volume per operation day = 100m3

P088

100m3 or less per operation day

day

1,500.00

27/02/2009

P089

101m3 and above per operation day

m3

15.00

27/02/2009

P090

P091

Schwing BP2000 static concrete pump


(monthly rental w/o diesel)
Minimum volume per operation month =
1000m3
1000m3 or less per operation month

mth

12,000.00

27/02/2009

P092

1001m3 and above per operation month

m3

12.00

27/02/2009

P093

Mobilization (2 way) (to & from)

Item

1,200.00

27/02/2009

P094

Provisional 100m concrete pipeline accessories

mth

6,000.00

27/02/2009

27/02/2009

27/02/2009

Skylift
P095

Monthly rental with diesel

mth

8,500.00

18/12/2008

P096

Daily

day

400.00

18/12/2008

P097

Overtime

hr

60.00

18/12/2008

P098

Sunday

day

400.00

18/12/2008

P099

Public holiday

day

450.00

18/12/2008

Plastering Mortar Machine


P100

Plastering machine NM 430, rental per month

mth

2,700.00

22/10/2008

P101

Plastering machine NM 303, rental per month

mth

2,800.00

22/10/2008

P102

Plastering machine NM 303, selling complete


set
Plastering machine NM 820, selling complete
set

set

55,000.00

22/10/2008

set

65,000.00

22/10/2008

P104

Lorry 6 wheeler, rental per day

day

330.00

13/01/2009

P105

Lorry 10 wheeler, rental per day

day

560.00

13/01/2009

P103

CHEW FU KEONG

Page :

of

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

P - Plant Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

Low Loader
P106

36 tonnes

trip

1,200.00

18/12/2008

P107

26 tonnes

trip

1,000.00

18/12/2008

P108

Rubbish Bin Rental

P109

size 12'(L) x 6.5'(W)x4'(H) - large

trip

180.00

24/10/2008

P110

size 12'(L) x 6.5'(W)x2'(H) - medium

trip

170.00

24/10/2008

P111

size 12'(L) x 6.5'(W)x1.5'(H) - small

trip

160.00

24/10/2008

P112

size 18'(L) x 8'(W)x6'(H) - extra large

trip

320.00

24/10/2008

P113

size 18'(L) x 8'(W)x3'(H)

trip

280.00

24/10/2008

Earthwork
P114

Dozer D8N, 300H.P

day

1,800.00

16/12/2008

P115

Dozer D7G

day

1,600.00

16/12/2008

P116

Dozer D6H, 200H.P

day

1,300.00

16/12/2008

P117

Motor Grader 12G, 140H.P

day

960.00

16/12/2008

P118

Wheel Loader 988B, 135H.P

day

1,500.00

16/12/2008

P119

Wheel Loader CAT 950E, 3.4m3

day

850.00

16/12/2008

P120

Tracked Loader CAT 973, 2.2m3

day

1,100.00

16/12/2008

P121

Hydraulic Excavator CAT EL200B, 2.5m3

day

850.00

16/12/2008

P122

Dozer Compactor CAT 815B, 0.9m3

day

900.00

16/12/2008

P123

Vibrating Roller Dynapac CA251, 170H.P

day

850.00

16/12/2008

P124

Vibrating Roller Dynapac CA301, 125H.P

day

750.00

16/12/2008

P125

Vibrating Roller SAKAI/TAIYOKU, 1 ton

day

38.46

23/12/2008

P126

Backhoe Loader 416, 125H.P

day

480.00

16/12/2008

P127

Mobile Crane, 67H.P

day

560.00

16/12/2008

P128

Dump Truck 8T, 20T

day

600.00

16/12/2008

P129

Vibrating Plate Dynapac LG250, 10H.P

day

150.00

16/12/2008

P130

Paver 11011R

day

780.00

16/12/2008

P131

Pneumatic Tyred Roller CP 201W

day

780.00

16/12/2008

Others
P132

Piling Frame

day

450.00

16/12/2008

P133

BG11 Drilling Plant

day

600.00

16/12/2008

P134

UBW05 Drilling Rig

day

800.00

16/12/2008

CHEW FU KEONG

Page :

