You are on page 1of 12

SERVIO

QUANTIDADE

CONCRETO FCK=10MPa

15.41m

CONCRETO FCK=30MPa

380.21m

FORMA COMUM

1614.14m

FORMA MADEIRIT

1029.25m

AO CA-50

38021.49kg

ESCAVAO

1993.10m

COMPACTAO

308.24m

BOTA-FORA

228.73m

REATERRO

1764.37m

CIMBRAMENTO

1985.50m

QUADRO DE LEVANTAMENTO QUANTITATIVO


Obra:

FGV-ELETROBRS

Local :

Obs.:

Data :

OAE-AP-ARQ-DT-004-R00
Esp. Conc. Magro

Folga de escavao

0.05 m
PEA

Reservatrio de Reuso
gua Recuperada
gua Potvel
Dutovia para Subsolo

0.35 m

QUANT.

COMP.

LARG.

ALT.

CONCRETO

FORMA

ESCAVA.

un

m3

m2

m3

2.00

9.52

1.08

5.20

18.564

148.51

1.00

11.76

2.20

5.20

15.288

2.00

23.82

4.11

5.20

1.00

87.09

5.20

TOTAL

8/29/2012

INFRAESTRUTURA
BLOCOS

C.MAGRO COMPAC.

B.FORA

m3

m2

190.221

1.028

20.56

19.59

122.30

189.190

1.294

25.87

16.58

46.449

371.59

1,236.379

9.790

195.80

56.24

113.217

905.74

319.556

113.22

242.24

205.63

193.52

1548.14

1935.35

12.11

m3

TATIVO
Folha :
1

REATERRO
m3

170.629
172.609 AO
#######
206.339
#######

19351.80

QUADRO DE LEVANTAMENTO QUANTITATIVO


Obra:

FGV - ELETROBRAS

Local :

Obs.:

Data :

OAE-AP-ARQ-DT-004-R00
Esp. Conc. Magro

cintas
cinta

Folha :
1

INFRAESTRUTURA
CINTAS

Folga de escavao

0.05 m
PEA

8/29/2012

0.45 m

QUANT.

COMP.

LARG.

ALT.

CONCRETO

FORMA

ESCAVA.

C.MAGRO

COMPAC.

B.FORA

REATERRO

un

m3

m2

m3

m3

m2

m3

m3

2.00

25.00

0.60

0.30

6.00

10.00

0.60

0.30

TOTAL

9.000
10.800
19.80

30.00
36.00
66.00

26.250
31.500
57.75

1.500
1.800
3.30

30.00
36.00
66.00

10.50
12.60
23.10

15.750
18.900
34.65

1980.00

QUADRO DE QUANTIDADES
Obra:

FGVELETROBRS

Local :

Data :
Folha :
8/29/2012

OAE-AP-ARQ-DT-004-R00

Obs.:
PEA

vigas
vigas
vigas
vigas

ESTRUTURA
VIGAS
QUANT.

COMP.

LARG.

ALT.

CONCRETO

FORMA

CIMBRAMENTO

P DIREITO

ARMAO

taxa m/kg

un

m3

m2

m2

KG

100

2.00

25.00

0.60

0.30

6.00

10.00

0.60

0.30

2.0

25.00

0.60

0.30

6.0

10.00

0.60

0.30

1
TOTAL

9.000
10.800
9.000
10.800
-

60.00
72.00
60.00
72.00
-

67.50
144.00
67.50
144.00
-

39.60

264.00

423.00

2.25
4.00
2.25
4.00

900.00
1,080.00
900.00
1,080.00
-

3,960.00

QUADRO DE QUANTIDADES
Obra:

FGVELETROBRS

Local :

Data :
8/29/2012

OAE-AP-ARQ-DT-004-R00

Obs.:

ESTRUTURA
PEA

pilares 60x25
pilares 60x25
pilares 25x25
pilares 25x25
pilares 298x25
pilares 298x25

QUANT.

DIM.

COMP.

LARG.

ALT.

CONCRETO

FORMA

ARMAO

un

m3

m2

KG

8.0

0.60

0.25

2.25

8.0

0.60

0.25

4.00

3.0

0.25

0.25

2.25

3.0

0.25

0.25

4.00

4.0

2.98

0.25

2.25

4.0

2.98

0.25

4.00

TOTAL

2.700
4.800
0.422
0.750
6.705
11.920
-

30.60
54.40
6.75
12.00
58.14
103.36
-

270.00
480.00
42.19
75.00
670.50
1,192.00
-

27.30

265.25

2,729.69

PILAR METLICO

4.0

3.00

O DE QUANTIDADES
Folha :
1
ESTRUTURA
taxa m/kg
100

QUADRO DE QUANTIDADES
Obra:

Local :
FGV-ELETROBRS

Data :
Folha :
8/29/2012

OAE-AP-ARQ-DT-004-R00

Obs.:

ESTRUTURA
LAJES
PEA

laje 1 pav
laje 2 pav

QUANT.

COMP.

LARG.

ALT.

CONCRETO

FORMA

CIMBRAMENTO

P DIREITO

ARMAO

taxa m/kg

un

m3

m2

m3

KG

100

1.0

25.00

10.00

0.15

1.0

25.00

10.00

0.15

37.500
37.500
-

250.00
250.00
-

562.50
1,000.00
-

75.00

500.00

1,562.50

TOTAL

2.25
4.00

3,750.00
3,750.00
-

7,500.00

QUADRO DE QUANTIDADES
Obra:

Local : OAE-AP-ARQ-DT-004-R00

Data :
Folha :
8/29/2012

FGV-ELETROBRS
Obs.:
Laje Convencional
PEA

laje de piso

ESTRUTURA
LAJES

m
0.10 m

Pre-laje :
Capeamento :

QUANT.

COMP.

LARG.

ALT.

CONCRETO

FORMA

CONCRETO

Pre-Laje

CIMBRAMENTO

P DIREITO

ARMAO

taxa m/kg

un

m3

m2

m3

m2

m3

KG

100

1.0

25.00

10.00

TOTAL

25.000
-

250.00
-

2,500.00
-

25.00

250.00

2,500.00

LEVANTAMENTO DE QUANTIDADES
Local :

Obra: FGV-ELETROBRS

Data :

8/29/2012 Folha :

OAE-AP-ARQ-DT-004-R00
Obs.:

ESTRUTURA :

Ld

4
3

2
1

ESCADA EM CONCRETO

QD

(E). Laje

L
PEA

QUANT.

COMP.(C)

(un)

(m)

LARG.(L) ESPES.(E) (H) DEGR. (Ld) DEGR. QD DEGR.


(m)

TOTAL

(m)

(m)

(m)

(un)

CONCRETO

FORMA

ARMAO

CIMBRAMENTO

(m3)

(m2)

100 kg/m

(m3)

--