ANY PIPE CONNECTION TO THE TURBINE IS A POTENTIAL SOURCE OF WATER EITHER BY INDUCTION FROM EXTERNAL EQUIPMENT OR BY ACCUMULATION OF CONDENSED STEAM
DESIGN BASIS
ASME TDP 1
RECORD NOTES OF DISCUSSION HELD AT TS-HQ, N.DELHI ON 12.09.91 REGARDING DRAINS SYSTEM
DESIGN CRITERIA
BY
MANUAL
OR
AUTOMATIC CLOSURE OF MS STRAINER & LINE DRAINS SEPARATE ATMOSPHERIC FLASH TANK (UFT) IS PROVIDED IN TG AREA TO RECEIVE MS DRAINS / HP BYPASS DRAINS TO MINIMIZE ROUTING PROBLEM DRAINAGE SYSTEM AS DESCRIBED HAS BEEN ADOPTED IN VARIOUS 210 MW / 250 MW / 500 MW PROJECTS LIKE DADRI, UNCHAHAR, BAKRESWAR, DAHANU, SURATGARH, KOTHAGUDEM, SIMHADRI ETC.
HPT
MAIN STEAM
10
11
ADDITIONALLY MANUAL DRAIN IS PROVIDED AT THE UPSTREAM OF RH ISOLATING DEVICE TO FACILITATE DRAINING OF PIPING AFTER HYDRO TEST OF RH SECTIONS
12
13
IPT
14
15
16
17
CRH PIPING DRAINS ARE LED TO CONDENSER AS IT COMES UNDER VACUUM DURING START-UP
CONTD.
18
PIPING DOWNSTREAM OF CRH NRV FORMS LOWEST POINT IN THE CRH LINE ADDITIONALLY DRAIN IS PROVIDED BETWEEN HP TURBINE EXHAUST & CRH NRV A MANUAL DRAIN IS ALSO PROVIDED AT THE DOWNSTREAM OF RH ISOLATING DEVICE TO FACILITATE DRAINING OF PIPING AFTER HYDRO TEST OF RH SECTIONS
19
20
HPT
HH A LS LS
DRAIN POT
H A
(L.O.)
(L.O.)
21
22
23
DRAIN POT OF 6 INCH DIA IS PROVIDED IN 210 MW / 250 MW & 12 INCH DIA IN 500 MW AT THE EACH LOW POINT TWO LEVEL SWITCHES ARE INSTALLED ON THE DRAIN POT FOR SENSING OF PRESENCE OF CONDENSATE IN THE DRAIN POT AND EFFICIENT EVACUATION OF THE SAME LEVEL SWITCH AT HIGH LEVEL SHALL INITIATE FULL OPENING OF THE DRAIN VALVE AS WELL AS PROVIDE AN ALARM IN CONTROL ROOM LEVEL SWITCH AT HIGH HIGH LEVEL SHALL INITIATE AN ALARM AND REPEAT COMMAND FOR OPENING DRAIN VALVE CONTD.
24
HIGH HIGH LEVEL IS A WARNING TO THE OPERATOR TO INVESTIGATE & ISOLATE THE SOURCE OF WATER INGRESS
BEFORE START OF VACUUM PULLING CRH DRAINS ARE OPEN TO CONDENSER AND OPERATOR TO ENSURE NO ALARM CONDITION ( CW PUMP & CEP ARE RUNNING) SPRAY IS ENVISAGED IN FLASH TANK TO COOL DRAINS
25
26
HP BYPASS PIPING
27
HP BYPASS PIPING
HP BYPASS WARM-UP & DRAIN ARRANGEMENT HAS BEEN ADOPTED IN LINE WITH DELIBERATIONS DTD. 20-21ST FEB. 1998 AT TRICHY HP BYPASS PIPING LAYOUT IS SUCH THAT ENTIRE PIPING IS SELF DRAINABLE TOWARDS MAIN STEAM / COLD REHEAT PIPING WARM-UP TAPPING IS PROVIDED CLOSE TO THE BYPASS VALVE FROM BOTTOM OF THE PIPING WARMING-UP LINE IS CONNECTED TO CRH LINE MINIMUM 5M AWAY FROM TEMPERATURE TAPPING POINTS START-UP DRAIN IS PROVIDED ON THE WARM-UP LINE AND IS LED TO ATMOSPHERE CONTD.