of

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

P - Plant Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

P135

Hydraulic Excavator CAT EI1200B & Breaker

day

950.00

16/12/2008

P136

Backhoe Loader CASE580, 70H.P

day

450.00

16/12/2008

P137

Dragline Excavator

day

800.00

16/12/2008

P138

Farm Tractor with Auger Drill

day

400.00

16/12/2008

P139

Tracked Launching Crane

day

900.00

16/12/2008

P140

Crawler Crane, 35T

day

600.00

16/12/2008

P141

Gantry Crane

day

950.00

16/12/2008

P142

Trailer c/w fencing, 20T

day

1,000.00

17/12/2008

P143

Trailer Kana 42, 30T

day

680.00

16/12/2008

P144

Gunite Machine with Hose

day

690.00

16/12/2008

P145

Air Compressor 600 cfm, 100H.P

day

650.00

16/12/2008

P146

Air Compressor 375 cfm, 50H.P

day

500.00

16/12/2008

P147

Water Truck, 165H.P

day

600.00

16/12/2008

P148

Generator Set, 50KVA

day

600.00

16/12/2008

P149

Generator Set, 16KVA

day

300.00

16/12/2008

P150

Pressure Distributor

day

400.00

16/12/2008

P151

Hydrograsser

day

450.00

16/12/2008

P152

Concrete Truck Mixer

day

680.00

16/12/2008

P153

Concrete Mixer with diesel engine, 7TM

day

19.23

23/12/2008

P154

Compressed Air Blower

day

300.00

16/12/2008

P155

Water Jet

day

250.00

16/12/2008

P156

Down The Hole Hammer

day

200.00

16/12/2008

P157

Power Broom

day

250.00

16/12/2008

P158

Water Pump, 6 inches

day

350.00

16/12/2008

P159

Welding Set

day

350.00

16/12/2008

P160

Vibrating Plate

day

200.00

16/12/2008

P161

Winch

day

250.00

16/12/2008

P162

Cutting Set

day

250.00

16/12/2008

P163

Jackhammer

day

300.00

16/12/2008

P164

Chainsaw

day

300.00

16/12/2008

P165

Concrete Vibrator

day

150.00

16/12/2008

'CONCUT' Poker Vibrator - UK hose


P166

1" Diameter

no

330.00

17/12/2008

P167

1 3/8" Diameter

no

230.00

17/12/2008

CHEW FU KEONG

Page :

of

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

P - Plant Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

P168

1 3/4" Diameter

no

230.00

17/12/2008

P169

2" Diameter

no

240.00

17/12/2008

day

3.80

16/12/2008

Sheet Pile Rental


P170

FSP 3A, 12m

Scaffolding
PP01

Rental Per Month

P171

Open end frame, 1219 x 1700

no

1.50

17/12/2008

P172

Ladder end frame, 1219 x 914

no

1.20

17/12/2008

P173

Cross brace, 1829 x 1219

no

0.60

17/12/2008

P174

Cross brace, 1829 x 610

no

0.60

17/12/2008

P175

U-head

no

0.85

17/12/2008

P176

Jack base

no

0.80

17/12/2008

P177

Joint pin

no

0.10

17/12/2008

P178

Mighty swivel clamp

no

0.30

17/12/2008

P179

Galvanise pipe, 6m

no

3.50

17/12/2008

P180

Walking platform

no

4.00

17/12/2008

P181

Step ladder

no

10.00

17/12/2008

P182

Safety netting, 1.83m x 5.1m

pcs

14.50

17/12/2008

PP02

Sales - New

P183

Main frame, 1219 x 1700mm

no

48.00

05/01/2009

P184

Ladder frame 1219 x 914mm

no

30.00

05/01/2009

P185

Cross brace 1219 x 1829mm (A14)

