Professional Documents
Culture Documents
Crew No.
Crew A-1
1 Building Laborer
1 Concrete saw, gas manual
Bare Costs
Hr.
Daily
Hr.
$35.10
$280.80
66.00
$54.00
$346.80
Hr.
Daily
Hr.
$45.40
$363.20
211.20
$70.20
$574.40
Hr.
Daily
Hr.
$35.10
$280.80
148.00
$54.00
Incl.
Subs O&P
$428.80
Hr.
Daily
Hr.
$35.10
$280.80
27.40
$54.00
$308.20
Crew A-1D
Hr.
Daily
Hr.
1 Building Laborer
1 Vibrating plate, gas, 450 mm
$35.10
$280.80
32.20
$54.00
$313.00
Crew A-1E
Hr.
Daily
Hr.
1 Building Laborer
1 Vibratory Plate, gas, 525 mm
$35.10
$280.80
40.80
$54.00
$321.60
Crew A-1F
Hr.
Daily
Hr.
1 Building Laborer
1 Rammer/tamper, gas, 200 mm
$35.10
$280.80
44.20
$54.00
$325.00
Crew A-1G
Hr.
Daily
Hr.
1 Building Laborer
1 Rammer/tamper, gas, 375 mm
$35.10
$280.80
49.80
$54.00
$330.60
Hr.
Daily
Hr.
$35.10
$280.80
66.80
$54.00
$347.60
Crew A-1J
Hr.
Daily
Hr.
1 Building Laborer
1 Cultivator, Walk-Behind, 3.8 kW
$35.10
$280.80
58.45
$54.00
$339.25
Crew A-1K
Hr.
Daily
Hr.
1 Building Laborer
1 Cultivator, Walk-Behind, 6.0 kW
$35.10
$280.80
89.75
$54.00
$370.55
Hr.
Daily
Hr.
$35.10
$280.80
53.10
$54.00
$333.90
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$432.00
72.60
$35.10
8.25
$54.00
9.07
$504.60
$43.35
$63.08
Daily
Bare
Costs
Incl.
O&P
$561.60
232.32
$45.40
26.40
$70.20
29.04
$793.92
$71.80
$99.24
Daily
Bare
Costs
Incl.
O&P
$432.00
162.80
$35.10
18.50
$54.00
20.35
$594.80
$53.60
$74.35
Daily
Bare
Costs
Incl.
O&P
$432.00
30.14
$35.10
3.42
$54.00
3.77
$462.14
$38.52
$57.77
Daily
Bare
Costs
Incl.
O&P
$432.00
35.42
$35.10
4.03
$54.00
4.43
$467.42
$39.13
$58.43
Daily
Bare
Costs
Incl.
O&P
$432.00
44.88
$35.10
5.10
$54.00
5.61
$476.88
$40.20
$59.61
Daily
Bare
Costs
Incl.
O&P
$432.00
48.62
$35.10
5.53
$54.00
6.08
$480.62
$40.63
$60.08
Daily
Bare
Costs
Incl.
O&P
$432.00
54.78
$35.10
6.22
$54.00
6.85
$486.78
$41.33
$60.85
Daily
Bare
Costs
Incl.
O&P
$432.00
73.48
$35.10
8.35
$54.00
9.19
$505.48
$43.45
$63.19
Daily
Bare
Costs
Incl.
O&P
$432.00
64.30
$35.10
7.31
$54.00
8.04
$496.30
$42.41
$62.04
Daily
Bare
Costs
Incl.
O&P
$432.00
98.72
$35.10
11.22
$54.00
12.34
$530.73
$46.32
$66.34
Daily
Bare
Costs
Incl.
O&P
$432.00
58.41
$35.10
6.64
$54.00
7.30
$490.41
$41.74
$61.30
Crew No.
Crew A-2
2 Laborers
1 Truck Driver (light)
1 Flatbed Truck, Gas, 1.4 MT
Bare Costs
Hr.
Daily
Hr.
$35.10
34.35
$561.60
274.80
211.00
$54.00
52.10
$1047.40
Hr.
Daily
Hr.
$35.10
34.35
$561.60
274.80
211.00
148.00
$54.00
52.10
$1195.40
Hr.
Daily
Hr.
$34.35
$274.80
211.00
$52.10
Incl.
Subs O&P
$485.80
Hr.
Daily
Hr.
$34.35
$274.80
139.00
$52.10
$413.80
Crew A-3B
Hr.
Daily
Hr.
$46.55
35.30
$372.40
282.40
584.60
472.40
$70.25
53.55
$1711.80
Hr.
Daily
Hr.
$44.75
$358.00
281.20
$67.55
$639.20
Hr.
Daily
Hr.
$34.35
$274.80
139.00
108.60
$52.10
$522.40
Hr.
Daily
Hr.
$47.80
35.30
$382.40
282.40
139.00
$72.15
53.55
$803.80
Hr.
Daily
Hr.
$47.80
35.30
$382.40
282.40
139.00
522.20
213.00
$72.15
53.55
$1539.00
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$864.00
416.80
232.10
$34.85
$53.37
8.79
9.67
$1512.90
$43.64
$63.04
Daily
Bare
Costs
Incl.
O&P
$864.00
416.80
232.10
162.80
$34.85
$53.37
14.96
16.45
$1675.70
$49.81
$69.82
Daily
Bare
Costs
Incl.
O&P
$416.80
232.10
$34.35
26.38
$52.10
29.01
$648.90
$60.73
$81.11
Daily
Bare
Costs
Incl.
O&P
$416.80
152.90
$34.35
17.38
$52.10
19.11
$569.70
$51.73
$71.21
Daily
Bare
Costs
Incl.
O&P
$562.00
428.40
643.06
519.64
$40.92
$61.90
66.06
72.67
$2153.10
$106.99
$134.57
Daily
Bare
Costs
Incl.
O&P
$540.40
309.32
$44.75
35.15
$67.55
38.66
$849.72
$79.90
$106.22
Daily
Bare
Costs
Incl.
O&P
$416.80
152.90
119.46
$34.35
$52.10
30.95
34.05
$689.16
$65.30
$86.14
Daily
Bare
Costs
Incl.
O&P
$577.20
428.40
152.90
$41.55
$62.85
8.69
9.56
$1158.50
$50.24
$72.41
Daily
Bare
Costs
Incl.
O&P
$577.20
428.40
152.90
574.42
234.30
$41.55
$62.85
54.64
60.10
$1967.22
$96.19
$122.95
Daily
793
Crews
Crew No.
Crew A-3G
1 Equip. Oper. (crane)
1 Truck Driver (heavy)
1 Pickup truck, 4 x 4, 0.7 MT
1 Truck Tractor, 6x4, 336 kW
1 Lowbed Trailer, 68 MT
Bare Costs
Hr.
Daily
Hr.
$47.80
35.30
$382.40
282.40
139.00
635.00
213.00
$72.15
53.55
$1651.80
Hr.
Daily
Hr.
$47.80
$382.40
824.00
$72.15
$1206.40
Hr.
Daily
Hr.
$47.80
$382.40
953.20
$72.15
$1335.60
Hr.
Daily
Hr.
$47.80
$382.40
1184.00
$72.15
$1566.40
Hr.
Daily
Hr.
$47.80
41.25
$382.40
330.00
1471.00
152.00
$72.15
62.25
$2335.40
Hr.
Daily
Hr.
$47.80
41.25
$382.40
330.00
2119.00
152.00
$72.15
62.25
$2983.40
Hr.
Daily
Hr.
$47.80
41.25
$382.40
330.00
2129.00
152.00
$72.15
62.25
$2993.40
Hr.
Daily
Hr.
$47.80
$382.40
1005.00
$72.15
$1387.40
Hr.
Daily
Hr.
$44.75
$358.00
481.80
$67.55
794
Incl.
Subs O&P
$839.80
Hr.
Daily
Hr.
$44.10
38.25
$705.60
306.00
$67.85
57.20
$1011.60
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$577.20
428.40
152.90
698.50
234.30
$41.55
$62.85
61.69
67.86
$2091.30
$103.24
$130.71
Daily
Bare
Costs
Incl.
O&P
$577.20
906.40
$47.80
103.00
$72.15
113.30
$1483.60
$150.80
$185.45
Daily
Bare
Costs
Incl.
O&P
$577.20
1048.52
$47.80
119.15
$72.15
131.07
$1625.72
$166.95
$203.22
Daily
Bare
Costs
Incl.
O&P
$577.20
1302.40
$47.80
148.00
$72.15
162.80
$1879.60
$195.80
$234.95
Daily
Bare
Costs
Incl.
O&P
$577.20
498.00
1618.10
167.20
$44.52
$67.20
101.44
111.58
$2860.50
$145.96
$178.78
Daily
Bare
Costs
Incl.
O&P
$577.20
498.00
2330.90
167.20
$44.52
$67.20
141.94
156.13
$3573.30
$186.46
$223.33
Daily
Bare
Costs
Incl.
O&P
$577.20
498.00
2341.90
167.20
$44.52
$67.20
142.56
156.82
$3584.30
$187.09
$224.02
Daily
Bare
Costs
Incl.
O&P
$577.20
1105.50
$47.80
125.63
$72.15
138.19
$1682.70
$173.43
$210.34
Daily
Bare
Costs
Incl.
O&P
$540.40
529.98
$44.75
60.23
$67.55
66.25
$1070.38
$104.97
$133.80
Daily
Bare
Costs
Incl.
O&P
$1085.60
457.60
$42.15
$1543.20
$42.15
Daily
Crew No.
Bare Costs
Incl.
Subs O&P
Crew A-5
Hr.
Daily
Hr.
2 Laborers
.25 Truck Driver (light)
.25 Flatbed Truck, Gas, 1.4 MT
$35.10
34.35
$561.60
68.70
52.75
$54.00
52.10
$683.05
Hr.
Daily
Hr.
$45.40
42.75
$363.20
342.00
78.70
$70.20
64.75
$783.90
Hr.
Daily
Hr.
$56.40
45.40
42.75
$451.20
363.20
342.00
78.70
$87.15
70.20
64.75
$1235.10
Hr.
Daily
Hr.
$56.40
45.40
42.75
$451.20
363.20
684.00
78.70
$87.15
70.20
64.75
$1577.10
Hr.
Daily
Hr.
$49.35
48.85
$394.80
2735.60
$76.90
76.10
$3130.40
Hr.
Daily
Hr.
$49.35
48.85
$394.80
781.60
$76.90
76.10
$1176.40
Hr.
Daily
Hr.
$49.35
48.85
$394.80
1172.40
$76.90
76.10
$1567.20
Hr.
Daily
Hr.
$48.85
$1172.40
211.00
$76.10
$1383.40
Hr.
Daily
Hr.
$48.85
47.80
41.25
$781.60
382.40
330.00
711.60
$76.10
72.15
62.25
$2205.60
Crew A-11
Hr.
Daily
Hr.
$64.30
1 Asbestos Foreman
7 Asbestos Workers
2 Chip. Hammers, 5.4 kg, Elec.
$49.35
48.85
$394.80
2735.60
39.60
$76.90
76.10
$64.30
$3170.00
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$864.00
104.20
58.02
$35.02
$53.79
2.93
3.22
$1026.22
$37.95
$57.01
Daily
Bare
Costs
Incl.
O&P
$561.60
518.00
86.57
$44.08
$67.47
4.92
5.41
$1166.17
$48.99
$72.89
Daily
Bare
Costs
Incl.
O&P
$697.20
561.60
518.00
86.57
$48.18
$74.03
3.28
3.61
$1863.37
$51.46
$77.64
Daily
Bare
Costs
Incl.
O&P
$697.20
561.60
1036.00
86.57
$46.83
$71.71
2.46
2.71
$2381.37
$49.28
$74.42
Daily
Bare
Costs
Incl.
O&P
$615.20
4261.60
$48.91
$76.20
$4876.80
$48.91
$76.20
Daily
Bare
Costs
Incl.
O&P
$615.20
1217.60
$49.02
$76.37
$1832.80
$49.02
$76.37
Daily
Bare
Costs
Incl.
O&P
$615.20
1826.40
$48.98
$76.30
$2441.60
$48.98
$76.30
Daily
Bare
Costs
Incl.
O&P
$1826.40
232.10
$48.85
8.79
$76.10
9.67
$2058.50
$57.64
$85.77
Daily
Bare
Costs
Incl.
O&P
$1217.60
577.20
498.00
782.76
$46.69
$71.65
22.24
24.46
$3075.56
$68.92
$96.11
Daily
Bare
Costs
Incl.
O&P
$615.20
4261.60
43.56
$48.91
$76.20
.62
.68
$4920.36
$49.53
$76.88
Daily
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew A-12
Hr.
Daily
Hr.
1 Asbestos Foreman
7 Asbestos Workers
1 Trk-mtd vac, 10.7 m3, 5.7 kL
1 Flatbed Truck, 9200 kg GVW
$49.35
48.85
$394.80
2735.60
518.50
215.80
$76.90
76.10
$3864.70
Crew A-13
Hr.
Daily
Hr.
$44.75
$358.00
518.50
215.80
$67.55
$1092.30
Hr.
Daily
Hr.
$37.10
35.10
$296.80
561.60
$57.10
54.00
$858.40
Hr.
Daily
Hr.
$37.10
35.10
$296.80
561.60
21.60
172.80
$57.10
54.00
$1052.80
Hr.
Daily
Hr.
$37.10
35.10
47.80
$296.80
561.60
382.40
21.60
172.80
612.00
$57.10
54.00
72.15
$2047.20
Hr.
Daily
Hr.
$37.10
35.10
$296.80
1123.20
$57.10
54.00
$1420.00
Crew B-3
Hr.
Daily
Hr.
$37.10
35.10
46.55
35.30
$296.80
561.60
372.40
564.80
1106.00
1169.20
$57.10
54.00
70.25
53.55
$4070.80
Hr.
Daily
Hr.
$35.10
46.55
$1123.20
372.40
960.40
$54.00
70.25
$2456.00
Crew B-3B
Hr.
Daily
Hr.
2 Laborers
1 Equip. Oper. (med.)
1 Truck Driver (heavy)
1 Backhoe Loader, 60 kW
1 Dump Truck, 9.2 m3, 298 kW
$35.10
46.55
35.30
$561.60
372.40
282.40
363.80
584.60
$54.00
70.25
53.55
$2164.80
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$615.20
4261.60
570.35
237.38
$48.91
$76.20
11.47
12.62
$5684.53
$60.39
$88.82
Daily
Bare
Costs
Incl.
O&P
$540.40
570.35
237.38
$44.75
$67.55
91.79
100.97
$1348.13
$136.54
$168.52
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
$35.77
$55.03
$1320.80
$35.77
$55.03
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
23.76
190.08
$35.77
$55.03
8.10
8.91
$1534.64
$43.87
$63.94
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
577.20
23.76
190.08
673.20
$38.77
$59.31
25.20
27.72
$2785.04
$63.98
$87.03
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
$35.50
$54.62
$2184.80
$35.50
$54.62
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
562.00
856.80
1216.60
1286.12
$37.41
$57.08
47.40
52.14
$5242.32
$84.81
$109.22
Daily
Bare
Costs
Incl.
O&P
$1728.00
562.00
1056.44
$37.39
$57.25
24.01
26.41
$3346.44
$61.40
$83.66
Daily
Bare
Costs
Incl.
O&P
$864.00
562.00
428.40
400.18
643.06
$38.01
$57.95
29.64
32.60
$2897.64
$67.65
$90.55
Daily
Crew No.
Crew B-3C
3 Laborers
1 Equip. Oper. (med.)
1 Crawler Loader, 3.1 m3
Bare Costs
Hr.
Daily
Hr.
$35.10
46.55
$842.40
372.40
1443.00
$54.00
70.25
Incl.
Subs O&P
$2657.80
Hr.
Daily
Hr.
$37.10
35.10
35.30
$296.80
1123.20
282.40
314.80
147.00
$57.10
54.00
53.55
$2164.20
Crew B-5
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
1123.20
744.80
177.00
19.60
12.60
1106.00
$57.10
54.00
70.25
$3480.00
Crew B-5A
Hr.
Daily
Hr.
$37.10
35.10
46.55
44.75
35.30
$296.80
1684.80
744.80
358.00
564.80
229.00
19.60
32.80
714.80
$57.10
54.00
70.25
67.55
53.55
$4645.40
Crew B-5B
Hr.
Daily
Hr.
1 Powderman
2 Equip. Oper. (med.)
3 Truck Drivers (heavy)
1 F.E. Loader, W.M., 1.9 m3
3 Dump Trucks, 9.2 m3, 298 kW
1 Air Compressor, 0.172 m3/s
$45.40
46.55
35.30
$363.20
744.80
847.20
472.40
1753.80
229.00
$70.20
70.25
53.55
$4410.40
Crew B-5C
Hr.
Daily
Hr.
