ANY PIPE CONNECTION TO THE TURBINE IS A POTENTIAL SOURCE OF WATER EITHER BY INDUCTION FROM EXTERNAL EQUIPMENT OR BY ACCUMULATION OF CONDENSED STEAM

DESIGN BASIS

ASME TDP 1
RECORD NOTES OF DISCUSSION HELD AT TS-HQ, N.DELHI ON 12.09.91 REGARDING DRAINS SYSTEM

SPECIFIC CUSTOMER REQUIREMENTS

DESIGN CRITERIA

DETECTION OF THE PRESENCE OF WATER


ISOLATION OF THE WATER PREFERABLY AUTOMATIC MEANS BY MANUAL OR

DISPOSAL OF THE WATER PREFERABLY AUTOMATIC MEANS

BY

MANUAL

OR

NO SINGLE FAILURE OF EQUIPMENT SHOULD RESULT IN WATER ENTERING THE TURBINE

MAIN STEAM PIPING

MAIN STEAM PIPING


MS PIPING DRAINS UPTO TURBINE VALVES ARE LED TO ATMOSPHERE

DRAINS DOWNSTREAM OF TURBINE STOP VALVES ARE LED TO CONDENSER


START-UP DRAIN IS PROVIDED AT THE UPSTREAM OF BOILER STOP VALVE MS STRAINER IS THE LOWEST POINT AND FORMS THE DRAIN POINT BEFORE SEAT DRAIN IS CASCADED BACK TO THE MAIN STEAM LINE DURING START-UP MS STRAINER / LINE DRAINS ARE OPEN TO ATMOSPHERE CONTD.
6

MAIN STEAM PIPING

AUTOMATIC CLOSURE OF MS STRAINER & LINE DRAINS SEPARATE ATMOSPHERIC FLASH TANK (UFT) IS PROVIDED IN TG AREA TO RECEIVE MS DRAINS / HP BYPASS DRAINS TO MINIMIZE ROUTING PROBLEM DRAINAGE SYSTEM AS DESCRIBED HAS BEEN ADOPTED IN VARIOUS 210 MW / 250 MW / 500 MW PROJECTS LIKE DADRI, UNCHAHAR, BAKRESWAR, DAHANU, SURATGARH, KOTHAGUDEM, SIMHADRI ETC.

START-UP DRAIN UPSTREAM OF BOILER STOP VALVE

MAIN STEAM LINE DRAINS (TYPICAL FOR ONE LEG)

HPT

(BEFORE SEAT DRAIN) TO TURBINE FLASH BOX (MAL SYSTEM)

MAIN STEAM

(AFTER SEAT DRAIN)

TO UNIT FLASH TANK (L.O.) (MS STRAINER DRAIN)

MAIN STEAM STRAINER DRAIN

10

HOT REHEAT PIPING

11

HOT REHEAT PIPING


DRAINAGE SYSTEM IS SIMILAR TO THAT OF MAIN
STEAM EXCEPT THAT PRIOR TO STARTING THE TURBINE THE HOT REHEAT PIPING WILL BE AT CONDENSER PRESSURE, HENCE HOT REHEAT PIPING DRAINS ARE TO BE LED TO CONDENSER HRH DRAIN VALVES ARE OPEN BEFORE START OF VACUUM PULLING AUTOMATIC CLOSURE OF HRH STRAINER & LINE DRAINS

ADDITIONALLY MANUAL DRAIN IS PROVIDED AT THE UPSTREAM OF RH ISOLATING DEVICE TO FACILITATE DRAINING OF PIPING AFTER HYDRO TEST OF RH SECTIONS
12

HRH RH ISOLATING DEVICE

13

HRH LINE DRAINS (TYPICAL FOR ONE LEG )

IPT

(BEFORE SEAT DRAIN)

TO TURBINE FLASH BOX (MAL SYSTEM) (AFTER SEAT DRAIN)

HOT REHEAT TO CONDENSER FLASH TANK

(L.O.) (HRH STRAINER DRAIN)

14

HRH DRAIN BETWEEN IPT & VALVE

15

HRH STRAINER DRAIN

16

COLD REHEAT PIPING

17

COLD REHEAT PIPING


THE POTENTIAL SOURCE OF WATER INGRESS INTO CRH PIPE ARE: REHEATER SPRAY HP BYPASS SPRAY TOP HEATER EXTRACTION PIPING FROM HP EXHAUST DESIGN OF DRAINAGE SYSTEM TO REMOVE THE ENTIRE WATER THAT CAN ENTER INTO CRH LINE IS IMPRACTICAL SYSTEM IS DESIGNED TO PROVIDE SIGNAL TO ENABLE OPERATOR TO TAKE CORRECTIVE ACTION TO PREVENT WATER INFLOW

