You are on page 1of 1

MixtureID: Yd DeisgnBatchSize(ft3): SG

CementitiousMaterial CM1 CM2 CM3 CM4 TotalCementitiousMaterials: Fibers F1 F2 Fiber1 Fiber2 TotalFibers: Aggregates A1 A2 A3 Aggreagate1 Aggreagate2 Aggreagate3 TotalAgregates: Water W1 fromCMHydration(W1a+W1b) W1a.WaterFromAdmixtures W1b.AdditionalWater W2 foraggreagtes,SSD TotalWater(W1+W2):

DeisgnProportions ActualBatched YieldedPorportions Porportions (NonSSD) Amount Volume Amount Volume Amount Volume (lb/yd3) (lb/yd3) (ft3) (lb) (ft3) (ft3)

1 1

SolidscontentofLatexAdmixturesandDyes S1 S2 Latex LiquidDye TotalWater(W1+W2) Waterin Waterin Admixtures(including Dosage Amount Dosage %Solids Admixture Admixture pigmentsinliquidform) (floz/cwt) (floz) (floz/cwt) (lb/yd3) (lb) Ad1 Latex Ad2 liquidDye Ad3 HRWR WaterfromAdmixtures(W1a): CementCementitiousMaterialsRatio WaterCementitiousMaterialsRatio Slump,SlumpFlow,in. M V T D D A Y MassofConcrete(lbs.) AbsoluteVol.ofConcrete(ft3) TheoreticalDensity(lb/ft3)=(M/V) DesignDensity(lb/ft3)=(M/27) MeasuredDensity(lb/ft3) AirContent%=[(TD)/TX100%] Yield(ft3)=(M/D) Waterin Admixture (lb/yd3)

Ry RelativeYield=(Y/Yd)

You might also like