3 Laborers
1 Equip. Oper. (med.)
2 Truck Drivers (heav.)
1 Equip. Oper. (crane)
1 Equip. Oper. Oiler
2 Dump Trucks, 9.2 m3, 298 kW
1 Crawler Loader, 3.1 m3
1 S.P. Crane, 4x4, 23 MT
$35.10
46.55
35.30
47.80
41.25
$842.40
372.40
564.80
382.40
330.00
1169.20
1443.00
565.20
$54.00
70.25
53.55
72.15
62.25
$5669.40
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1296.00
562.00
1587.30
$37.96
$58.06
45.09
49.60
$3445.30
$83.06
$107.67
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
428.40
346.28
161.70
$35.47
$54.44
9.62
10.58
$3121.18
$45.09
$65.02
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
1124.00
194.70
21.56
13.86
1216.60
$38.66
$59.09
23.49
25.83
$4755.52
$62.14
$84.92
Daily
Bare
Costs
Incl.
O&P
$456.80
2592.00
1124.00
540.40
856.80
251.90
21.56
36.08
786.28
$38.01
$58.02
10.38
11.41
$6665.82
$48.39
$69.44
Daily
Bare
Costs
Incl.
O&P
$561.60
1124.00
1285.20
519.64
1929.18
251.90
$40.73
$61.89
51.15
56.27
$5671.52
$91.88
$118.16
Daily
Bare
Costs
Incl.
O&P
$1296.00
562.00
856.80
577.20
498.00
1286.12
1587.30
621.72
$38.94
$59.22
49.65
54.61
$7285.14
$88.58
$113.83
Daily
795
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-5D
Hr.
Daily
Hr.
$37.10
35.10
46.55
35.30
$296.80
1123.20
744.80
282.40
177.00
19.60
12.60
1106.00
584.60
$57.10
54.00
70.25
53.55
$4347.00
Hr.
Daily
Hr.
$35.10
44.75
$561.60
358.00
334.00
$54.00
67.55
$1253.60
Hr.
Daily
Hr.
$37.10
35.10
46.55
$148.40
280.80
372.40
357.20
$57.10
54.00
70.25
$1158.80
Hr.
Hr.
2 Laborers
1 Equip. Oper. (light)
1 Rake w/Tractor
2 Chain Saws, gas, 450 mm
24 L.H., Daily Totals
796
$593.60
1123.20
264.60
211.00
376.45
$57.10
54.00
Daily
Hr.
$593.60
1123.20
448.20
264.40
806.15
$57.10
54.00
$3235.55
Crew B-7A
Hr.
$2568.85
Crew B-7
Daily
Daily
Hr.
$296.80
1123.20
372.40
283.80
1106.00
87.20
$57.10
54.00
70.25
$3269.40
Hr.
Daily
Hr.
$35.10
44.75
$561.60
358.00
324.70
54.80
$54.00
67.55
$1299.10
Cost
Per Labor-Hour
Crew No.
Bare Costs
Incl.
Subs O&P
Bare
Costs
Incl.
O&P
$456.80
1728.00
1124.00
428.40
194.70
21.56
13.86
1216.60
643.06
$38.24
$58.39
29.68
32.65
$5826.98
$67.92
$91.05
Daily
Bare
Costs
Incl.
O&P
$864.00
540.40
367.40
$38.32
$58.52
13.92
15.31
$1771.80
$52.23
$73.83
Daily
Bare
Costs
Incl.
O&P
$228.40
432.00
562.00
392.92
$40.08
$61.12
17.86
19.65
Crew B-8
Hr.
Daily
Hr.
$1615.32
$57.94
$80.77
Daily
Bare
Costs
Incl.
O&P
$913.60
1728.00
291.06
232.10
414.10
$35.77
$55.03
$37.10
35.10
46.55
41.25
35.30
19.53
$296.80
561.60
744.80
330.00
564.80
697.20
1106.00
1169.20
$57.10
54.00
70.25
62.25
53.55
17.75
$3578.86
$53.52
$74.56
Daily
Bare
Costs
Incl.
O&P
$913.60
1728.00
493.02
290.84
886.76
$35.77
$55.03
31.64
34.80
$4312.23
$67.41
$89.84
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
562.00
312.18
1216.60
95.92
$37.34
$57.23
30.77
33.85
$4371.50
$68.11
$91.07
Daily
Bare
Costs
Incl.
O&P
$864.00
540.40
357.17
60.28
$38.32
$58.52
15.81
17.39
$1821.85
$54.13
$75.91
Daily
Crew B-7B
Hr.
Daily
Hr.
$296.80
1123.20
372.40
282.40
283.80
1106.00
87.20
357.40
$57.10
54.00
70.25
53.55
$3909.20
Hr.
Daily
Hr.
$296.80
1123.20
372.40
282.40
283.80
1106.00
87.20
584.60
$57.10
54.00
70.25
53.55
$4136.40
$5470.40
Crew B-9
Hr.
Daily
Hr.
$37.10
35.10
$296.80
1123.20
177.00
19.60
12.60
$57.10
54.00
$1629.20
Hr.
2 Laborers
$35.10
1 Truck Driver (heavy)
35.30
1 Water Tank Trailer, 19 kL
1 Truck Tractor, 164kW
2 -15 m Discharge Hoses, 80 mm
24 L.H., Daily Totals
Crew B-9B
Hr.
$561.60
282.40
141.00
314.80
6.10
$54.00
53.55
$1305.90
Hr.
2 Laborers
$35.10
1 Truck Driver (heavy)
35.30
2 -15 m Discharge Hoses, 80 mm
1 Water Tank Trailer, 19 kL
1 Truck Tractor, 164kW
1 Pressure Washer
24 L.H., Daily Totals
Daily
Daily
Hr.
$561.60
282.40
6.10
141.00
314.80
63.00
$54.00
53.55
$1368.90
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
1728.00
562.00
428.40
312.18
1216.60
95.92
393.14
$37.05
$56.70
32.76
36.03
$5193.04
$69.81
$92.73
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
562.00
428.40
312.18
1216.60
95.92
643.06
$37.05
$56.70
36.81
40.50
$5442.96
$73.86
$97.20
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
1124.00
498.00
856.80
766.92
1216.60
1286.12
$39.03
$59.37
46.44
51.09
$7069.24
$85.48
$110.46
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
194.70
21.56
13.86
$35.50
$54.62
5.23
5.75
$2414.92
$40.73
$60.37
Daily
Bare
Costs
Incl.
O&P
$864.00
428.40
155.10
346.28
6.71
$35.17
$53.85
19.25
21.17
$1800.49
$54.41
$75.02
Daily
Bare
Costs
Incl.
O&P
$864.00
428.40
6.71
155.10
346.28
69.30
$35.17
$53.85
21.87
24.06
$1869.79
$57.04
$77.91
Daily
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-9D
Hr.
Daily
Hr.
$37.10
35.10
$296.80
1123.20
177.00
12.60
52.40
$57.10
54.00
$1662.00
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
$70.25
54.00
$512.80
Crew B-10A
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
171.60
$70.25
54.00
$684.40
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
1243.00
$70.25
54.00
$1755.80
Crew B-10C
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
1243.00
388.80
$70.25
54.00
$2144.60
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
1243.00
420.20
$70.25
54.00
$2176.00
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
149.20
$70.25
54.00
$662.00
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
227.60
$70.25
54.00
$740.40
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
1101.00
$70.25
54.00
$1613.80
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
1728.00
194.70
13.86
57.64
$35.50
$54.62
6.05
6.66
$2451.00
$41.55
$61.27
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
$42.73
$64.83
$778.00
$42.73
$64.83
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
188.76
$42.73
$64.83
14.30
15.73
$966.76
$57.03
$80.56
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
1367.30
$42.73
$64.83
103.58
113.94
$2145.30
$146.32
$178.78
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
1367.30
427.68
$42.73
$64.83
135.98
149.58
$2572.98
$178.72
$214.41
Daily
Crew No.
Crew B-10H
Hr.
$372.40
140.40
68.60
1.95
3.50
$70.25
54.00
$586.85
Crew B-10I
Hr.
Incl.
Subs O&P
Daily
Hr.
Hr.
$372.40
140.40
111.20
3.25
$70.25
54.00
$42.73
$64.83
138.60
152.46
$2607.52
$181.33
$217.29
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
164.12
$42.73
$64.83
12.43
13.68
$942.12
$55.17
$78.51
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
250.36
$42.73
$64.83
18.97
20.86
$1028.36
$61.70
$85.70
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
1211.10
$42.73
$64.83
91.75
100.93
$1989.10
$134.48
$165.76
Crew B-10L
Crew B-10M
Crew B-10N
1 Equip. Oper. (med.)
.5 Laborer
1 F.E. Loader, T.M., 1.15 m3
Crew B-10O
1 Equip. Oper. (med.)
.5 Laborer
1 F.E. Loader, T.M., 1.72 m3
12 L.H., Daily Totals
6.17
6.79
$859.46
$48.90
$71.62
Daily
Bare
Costs
Incl.
O&P
$42.73
$64.83
$562.00
216.00
122.32
3.58
11.35
$76.19
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
81.18
3.13
6.71
$42.73
$64.83
6.90
7.59
$869.02
$49.63
$72.42
Daily
Bare
Costs
Incl.
O&P
$42.73
$64.83
Daily
Hr.
$372.40
140.40
308.40
11.50
$70.25
54.00
$562.00
216.00
339.24
12.65
24.20
26.62
28.68
31.54
$856.90
$1156.51
$71.41
$96.38
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
486.64
$42.73
$64.83
36.87
40.55
$1264.64
$79.60
$105.39
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
1889.80
$42.73
$64.83
143.17
157.48
$2667.80
$185.90
$222.32
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
537.46
$42.73
$64.83
40.72
44.79
$1315.46
$83.45
$109.62
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
984.72
$42.73
$64.83
74.60
82.06
$1762.72
$117.33
$146.89
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
442.40
$70.25
54.00
$955.20
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
1718.00
$70.25
54.00
$2230.80
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
488.60
$70.25
54.00
$64.83
10.32
$595.55
$562.00
216.00
1367.30
462.22
$42.73
$53.05
Incl.
O&P
$562.00
216.00
75.46
2.15
3.85
10.34
$70.25
54.00
Incl.
O&P
$914.24
$372.40
140.40
73.80
2.85
6.10
Bare
Costs
Daily
9.40
Hr.
Cost
Per Labor-Hour
$636.65
Hr.
Crew B-10K
Hr.
Daily
Daily
Bare
Costs
Daily
Bare Costs
$1001.40
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
895.20
$70.25
54.00
$1408.00
797
Crews
Crew No.
Crew B-10P
1 Equip. Oper. (med.)
.5 Laborer
1 Crawler Loader, 2.3 m3
Bare Costs
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
1106.00
$70.25
54.00
$1618.80
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
1443.00
$70.25
54.00
$1955.80
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
268.20
$70.25
54.00
$781.00
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
333.80
$70.25
54.00
$846.60
Hr.
$46.55
35.10
Hr.
$46.55
35.10
Crew B-10W
Hr.
$46.55
35.10
Crew B-10X
Crew B-10Y
798
Daily
$372.40
140.40
960.00
Hr.
$70.25
54.00
Daily
$372.40
140.40
4235.00
Hr.
$70.25
54.00
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
550.80
$70.25
54.00
$1063.60
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
2272.00
$70.25
54.00
$70.25
54.00
$4747.80
$372.40
140.40
472.40
Hr.
$1472.80
Daily
$985.20
Incl.
Subs O&P
$2784.80
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
514.80
$70.25
54.00
$1027.60
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$562.00
216.00
1216.60
$42.73
$64.83
92.17
101.38
$1994.60
$134.90
$166.22
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
1587.30
$42.73
$64.83
120.25
132.28
$2365.30
$162.98
$197.11
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
295.02
$42.73
$64.83
22.35
24.59
$1073.02
$65.08
$89.42
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
367.18
$42.73
$64.83
27.82
30.60
$1145.18
$70.55
$95.43
Daily
Bare
Costs
Incl.
O&P
Daily
Crew No.
Crew B-11A
1 Equipment Oper. (med.)
1 Laborer
1 Dozer, 149 kW
$64.83
39.37
43.30
$1297.64
$82.10
$108.14
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
1056.00
$42.73
$64.83
80.00
88.00
$1834.00
$122.73
$152.83
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
4658.50
$42.73
$64.83
352.92
388.21
$5436.50
$395.65
$453.04
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
605.88
$42.73
$64.83
45.90
50.49
$1383.88
$88.63
$115.32
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
2499.20
$42.73
$64.83
189.33
208.27
$3277.20
$232.07
$273.10
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
566.28
$42.73
$64.83
42.90
47.19
$1344.28
$85.63
$112.02
Daily
Hr.
$46.55
35.10
$372.40
280.80
1243.00
$70.25
54.00
$1896.20
Crew B-11B
Hr.
Daily
Hr.
$44.75
35.10
$358.00
280.80
26.20
229.00
12.60
$67.55
54.00
$906.60
Hr.
Daily
Hr.
$46.55
35.10
$372.40
280.80
334.00
$70.25
54.00
$42.73
Incl.
Subs O&P
Hr.
Crew B-11C
$562.00
216.00
519.64
Bare Costs
$987.20
Hr.
Daily
Hr.
$46.55
35.10
$372.40
280.80
610.80
81.60
$70.25
54.00
$1345.60
Hr.
Daily
Hr.
$46.55
35.10
$372.40
280.80
2848.00
$70.25
54.00
$3501.20
Hr.
Daily
Hr.
$46.55
35.10
$372.40
280.80
610.80
$70.25
54.00
$1264.00
Hr.
Daily
Hr.
$46.55
35.10
$372.40
280.80
363.80
$70.25
54.00
$1017.00
Crew B-11N
Hr.
Daily
Hr.
$37.10
46.55
35.30
$296.80
744.80
1694.40
960.00
2272.00
9408.00
$57.10
70.25
53.55
$15376.00
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
817.40
$70.25
54.00
$1330.20
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$562.00
432.00
1367.30
$40.83
$62.13
77.69
85.46
$2361.30
$118.51
$147.58
Daily
Bare
Costs
Incl.
O&P
$540.40
432.00
28.82
251.90
13.86
$39.92
$60.77
16.74
18.41
$1266.98
$56.66
$79.19
Daily
Bare
Costs
Incl.
O&P
$562.00
432.00
367.40
$40.83
$62.13
20.88
22.96
$1361.40
$61.70
$85.09
Daily
Bare
Costs
Incl.
O&P
$562.00
432.00
671.88
89.76
$40.83
$62.13
43.27
47.60
$1755.64
$84.10
$109.73
Daily
Bare
Costs
Incl.
O&P
$562.00
432.00
3132.80
$40.83
$62.13
178.00
195.80
$4126.80
$218.82
$257.93
Daily
Bare
Costs
Incl.
O&P
$562.00
432.00
671.88
$40.83
$62.13
38.17
41.99
$1665.88
$79.00
$104.12
Daily
Bare
Costs
Incl.
O&P
$562.00
432.00
400.18
$40.83
$62.13
22.74
25.01
$1394.18
$63.56
$87.14
Daily
Bare
Costs
Incl.
O&P
$456.80
1124.00
2570.40
1056.00
2499.20
10348.80
$38.00
$57.66
175.56
193.11
$18055.20
$213.56
$250.77
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
899.14
$42.73
$64.83
68.12
74.93
$1677.14
$110.85
$139.76
Daily
Crews
Crew No.
Crew B-11R
1 Equipment Operator (med.)
.5 Laborer
1 Dozer, 149 kW
Bare Costs
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
1243.00
$70.25
54.00
$1755.80
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
1718.00
81.60
$70.25
54.00
$2312.40
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
2272.00
91.80
$70.25
54.00
Incl.
Subs O&P
$2876.60
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
2937.00
$70.25
54.00
$3449.80
Crew B-11V
Hr.
Daily
Hr.
3 Laborers
1 Roller, 2-Drum, W.B., 5.6 kW
$35.10
$842.40
171.60
$54.00
$1014.00
Crew B-11W
Hr.
Daily
Hr.
$46.55
35.10
35.30
$372.40
280.80
2824.00
1243.00
388.80
3574.00
$70.25
54.00
53.55
$8683.00
Crew B-11Y
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
1404.00
1117.20
442.40
343.20
163.20
$57.10
54.00
70.25
$3766.80
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
748.60
$72.15
54.00
$1411.80
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
960.40
$72.15
54.00
$1623.60
Cost
Per Labor-Hour
Crew No.
Bare
Costs
Incl.
O&P
$562.00
216.00
1367.30
$42.73
$64.83
103.58
113.94
$2145.30
$146.32
$178.78
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
1889.80
89.76
$42.73
$64.83
149.97
164.96
$2757.56
$192.70
$229.80
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
2499.20
100.98
$42.73
$64.83
196.98
216.68
$3378.18
$239.72
$281.51
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
3230.70
$42.73
$64.83
244.75
269.23
$4008.70
$287.48
$334.06
Daily
Bare
Costs
Incl.
O&P
$1296.00
188.76
$35.10
7.15
$54.00
7.87
$1484.76
$42.25
$61.87
Daily
Bare
Costs
Incl.