CRH PIPING DRAINS ARE LED TO CONDENSER AS IT COMES UNDER VACUUM DURING START-UP
CONTD.
18

COLD REHEAT PIPING

PIPING DOWNSTREAM OF CRH NRV FORMS LOWEST POINT IN THE CRH LINE ADDITIONALLY DRAIN IS PROVIDED BETWEEN HP TURBINE EXHAUST & CRH NRV A MANUAL DRAIN IS ALSO PROVIDED AT THE DOWNSTREAM OF RH ISOLATING DEVICE TO FACILITATE DRAINING OF PIPING AFTER HYDRO TEST OF RH SECTIONS

19

CRH RH ISOLATING DEVICE

20

COLD REHEAT LINE DRAINS

HPT
HH A LS LS

DRAIN POT
H A

(L.O.)

TO TURBINE FLASH BOX (MAL SYSTEM)

(L.O.)

TO CONDENSER FLASH TANK

21

CRH PIPING DRAIN BETWEEN HPT EXHAUST & NRV

22

CRH PIPING DRAINS

23

CRH PIPING DRAIN POT

DRAIN POT OF 6 INCH DIA IS PROVIDED IN 210 MW / 250 MW & 12 INCH DIA IN 500 MW AT THE EACH LOW POINT TWO LEVEL SWITCHES ARE INSTALLED ON THE DRAIN POT FOR SENSING OF PRESENCE OF CONDENSATE IN THE DRAIN POT AND EFFICIENT EVACUATION OF THE SAME LEVEL SWITCH AT HIGH LEVEL SHALL INITIATE FULL OPENING OF THE DRAIN VALVE AS WELL AS PROVIDE AN ALARM IN CONTROL ROOM LEVEL SWITCH AT HIGH HIGH LEVEL SHALL INITIATE AN ALARM AND REPEAT COMMAND FOR OPENING DRAIN VALVE CONTD.
24

CRH PIPING DRAIN POT

HIGH HIGH LEVEL IS A WARNING TO THE OPERATOR TO INVESTIGATE & ISOLATE THE SOURCE OF WATER INGRESS
BEFORE START OF VACUUM PULLING CRH DRAINS ARE OPEN TO CONDENSER AND OPERATOR TO ENSURE NO ALARM CONDITION ( CW PUMP & CEP ARE RUNNING) SPRAY IS ENVISAGED IN FLASH TANK TO COOL DRAINS

CLOSING OF CRH DRAIN VALVE IS REMOTE MANUAL

25

CRH DRAIN POT ARRANGEMENT

26

HP BYPASS PIPING

27

HP BYPASS PIPING
HP BYPASS WARM-UP & DRAIN ARRANGEMENT HAS BEEN ADOPTED IN LINE WITH DELIBERATIONS DTD. 20-21ST FEB. 1998 AT TRICHY HP BYPASS PIPING LAYOUT IS SUCH THAT ENTIRE PIPING IS SELF DRAINABLE TOWARDS MAIN STEAM / COLD REHEAT PIPING WARM-UP TAPPING IS PROVIDED CLOSE TO THE BYPASS VALVE FROM BOTTOM OF THE PIPING WARMING-UP LINE IS CONNECTED TO CRH LINE MINIMUM 5M AWAY FROM TEMPERATURE TAPPING POINTS START-UP DRAIN IS PROVIDED ON THE WARM-UP LINE AND IS LED TO ATMOSPHERE CONTD.
28

HP BYPASS PIPING

START-UP DRAIN OPENS PRIOR TO STARTING THE UNIT AND CLOSES WHEN HP BYPASS VALVE IS TAKEN INTO SERVICE

TEMPERATURE MEASUREMENT SHALL BE PROVIDED AT HP BYPASS VALVE INLET


HP BYPASS VALVE TO BE LOCATED ABOVE THE MAIN STEAM & CRH PIPING WARMING-UP LINE TO DOWNSTREAM OF MS STRAINER IS NOT PREFERRED AT IT WOULD LEAD TO UNSTRAINED STEAM TO TURBINE

29

HP BYPASS WARMING-UP SCHEME

HP BYPASS VALVE
TE TE TE

250 mm

5 M (min)

WARM-UP LINE (LO)

