Professional Documents
Culture Documents
QUANTIDADE
CONCRETO FCK=10MPa
15.41m
CONCRETO FCK=30MPa
380.21m
FORMA COMUM
1614.14m
FORMA MADEIRIT
1029.25m
AO CA-50
38021.49kg
ESCAVAO
1993.10m
COMPACTAO
308.24m
BOTA-FORA
228.73m
REATERRO
1764.37m
CIMBRAMENTO
1985.50m
FGV-ELETROBRS
Local :
Obs.:
Data :
OAE-AP-ARQ-DT-004-R00
Esp. Conc. Magro
Folga de escavao
0.05 m
PEA
Reservatrio de Reuso
gua Recuperada
gua Potvel
Dutovia para Subsolo
0.35 m
QUANT.
COMP.
LARG.
ALT.
CONCRETO
FORMA
ESCAVA.
un
m3
m2
m3
2.00
9.52
1.08
5.20
18.564
148.51
1.00
11.76
2.20
5.20
15.288
2.00
23.82
4.11
5.20
1.00
87.09
5.20
TOTAL
8/29/2012
INFRAESTRUTURA
BLOCOS
C.MAGRO COMPAC.
B.FORA
m3
m2
190.221
1.028
20.56
19.59
122.30
189.190
1.294
25.87
16.58
46.449
371.59
1,236.379
9.790
195.80
56.24
113.217
905.74
319.556
113.22
242.24
205.63
193.52
1548.14
1935.35
12.11
m3
TATIVO
Folha :
1
REATERRO
m3
170.629
172.609 AO
#######
206.339
#######
19351.80
FGV - ELETROBRAS
Local :
Obs.:
Data :
OAE-AP-ARQ-DT-004-R00
Esp. Conc. Magro
cintas
cinta
Folha :
1
INFRAESTRUTURA
CINTAS
Folga de escavao
0.05 m
PEA
8/29/2012
0.45 m
QUANT.
COMP.
LARG.
ALT.
CONCRETO
FORMA
ESCAVA.
C.MAGRO
COMPAC.
B.FORA
REATERRO
un
m3
m2
m3
m3
m2
m3
m3
2.00
25.00
0.60
0.30
6.00
10.00
0.60
0.30
TOTAL
9.000
10.800
19.80
30.00
36.00
66.00
26.250
31.500
57.75
1.500
1.800
3.30
30.00
36.00
66.00
10.50
12.60
23.10
15.750
18.900
34.65
1980.00
QUADRO DE QUANTIDADES
Obra:
FGVELETROBRS
Local :
Data :
Folha :
8/29/2012
OAE-AP-ARQ-DT-004-R00
Obs.:
PEA
vigas
vigas
vigas
vigas
ESTRUTURA
VIGAS
QUANT.
COMP.
LARG.
ALT.
CONCRETO
FORMA
CIMBRAMENTO
P DIREITO
ARMAO
taxa m/kg
un
m3
m2
m2
KG
100
2.00
25.00
0.60
0.30
6.00
10.00
0.60
0.30
2.0
25.00
0.60
0.30
6.0
10.00
0.60
0.30
1
TOTAL
9.000
10.800
9.000
10.800
-
60.00
72.00
60.00
72.00
-
67.50
144.00
67.50
144.00
-
39.60
264.00
423.00
2.25
4.00
2.25
4.00
900.00
1,080.00
900.00
1,080.00
-
3,960.00
QUADRO DE QUANTIDADES
Obra:
FGVELETROBRS
Local :
Data :
8/29/2012
OAE-AP-ARQ-DT-004-R00
Obs.:
ESTRUTURA
PEA
pilares 60x25
pilares 60x25
pilares 25x25
pilares 25x25
pilares 298x25
pilares 298x25
QUANT.
DIM.
COMP.
LARG.
ALT.
CONCRETO
FORMA
ARMAO
un
m3
m2
KG
8.0
0.60
0.25
2.25
8.0
0.60
0.25
4.00
3.0
0.25
0.25
2.25
3.0
0.25
0.25
4.00
4.0
2.98
0.25
2.25
4.0
2.98
0.25
4.00
TOTAL
2.700
4.800
0.422
0.750
6.705
11.920
-
30.60
54.40
6.75
12.00
58.14
103.36
-
270.00
480.00
42.19
75.00
670.50
1,192.00
-
27.30
265.25
2,729.69
PILAR METLICO
4.0
3.00
O DE QUANTIDADES
Folha :
1
ESTRUTURA
taxa m/kg
100
QUADRO DE QUANTIDADES
Obra:
Local :
FGV-ELETROBRS
Data :
Folha :
8/29/2012
OAE-AP-ARQ-DT-004-R00
Obs.:
ESTRUTURA
LAJES
PEA
laje 1 pav
laje 2 pav
QUANT.
COMP.
LARG.
ALT.
CONCRETO
FORMA
CIMBRAMENTO
P DIREITO
ARMAO
taxa m/kg
un
m3
m2
m3
KG
100
1.0
25.00
10.00
0.15
1.0
25.00
10.00
0.15
37.500
37.500
-
250.00
250.00
-
562.50
1,000.00
-
75.00
500.00
1,562.50
TOTAL
2.25
4.00
3,750.00
3,750.00
-
7,500.00
QUADRO DE QUANTIDADES
Obra:
Local : OAE-AP-ARQ-DT-004-R00
Data :
Folha :
8/29/2012
FGV-ELETROBRS
Obs.:
Laje Convencional
PEA
laje de piso
ESTRUTURA
LAJES
m
0.10 m
Pre-laje :
Capeamento :
QUANT.
COMP.
LARG.
ALT.
CONCRETO
FORMA
CONCRETO
Pre-Laje
CIMBRAMENTO
P DIREITO
ARMAO
taxa m/kg
un
m3
m2
m3
m2
m3
KG
100
1.0
25.00
10.00
TOTAL
25.000
-
250.00
-
2,500.00
-
25.00
250.00
2,500.00
LEVANTAMENTO DE QUANTIDADES
Local :
Obra: FGV-ELETROBRS
Data :
8/29/2012 Folha :
OAE-AP-ARQ-DT-004-R00
Obs.:
ESTRUTURA :
Ld
4
3
2
1
ESCADA EM CONCRETO
QD
(E). Laje
L
PEA
QUANT.
COMP.(C)
(un)
(m)
TOTAL
(m)
(m)
(m)
(un)
CONCRETO
FORMA
ARMAO
CIMBRAMENTO
(m3)
(m2)
100 kg/m
(m3)
--