O&P
$562.00
432.00
4284.00
1367.30
427.68
3931.40
$36.22
$54.98
54.23
59.65
$11004.38
$90.45
$114.63
Daily
Bare
Costs
Incl.
O&P
$456.80
2160.00
1686.00
486.64
377.52
179.52
$39.14
$59.76
13.18
14.50
$5346.48
$52.32
$74.26
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
823.46
$41.45
$63.08
46.79
51.47
$1832.66
$88.24
$114.54
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
1056.44
$41.45
$63.08
60.02
66.03
$2065.64
$101.47
$129.10
Daily
Crew B-12C
1 Equip. Oper. (crane)
1 Laborer
1 Hyd. Excavator, 1.53 m3
Bare Costs
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
1253.00
$72.15
54.00
Crew B-12E
1 Equip. Oper. (crane)
1 Laborer
1 Hyd. Excavator, 0.38 m3
$1916.20
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
2211.00
$72.15
54.00
$2874.20
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
371.40
$72.15
54.00
$1034.60
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
647.20
$72.15
54.00
Crew B-12H
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 22.7 MT
1 Clamshell Bucket, 0.76 m3
$1310.40
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
647.50
37.40
$72.15
54.00
$1348.10
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
1110.00
47.00
$72.15
54.00
$1820.20
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
832.00
20.40
$72.15
54.00
$1515.60
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
844.00
$72.15
54.00
Incl.
Subs O&P
$1507.20
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
961.20
$72.15
54.00
$1624.40
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$577.20
432.00
1378.30
$41.45
$63.08
78.31
86.14
$2387.50
$119.76
$149.22
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
2432.10
$41.45
$63.08
138.19
152.01
$3441.30
$179.64
$215.08
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
408.54
$41.45
$63.08
23.21
25.53
$1417.74
$64.66
$88.61
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
711.92
$41.45
$63.08
40.45
44.49
$1721.12
$81.90
$107.57
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
712.25
41.14
$41.45
$63.08
42.81
47.09
$1762.59
$84.26
$110.16
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
1221.00
51.70
$41.45
$63.08
72.31
79.54
$2281.90
$113.76
$142.62
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
915.20
22.44
$41.45
$63.08
53.27
58.60
$1946.84
$94.72
$121.68
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
928.40
$41.45
$63.08
52.75
58.02
$1937.60
$94.20
$121.10
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
1057.32
$41.45
$63.08
60.08
66.08
$2066.52
$101.53
$129.16
Daily
799
Crews
Crew No.
Crew B-12L
1 Equip. Oper. (crane)
1 Laborer
1 Crawler Crane, 13.6 MT
1 F.E. Attachment, 0.38 m3
Bare Costs
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
647.50
57.40
$72.15
54.00
$1368.10
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
832.00
62.20
$72.15
54.00
$1557.40
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
1110.00
68.00
$72.15
54.00
$1841.20
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
1115.00
76.80
$72.15
54.00
$1855.00
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
1115.00
33.20
$72.15
54.00
$1811.40
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
551.80
$72.15
54.00
$1215.00
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
1652.00
$72.15
54.00
$2315.20
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
1423.00
99.60
$72.15
54.00
800
Incl.
Subs O&P
$2185.80
Hr.
Daily
Hr.
$47.80
35.10
$382.40
280.80
1423.00
51.80
$72.15
54.00
$2138.00
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$577.20
432.00
712.25
63.14
$41.45
$63.08
44.06
48.46
$1784.59
$85.51
$111.54
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
915.20
68.42
$41.45
$63.08
55.89
61.48
$1992.82
$97.34
$124.55
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
1221.00
74.80
$41.45
$63.08
73.63
80.99
$2305.00
$115.08
$144.06
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
1226.50
84.48
$41.45
$63.08
74.49
81.94
$2320.18
$115.94
$145.01
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
1226.50
36.52
$41.45
$63.08
71.76
78.94
$2272.22
$113.21
$142.01
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
606.98
$41.45
$63.08
34.49
37.94
$1616.18
$75.94
$101.01
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
1817.20
$41.45
$63.08
103.25
113.58
$2826.40
$144.70
$176.65
Daily
Crew B-12Y
1 Equip. Oper. (crane)
2 Laborers
1 Hyd. Excavator, 2.6 m3
Bare Costs
Daily
Hr.
$47.80
35.10
$382.40
561.60
2211.00
$72.15
54.00
Crew B-13
1 Labor Foreman (outside)
4 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. Oiler
1 Hyd. Crane, 23 metric ton
$3155.00
Hr.
Daily
Hr.
$47.80
35.10
$382.40
561.60
1652.00
$72.15
54.00
$577.20
432.00
1565.30
109.56
$41.45
$63.08
95.16
104.68
$2684.06
$136.61
$167.75
Daily
Bare
Costs
Incl.
O&P
$577.20
432.00
1565.30
56.98
$41.45
$63.08
92.17
101.39
$2631.48
$133.63
$164.47
$2596.00
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
1123.20
382.40
330.00
697.20
$57.10
54.00
72.15
62.25
$2829.60
Crew B-13A
Hr.
Daily
Hr.
$37.10
35.10
46.55
35.30
$296.80
561.60
744.80
564.80
1423.00
1443.00
714.80
$57.10
54.00
70.25
53.55
Incl.
O&P
Incl.
Subs O&P
Hr.
Bare
Costs
Daily
Crew No.
$5748.80
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
1123.20
382.40
330.00
1100.00
$57.10
54.00
72.15
62.25
$3232.40
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
1123.20
382.40
330.00
1628.00
$57.10
54.00
72.15
62.25
$3760.40
Hr.
Daily
Hr.
$35.10
47.80
$280.80
382.40
748.60
113.40
$54.00
72.15
$1525.20
Hr.
Daily
Hr.
$35.10
47.80
$280.80
382.40
960.40
113.40
$54.00
72.15
$1737.00
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$577.20
864.00
2432.10
$39.33
$60.05
92.13
101.34
$3873.30
$131.46
$161.39
Daily
Bare
Costs
Incl.
O&P
$577.20
864.00
1817.20
$39.33
$60.05
68.83
75.72
$3258.40
$108.17
$135.77
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
577.20
498.00
766.92
$38.08
$58.21
12.45
13.70
$4026.92
$50.53
$71.91
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
1124.00
856.80
1565.30
1587.30
786.28
$38.71
$58.96
63.94
70.34
$7240.48
$102.66
$129.29
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
577.20
498.00
1210.00
$38.08
$58.21
19.64
21.61
$4470.00
$57.72
$79.82
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
577.20
498.00
1790.80
$38.08
$58.21
29.07
31.98
$5050.80
$67.15
$90.19
Daily
Bare
Costs
Incl.
O&P
$432.00
577.20
823.46
124.74
$41.45
$63.08
53.88
59.26
$1957.40
$95.33
$122.34
Daily
Bare
Costs
Incl.
O&P
$432.00
577.20
1056.44
124.74
$41.45
$63.08
67.11
73.82
$2190.38
$108.56
$136.90
Daily
Crews
Crew No.
Crew B-13F
1 Laborer
1 Equip. Oper. (crane)
1 Hyd. Excavator, 2.67 m3
1 Trench Box
Bare Costs
Hr.
Daily
Hr.
$35.10
47.80
$280.80
382.40
2211.00
113.40
$54.00
72.15
$2987.60
Hr.
Daily
Hr.
$35.10
47.80
$280.80
382.40
647.20
113.40
$54.00
72.15
$1423.80
Hr.
Daily
Hr.
$35.10
47.80
$280.80
382.40
844.00
113.40
$54.00
72.15
$1620.60
Hr.
Daily
Hr.
$35.10
47.80
$280.80
382.40
961.20
113.40
$54.00
72.15
$1737.80
Hr.
Daily
Hr.
$35.10
47.80
$280.80
382.40
1652.00
113.40
$54.00
72.15
$2428.60
Hr.
Daily
Hr.
$37.10
35.10
44.75
$296.80
1123.20
358.00
334.00
$57.10
54.00
67.55
$2112.00
Hr.
Daily
Hr.
$47.80
35.10
$382.40
140.40
2748.00
$72.15
54.00
$3270.80
Hr.
Daily
Hr.
$47.80
35.10
$382.40
140.40
3229.00
$72.15
54.00
Incl.
Subs O&P
$3751.80
Hr.
Daily
Hr.
$47.80
35.10
$382.40
140.40
3304.00
$72.15
54.00
$3826.80
Cost
Per Labor-Hour
Crew No.
Bare
Costs
Incl.
O&P
$432.00
577.20
2432.10
124.74
$41.45
$63.08
145.28
159.80
$3566.04
$186.72
$222.88
Daily
Bare
Costs
Incl.
O&P
$432.00
577.20
711.92
124.74
$41.45
$63.08
47.54
52.29
$1845.86
$88.99
$115.37
Daily
Bare
Costs
Incl.
O&P
$432.00
577.20
928.40
124.74
$41.45
$63.08
59.84
65.82
$2062.34
$101.29
$128.90
Daily
Bare
Costs
Incl.
O&P
$432.00
577.20
1057.32
124.74
$41.45
$63.08
67.16
73.88
$2191.26
$108.61
$136.95
Daily
Bare
Costs
Incl.
O&P
$432.00
577.20
1817.20
124.74
$41.45
$63.08
110.34
121.37
$2951.14
$151.79
$184.45
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
540.40
367.40
$37.04
$56.77
6.96
7.65
$3092.60
$44.00
$64.43
Daily
Bare
Costs
Incl.
O&P
$577.20
216.00
3022.80
$43.57
$66.10
229.00
251.90
$3816.00
$272.57
$318.00
Daily
Bare
Costs
Incl.
O&P
$577.20
216.00
3551.90
$43.57
$66.10
269.08
295.99
$4345.10
$312.65
$362.09
Daily
Bare
Costs
Incl.
O&P
$577.20
216.00
3634.40
$43.57
$66.10
275.33
302.87
$4427.60
$318.90
$368.97
Daily
Crew B-14F
Crew B-14G
1 Equip. Oper. (crane)
.5 Laborer
1 Hyd. Shovel, 9.18 m3
Bare Costs
Hr.
Daily
Hr.
$47.80
35.10
$382.40
140.40
3259.00
$72.15
54.00
$3781.80
Hr.
Daily
Hr.
$47.80
35.10
$382.40
140.40
4249.00
$72.15
54.00
$4771.80
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
1856.00
$70.25
54.00
Incl.
Subs O&P
$2368.80
Hr.
Daily
Hr.
$46.55
35.10
$372.40
140.40
2556.00
$70.25
54.00
$3068.80
Crew B-15
Hr.
Daily
Hr.
$46.55
35.10
35.30
$372.40
140.40
564.80
1169.20
1243.00
$70.25
54.00
53.55
$3489.80
Crew B-16
Hr.
Daily
Hr.
$37.10
35.10
35.30
$296.80
561.60
282.40
584.60
$57.10
54.00
53.55
$1725.40
Hr.
Daily
Hr.
$35.10
44.75
35.30
$561.60
358.00
282.40
334.00
357.40
$54.00
67.55
53.55
$1893.40
Crew B-17A
Hr.
Daily
Hr.
$37.10
35.10
47.40
45.40
$593.60
1684.80
379.20
363.20
$57.10
54.00
73.30
70.20
$3020.80
Crew B-17B
Hr.
Daily
Hr.
2 Laborers
1 Equip. Oper. (light)
1 Truck Driver (heavy)
1 Backhoe Loader, 36 kW
1 Dump Truck, 9.2 m3, 298 kW
$35.10
44.75
35.30
$561.60
358.00
282.40
334.00
584.60
$54.00
67.55
53.55
$2120.60
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$577.20
216.00
3584.90
$43.57
$66.10
271.58
298.74
$4378.10
$315.15
$364.84
Daily
Bare
Costs
Incl.
O&P
$577.20
216.00
4673.90
$43.57
$66.10
354.08
389.49
$5467.10
$397.65
$455.59
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
2041.60
$42.73
$64.83
154.67
170.13
$2819.60
$197.40
$234.97
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
2811.60
$42.73
$64.83
213.00
234.30
$3589.60
$255.73
$299.13
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
856.80
1286.12
1367.30
$38.49
$58.39
86.15
94.77
$4288.22
$124.64
$153.15
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
428.40
643.06
$35.65
$54.66
18.27
20.10
$2392.26
$53.92
$74.76
Daily
Bare
Costs
Incl.
O&P
$864.00
540.40
428.40
367.40
393.14
$37.56
$57.27
21.61
23.77
$2593.34
$59.17
$81.04
Daily
Bare
Costs
Incl.
O&P
$913.60
2592.00
586.40
561.60
$37.76
$58.17
$4653.60
$37.76
$58.17
Daily
Bare
Costs
Incl.
O&P
$864.00
540.40
428.40
367.40
643.06
$37.56
$57.27
28.71
31.58
$2843.26
$66.27
$88.85
Daily
801
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-18
Hr.
Daily
Hr.
$37.10
35.10
$296.80
561.60
40.80
$57.10
54.00
$899.20
Crew B-19
Hr.
Daily
Hr.
$44.80
42.80
47.80
41.25
$358.40
1369.60
764.80
330.00
1115.00
124.00
592.80
$72.00
68.80
72.15
62.25
$4654.60
Crew B-19A
Hr.
Daily
Hr.
$44.80
42.80
47.80
41.25
$358.40
1369.60
764.80
330.00
1423.00
124.00
686.80
$72.00
68.80
72.15
62.25
$5056.60
Crew B-19B
Hr.
Daily
Hr.
$44.80
42.80
47.80
41.25
$358.40
1369.60
764.80
330.00
1115.00
124.00
592.80
779.20
$72.00
68.80
72.15
62.25
$5433.80
Crew B-19C
Hr.
Daily
Hr.
$44.80
42.80
47.80
41.25
$358.40
1369.60
764.80
330.00
1423.00
124.00
686.80
779.20
$72.00
68.80
72.15
62.25
$5835.80
Hr.
Daily
Hr.
$37.10
45.40
35.10
$296.80
363.20
280.80
$57.10
70.20
54.00
802
$940.80
Hr.
Daily
Hr.
$37.10
35.10
54.60
43.70
$296.80
280.80
436.80
349.60
$57.10
54.00
82.35
65.90
$1364.00
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
864.00
44.88
$35.77
$55.03
1.70
1.87
$1365.68
$37.47
$56.90
Daily
Bare
Costs
Incl.
O&P
$576.00
2201.60
1154.40
498.00
1226.50
136.40
652.08
$44.11
$69.22
28.62
31.48
$6444.98
$72.73
$100.70
Daily
Bare
Costs
Incl.
O&P
$576.00
2201.60
1154.40
498.00
1565.30
136.40
755.48
$44.11
$69.22
34.90
38.39
$6887.18
$79.01
$107.61
Daily
Bare
Costs
Incl.
O&P
$576.00
2201.60
1154.40
498.00
1226.50
136.40
652.08
857.12
$44.11
$69.22
40.80
44.88
$7302.10
$84.90
$114.10
Daily
Bare
Costs
Incl.
O&P
$576.00
2201.60
1154.40
498.00
1565.30
136.40
755.48
857.12
$44.11
$69.22
47.08
51.79
$7744.30
$91.18
$121.00
Daily
Bare
Costs
Incl.
O&P
$456.80
561.60
432.00
$39.20
$60.43
$1450.40
$39.20
$60.43
Daily
Bare
Costs
Incl.
O&P
$456.80
432.00
658.80
527.20
$42.63
$64.84
$2074.80
$42.63
Daily
Crew No.
Crew B-21
1 Labor Foreman (outside)
1 Skilled Worker
1 Laborer
.5 Equip. Oper. (crane)
.5 S.P. Crane, 4x4, 4.5 MT
Bare Costs
Hr.
Daily
Hr.
$37.10
45.40
35.10
47.80
$296.80
363.20
280.80
191.20
132.30
$57.10
70.20
54.00
72.15
$1264.30
Hr.
Daily
Hr.
$37.10
35.10
54.60
43.70
47.80
$296.80
280.80
436.80
349.60
382.40
448.20
$57.10
54.00
82.35
65.90
72.15
$2194.60
Hr.
Daily
Hr.
$37.10
35.10
47.80
$296.80
842.40
382.40
612.00
$57.10
54.00
72.15
$2133.60
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
1123.20
382.40
330.00
21.60
172.80
1497.00
$57.10
54.00
72.15
62.25
$3823.80
Hr.
Daily
Hr.
$37.10
45.40
35.10
47.80
$296.80
363.20
280.80
286.80
198.45
$57.10
70.20
54.00
72.15
Hr.
Daily
Hr.
$296.80
363.20
561.60
382.40
264.60
376.45
$57.10
70.20
54.00
72.15
$2245.05
Hr.
$64.84
$1426.05
Crew B-22B
Incl.
Subs O&P
Daily
Hr.
$296.80
363.20
561.60
382.40
264.60
806.15
$57.10
70.20
54.00
72.15
$2674.75
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
561.60
432.00
288.60
145.53
$40.43
$62.11
4.72
5.20
$1884.53
$45.15
$67.30
Daily
Bare
Costs
Incl.