MAIN STEAM LINE START-UP DRAIN TO UFT

COLD REHEAT LINE

30

HP BYPASS WARM-UP PIPING

31

LP BYPASS PIPING

32

LP BYPASS WARM-UP PIPING

33

LP BYPASS WARM UP PIPING

34

LP BYPASS PIPING
IN EARLIER 210MW SETS AN ISOLATING ENVISAGED IN LP BYPASS WARM-UP SCHEME VALVE WAS

THE PURPOSE OF ISOLATING VALVE IS TO ISOLATE WARM-UP LINE DURING INITIAL COLD START-UP THIS VALVE HAS TO BE KEPT OPEN IN ALL OTHER MODES OF OPERATION BASED ON THE SITE FEEDBACK AN ANALYSIS WAS DONE & IT WAS OBSERVED THAT OPERATION OF ISOLATING VALVE WAS NOT PROPER AND WAS USUALLY LEFT CLOSED WHICH LEAD TO PROBLEMS WITH LP BYPASS SYSTEM

FROM DADRI 210MW TPS ONWARDS THIS ISOLATING VALVE HAS BEEN DISPENSED WITH CONTD.
35

LP BYPASS PIPING

IN 500MW PROJECTS ALSO THERE IS NO ISOLATING VALVE IN THE WARM-UP LINE THIS HAS ENHANCED THE SYSTEM RELIABILITY AND EASE IN OPERATION

LP BYPASS LOOP PIPING DRAINS CAN BE CASCADED BACK TO HRH PIPING (BETWEEN TURBINE & STRAINER) AT AN LOWER ELEVATION OTHERWISE DRAIN CAN BE LED TO CONDENSER
DRAIN ON WARMUP LINE IS PROVIDED CLOSE TO VALVE TO ENSURE WARMING UP CONTD.
36

LP BYPASS PIPING

BEFORE PULLING VACUUM IN THE CONDENSER OPEN ABOVE DRAINS TO CONDENSER ONCE LP BYPASS VALVE IS TAKEN INTO OPERATION THESE DRAIN VALVES CAN BE CLOSED

37

LP BYPASS WARMING UP SCHEME FOR 210 MW UNITS

HRH LINE

HRH STRAINER

CONTROL VALVE TO CONDENSER

Nb 450

STOP VALVE

LP BYPASS MAIN LINE TO TURBINE


Nb 50

LP BYPASS WARM-UP LINE

TO CONDENSER VIA FLASH TANK

WARM-UP STEAM FLOW IN COLD CONDITION WARM-UP STEAM FLOW DURING NORMAL RUNNING OF TURBINE

38

LP BYPASS WARMING UP SCHEME FOR 500 MW UNITS


HRH LINE HRH STRAINER

Nb 650

STOP VALVE

LP BYPASS MAIN LINE TO TURBINE CONTROL VALVE


Nb 50

TO CONDENSER

TO CONDENSER VIA FLASH TANK

LP BYPASS WARM-UP LINE

WARM-UP STEAM FLOW IN COLD CONDITION WARM-UP STEAM FLOW DURING NORMAL RUNNING OF TURBINE

39

OPERATING MODES

COLD START-UP DRAINS SHALL BE OPERATED AS DESCRIBED EARLIER HOT START-UP DURING TURBINE TRIPPED / BOILER TRIPPED CONDITION, OPEN AND CLOSE DRAINS AS IN COLD START-UP. MS STRAINER DRAINS ARE TO BE CLOSED AS SOON AS 50COF SUPERHEAT IS ACHIEVED AND BYPASS IS ESTABLISHED. DURING TURBINE TRIPPED / BOILER IN SERVICE WITH HP/LP BYPASS CONDITION NO DRAINS TO BE OPENED
40

NTPC SPECIFIC REQUIREMENTS

FOLLOWING ARE ADDITIONAL FEATURES PROVIDED IN NTPC PROJECTS AS PER THE CONTRACTUAL REQUIREMENT: ANGLE VALVES INSTEAD OF GLOBE VALVES IN DRAIN LINES NTPC SPECN. CALLS FOR TWO DRAINS FOR EACH DRAIN POINT I.E. ONE AS NORMAL DRAIN TO DRAIN FLASH TANK AND THE OTHER AS ALTERNATE DRAIN TO ATMOSPHERIC FLASH TANK. AFTER DELIBERATIONS ALTERNATE PATH ARE PROVIDED FOR MAIN STEAM DRAINS & HOT REHEAT DRAINS ONLY CLEAN OUT VALVES FOR DRIP POTS