28
HP BYPASS PIPING
START-UP DRAIN OPENS PRIOR TO STARTING THE UNIT AND CLOSES WHEN HP BYPASS VALVE IS TAKEN INTO SERVICE
29
HP BYPASS VALVE
TE TE TE
250 mm
5 M (min)
30
31
LP BYPASS PIPING
32
33
34
LP BYPASS PIPING
IN EARLIER 210MW SETS AN ISOLATING ENVISAGED IN LP BYPASS WARM-UP SCHEME VALVE WAS
THE PURPOSE OF ISOLATING VALVE IS TO ISOLATE WARM-UP LINE DURING INITIAL COLD START-UP THIS VALVE HAS TO BE KEPT OPEN IN ALL OTHER MODES OF OPERATION BASED ON THE SITE FEEDBACK AN ANALYSIS WAS DONE & IT WAS OBSERVED THAT OPERATION OF ISOLATING VALVE WAS NOT PROPER AND WAS USUALLY LEFT CLOSED WHICH LEAD TO PROBLEMS WITH LP BYPASS SYSTEM
FROM DADRI 210MW TPS ONWARDS THIS ISOLATING VALVE HAS BEEN DISPENSED WITH CONTD.
35
LP BYPASS PIPING
IN 500MW PROJECTS ALSO THERE IS NO ISOLATING VALVE IN THE WARM-UP LINE THIS HAS ENHANCED THE SYSTEM RELIABILITY AND EASE IN OPERATION
LP BYPASS LOOP PIPING DRAINS CAN BE CASCADED BACK TO HRH PIPING (BETWEEN TURBINE & STRAINER) AT AN LOWER ELEVATION OTHERWISE DRAIN CAN BE LED TO CONDENSER
DRAIN ON WARMUP LINE IS PROVIDED CLOSE TO VALVE TO ENSURE WARMING UP CONTD.
36
LP BYPASS PIPING
BEFORE PULLING VACUUM IN THE CONDENSER OPEN ABOVE DRAINS TO CONDENSER ONCE LP BYPASS VALVE IS TAKEN INTO OPERATION THESE DRAIN VALVES CAN BE CLOSED
37
HRH LINE
HRH STRAINER
Nb 450
STOP VALVE
WARM-UP STEAM FLOW IN COLD CONDITION WARM-UP STEAM FLOW DURING NORMAL RUNNING OF TURBINE
38
Nb 650
STOP VALVE
TO CONDENSER
WARM-UP STEAM FLOW IN COLD CONDITION WARM-UP STEAM FLOW DURING NORMAL RUNNING OF TURBINE
39
OPERATING MODES
COLD START-UP DRAINS SHALL BE OPERATED AS DESCRIBED EARLIER HOT START-UP DURING TURBINE TRIPPED / BOILER TRIPPED CONDITION, OPEN AND CLOSE DRAINS AS IN COLD START-UP. MS STRAINER DRAINS ARE TO BE CLOSED AS SOON AS 50COF SUPERHEAT IS ACHIEVED AND BYPASS IS ESTABLISHED. DURING TURBINE TRIPPED / BOILER IN SERVICE WITH HP/LP BYPASS CONDITION NO DRAINS TO BE OPENED
40
FOLLOWING ARE ADDITIONAL FEATURES PROVIDED IN NTPC PROJECTS AS PER THE CONTRACTUAL REQUIREMENT: ANGLE VALVES INSTEAD OF GLOBE VALVES IN DRAIN LINES NTPC SPECN. CALLS FOR TWO DRAINS FOR EACH DRAIN POINT I.E. ONE AS NORMAL DRAIN TO DRAIN FLASH TANK AND THE OTHER AS ALTERNATE DRAIN TO ATMOSPHERIC FLASH TANK. AFTER DELIBERATIONS ALTERNATE PATH ARE PROVIDED FOR MAIN STEAM DRAINS & HOT REHEAT DRAINS ONLY CLEAN OUT VALVES FOR DRIP POTS