O&P
$456.80
432.00
658.80
527.20
577.20
493.02
$43.66
$66.30
11.21
12.33
$3145.02
$54.87
$78.63
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
577.20
673.20
$38.04
$58.25
15.30
16.83
$3003.20
$53.34
$75.08
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
577.20
498.00
23.76
190.08
1646.70
$38.08
$58.21
30.20
33.22
$5120.54
$68.28
$91.44
Daily
Bare
Costs
Incl.
O&P
$456.80
561.60
432.00
432.90
218.29
$40.92
$62.78
6.62
7.28
$2101.59
$47.53
$70.05
Daily
Bare
Costs
Incl.
O&P
$456.80
561.60
864.00
577.20
291.06
414.10
$40.10
$61.49
16.03
17.63
$3164.76
$56.13
$79.12
Daily
Bare
Costs
Incl.
O&P
$456.80
561.60
864.00
577.20
291.06
886.76
$40.10
$61.49
26.77
29.45
$3637.43
$66.87
$90.94
Daily
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-22C
Hr.
Daily
Hr.
1 Skilled Worker
1 Laborer
1 Butt Fusion Mach., 50-200 mm
$45.40
35.10
$363.20
280.80
120.50
$70.20
54.00
$764.50
Hr.
Daily
Hr.
$37.10
35.10
$296.80
1123.20
2441.00
264.40
$57.10
54.00
$4125.40
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
280.80
372.40
2441.00
127.00
$57.10
54.00
70.25
$3518.00
Crew B-23B
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
280.80
372.40
2441.00
127.00
308.40
$57.10
54.00
70.25
$3826.40
Hr.
Daily
Hr.
$42.35
35.10
44.10
$338.80
280.80
352.80
$62.30
54.00
67.85
$972.40
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
1965.60
1117.20
1996.00
227.60
313.20
$57.10
54.00
70.25
$5916.40
Crew B-25B
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
1965.60
1489.60
1996.00
455.20
313.20
$57.10
54.00
70.25
$6516.40
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
842.40
744.80
1996.00
227.60
$57.10
54.00
70.25
$4107.60
Cost
Per Labor-Hour
Crew No.
Bare Costs
Incl.
Subs O&P
Bare
Costs
Incl.
O&P
$561.60
432.00
132.55
$40.25
$62.10
7.53
8.28
$1126.15
$47.78
$70.38
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
2685.10
290.84
$35.50
$54.62
67.64
74.40
$5160.74
$103.14
$129.02
Daily
Bare
Costs
Incl.
O&P
$456.80
432.00
562.00
2685.10
139.70
$39.58
$60.45
107.00
117.70
$4275.60
$146.58
$178.15
Daily
Bare
Costs
Incl.
O&P
$456.80
432.00
562.00
2685.10
139.70
339.24
$39.58
$60.45
119.85
131.84
$4614.84
$159.43
$192.29
Daily
Bare
Costs
Incl.
O&P
$498.40
432.00
542.80
$40.52
$61.38
$1473.20
$40.52
$61.38
Daily
Bare
Costs
Incl.
O&P
$456.80
3024.00
1686.00
2195.60
250.36
344.52
$38.40
$58.71
28.83
31.71
$7957.28
$67.23
$90.42
Daily
Bare
Costs
Incl.
O&P
$456.80
3024.00
2248.00
2195.60
500.72
344.52
$39.08
$59.67
28.80
31.68
Crew B-30
Hr.
Daily
Hr.
$8769.64
$67.88
$91.35
Incl.
O&P
$39.25
$59.93
$372.40
564.80
960.40
1169.20
$70.25
53.55
$456.80
1296.00
1124.00
2195.60
250.36
$46.55
35.30
Daily
Bare
Costs
46.33
50.96
$5322.76
$85.58
$110.89
Daily
Crew B-26
1 Labor Foreman (outside)
6 Laborers
2 Equip. Oper. (med.)
1 Rodman (reinf.)
1 Cement Finisher
1 Grader, 14 000 kg
1 Paving Mach. & Equip.
Hr.
Daily
Hr.
$37.10
35.10
46.55
49.10
42.35
$296.80
1684.80
744.80
392.80
338.80
610.80
2531.00
$57.10
54.00
70.25
78.40
62.30
$6599.80
Hr.
Daily
Hr.
$37.10
35.10
46.55
49.10
42.35
$296.80
1684.80
744.80
392.80
338.80
610.80
2531.00
148.00
$57.10
54.00
70.25
78.40
62.30
$6747.80
Hr.
Daily
Hr.
$37.10
35.10
46.55
49.10
42.35
$296.80
1684.80
1117.20
392.80
338.80
610.80
2531.00
941.40
$57.10
54.00
70.25
78.40
62.30
$7913.60
Hr.
Daily
Hr.
$37.10
35.10
$296.80
842.40
280.00
$57.10
54.00
$1419.20
Hr.
Daily
Hr.
$44.10
35.10
$705.60
280.80
$67.85
54.00
$986.40
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
1123.20
382.40
330.00
844.00
$57.10
54.00
72.15
62.25
$2976.40
$3066.80
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
2592.00
1124.00
627.20
498.40
671.88
2784.10
$39.30
$60.21
35.70
39.27
$8754.38
$75.00
$99.48
Daily
Bare
Costs
Incl.
O&P
$456.80
2592.00
1124.00
627.20
498.40
671.88
2784.10
162.80
$39.30
$60.21
37.38
41.12
$8917.18
$76.68
$101.33
Daily
Bare
Costs
Incl.
O&P
$456.80
2592.00
1686.00
627.20
498.40
671.88
2784.10
1035.54
$39.90
$61.05
42.53
46.79
$10351.92
$82.43
$107.83
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
308.00
$35.60
$54.77
8.75
9.63
$2060.80
$44.35
$64.40
Daily
Bare
Costs
Incl.
O&P
$1085.60
432.00
$41.10
$63.23
$1517.60
$41.10
$63.23
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
577.20
498.00
928.40
$38.08
$58.21
15.07
16.58
$4188.40
$53.15
$74.79
Daily
Bare
Costs
Incl.
O&P
$562.00
856.80
1056.44
1286.12
$39.05
$59.12
88.73
97.61
$3761.36
$127.78
$156.72
Daily
803
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-31
Hr.
Daily
Hr.
$37.10
35.10
44.10
$296.80
842.40
352.80
177.00
5.75
12.60
$57.10
54.00
67.85
$1687.35
Hr.
Daily
Hr.
$35.10
46.55
$280.80
1117.20
610.80
227.60
1243.00
$54.00
70.25
$3479.40
Hr.
Daily
Hr.
$35.10
46.55
$280.80
744.80
610.80
640.20
$54.00
70.25
$2276.60
Hr.
Daily
Hr.
$35.10
46.55
$280.80
744.80
1243.00
640.20
$54.00
70.25
$2908.80
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
561.60
1117.20
610.80
227.60
1243.00
$57.10
54.00
70.25
$4057.00
Hr.
Daily
Hr.
$46.55
35.10
46.55
$372.40
140.40
93.10
108.20
2147.50
$70.25
54.00
70.25
$2861.60
Hr.
Daily
Hr.
$46.55
35.10
46.55
$372.40
140.40
93.10
139.20
2147.50
$70.25
54.00
70.25
$2892.60
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
1296.00
542.80
194.70
6.33
13.86
$37.30
$57.39
4.88
5.37
$2510.49
$42.18
$62.76
Daily
Bare
Costs
Incl.
O&P
$432.00
1686.00
671.88
250.36
1367.30
$43.69
$66.19
65.04
71.55
$4407.54
$108.73
$137.74
Daily
Bare
Costs
Incl.
O&P
$432.00
1124.00
671.88
704.22
$42.73
$64.83
52.13
57.34
$2932.10
$94.86
$122.17
Daily
Bare
Costs
Incl.
O&P
$432.00
1124.00
1367.30
704.22
$42.73
$64.83
78.47
86.31
$3627.52
$121.20
$151.15
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
1686.00
671.88
250.36
1367.30
$41.16
$62.64
43.36
47.70
$5296.34
$84.52
$110.34
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
140.50
119.02
2362.25
$43.28
$65.61
161.12
177.23
$3399.77
$204.40
$242.84
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
140.50
153.12
2362.25
$43.28
$65.61
163.34
179.67
$3433.87
$206.61
$245.28
Daily
Crew No.
Crew B-33C
1 Equip. Oper. (med.)
.5 Laborer
.25 Equip. Oper. (med.)
1 Scraper, Towed, 11 m3
1.25 Dozers, 224 kW
Crew B-33D
1 Equip. Oper. (med.)
.5 Laborer
.25 Equip. Oper. (med.)
1 S.P. Scraper, 11 m3
.25 Dozer, 224 kW
Daily
Hr.
$46.55
35.10
46.55
$372.40
140.40
93.10
156.80
2147.50
$70.25
54.00
70.25
$2910.20
Hr.
Daily
Hr.
$46.55
35.10
46.55
$372.40
140.40
93.10
1537.00
429.50
$70.25
54.00
70.25
$2572.40
Hr.
Daily
Hr.
$46.55
35.10
46.55
$372.40
140.40
93.10
1974.00
429.50
$70.25
54.00
70.25
$3009.40
Hr.
Daily
Hr.
$46.55
35.10
46.55
$372.40
140.40
93.10
1105.00
429.50
$70.25
54.00
70.25
Incl.
Subs O&P
Hr.
$2140.40
Hr.
Daily
Hr.
$46.55
35.10
46.55
$372.40
140.40
93.10
2099.00
429.50
$70.25
54.00
70.25
$3134.40
Crew B-33H
Hr.
Daily
Hr.
.5 Laborer
1 Equipment Operator (med.)
.25 Equipment Operator (med.)
1 S.P. Scraper, 33.6 m3
.25 Dozer, 305 kW
$35.10
46.55
46.55
$140.40
372.40
93.10
3768.00
568.00
$54.00
70.25
70.25
$4941.90
Hr.
Daily
Hr.
$46.55
$372.40
1537.00
$70.25
$1909.40
Crew B-33K
Hr.
Daily
Hr.
$46.55
46.55
35.10
$372.40
93.10
140.40
2868.00
568.00
$70.25
70.25
54.00
804
Bare Costs
$4041.90
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$562.00
216.00
140.50
172.48
2362.25
$43.28
$65.61
164.59
181.05
$3453.23
$207.87
$246.66
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
140.50
1690.70
472.45
$43.28
$65.61
140.46
154.51
$3081.65
$183.74
$220.12
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
140.50
2171.40
472.45
$43.28
$65.61
171.68
188.85
$3562.35
$214.96
$254.45
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
140.50
1215.50
472.45
$43.28
$65.61
109.61
120.57
$2606.45
$152.89
$186.18
Daily
Bare
Costs
Incl.
O&P
$562.00
216.00
140.50
2308.90
472.45
$43.28
$65.61
180.61
198.67
$3699.85
$223.89
$264.27
Daily
Bare
Costs
Incl.
O&P
$216.00
562.00
140.50
4144.80
624.80
$43.28
$65.61
309.71
340.69
$5688.10
$352.99
$406.29
Daily
Bare
Costs
Incl.
O&P
$562.00
1690.70
$46.55
192.13
$70.25
211.34
$2252.70
$238.68
$281.59
Daily
Bare
Costs
Incl.
O&P
$562.00
140.50
216.00
3154.80
624.80
$43.28
$65.61
245.43
269.97
$4698.10
$288.71
$335.58
Daily
Crews
Crew No.
Crew B-34A
1 Truck Driver (heavy)
1 Dump Truck, 6 m3, 164 kW
Bare Costs
Incl.
Subs O&P
Hr.
Daily
Hr.
$35.30
$282.40
357.40
$53.55
$639.80
Crew B-34B
Hr.
Daily
Hr.
$35.30
$282.40
584.60
$53.55
$867.00
Hr.
Daily
Hr.
$35.30
$282.40
522.20
123.20
$53.55
$927.80
Hr.
Daily
Hr.
$35.30
$282.40
522.20
137.80
$53.55
$942.40
Crew B-34E
Hr.
Daily
Hr.
$35.30
$282.40
1271.00
$53.55
$1553.40
Crew B-34F
Hr.
Daily
Hr.
$35.30
$282.40
1157.00
$53.55
$1439.40
Crew B-34G
Hr.
Daily
Hr.
$35.30
$282.40
1568.00
$53.55
$1850.40
Crew B-34H
Hr.
Daily
Hr.
$35.30
$282.40
1572.00
$53.55
$1854.40
Crew B-34I
Hr.
Daily
Hr.
$35.30
$282.40
745.00
$53.55
$1027.40
Crew B-34J
Hr.
Daily
Hr.
$35.30
$282.40
2071.00
$53.55
$2353.40
Hr.
Daily
Hr.
$35.30
$282.40
635.00
213.00
$53.55
$1130.40
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$428.40
393.14
$35.30
44.67
$53.55
49.14
$821.54
$79.97
$102.69
Daily
Bare
Costs
Incl.
O&P
$428.40
643.06
$35.30
73.08
$53.55
80.38
$1071.46
$108.38
$133.93
Daily
Bare
Costs
Incl.
O&P
$428.40
574.42
135.52
$35.30
$53.55
80.67
88.74
$1138.34
$115.97
$142.29
Daily
Bare
Costs
Incl.
O&P
$428.40
574.42
151.58
$35.30
$53.55
82.50
90.75
$1154.40
$117.80
$144.30
Daily
Bare
Costs
Incl.
O&P
$428.40
1398.10
$35.30
158.88
$53.55
174.76
$1826.50
$194.18
$228.31
Daily
Bare
Costs
Incl.
O&P
$428.40
1272.70
$35.30
144.63
$53.55
159.09
$1701.10
$179.93
$212.64
Daily
Bare
Costs
Incl.
O&P
$428.40
1724.80
$35.30
196.00
$53.55
215.60
$2153.20
$231.30
$269.15
Daily
Bare
Costs
Incl.
O&P
$428.40
1729.20
$35.30
196.50
$53.55
216.15
$2157.60
$231.80
$269.70
Daily
Bare
Costs
Incl.
O&P
$428.40
819.50
$35.30
93.13
$53.55
102.44
$1247.90
$128.43
$155.99
Daily
Bare
Costs
Incl.
O&P
$428.40
2278.10
$35.30
258.88
$53.55
284.76
$2706.50
$294.18
$338.31
Daily
Bare
Costs
Incl.
O&P
$428.40
698.50
234.30
$35.30
$53.55
106.00
116.60
$1361.20
$141.30
$170.15
Crew No.
Crew B-34L
1 Equip. Oper. (light)
1 Flatbed Truck, Gas, 1.4 MT
Bare Costs
Hr.
Daily
Hr.
$44.75
$358.00
211.00
$67.55
$569.00
Hr.
Daily
Hr.
$44.75
$358.00
264.40
$67.55
$622.40
Hr.
Daily
Hr.
$35.30
$282.40
357.40
147.00
$53.55
$786.80
Hr.
Daily
Hr.
$55.70
34.35
46.55
$445.60
274.80
372.40
264.40
334.00
$84.00
52.10
70.25
$1691.20
Hr.
Daily
Hr.
$55.70
34.35
47.80
$445.60
274.80
382.40
108.60
357.40
697.20
$84.00
52.10
72.15
$2266.00
Hr.
Daily
Hr.
$55.70
34.35
47.80
$445.60
274.80
382.40
108.60
357.40
697.20
748.60
$84.00
52.10
72.15
$3014.60
Hr.
Daily
Hr.
$55.70
35.30
47.80
$891.20
282.40
382.40
147.00
522.20
1554.00
1253.00
$84.00
53.55
72.15
Incl.
Subs O&P
$5032.20
Hr.
Daily
Hr.
$55.70
35.30
47.80
$891.20
282.40
382.40
147.00
522.20
1554.00
$84.00
53.55
72.15
$3779.20
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$540.40
232.10
$44.75
26.38
$67.55
29.01
$772.50
$71.13
$96.56
Daily
Bare
Costs
Incl.
O&P
$540.40
290.84
$44.75
33.05
$67.55
36.35
$831.24
$77.80
$103.91
Daily
Bare
Costs
Incl.
O&P
$428.40
393.14
161.70
$35.30
$53.55
63.05
69.36
$983.24
$98.35
$122.91
Daily
Bare
Costs
Incl.
O&P
$672.00
416.80
562.00
290.84
367.40
$45.53
$68.78
24.93
27.43
$2309.04
$70.47
$96.21
Daily
Bare
Costs
Incl.
O&P
$672.00
416.80
577.20
119.46
393.14
766.92
$45.95
$69.42
48.47
53.31
$2945.52
$94.42
$122.73
Daily
Bare
Costs
Incl.
O&P
$672.00
416.80
577.20
119.46
393.14
766.92
823.46
$45.95
$69.42
79.66
87.62
$3768.98
$125.61
$157.04
Daily
Bare
Costs
Incl.