41

ANGLE VALVE DRAIN ARRANGEMENT

42

FLASH TANKS SPRAY SYSTEM

FOR COOLING OF INCOMING HOT DRAINS FOLLOWING SPRAYS ARE ENVISAGED IN THE FLASH TANKS: CONDENSATE SPRAY FROM CEP DISCHARGE TO CONDENSER FLASH TANK THROUGH TEMPERATURE REGULATED ON / OFF TYPE CONTROL VALVE CONTINUOUS SPRAY THROUGH A MANUAL REGULATING VALVE & RESTRICTION ORIFICE FROM SERVICE WATER SYSTEM TO UNIT FLASH TANK CONTINUOUS SPRAY THROUGH A RESTRICTION ORIFICE FROM CEP DISCHARGE VALVE GLAND SEALING HEADER TO HP DRAIN FLASH TANK
43

UNIT FLASH TANK ARRANGEMENT (TYP)

HPBP WARM-UP MS STRAINER LINE DRAINS (TYP) DRAINS (TYP)

( LO )

( LO ) SPRAY WATER FROM SERVICE WATER SYSTEM

UNIT FLASH TANK

3M

TO DRAIN TRENCH

44

GENERAL RECOMMENDATIONS
DESIGN , CONTROL AND OPERATION OF ALL SYSTEM THAT HAVE A POTENTIAL FOR ALLOWING WATER TO THE TURBINE SHALL PREVENT ANY UNUSUAL ACCUMULATION DRAINS SHALL BE INSTALLED AT EVERY LOW POINT WITH ADEQUATE MEANS (MANUAL / AUTOMATIC) TO DISPOSE OFF THE CONDENSATE COLLECTED DRAIN LINE SIZE SHALL BE SUFFICIENT TO PREVENT RISK OF PLUGGING BY FOREIGN MATERIAL. NORMALLY DRAIN LINE SIZE IS 2 INCH

ALL DRAIN LINES SHALL PREFERABLY BE RUN INDIVIDUALLY AND HAVE CONTINUOUS SLOPE TOWARDS THE DISPOSAL POINT
CONTD.
45

GENERAL RECOMMENDATIONS

HIGH PRESSURE DRAINS SHALL BE PROVIDED WITH TWO VALVES IN SERIES , UPSTREAM LOCKED OPEN VALVE & DOWNSTREAM MOTORIZED VALVE. LOW PRESSURE DRAINS SHALL BE PROVIDED WITH MOTORIZED VALVE ALL MOTORIZED DRAINS SHALL HAVE FACILITY TO OPERATE FROM UNIT CONTROL ROOM WITH OPEN / CLOSE POSITION INDICATION OPERATOR TO ENSURE THAT ALL THE MOTORISED DRAIN VALVES SHALL BE CLOSED IMMEDIATELY ON ATTAINMENT OF 10% BLOCK LOAD ON TURBINE INSTALLATION LEVELS OF MS STRAINER. HRH STRAINER , CRH NRV ETC SHALL BE SUCH THAT DRAIN CAN BE LED WITH CONTINUOUS PROPER SLOPE TO THE TERMINAL POINT CONTD.

46

GENERAL RECOMMENDATIONS

ALTERNATE PATH SHOULD BE AVOIDED AS IT BECOMES SOURCE OF AIR INGRESS. ALSO AT SOME SITES ITS MALOPERATION RESULTED SUCKING OF WATER FROM ATMOSPHERIC TANK INTO THE MAIN PIPING LEADING TO SEVERE PROBLEMS DRAINS TO MANIFOLD SHALL BE GROUPED IN APPROXIMATELY SAME PRESSURE RANGES OTHERWISE DRAINS SHALL BE ARRANGED IN A DECREASING ORDER OF THE PRESSURE DRAIN LINES TO THE MANIFOLD SHALL BE MOUNTED AT 450 TO THE MANIFOLD AXIAL CENTRE LINE WITH THE DRAIN LINE DISCHARGE POINTING TOWARDS THE DISPOSAL POINT CONTD.
47

GENERAL RECOMMENDATIONS

DRAIN SHALL BE PREFERABLY TAPPED THROUGH A DRIP POT

LOOPS REQUIRED FOR FLEXIBILITY SHALL BE IN THE PLANE OF THE SLOPE


LOOP DRAINS CAN BE CASCADED BACK TO THE MAIN PIPING BY GRAVITY AT A LOWER ELEVATION OPERATION OF DRAIN VALVE, PLUGGING OF DRAIN LINES AND HEALTHINESS OF INSTRUMENTS SHALL BE PERIODICALLY CHECKED LEVEL ACTUATED MECHANISM SHALL BE TESTED AT INTERVALS TO ENSURE THEIR PROPER FUNCTIONING DRIP POTS, TRAPS & ORIFICES FOR ALL DRAIN LINES SHALL BE REGULARLY CLEANED