41
42
FOR COOLING OF INCOMING HOT DRAINS FOLLOWING SPRAYS ARE ENVISAGED IN THE FLASH TANKS: CONDENSATE SPRAY FROM CEP DISCHARGE TO CONDENSER FLASH TANK THROUGH TEMPERATURE REGULATED ON / OFF TYPE CONTROL VALVE CONTINUOUS SPRAY THROUGH A MANUAL REGULATING VALVE & RESTRICTION ORIFICE FROM SERVICE WATER SYSTEM TO UNIT FLASH TANK CONTINUOUS SPRAY THROUGH A RESTRICTION ORIFICE FROM CEP DISCHARGE VALVE GLAND SEALING HEADER TO HP DRAIN FLASH TANK
43
( LO )
3M
TO DRAIN TRENCH
44
GENERAL RECOMMENDATIONS
DESIGN , CONTROL AND OPERATION OF ALL SYSTEM THAT HAVE A POTENTIAL FOR ALLOWING WATER TO THE TURBINE SHALL PREVENT ANY UNUSUAL ACCUMULATION DRAINS SHALL BE INSTALLED AT EVERY LOW POINT WITH ADEQUATE MEANS (MANUAL / AUTOMATIC) TO DISPOSE OFF THE CONDENSATE COLLECTED DRAIN LINE SIZE SHALL BE SUFFICIENT TO PREVENT RISK OF PLUGGING BY FOREIGN MATERIAL. NORMALLY DRAIN LINE SIZE IS 2 INCH
ALL DRAIN LINES SHALL PREFERABLY BE RUN INDIVIDUALLY AND HAVE CONTINUOUS SLOPE TOWARDS THE DISPOSAL POINT
CONTD.
45
GENERAL RECOMMENDATIONS
HIGH PRESSURE DRAINS SHALL BE PROVIDED WITH TWO VALVES IN SERIES , UPSTREAM LOCKED OPEN VALVE & DOWNSTREAM MOTORIZED VALVE. LOW PRESSURE DRAINS SHALL BE PROVIDED WITH MOTORIZED VALVE ALL MOTORIZED DRAINS SHALL HAVE FACILITY TO OPERATE FROM UNIT CONTROL ROOM WITH OPEN / CLOSE POSITION INDICATION OPERATOR TO ENSURE THAT ALL THE MOTORISED DRAIN VALVES SHALL BE CLOSED IMMEDIATELY ON ATTAINMENT OF 10% BLOCK LOAD ON TURBINE INSTALLATION LEVELS OF MS STRAINER. HRH STRAINER , CRH NRV ETC SHALL BE SUCH THAT DRAIN CAN BE LED WITH CONTINUOUS PROPER SLOPE TO THE TERMINAL POINT CONTD.
46
GENERAL RECOMMENDATIONS
ALTERNATE PATH SHOULD BE AVOIDED AS IT BECOMES SOURCE OF AIR INGRESS. ALSO AT SOME SITES ITS MALOPERATION RESULTED SUCKING OF WATER FROM ATMOSPHERIC TANK INTO THE MAIN PIPING LEADING TO SEVERE PROBLEMS DRAINS TO MANIFOLD SHALL BE GROUPED IN APPROXIMATELY SAME PRESSURE RANGES OTHERWISE DRAINS SHALL BE ARRANGED IN A DECREASING ORDER OF THE PRESSURE DRAIN LINES TO THE MANIFOLD SHALL BE MOUNTED AT 450 TO THE MANIFOLD AXIAL CENTRE LINE WITH THE DRAIN LINE DISCHARGE POINTING TOWARDS THE DISPOSAL POINT CONTD.
47
GENERAL RECOMMENDATIONS
49