O&P
$1344.00
428.40
577.20
161.70
574.42
1709.40
1378.30
$48.63
$73.42
108.63
119.49
$6173.42
$157.26
$192.92
Daily
Bare
Costs
Incl.
O&P
$1344.00
428.40
577.20
161.70
574.42
1709.40
$48.63
$73.42
69.47
76.42
$4795.12
$118.10
$149.85
805
Crews
Crew No.
Crew B-35
1 Labor Foreman (outside)
1 Skilled Worker
1 Welder (plumber)
1 Laborer
1 Equip. Oper. (crane)
1 Equip. Oper. Oiler
1 Welder, electric, 300 amp
1 Hyd. Excavator, 0.57 m3
Bare Costs
Incl.
Subs O&P
Hr.
Daily
Hr.
$37.10
45.40
54.60
35.10
47.80
41.25
$296.80
363.20
436.80
280.80
382.40
330.00
36.90
647.20
$57.10
70.20
82.35
54.00
72.15
62.25
$2774.10
Crew B-35A
Hr.
Daily
Hr.
$37.10
35.10
45.40
54.60
47.80
41.25
$296.80
561.60
363.20
436.80
382.40
330.00
121.60
1423.00
$57.10
54.00
70.20
82.35
72.15
62.25
$3915.40
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
561.60
744.80
1243.00
36.80
227.60
$57.10
54.00
70.25
$3110.60
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
561.60
1489.60
1243.00
36.80
227.60
313.20
$57.10
54.00
70.25
806
$4168.60
Hr.
Daily
Hr.
$37.10
35.10
46.55
35.30
$296.80
561.60
1489.60
282.40
610.80
598.20
1718.00
640.20
635.00
141.00
$57.10
54.00
70.25
53.55
$6973.60
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
561.60
658.80
432.00
577.20
498.00
40.59
711.92
$43.54
$66.34
14.25
15.68
$3936.91
$57.79
$82.02
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
561.60
658.80
577.20
498.00
133.76
1565.30
$42.34
$64.58
27.58
30.34
$5315.46
$69.92
$94.92
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
1124.00
1367.30
40.48
250.36
$40.08
$61.12
37.69
41.45
$4102.94
$77.77
$102.57
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
2248.00
1367.30
40.48
250.36
344.52
$41.93
$63.73
32.51
35.76
$5571.46
$74.44
$99.49
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
2248.00
428.40
671.88
658.02
1889.80
704.22
698.50
155.10
$41.10
$62.46
67.86
74.65
$8774.72
$108.96
$137.11
Daily
Crew No.
Crew B-36C
1 Labor Foreman (outside)
3 Equip. Oper. (med.)
1 Truck Driver, Heavy
1 Grader, 14 000 kg
1 Dozer, 224 kW
1 Roller, Vibratory, 23 MT
1 Truck Tractor, 6x4, 336 kW
1 Water Tank Trailer, 19 kL
Bare Costs
Hr.
Daily
Hr.
$37.10
46.55
35.30
$296.80
1117.20
282.40
610.80
1718.00
640.20
635.00
141.00
$57.10
70.25
53.55
$5441.40
Hr.
Daily
Hr.
$37.10
46.55
$296.80
1117.20
610.80
1718.00
640.20
$57.10
70.25
$4383.00
Hr.
Daily
Hr.
$37.10
35.10
44.75
$296.80
1123.20
358.00
149.20
$57.10
54.00
67.55
$1927.20
Hr.
Daily
Hr.
$35.10
34.35
$561.60
274.80
211.00
77.20
$54.00
52.10
$1124.60
Hr.
Daily
Hr.
$35.10
34.35
$842.40
274.80
211.00
77.20
$54.00
52.10
$1405.40
Hr.
Daily
Hr.
$35.10
34.35
$561.60
549.60
422.00
77.20
$54.00
52.10
Incl.
Subs O&P
$1610.40
Hr.
Daily
Hr.
$35.10
34.35
$280.80
274.80
127.00
$54.00
52.10
$682.60
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
1686.00
428.40
671.88
1889.80
704.22
698.50
155.10
$42.41
$64.28
93.63
102.99
$6690.70
$136.04
$167.27
Daily
Bare
Costs
Incl.
O&P
$456.80
1686.00
671.88
1889.80
704.22
$44.19
$66.96
92.78
102.06
$5408.70
$136.97
$169.02
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
540.40
164.12
$37.04
$56.77
3.11
3.42
$2889.32
$40.15
$60.19
Daily
Bare
Costs
Incl.
O&P
$864.00
416.80
232.10
84.92
$34.85
$53.37
12.01
13.21
$1597.82
$46.86
$66.58
Daily
Bare
Costs
Incl.
O&P
$1296.00
416.80
232.10
84.92
$34.91
$53.52
9.01
9.91
$2029.82
$43.92
$63.43
Daily
Bare
Costs
Incl.
O&P
$864.00
833.60
464.20
84.92
$34.73
$53.05
15.60
17.16
$2246.72
$50.33
$70.21
Daily
Bare
Costs
Incl.
O&P
$432.00
416.80
139.70
$34.73
$53.05
7.94
8.73
$988.50
$42.66
$61.78
Daily
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-37E
Hr.
Daily
Hr.
3 Laborers
1 Equip. Oper. (light)
1 Equip. Oper. (medium)
2 Truck Drivers (light)
4 Barrel w/ Flasher
1 Concrete Saw
1 Rotary Hammer Drill
1 Hammer Drill Bit
1 Loader, Skid Steer, 22 kW
1 Conc. Hammer Attach.
1 Vibrating plate, gas, 450 mm
2 Flatbed Truck, Gas, 1.4 MT
$35.10
44.75
46.55
34.35
$842.40
358.00
372.40
549.60
13.60
148.00
22.55
3.15
159.60
116.25
32.20
422.00
$54.00
67.55
70.25
52.10
$3039.75
Crew B-37F
Hr.
Daily
Hr.
3 Laborers
1 Truck Driver (light)
4 Barrel w/ Flasher
1 Concrete Mixer, 0.28 m3
1 Air Compressor, 0.028 m3/s
1 -15 m Air Hose, 19 mm
1 Spade (chipper)
1 Flatbed Truck, Gas, 1.4 MT
$35.10
34.35
$842.40
274.80
13.60
160.60
120.40
3.05
7.60
211.00
$54.00
52.10
$1633.45
Hr.
Daily
Hr.
$37.10
35.10
44.75
$296.80
1123.20
358.00
280.00
149.20
$57.10
54.00
67.55
$2207.20
Hr.
Daily
Hr.
$37.10
35.10
44.75
46.55
$296.80
561.60
358.00
372.40
334.00
178.40
611.00
59.00
$57.10
54.00
67.55
70.25
$2771.20
Crew B-39
Hr.
Daily
Hr.
$37.10
35.10
44.75
$296.80
1123.20
358.00
177.00
19.60
12.60
$57.10
54.00
67.55
$1987.20
Crew B-40
Hr.
Daily
Hr.
$44.80
42.80
47.80
41.25
$358.40
1369.60
764.80
330.00
1115.00
2335.00
$72.00
68.80
72.15
62.25
$6272.80
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1296.00
540.40
562.00
833.60
14.96
162.80
24.81
3.46
175.56
127.88
35.42
464.20
$37.90
$57.71
16.38
18.02
$4241.09
$54.28
$75.73
Daily
Bare
Costs
Incl.
O&P
$1296.00
416.80
14.96
176.66
132.44
3.36
8.36
232.10
$34.91
$53.52
16.13
17.75
$2280.68
$51.05
$71.27
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
540.40
308.00
164.12
$37.04
$56.77
8.94
9.84
$3197.32
$45.98
$66.61
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
540.40
562.00
367.40
196.24
672.10
64.90
$39.72
$60.58
29.56
32.52
$3723.84
$69.28
$93.10
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
540.40
194.70
21.56
13.86
$37.04
$56.77
4.36
4.79
$2955.32
$41.40
$61.57
Daily
Crew B-40B
1 Labor Foreman (outside)
3 Laborers
1 Equip. Oper. (crane)
1 Equip. Oper. Oiler
1 Lattice Boom Crane, 36 MT
Bare Costs
Crew B-41
Incl.
O&P
$576.00
2201.60
1154.40
498.00
1226.50
2568.50
$44.11
$69.22
53.91
59.30
$8225.00
$98.01
$128.52
Incl.
Subs O&P
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
842.40
382.40
330.00
1163.00
$57.10
54.00
72.15
62.25
Bare
Costs
Daily
Crew No.
$3014.60
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
1123.20
95.60
82.50
278.75
$57.10
54.00
72.15
62.25
$1876.85
Crew B-42
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
49.35
$296.80
1123.20
382.40
330.00
394.80
697.20
121.60
447.60
$57.10
54.00
72.15
62.25
88.25
$3793.60
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
842.40
382.40
330.00
2441.00
$57.10
54.00
72.15
62.25
$4292.60
Crew B-44
Hr.
Daily
Hr.
$44.80
42.80
47.80
35.10
$358.40
1369.60
764.80
280.80
1115.00
73.60
591.40
$72.00
68.80
72.15
54.00
$4553.60
Hr.
Daily
Hr.
$46.55
35.30
$372.40
282.40
306.00
522.20
$70.25
53.55
$1483.00
Crew B-46
Hr.
Daily
Hr.
$44.80
42.80
35.10
$358.40
684.80
842.40
43.60
$72.00
68.80
54.00
$1929.20
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
1296.00
577.20
498.00
1279.30
$38.58
$58.92
24.23
26.65
$4107.30
$62.80
$85.57
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
144.30
124.50
306.63
$36.32
$55.76
6.34
6.97
$2760.22
$42.66
$62.73
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
577.20
498.00
706.00
766.92
133.76
492.36
$39.49
$61.97
19.79
21.77
$5359.04
$59.27
$83.74
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
577.20
498.00
2685.10
$38.58
$58.92
50.85
55.94
$5513.10
$89.43
$114.86
Daily
Bare
Costs
Incl.
O&P
$576.00
2201.60
1154.40
432.00
1226.50
80.96
650.54
$43.34
$68.19
27.81
30.59
$6322.00
$71.15
$98.78
Daily
Bare
Costs
Incl.
O&P
$562.00
428.40
336.60
574.42
$40.92
$61.90
51.76
56.94
$1901.42
$92.69
$118.84
Daily
Bare
Costs
Incl.
O&P
$576.00
1100.80
1296.00
47.96
$39.28
$61.93
.91
1.00
$3020.76
$40.19
$62.93
Daily
807
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-47
Hr.
Daily
Hr.
$37.10
35.10
44.75
$296.80
280.80
358.00
937.20
467.60
29.80
$57.10
54.00
67.55
$2370.20
Hr.
Daily
Hr.
$37.10
47.80
41.25
$296.80
382.40
330.00
1088.00
$57.10
72.15
62.25
$2097.20
Crew B-47C
Hr.
Daily
Hr.
1 Laborer
1 Equip. Oper. (light)
1 Air Compressor, 0.354 m3/s
2 -15 m Air Hoses, 80 mm
1 Air Track Drill, 100 mm
$35.10
44.75
$280.80
358.00
474.80
29.80
937.20
$54.00
67.55
$2080.60
Hr.
Daily
Hr.
$37.10
35.10
$296.80
842.40
264.40
$57.10
54.00
$1403.60
Crew B-47G
Hr.
Daily
Hr.
$37.10
35.10
44.75
$296.80
561.60
358.00
937.20
467.60
29.80
280.40
$57.10
54.00
67.55
$2931.40
Crew B-47H
Hr.
Daily
Hr.
$47.40
45.40
$379.20
1089.60
264.40
$73.30
70.20
$1733.20
Hr.
Daily
Hr.
$296.80
842.40
382.40
330.00
358.00
308.40
11.50
12.10
2441.00
$57.10
54.00
72.15
62.25
67.55
$4982.60
Cost
Per Labor-Hour
Crew No.
Bare
Costs
Incl.
O&P
$456.80
432.00
540.40
1030.92
514.36
32.78
$38.98
$59.55
59.77
65.75
$3007.26
$98.76
$125.30
Daily
Bare
Costs
Incl.
O&P
$456.80
577.20
498.00
1196.80
$42.05
$63.83
45.33
49.87
$2728.80
$87.38
$113.70
Daily
Bare
Costs
Incl.
O&P
$432.00
540.40
522.28
32.78
1030.92
$39.92
$60.77
90.11
99.12
$2558.38
$130.04
$159.90
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
290.84
$35.60
$54.77
8.26
9.09
Crew B-51
$2043.64
$43.86
$63.86
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
540.40
1030.92
514.36
32.78
308.44
$38.01
$58.16
53.59
58.95
$3747.70
$91.61
$117.12
Daily
Bare
Costs
Incl.
O&P
$586.40
1684.80
290.84
$45.90
$70.97
8.26
9.09
$2562.04
$54.16
$80.06
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
577.20
498.00
540.40
339.24
12.65
13.31
2685.10
$39.46
$60.15
49.52
54.47
$6418.70
$88.97
$114.62
Daily
Crew B-49
Hr.
Incl.
Subs O&P
Daily
Hr.
$296.80
842.40
764.80
660.00
358.00
684.80
697.20
308.40
11.50
12.10
2441.00
$57.10
54.00
72.15
62.25
67.55
68.80
$7077.00
Crew B-50
Hr.
Daily
Hr.
$44.80
42.80
47.80
41.25
35.10
$716.80
2054.40
764.80
330.00
842.40
1115.00
73.60
591.40
467.60
29.80
43.60
$72.00
68.80
72.15
62.25
54.00
$7029.40
Hr.
Daily
Hr.
$37.10
35.10
34.35
$296.80
1123.20
274.80
211.00
$57.10
54.00
52.10
$1905.80
Hr.
Daily
Hr.
$46.10
44.10
35.10
42.35
49.10
46.55
$368.80
352.80
842.40
338.80
196.40
186.20
553.00
$70.95
67.85
54.00
62.30
78.40
70.25
$2838.40
Hr.
Daily
Hr.
$44.75
$358.00
62.80
$67.55
$420.80
Hr.
Daily
Hr.
$44.75
$358.00
312.80
$67.55
808
Bare Costs
$670.80
Hr.
Daily
Hr.
$37.10
46.55
$50.46
372.40
1084.00
$57.10
70.25
$1506.86
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
1296.00
1154.40
996.00
540.40
1100.80
766.92
339.24
12.65
13.31
2685.10
$40.99
$63.00
39.43
43.38
$9361.62
$80.42
$106.38
Daily
Bare
Costs
Incl.
O&P
$1152.00
3302.40
1154.40
498.00
1296.00
1226.50
80.96
650.54
514.36
32.78
47.96
$42.04
$66.10
20.72
22.80
$9955.90
$62.76
$88.89
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
416.80
232.10
$35.31
$54.20
4.40
4.84
$2833.70
$39.70
$59.04
Daily
Bare
Costs
Incl.
O&P
$567.60
542.80
1296.00
498.40
313.60
281.00
608.30
$40.81
$62.49
9.88
10.86
$4107.70
$50.69
$73.35
Daily
Bare
Costs
Incl.
O&P
$540.40
69.08
$44.75
7.85
$67.55
8.63
$609.48
$52.60
$76.19
Daily
Bare
Costs
Incl.
O&P
$540.40
344.08
$44.75
39.10
$67.55
43.01
$884.48
$83.85
$110.56
Daily
Bare
Costs
Incl.
O&P
$77.66
562.00
1192.40
$45.18
$68.34
115.81
127.39
$1832.06
$160.99
$195.73
Daily
Crews
Crew No.
Crew B-54B
.25 Labor Foreman (outside)
1 Equipment Operator (med.)
1 Wheel Trencher, 112 kW
Bare Costs
Hr.
Daily
Hr.
$37.10
46.55
$74.20
372.40
1816.00
$57.10
70.25
Incl.
Subs O&P
$2262.60
Hr.
Daily
Hr.
$35.10
46.55
$280.80
372.40
1084.00
$54.00
70.25
$1737.20
Crew B-54D
Hr.
Daily
Hr.
1 Laborer
1 Equipment Operator (med.)
1 Rock trencher, 150 mm width
$35.10
46.55
$280.80
372.40
344.40
$54.00
70.25
$997.60
Crew B-54E
Hr.
Daily
Hr.
1 Laborer
1 Equipment Operator (med.)
1 Rock trencher, 450 mm width
$35.10
46.55
$280.80
372.40
2517.00
$54.00
70.25
$3170.20
Hr.
Daily
Hr.
$35.10
34.35
$561.60
274.80
718.40
264.40
$54.00
52.10
$1819.20
Crew B-56
Hr.
Daily
Hr.
1 Laborer
1 Equip. Oper. (light)
1 Air Track Drill, 100 mm
1 Air Compressor, 0.283 m3/s
1 -15 m Air Hose, 80 mm
$35.10
44.75
$280.80
358.00
937.20
467.60
14.90
$54.00
67.55
$2058.50
Crew B-57
Hr.
Daily
Hr.