no

8.50

05/01/2009

P186

Cross brace 1829 x 610mm (A08)

no

8.50

05/01/2009

P187

Joint pin 225mm - G.I

no

1.50

05/01/2009

P188

Jack base 600mm

no

19.00

05/01/2009

P189

U head 600mm

no

20.00

05/01/2009

P190

Galvanise pipe 48.6mm diameter x 6m

no

60.00

05/01/2009

P191

Fixed / Swivel clamp

no

5.00

05/01/2009

P192

Walking board 1829 x 500mm

no

100.00

05/01/2009

P193

Staircase galvanise 1829 x 1725mm

no

160.00

05/01/2009

P194

pcs

16.00

05/01/2009

P195

Safety netting c/w top & bottom eyelet 1.83m x


5.1m
Wall tie

no

7.00

05/01/2009

PP03

Sales - Recond

CHEW FU KEONG

Page :

of

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

P - Plant Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

P196

Main frame, 1219 x 1700mm

no

40.00

05/01/2009

P197

Ladder frame 1219 x 914mm

no

26.00

05/01/2009

P198

Cross brace 1219 x 1829mm (A14)

no

7.00

05/01/2009

P199

Cross brace 1829 x 610mm (A08)

no

7.00

05/01/2009

P200

Joint pin 225mm - G.I

no

1.00

05/01/2009

P201

Jack base 600mm

no

14.00

05/01/2009

P202

U head 600mm

no

15.00

05/01/2009

P203

Galvanise pipe 48.6mm diameter x 6m

no

48.00

05/01/2009

P204

Fixed / Swivel clamp

no

3.60

05/01/2009

P205

Walking board 1829 x 500mm

no

70.00

05/01/2009

P206

Staircase galvanise 1829 x 1725mm

no

110.00

05/01/2009

P207

Safety netting c/w top & bottom eyelet 1.83m x


5.1m
Wall tie

pcs

mth

600.00

17/12/2008

P208

no

Portable Toilet
P209

Flushing toiler w/o hand wash

Land Survey
P210

Demarcation survey

Item

3,500.00

17/12/2008

P211

Item

450.00

17/12/2008

P212

Transfer level from bench mark & height


control
Existing building & detail survey

Item

2,800.00

17/12/2008

P213

Piling points & ecentricity plan preparation

Item

1,200.00

17/12/2008

P214

Building gridline setting out

Item

600.00

17/12/2008

P215

Building as built including borang C

Item

1,250.00

17/12/2008

CSR AAC Tools & Accessories


P216

Levelling Plane

no

32.70

16/02/2009

P217

Teeth for Levelling Plane

no

87.10

16/02/2009

P218

Stirrer

no

12.10

16/02/2009

P219

Sanding Float

no

38.50

31/12/2008

P220

Rubber Mallet

no

20.00

16/02/2009

P221

Hand Router

no

11.95

31/12/2008

P222

Trowels - 100mm

no

11.40

16/02/2009

P223

Trowels - 125mm

no

12.20

16/02/2009

CHEW FU KEONG

Page :

of

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H

Price List
Ref Code

Trade Heading:

Name : PCK1

Item Description

Unit

Rate

P - Plant Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

P224

Trowels - 150mm

no

13.00

16/02/2009

P225

Trowels - 200mm

no

22.00

16/02/2009

P226

Steel Square

no

19.25

31/12/2008

P227

Handsaw

no

207.00

16/02/2009

P228

Steel Bracket FB1

no

0.80

16/02/2009

P229

Steel Bracket FB2

no

0.80

16/02/2009

P230

Steel Bracket FB6

no

1.04

31/12/2008

P231

V - Nail

no

0.60

16/02/2009

P232

Fibremesh, white, 160mm x 300m - 48m2/roll

roll

314.00

16/02/2009

CHEW FU KEONG

Page :

of

Date of Printing: 21/Jul/11


Global Estimating System (32 Bit) - H