$37.10
35.10
47.80
44.75
41.25
$296.80
561.60
382.40
358.00
330.00
1110.00
47.00
308.40
11.50
242.00
$57.10
54.00
72.15
67.55
62.25
$3647.70
Hr.
Daily
Hr.
$35.10
44.75
$561.60
358.00
334.00
2625.00
$54.00
67.55
$3878.60
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$114.20
562.00
1997.60
$44.66
$67.62
181.60
199.76
$2673.80
$226.26
$267.38
Daily
Bare
Costs
Incl.
O&P
$432.00
562.00
1192.40
$40.83
$62.13
67.75
74.53
$2186.40
$108.58
$136.65
Daily
Bare
Costs
Incl.
O&P
$432.00
562.00
378.84
$40.83
$62.13
21.52
23.68
$1372.84
$62.35
$85.80
Daily
Bare
Costs
Incl.
O&P
$432.00
562.00
2768.70
$40.83
$62.13
157.31
173.04
$3762.70
$198.14
$235.17
Daily
Bare
Costs
Incl.
O&P
$864.00
416.80
790.24
290.84
$34.85
$53.37
40.95
45.05
$2361.88
$75.80
$98.41
Daily
Bare
Costs
Incl.
O&P
$432.00
540.40
1030.92
514.36
16.39
$39.92
$60.77
88.73
97.60
$2534.07
$128.66
$158.38
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
577.20
540.40
498.00
1221.00
51.70
339.24
12.65
266.20
$40.18
$61.17
35.81
39.39
$4827.19
$75.99
$100.57
Daily
Bare
Costs
Incl.
O&P
$864.00
540.40
367.40
2887.50
$38.32
$58.52
123.29
135.62
$4659.30
$161.61
$194.14
Daily
Crew No.
Crew B-59
1 Truck Driver (heavy)
1 Truck Tractor, 164kW
1 Water Tank Trailer, 19 kL
Bare Costs
Hr.
Daily
Hr.
$35.30
$282.40
314.80
141.00
$53.55
$738.20
Hr.
Daily
Hr.
$35.10
35.30
$561.60
282.40
141.00
314.80
$54.00
53.55
Incl.
Subs O&P
$1299.80
Hr.
Daily
Hr.
$37.10
35.10
47.80
44.75
41.25
$296.80
561.60
382.40
716.00
330.00
1115.00
73.60
591.40
334.00
$57.10
54.00
72.15
67.55
62.25
$4400.80
Crew B-61
Hr.
Daily
Hr.
$37.10
35.10
44.75
$296.80
842.40
358.00
190.40
136.80
$57.10
54.00
67.55
$1824.40
Hr.
Daily
Hr.
$35.10
44.75
$561.60
358.00
159.60
$54.00
67.55
$1079.20
Hr.
Daily
Hr.
$35.10
44.75
$1123.20
358.00
159.60
$54.00
67.55
$1640.80
Hr.
Daily
Hr.
$35.10
34.35
$280.80
274.80
142.00
211.00
$54.00
52.10
$908.60
Hr.
Daily
Hr.
$35.10
34.35
$280.80
274.80
286.60
211.00
$54.00
52.10
$1053.20
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$428.40
346.28
155.10
$35.30
$53.55
56.98
62.67
$929.78
$92.28
$116.22
Daily
Bare
Costs
Incl.
O&P
$864.00
428.40
155.10
346.28
$35.17
$53.85
18.99
20.89
$1793.78
$54.16
$74.74
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
577.20
1080.80
498.00
1226.50
80.96
650.54
367.40
$40.84
$62.09
37.75
41.52
$5802.20
$78.59
$103.61
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
540.40
209.44
150.48
$37.43
$57.33
8.18
9.00
$2653.12
$45.61
$66.33
Daily
Bare
Costs
Incl.
O&P
$864.00
540.40
175.56
$38.32
$58.52
6.65
7.32
$1579.96
$44.97
$65.83
Daily
Bare
Costs
Incl.
O&P
$1728.00
540.40
175.56
$37.03
$56.71
3.99
4.39
$2443.96
$41.02
$61.10
Daily
Bare
Costs
Incl.
O&P
$432.00
416.80
156.20
232.10
$34.73
$53.05
22.06
24.27
$1237.10
$56.79
$77.32
Daily
Bare
Costs
Incl.
O&P
$432.00
416.80
315.26
232.10
$34.73
$53.05
31.10
34.21
$1396.16
$65.83
$87.26
Daily
809
Crews
Crew No.
Crew B-66
1 Equip. Oper. (light)
1 Loader-Backhoe
Bare Costs
Hr.
Daily
Hr.
$44.75
$358.00
247.20
$67.55
$605.20
Hr.
Daily
Hr.
$46.05
44.75
$368.40
358.00
289.20
$67.85
67.55
$1015.60
Hr.
Daily
Hr.
$46.05
44.75
$736.80
358.00
289.20
$67.85
67.55
$1384.00
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
842.40
382.40
330.00
1554.00
$57.10
54.00
72.15
62.25
$3405.60
Hr.
Daily
Hr.
$37.10
35.10
46.55
42.35
$296.80
842.40
372.40
338.80
761.00
$57.10
54.00
70.25
62.30
Incl.
Subs O&P
$2611.40
Hr.
Daily
Hr.
$37.10
35.10
46.55
42.35
$296.80
842.40
372.40
338.80
733.20
$57.10
54.00
70.25
62.30
$2583.60
Crew B-70
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
842.40
1117.20
610.80
81.60
620.80
333.80
$57.10
54.00
70.25
810
$3903.40
Hr.
Daily
Hr.
$35.10
46.55
$280.80
1489.60
1011.00
472.40
442.40
313.20
$54.00
70.25
$4009.40
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$540.40
271.92
$44.75
30.90
$67.55
33.99
$812.32
$75.65
$101.54
Daily
Bare
Costs
Incl.
O&P
$542.80
540.40
318.12
$45.40
$67.70
18.07
19.88
$1401.32
$63.48
$87.58
Daily
Bare
Costs
Incl.
O&P
$1085.60
540.40
318.12
$45.62
$67.75
12.05
13.26
$1944.12
$57.67
$81.00
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
577.20
498.00
1709.40
$38.58
$58.92
32.38
35.61
$4537.40
$70.95
$94.53
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
562.00
498.40
837.10
$38.55
$58.61
15.85
17.44
$3650.30
$54.40
$76.05
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
562.00
498.40
806.52
$38.55
$58.61
15.28
16.80
$3619.72
$53.83
$75.41
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
1686.00
671.88
89.76
682.88
367.18
$40.29
$61.41
29.41
32.35
$5250.50
$69.70
$93.76
Daily
Bare
Costs
Incl.
O&P
$432.00
2248.00
1112.10
519.64
486.64
344.52
$44.26
$67.00
55.98
61.57
$5142.90
$100.24
$128.57
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-71
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
842.40
1117.20
5459.00
620.80
333.80
$57.10
54.00
70.25
$8670.00
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
842.40
1489.60
5459.00
1721.00
1207.00
2012.00
313.20
$57.10
54.00
70.25
$13341.00
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
561.60
1862.00
1882.00
227.60
1721.00
610.80
166.90
157.40
70.50
$57.10
54.00
70.25
$7556.60
Hr.
Daily
Hr.
$37.10
35.10
46.55
35.30
$296.80
280.80
1489.60
564.80
610.80
81.60
3170.00
264.40
50.00
640.20
141.00
314.80
$57.10
54.00
70.25
53.55
$7904.80
Hr.
Daily
Hr.
$37.10
35.10
46.55
35.30
$296.80
280.80
1489.60
282.40
610.80
81.60
3170.00
306.00
522.20
640.20
$57.10
54.00
70.25
53.55
$7680.40
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
1296.00
1686.00
6004.90
682.88
367.18
$40.29
$61.41
114.53
125.98
$10493.76
$154.82
$187.39
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
2248.00
6004.90
1893.10
1327.70
2213.20
344.52
$41.08
$62.51
167.38
184.12
$15784.22
$208.45
$246.63
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
2810.00
2070.20
250.36
1893.10
671.88
183.59
173.14
77.55
$42.51
$64.54
75.57
83.12
$9450.62
$118.07
$147.67
Daily
Bare
Costs
Incl.
O&P
$456.80
432.00
2248.00
856.80
671.88
89.76
3487.00
290.84
55.00
704.22
155.10
346.28
$41.13
$62.40
82.39
90.63
$9793.68
$123.51
$153.03
Daily
Bare
Costs
Incl.
O&P
$456.80
432.00
2248.00
428.40
671.88
89.76
3487.00
336.60
574.42
704.22
$41.96
$63.66
95.19
104.71
$9429.08
$137.15
$168.38
Daily
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-76
Hr.
Daily
Hr.
$44.80
42.80
47.80
41.25
$358.40
1712.00
764.80
330.00
1257.00
779.20
591.40
73.60
467.60
29.80
$72.00
68.80
72.15
62.25
$6363.80
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
1404.00
382.40
330.00
1257.00
779.20
$57.10
54.00
72.15
62.25
$4449.40
Hr.
Daily
Hr.
$37.10
35.10
34.35
$296.80
842.40
274.80
57.20
196.40
264.40
$57.10
54.00
52.10
$1932.00
Hr.
Daily
Hr.
$37.10
35.10
34.35
$296.80
1123.20
274.80
148.60
264.40
127.00
$57.10
54.00
52.10
$2234.80
Crew B-78A
Hr.
Daily
Hr.
$44.75
$358.00
800.80
$67.55
$1158.80
Crew B-78B
Hr.
Daily
Hr.
2 Laborers
.25 Equip. Oper. (light)
1 Pickup Truck, 0.7 MT
1 Line Rem., 8 kW, walk behind
.25 Road Sweeper, SP, 2.4 m W
$35.10
44.75
$561.60
89.50
127.00
61.20
155.20
$54.00
67.55
$994.50
Hr.
Daily
Hr.
$37.10
35.10
34.35
$296.80
1123.20
274.80
735.80
264.40
127.00
$57.10
54.00
52.10
$2822.00
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$576.00
2752.00
1154.40
498.00
1382.70
857.12
650.54
80.96
514.36
32.78
$43.96
$69.17
44.42
48.87
$8498.86
$88.39
$118.04
Daily
Bare
Costs
Incl.
O&P
$456.80
2160.00
577.20
498.00
1382.70
857.12
$37.71
$57.69
31.82
35.00
$5931.82
$69.52
$92.68
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
416.80
62.92
216.04
290.84
$35.35
$54.24
12.95
14.24
$2739.40
$48.30
$68.48
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
416.80
163.46
290.84
139.70
$35.31
$54.20
11.25
12.38
$3195.60
$46.56
$66.58
Daily
Bare
Costs
Incl.
O&P
$540.40
880.88
$44.75
100.10
$67.55
110.11
$1421.28
$144.85
$177.66
Daily
Bare
Costs
Incl.
O&P
$864.00
135.10
139.70
67.32
170.72
$36.17
$55.51
19.08
20.99
$1376.84
$55.25
$76.49
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
416.80
809.38
290.84
139.70
$35.31
$54.20
23.48
25.83
$3841.52
$58.79
$80.03
Daily
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-78D
Hr.
Daily
Hr.
$37.10
35.10
34.35
$593.60
1965.60
274.80
735.80
264.40
381.00
120.40
3.05
9.80
$57.10
54.00
52.10
$4348.45
Crew B-78E
Hr.
Daily
Hr.
$37.10
35.10
34.35
$593.60
2527.20
274.80
735.80
264.40
508.00
240.80
6.10
19.60
$57.10
54.00
52.10
$5170.30
Crew B-78F
Hr.
Daily
Hr.
$37.10
35.10
34.35
$593.60
3088.80
274.80
735.80
264.40
889.00
361.20
9.15
29.40
$57.10
54.00
52.10
$6246.15
Hr.
Daily
Hr.
$37.10
35.10
34.35
$296.80
842.40
274.80
735.80
44.50
264.40
254.00
$57.10
54.00
52.10
$2712.70
Crew B-79A
Hr.
Daily
Hr.
$44.75
$537.00
441.40
800.80
$67.55
$1779.20
Hr.
Daily
Hr.
$35.10
$280.80
86.40
$54.00
$367.20
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$913.60
3024.00
416.80
809.38
290.84
419.10
132.44
3.36
10.78
$35.42
$54.43
18.93
20.82
$6020.30
$54.36
$75.25
Daily
Bare
Costs
Incl.
O&P
$913.60
3888.00
416.80
809.38
290.84
558.80
264.88
6.71
21.56
$35.37
$54.36
18.49
20.34
$7170.57
$53.86
$74.69
Daily
Bare
Costs
Incl.
O&P
$913.60
4752.00
416.80
809.38
290.84
977.90
397.32
10.07
32.34
$35.33
$54.31
20.44
22.48
$8600.25
$55.77
$76.79
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
416.80
809.38
48.95
290.84
279.40
$35.35
$54.24
32.47
35.71
$3598.17
$67.82
$89.95
Daily
Bare
Costs
Incl.
O&P
$810.60
485.54
880.88
$44.75
$67.55
103.52
113.87
$2177.02
$148.27
$181.42
Daily
Bare
Costs
Incl.
O&P
$432.00
95.04
$35.10
10.80
$54.00
11.88
$527.04
$45.90
$65.88
Daily
811
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew B-79C
Hr.
Daily
Hr.
$37.10
35.10
34.35
$296.80
1404.00
274.80
735.80
44.50
264.40
381.00
120.40
3.05
9.80
$57.10
54.00
52.10
$3534.55
Crew B-79D
Hr.
Daily
Hr.
$37.10
35.10
34.35
$593.60
1404.00
274.80
735.80
44.50
264.40
508.00
120.40
3.05
9.80
$57.10
54.00
52.10
$3958.35
Crew B-79E
Hr.
Daily
Hr.
$37.10
35.10
34.35
$593.60
1965.60
274.80
735.80
44.50
264.40
635.00
240.80
6.10
19.60
$57.10
54.00
52.10
$4780.20
Hr.
Daily
Hr.
$37.10
35.10
34.35
44.75
$296.80
280.80
274.80
358.00
264.40
403.40
$57.10
54.00
52.10
67.55
$1878.20
Hr.
Daily
Hr.
$35.10
$842.40
264.40
$54.00
812
$1106.80
Hr.
Daily
Hr.
$35.10
44.75
$842.40
358.00
232.40
$54.00
67.55
$1432.80
Cost
Per Labor-Hour
Crew No.
Bare Costs
Incl.
Subs O&P
Bare
Costs
Incl.
O&P
$456.80
2160.00
416.80
809.38
48.95
290.84
419.10
132.44
3.36
10.78
$35.28
$54.17
27.84
30.62
$4748.44
$63.12
$84.79
Daily
Bare
Costs
Incl.
O&P
$913.60
2160.00
416.80
809.38
48.95
290.84
558.80
132.44
3.36
10.78
$35.51
$54.54
26.34
28.98
$5344.94
$61.85
$83.51
Daily
Bare
Costs
Incl.
O&P
$913.60
3024.00
416.80
809.38
48.95
290.84
698.50
264.88
6.71
21.56
$35.42
$54.43
24.33
26.76
$6495.22
$59.75
$81.19
Crew B-82B
Hr.
Daily
Hr.
Daily
Bare
Costs
Incl.
O&P
$35.10
44.75
$37.83
$57.69
$561.60
358.00
264.40
108.60
886.20
$54.00
67.55
$456.80
432.00
416.80
540.40
290.84
443.74
2 Laborers
1 Equip. Oper. (light)
1 Flatbed Truck, Gas, 2.7 MT
1 Flatbed Trailer, 23 MT
1 Horiz. Dir. Drill, 134 kN thrust
20.87
22.96
$2580.58
$58.69
$80.64
Daily
Bare
Costs
Incl.
O&P
$1296.00
290.84
$35.10
11.02
$1586.84
Daily
Daily
Crew B-80C
Hr.
Daily
Hr.
2 Laborers
1 Truck Driver (light)
1 Flatbed Truck, Gas, 1.4 MT
1 Manual fence post auger, gas
$35.10
34.35
$561.60
274.80
211.00
7.60
$54.00
52.10
$1055.00
Crew B-81
Hr.
Daily
Hr.
1 Laborer
1 Equip. Oper. (med.)
1 Truck Driver (heavy)
1 Hydromulcher, T.M., 11.34 kL
1 Truck Tractor, 164kW
$35.10
46.55
35.30
$280.80
372.40
282.40
303.80
314.80
$54.00
70.25
53.55
$1554.20
Hr.
Daily
Hr.
$35.10
34.35
$280.80
274.80
120.40
264.40
$54.00
52.10
$940.40
Hr.
Daily
Hr.
$35.10
44.75
$280.80
358.00
77.20
$54.00
67.55
$716.00
Hr.
Daily
Hr.
$35.10
44.75
$280.80
358.00
264.40
108.60
622.00
$54.00
67.55
$1633.80
$2178.80
Crew B-82C
Hr.
Daily
Hr.
$35.10
44.75
$561.60
358.00
264.40
108.60
1176.00
$54.00
67.55
$54.00
12.12
2 Laborers
1 Equip. Oper. (light)
1 Flatbed Truck, Gas, 2.7 MT
1 Flatbed Trailer, 23 MT
1 Horiz. Dir. Drill, 223 kN thrust
$46.12
$66.12
Bare
Costs
Incl.
O&P
$1296.00
540.40
255.64
$37.51
$57.39
7.26
7.99
$2092.04
$44.77
$65.38
Crew B-82D
1 Equip. Oper. (light)
1 Mud Trailer for HDD, 5.7 kL
8 L.H., Daily Totals
$2468.60
Hr.
Daily
Hr.
$44.75
$358.00
309.20
$67.55
$667.20
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$864.00
416.80
232.10
8.36
$34.85
$53.37
9.11
10.02
$1521.26
$43.96
$63.39
Daily
Bare
Costs
Incl.
O&P
$432.00
562.00
428.40
334.18
346.28
$38.98
$59.27
25.77
28.35
$2102.86
$64.76
$87.62
Daily
Bare
Costs
Incl.
O&P
$432.00
416.80
132.44
290.84
$34.73
$53.05
24.05
26.45
$1272.08
$58.77
$79.50
Daily
Bare
Costs
Incl.
O&P
$432.00
540.40
84.92
$39.92
$60.77
4.83
5.31
$1057.32
$44.75
$66.08
Daily
Bare
Costs
Incl.
O&P
$432.00
540.40
290.84
119.46
684.20
$39.92
$60.77
62.19
68.41
$2066.90
$102.11
$129.18
Daily
Bare
Costs
Incl.
O&P
$864.00
540.40
290.84
119.46
974.82
$38.32
$58.52
52.47
57.71
$2789.52
$90.78
$116.23
Daily
Bare
Costs
Incl.
O&P
$864.00
540.40
290.84
119.46
1293.60
$38.32
$58.52
64.54
71.00
$3108.30
$102.86
$129.51
Daily
Bare
Costs
Incl.
O&P
$540.40
340.12
$44.75
38.65
$67.55
42.52
$880.52
$83.40
$110.07
Daily
Crews
Crew No.
Crew B-83
1 Tugboat Captain
1 Tugboat Hand
1 Tugboat, 185 kW
Bare Costs
Hr.
Daily
Hr.
$46.55
35.10
$372.40
280.80
748.00
$70.25
54.00
$1401.20
Hr.
Daily
Hr.
$46.55
$372.40
343.40
$70.25
$715.80
Hr.
Daily
Hr.
$35.10
46.55
35.30
$842.40
372.40
282.40
637.60
283.80
6.30
$54.00
70.25
53.55
$2424.90
Hr.
Daily
Hr.
$46.55
$372.40
170.70
$70.25
$543.10
Hr.
Daily
Hr.
$46.55
$372.40
610.80
$70.25
Incl.
Subs O&P
$983.20
Hr.
Daily
Hr.
$46.55
$372.40
1243.00
$70.25
$1615.40
Crew B-87
Hr.
Daily
Hr.
1 Laborer
4 Equip. Oper. (med.)
2 Feller Bunchers, 75 kW
1 Log Chipper, 559 mm Tree
1 Dozer, 78 kW
1 Chain Saw, gas, 900 mm Long
$35.10
46.55
$280.80
1489.60
1154.40
710.60
550.80
43.60
$54.00
70.25
$4229.80
Crew B-88
Hr.
Daily
Hr.
1 Laborer
6 Equip. Oper. (med.)
2 Feller Bunchers, 75 kW
1 Log Chipper, 559 mm Tree
2 Log Skidders, 37 kW
1 Dozer, 78 kW
1 Chain Saw, gas, 900 mm Long
$35.10
46.55
$280.80
2234.40
1154.40
710.60
1730.40
550.80
43.60
$54.00
70.25
$6705.00
Hr.
Daily
Hr.
$44.75
34.35
$358.00
274.80
264.40
148.00
17.40
$67.55
52.10
$1062.60
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$562.00
432.00
822.80
$40.83
$62.13
46.75
51.42
$1816.80
$87.58
$113.55
Daily
Bare
Costs
Incl.
O&P
$562.00
377.74
$46.55
42.92
$70.25
47.22
$939.74
$89.47
$117.47
Daily
Bare
Costs
Incl.
O&P
$1296.00
562.00
428.40
701.36
312.18
6.93
$37.43
$57.16
23.19
25.51
$3306.87
$60.62
$82.67
Daily
Bare
Costs
Incl.
O&P
$562.00
187.77
$46.55
21.34
$70.25
23.47
$749.77
$67.89
$93.72
Daily
Crew No.
Crew B-89A
1 Skilled Worker
1 Laborer
1 Core Drill (large)
Crew B-89B
1 Equip. Oper. (light)
1 Truck Driver, Light
1 Wall Saw, Hydraulic, 7.5 kW
1 Generator, Diesel, 100 kW
1 Water Tank, 246 L
1 Flatbed Truck, Gas, 2.7 MT
Bare
Costs
Incl.
O&P
$562.00
671.88
$46.55
76.35
$70.25
83.98
$1233.88
$122.90
$154.24
Daily
Bare
Costs
Incl.
O&P
$562.00
1367.30
$46.55
155.38
$70.25
170.91
$1929.30
$201.93
$241.16
Daily
Bare
Costs
Incl.
O&P
$432.00
2248.00
1269.84
781.66
605.88
47.96
$44.26
$67.00
61.48
67.63
$5385.34
$105.75
$134.63
Daily
Bare
Costs
Incl.
O&P
$432.00
3372.00
1269.84
781.66
1903.44
605.88
47.96
$44.91
$67.93
74.82
82.30
$8412.78
$119.73
$150.23
Daily
Bare
Costs
Incl.
O&P
$540.40
416.80
290.84
162.80
19.14
$39.55
$59.83
26.86
29.55
$1429.98
$66.41
$89.37
Daily
Hr.
$45.40
35.10
$363.20
280.80
110.20
$70.20
54.00
$754.20
Hr.
Daily
Hr.
$44.75
34.35
$358.00
274.80
92.00
363.40
17.40
264.40
$67.55
52.10
$1370.00
Hr.
Daily
Hr.
$37.10
35.10
44.75
35.30
$296.80
842.40
716.00
564.80
1882.00
276.40
$57.10
54.00
67.55
53.55
$4578.40
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
561.60
1489.60
1221.60
227.60
313.20
$57.10
54.00
70.25
$4110.40
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
561.60
1117.20
313.20
1882.00
$57.10
54.00
70.25
$4170.80
Hr.
Daily
Hr.
$37.10
35.10
46.55
35.30
$296.80
1123.20
1117.20
847.20
5646.00
$57.10
54.00
70.25
53.55
Incl.
Subs O&P
Hr.
Crew B-90
Daily
Bare Costs
$9030.40
Hr.
Daily
Hr.
$37.10
35.10
46.55
35.30
$296.80
1684.80
1117.20
847.20
5646.00
$57.10
54.00
70.25
53.55
$9592.00
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$561.60
432.00
121.22
$40.25
$62.10
6.89
7.58
$1114.82
$47.14
$69.68
Daily
Bare
Costs
Incl.
O&P
$540.40
416.80
101.20
399.74
19.14
290.84
$39.55
$59.83
46.08
50.68
$1768.12
$85.63
$110.51
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
1080.80
856.80
2070.20
304.04
$37.81
$57.66
33.73
37.10
$6064.64
$71.54
$94.76
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
2248.00
1343.76
250.36
344.52
$41.93
$63.73
31.47
34.62
$5507.44
$73.40
$98.35
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
1686.00
344.52
2070.20
$41.16
$62.64
45.73
50.31
$5421.52
$86.89
$112.95
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
1686.00
1285.20
6210.60
$38.46
$58.59
64.16
70.58
$11366.60
$102.62
$129.17
Daily
Bare
Costs
Incl.
O&P
$456.80
2592.00
1686.00
1285.20
6210.60
$37.94
$57.88
54.29
59.72
$12230.60
$92.23
$117.60
Daily
813
Crews
Crew No.
Crew B-91
1 Labor Foreman (outside)
2 Laborers
4 Equip. Oper. (med.)
1 Truck Driver (heavy)
1 Dist. Tanker, 19 kL
1 Truck Tractor, 6x4, 283 kW
1 Aggreg. Spreader, S.P.
1 Roller, Pneum. Whl, 11 MT
1 Tandem Roller, 9 metric ton
Bare Costs
Hr.
Daily
Hr.
$37.10
35.10
46.55
35.30
$296.80
561.60
1489.60
282.40
306.00
522.20
781.80
313.20
227.60
$57.10
54.00
70.25
53.55
$4781.20
Hr.
Daily
Hr.
$35.10
46.55
$280.80
372.40
876.60
$54.00
70.25
$1529.80
Hr.
Daily
Hr.
$35.10
34.35
$280.80
274.80
535.80
$54.00
52.10
Incl.
Subs O&P
$1091.40
Hr.
Daily
Hr.
$37.10
35.10
46.55
35.30
$296.80
1404.00
1862.00
564.80
781.80
1044.40
612.00
163.60
626.40
$57.10
54.00
70.25
53.55
$7355.80
Crew B-92
Hr.
Daily
Hr.
$37.10
35.10
$296.80
842.40
57.20
120.40
77.20
264.40
$57.10
54.00
$1658.40
Hr.
Daily
Hr.
$46.55
$372.40
577.20
$70.25
$949.60
Hr.
Daily
Hr.
1 Laborer
$35.10
1 Diaphragm Water Pump, 50 mm
1 -6 m Suction Hose, 50 mm
2 -15 m Discharge Hoses, 50 mm
$280.80
68.60
1.95
3.50
$54.00
$354.85
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
864.00
2248.00
428.40
336.60
574.42
859.98
344.52
250.36
$41.10
$62.46
33.61
36.97
$6363.08
$74.71
$99.42
Daily
Bare
Costs
Incl.
O&P
$432.00
562.00
964.26
$40.83
$62.13
54.79
60.27
$1958.26
$95.61
$122.39
Daily
Bare
Costs
Incl.
O&P
$432.00
416.80
589.38
$34.73
$53.05
33.49
36.84
$1438.18
$68.21
$89.89
Daily
Bare
Costs
Incl.
O&P
$456.80
2160.00
2810.00
856.80
859.98
1148.84
673.20
179.96
689.04
$39.69
$60.42
31.04
34.14
$9834.62
$70.73
$94.56
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
62.92
132.44
84.92
290.84
$35.60
$54.77
16.23
17.85
$2323.92
$51.83
$72.62
Daily
Bare
Costs
Incl.
O&P
$562.00
634.92
$46.55
72.15
$70.25
79.36
$1196.92
$118.70
$149.62
Daily
Hr.
Daily
Hr.
1 Laborer
1 Diaphr. Water Pump, 100 mm
1 -6 m Suction Hose, 100 mm
2 -15 m Disch. Hoses, 100 mm
$35.10
$280.80
111.20
3.25
9.40
$54.00
Crew B-94C
$404.65
Daily
Hr.
1 Laborer
$35.10
1 Centrifugal Water Pump, 80 mm
1 -6 m Suction Hose, 80 mm
2 -15 m Discharge Hoses, 80 mm
$280.80
73.80
2.85
6.10
$54.00
$363.55
Hr.
Crew B-94D
Hr.
Daily
Hr.
1 Laborer
1 Centr. Water Pump, 150 mm
1 -6 m Suction Hose, 150 mm
2 -15 m Disch. Hoses, 150 mm
$35.10
$280.80
308.40
11.50
24.20
$54.00
$624.90
Hr.
Daily
Hr.
$44.10
35.10
$1058.40
280.80
$67.85
54.00
$1339.20
Hr.
Daily
Hr.
$46.10
44.10
35.10
$368.80
1411.20
280.80
$70.95
67.85
54.00
$432.00
75.46
2.15
3.85
$35.10
$54.00
9.26
10.18
$513.46
$44.36
$64.18
$2060.80
Hr.
Daily
Hr.
$46.10
44.10
42.35
35.10
$368.80
1058.40
338.80
280.80
$70.95
67.85
62.30
54.00
Incl.
O&P
Incl.
Subs O&P
Crew B-94B
$2046.80
Hr.
Daily
Hr.
$51.10
49.10
44.75
35.10
$408.80
1571.20
358.00
561.60
30.60
77.30
$81.60
78.40
67.55
54.00
$3007.50
Hr.
Daily
Hr.
$51.10
49.10
$408.80
1178.40
30.60
$81.60
78.40
814
Bare Costs
Bare
Costs
Daily
Crew No.
$1617.80
Hr.
Daily
Hr.
$49.10
$785.60
40.80
$78.40
$826.40
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$432.00
122.32
3.58
10.34
$35.10
$54.00
15.48
17.03
$568.24
$50.58
$71.03
Daily
Bare
Costs
Incl.
O&P
$432.00
81.18
3.13
6.71
$35.10
$54.00
10.34
11.38
$523.02
$45.44
$65.38
Daily
Bare
Costs
Incl.
O&P
$432.00
339.24
12.65
26.62
$35.10
$54.00
43.01
47.31
$810.51
$78.11
$101.31
Daily
Bare
Costs
Incl.
O&P
$1628.40
432.00
$41.85
$64.39
$2060.40
$41.85
$64.39
Daily
Bare
Costs
Incl.
O&P
$567.60
2171.20
432.00
$42.93
$66.06
$3170.80
$42.93
$66.06
Daily
Bare
Costs
Incl.
O&P
$567.60
1628.40
498.40
432.00
$42.64
$65.13
$3126.40
$42.64
$65.13
Daily
Bare
Costs
Incl.
O&P
$652.80
2508.80
540.40
864.00
33.66
85.03
$45.31
$71.34
1.69
1.85
$4684.69
$46.99
$73.20
Daily
Bare
Costs
Incl.
O&P
$652.80
1881.60
33.66
$49.60
$79.20
.96
1.05
$2568.06
$50.56
$80.25
Daily
Bare
Costs
Incl.
O&P
$1254.40
44.88
$49.10
2.55
$78.40
2.81
$1299.28
$51.65
$81.20
Daily
Crews
Crew No.
Crew C-5
1 Rodman Foreman (outside)
4 Rodmen (reinf.)
1 Equip. Oper. (crane)
1 Equip. Oper. Oiler
1 Hyd. Crane, 23 metric ton
Bare Costs
Hr.
Daily
Hr.
$51.10
49.10
47.80
41.25
$408.80
1571.20
382.40
330.00
697.20
$81.60
78.40
72.15
62.25
$3389.60
Hr.
Daily
Hr.
$37.10
35.10
42.35
$296.80
1123.20
338.80
54.80
$57.10
54.00
62.30
$1813.60
Hr.
Daily
Hr.
$37.10
35.10
42.35
46.55
41.25
$296.80
1404.00
338.80
372.40
330.00
54.80
22.40
1100.00
$57.10
54.00
62.30
70.25
62.25
Incl.
Subs O&P
$3919.20
Hr.
Daily
Hr.
$37.10
35.10
35.30
$296.80
1404.00
564.80
1855.60
$57.10
54.00
53.55
$4121.20
Crew C-7B
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
1404.00
382.40
330.00
35.20
1907.00
$57.10
54.00
72.15
62.25
$4355.40
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
1404.00
744.80
1222.00
$57.10
54.00
70.25
$3667.60
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
1404.00
372.40
186.00
$57.10
54.00
70.25
$2259.20
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$652.80
2508.80
577.20
498.00
766.92
$48.08
$75.66
12.45
13.70
$5003.72
$60.53
$89.35
Daily
Bare
Costs
Incl.
O&P
$456.80
1728.00
498.40
60.28
$36.64
$55.90
1.14
1.26
$2743.48
$37.78
$57.16
Daily
Bare
Costs
Incl.
O&P
$456.80
2160.00
498.40
562.00
498.00
60.28
24.64
1210.00
$38.08
$57.99
16.35
17.98
$5470.12
$54.43
$75.97
Daily
Bare
Costs
Incl.
O&P
$456.80
2160.00
856.80
2041.16
$35.40
$54.27
28.99
31.89
$5514.76
$64.39
$86.17
Daily
Incl.
O&P
$456.80
2160.00
577.20
498.00
38.72
2097.70
$37.71
$57.69
30.35
33.38
$5828.42
$68.05
$91.07
Bare
Costs
Incl.
O&P
$456.80
2160.00
1124.00
1344.20
$38.21
$58.45
19.09
21.00
$5085.00
$57.31
$79.45
Daily
Bare
Costs
Incl.
O&P
$456.80
2160.00
562.00
204.60
$37.02
$56.76
3.32
3.65
$3383.40
$40.34
$60.42
Daily
Crew C-8
1 Labor Foreman (outside)
3 Laborers
2 Cement Finishers
1 Equip. Oper. (med.)
1 Concrete Pump (small)
Bare Costs
Daily
Hr.
$37.10
35.10
42.35
46.55
$296.80
842.40
677.60
372.40
715.60
$57.10
54.00
62.30
70.25
$2904.80
Hr.
Daily
Hr.
$37.10
35.10
42.35
$296.80
842.40
677.60
$57.10
54.00
62.30
Incl.
Subs O&P
Hr.
$1816.80
Hr.
Daily
Hr.
$37.10
35.10
46.55
$296.80
842.40
372.40
65.50
640.20
1243.00
$57.10
54.00
70.25
Bare
Costs
Daily
Crew No.
$3460.30
Crew C-8C
Hr.
Daily
Hr.
$37.10
35.10
42.35
46.55
$296.80
842.40
338.80
372.40
242.00
136.80
16.40
31.00
$57.10
54.00
62.30
70.25
$2276.60
Crew C-8D
Hr.
Daily
Hr.
$37.10
35.10
42.35
44.75
$296.80
280.80
338.80
358.00
177.00
8.20
$57.10
54.00
62.30
67.55
$1459.60
Crew C-8E
Hr.
Daily
Hr.
$37.10
35.10
42.35
44.75
$296.80
842.40
338.80
358.00
268.80
177.00
16.40
31.00
$57.10
54.00
62.30
67.55
$2329.20
Hr.
Daily
Hr.
$35.10
42.35
$280.80
677.60
$54.00
62.30
$958.40
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$456.80
1296.00
996.80
562.00
787.16
$39.09
$59.14
12.78
14.06
$4098.76
$51.87
$73.19
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
996.80
$37.85
$57.28
$2749.60
$37.85
$57.28
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
562.00
72.05
704.22
1367.30
$37.79
$57.87
48.72
53.59
$4458.37
$86.51
$111.46
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
498.40
562.00
266.20
150.48
18.04
34.10
$38.55
$58.61
8.88
9.77
$3282.02
$47.43
$68.38
Daily
Bare
Costs
Incl.
O&P
$456.80
432.00
498.40
540.40
194.70
9.02
$39.83
$60.24
5.79
6.37
$2131.32
$45.61
$66.60
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
498.40
540.40
295.68
194.70
18.04
34.10
$38.25
$58.16
10.28
11.30
$3334.12
$48.52
$69.46
Daily
Bare
Costs
Incl.
O&P
$432.00
996.80
$39.93
$59.53
$1428.80
$39.93
$59.53
Daily
815
Crews
Crew No.
Crew C-10B
3 Laborers
2 Cement Finishers
1 Concrete Mixer, 0.28 m3
2 Trowels, 1.2 m Walk-Behind
Bare Costs
Hr.
Daily
Hr.
$35.10
42.35
$842.40
677.60
160.60
89.20
$54.00
62.30
$1769.80
Hr.
Daily
Hr.
$35.10
42.35
$280.80
677.60
44.60
$54.00
62.30
Incl.
Subs O&P
$1003.00
Hr.
Daily
Hr.
$35.10
42.35
$280.80
677.60
65.50
44.60
$54.00
62.30
$1068.50
Crew C-10E
Hr.
Daily
Hr.
1 Laborer
2 Cement Finishers
1 Vibrating Power Screed
1 Cement Trowel, 2.4 m Ride-On
$35.10
42.35
$280.80
677.60
65.50
174.20
$54.00
62.30
$1198.10
Crew C-11
Hr.
Daily
Hr.
$51.35
49.35
47.80
41.25
$410.80
2368.80
382.40
330.00
1829.00
$91.80
88.25
72.15
62.25
$5321.00
Hr.
Daily
Hr.
$46.10
44.10
35.10
47.80
$368.80
1058.40
280.80
382.40
612.00
$70.95
67.85
54.00
72.15
$2702.40
Crew C-13
Hr.
Daily
Hr.
$49.35
49.35
44.10
$394.80
394.80
352.80
121.60
$88.25
88.25
67.85
816
$1264.00
Hr.
Daily
Hr.
$46.10
44.10
35.10
49.10
42.35
47.80
41.25
$368.80
1764.00
1123.20
1571.20
677.60
382.40
330.00
1554.00
$70.95
67.85
54.00
78.40
62.30
72.15
62.25
$7771.20
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1296.00
996.80
176.66
98.12
$38.00
$57.32
6.25
6.87
$2567.58
$44.24
$64.19
Daily
Bare
Costs
Incl.
O&P
$432.00
996.80
49.06
$39.93
$59.53
1.86
2.04
$1477.86
$41.79
$61.58
Daily
Bare
Costs
Incl.
O&P
$432.00
996.80
72.05
49.06
$39.93
$59.53
4.59
5.05
$1549.91
$44.52
$64.58
Daily
Bare
Costs
Incl.
O&P
$432.00
996.80
72.05
191.62
$39.93
$59.53
9.99
10.99
$1692.47
$49.92
$70.52
Daily
Bare
Costs
Incl.
O&P
$734.40
4236.00
577.20
498.00
2011.90
$48.50
$83.97
25.40
27.94
$8057.50
$73.90
$111.91
Daily
Bare
Costs
Incl.
O&P
$567.60
1628.40
432.00
577.20
673.20
$43.55
$66.78
12.75
14.03
$3878.40
$56.30
$80.80
Daily
Bare
Costs
Incl.
O&P
$706.00
706.00
542.80
133.76
$47.60
$81.45
5.07
5.57
$2088.56
$52.67
$87.02
Daily
Bare
Costs
Incl.
O&P
$567.60
2714.00
1728.00
2508.80
996.80
577.20
498.00
1709.40
$43.17
$66.60
10.79
11.87
$11299.80
$53.97
$78.47
Daily
Crew No.
Crew C-14A
1 Carpenter Foreman (outside)
16 Carpenters
4 Rodmen (reinf.)
2 Laborers
1 Cement Finisher
1 Equip. Oper. (med.)
1 Gas Engine Vibrator
1 Concrete Pump (small)
Bare Costs
Hr.
Daily
Hr.
$46.10
44.10
49.10
35.10
42.35
46.55
$368.80
5644.80
1571.20
561.60
338.80
372.40
27.40
715.60
$70.95
67.85
78.40
54.00
62.30
70.25
$9600.60
Hr.
Daily
Hr.
$46.10
44.10
49.10
35.10
42.35
46.55
$368.80
5644.80
1571.20
561.60
677.60
372.40
27.40
715.60
$70.95
67.85
78.40
54.00
62.30
70.25
$9939.40
Hr.
Daily
Hr.
$46.10
44.10
49.10
35.10
42.35
$368.80
2116.80
785.60
1123.20
338.80
27.40
$70.95
67.85
78.40
54.00
62.30
$4760.60
Hr.
Daily
Hr.
$46.10
44.10
49.10
35.10
42.35
46.55
$368.80
6350.40
785.60
561.60
338.80
372.40
27.40
715.60
$70.95
67.85
78.40
54.00
62.30
70.25
$9520.60
Hr.
Daily
Hr.
$46.10
44.10
49.10
35.10
42.35
$368.80
705.60
1571.20
842.40
338.80
27.40
$70.95
67.85
78.40
54.00
62.30
Incl.
Subs O&P
$3854.20
Hr.
Daily
Hr.
$37.10
35.10
42.35
$296.80
561.60
2032.80
27.40
$57.10
54.00
62.30
$2918.60
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$567.60
8684.80
2508.80
864.00
498.40
562.00
30.14
787.16
$44.29
$68.43
3.71
4.09
$14502.90
$48.00
$72.51
Daily
Bare
Costs
Incl.
O&P
$567.60
8684.80
2508.80
864.00
996.80
562.00
30.14
787.16
$44.21
$68.19
3.57
3.93
$15001.30
$47.79
$72.12
Daily
Bare
Costs
Incl.
O&P
$567.60
3256.80
1254.40
1728.00
498.40
30.14
$42.26
$65.22
.24
.27
$7335.34
$42.51
$65.49
Daily
Bare
Costs
Incl.
O&P
$567.60
9770.40
1254.40
864.00
498.40
562.00
30.14
787.16
$43.89
$67.58
3.71
4.09
$14334.10
$47.60
$71.67
Daily
Bare
Costs
Incl.
O&P
$567.60
1085.60
2508.80
1296.00
498.40
30.14
$43.49
$67.69
.31
.34
$5986.54
$43.80
$68.03
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
2990.40
30.14
$40.16
$59.88
.38
.42
$4341.34
$40.54
$60.30
Daily
Crews
Crew No.
Crew C-14G
1 Labor Foreman (outside)
2 Laborers
4 Cement Finishers
1 Gas Engine Vibrator
Bare Costs
Hr.
Daily
Hr.
$37.10
35.10
42.35
$296.80
561.60
1355.20
27.40
$57.10
54.00
62.30
$2241.00
Hr.
Daily
Hr.
$46.10
44.10
49.10
35.10
42.35
$368.80
705.60
392.80
280.80
338.80
27.40
$70.95
67.85
78.40
54.00
62.30
$2114.20
Hr.
Daily
Hr.
$46.10
44.10
35.10
42.35
$368.80
2116.80
1123.20
338.80
27.40
$70.95
67.85
54.00
62.30
$3975.00
Hr.
Daily
Hr.
$46.10
44.10
35.10
42.35
49.10
$368.80
705.60
842.40
677.60
392.80
$70.95
67.85
54.00
62.30
78.40
Incl.
Subs O&P
$2987.20
Hr.
Daily
Hr.
$37.10
35.10
42.35
46.55
$296.80
842.40
677.60
372.40
280.40
6.10
15.50
$57.10
54.00
62.30
70.25
$2491.20
Crew C-17
Hr.
Daily
Hr.
$47.40
45.40
$758.40
2905.60
$73.30
70.20
$3664.00
Crew C-17A
Hr.
Daily
Hr.
$47.40
45.40
47.80
$758.40
2905.60
47.80
194.25
$73.30
70.20
72.15
$3906.05
Crew C-17B
Hr.
Daily
Hr.
$47.40
45.40
47.80
$758.40
2905.60
95.60
388.50
11.15
$73.30
70.20
72.15
$4159.25
Cost
Per Labor-Hour
Crew No.
Bare Costs
Incl.
Subs O&P
Bare
Costs
Incl.
O&P
$456.80
864.00
1993.60
30.14
$39.53
$59.19
.49
.54
$3344.54
$40.02
$59.72
Daily
Bare
Costs
Incl.
O&P
$567.60
1085.60
627.20
432.00
498.40
30.14
$43.48
$66.89
.57
.63
$3240.94
$44.05
$67.52
Crew C-17E
Hr.
Daily
Hr.
Daily
Bare
Costs
Incl.
O&P
$47.40
45.40
$41.12
$63.03
$758.40
2905.60
90.70
$73.30
70.20
$567.60
3256.80
1728.00
498.40
30.14
.29
.31
$6080.94
$41.41
$63.34
Daily
Bare
Costs
Incl.
O&P
$567.60
1085.60
1296.00
996.80
627.20
$41.49
$63.52
$4573.20
$41.49
$63.52
Daily
Bare
Costs
Incl.
O&P
$456.80
1296.00
996.80
562.00
308.44
6.71
17.05
$39.09
$59.14
5.39
5.93
$3643.80
$44.49
$65.07
Daily
Bare
Costs
Incl.
O&P
$1172.80
4492.80
$45.80
$70.82
$5665.60
$45.80
$70.82
Daily
Bare
Costs
Incl.
O&P
$1172.80
4492.80
72.15
213.68
$45.82
$70.84
2.40
2.64
$5951.43
$48.22
$73.47
Daily
Bare
Costs
Incl.
O&P
$1172.80
4492.80
144.30
427.35
12.27
$45.85
$70.85
4.87
5.36
$6249.52
$50.72
$76.21
Daily
Crew C-17C
Hr.
Daily
Hr.
$47.40
45.40
47.80
$758.40
2905.60
143.40
582.75
$73.30
70.20
72.15
$4390.15
Crew C-17D
Hr.
Daily
Hr.
$47.40
45.40
47.80
$758.40
2905.60
191.20
777.00
$73.30
70.20
72.15
$4632.20
$3754.70
Hr.
Daily
Hr.
$37.10
35.10
$37.10
280.80
56.80
$57.10
54.00
$374.70
Hr.
Daily
Hr.
$37.10
35.10
$37.10
280.80
94.40
$57.10
54.00
$412.30
Hr.
Daily
Hr.
$37.10
35.10
42.35
46.55
$296.80
1404.00
338.80
372.40
54.80
715.60
$57.10
54.00
62.30
70.25
$3182.40
Hr.
Daily
Hr.
$37.10
35.10
42.35
46.55
$296.80
1404.00
338.80
372.40
54.80
186.00
$57.10
54.00
62.30
70.25
$2652.80
Crew C-22
Hr.
Daily
Hr.
$51.10
49.10
47.80
41.25
$408.80
1571.20
47.80
41.25
87.15
$81.60
78.40
72.15
62.25
$2156.20
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$1172.80
4492.80
216.45
641.02
$45.87
$70.87
7.02
7.72
$6523.07
$52.89
$78.59
Daily
Bare
Costs
Incl.
O&P
$1172.80
4492.80
288.60
854.70
$45.90
$70.88
9.25
10.18
$6808.90
$55.15
$81.06
Daily
Bare
Costs
Incl.
O&P
$1172.80
4492.80
99.77
$45.80
$70.82
1.13
1.25
$5765.37
$46.93
$72.07
Daily
Bare
Costs
Incl.
O&P
$57.10
432.00
62.48
$35.32
$54.34
6.31
6.94
$551.58
$41.63
$61.29
Daily
Bare
Costs
Incl.
O&P
$57.10
432.00
103.84
$35.32
$54.34
10.49
11.54
$592.94
$45.81
$65.88
Daily
Bare
Costs
Incl.
O&P
$456.80
2160.00
498.40
562.00
60.28
787.16
$37.69
$57.46
12.04
13.24
$4524.64
$49.73
$70.70
Daily
Bare
Costs
Incl.
O&P
$456.80
2160.00
498.40
562.00
60.28
204.60
$37.69
$57.46
3.76
4.14
$3942.08
$41.45
$61.60
Daily
Bare
Costs
Incl.
O&P
$652.80
2508.80
72.15
62.25
95.86
$49.26
$78.48
2.08
2.28
$3391.86
$51.34
$80.76
Daily
817
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew C-23
Hr.
Daily
Hr.
$47.40
45.40
47.80
41.25
$758.40
2179.20
382.40
330.00
1497.00
$73.30
70.20
72.15
62.25
$5147.00
Hr.
Daily
Hr.
$37.10
35.10
47.80
41.25
$296.80
561.60
382.40
330.00
1628.00
598.20
$57.10
54.00
72.15
62.25
$3797.00
Crew C-24
Hr.
Daily
Hr.
$47.40
45.40
47.80
41.25
$758.40
2179.20
382.40
330.00
1829.00
$73.30
70.20
72.15
62.25
$5479.00
Daily
Hr.
$49.10
27.85
$785.60
445.60
$78.40
46.70
$1231.20
Hr.
Daily
Hr.
$42.35
$677.60
148.00
$62.30
$825.60
Hr.
Daily
Hr.
1 Cement Finisher
1 Portable Air Compressor, Gas
$42.35
$338.80
17.55
$62.30
Crew C-29
1 Laborer
1 Pressure Washer
$356.35
Crew C-30
1 Laborer
1 Concrete Mixer, 0.28 m3
Daily
Hr.
$35.10
$280.80
63.00
$54.00
$343.80
Hr.
Daily
Hr.
$35.10
$280.80
160.60
$54.00
$441.40
Hr.
Daily
Hr.
$44.10
35.60
$352.80
284.80
$66.60
53.75
818
$637.60
Hr.
Daily
Hr.
$44.10
35.60
44.10
$1058.40
569.60
176.40
$66.60
53.75
67.85
$1804.40
$1172.80
3369.60
577.20
498.00
1646.70
$45.63
$70.22
18.71
20.58
$7264.30
$64.34
$90.80
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
577.20
498.00
1790.80
658.02
$39.27
$59.90
55.66
61.22
$4844.82
$94.92
$121.12
Daily
Bare
Costs
Incl.
O&P
$45.63
$70.22
22.86
25.15
$1172.80
3369.60
577.20
498.00
2011.90
Crew No.
Crew D-3
3 Bricklayers
2 Bricklayer Helpers
.25 Carpenter
Bare Costs
Crew D-4
1 Bricklayer
2 Bricklayer Helpers
1 Equip. Oper. (light)
1 Grout Pump, 1.5 m3/hr.
Daily
Hr.
$44.10
35.60
44.10
$1058.40
569.60
88.20
$66.60
53.75
67.85
$1716.20
Hr.
Daily
Hr.
$44.10
35.60
44.75
$352.80
569.60
358.00
127.40
$66.60
53.75
67.55
$68.49
$1254.40
747.20
$38.48
$62.55
$2001.60
$38.48
$62.55
Daily
Bare
Costs
Incl.
O&P
$996.80
162.80
$42.35
9.25
$62.30
10.18
Hr.
Daily
Hr.
$44.10
$352.80
$66.60
$352.80
Hr.
Daily
Hr.
$44.10
35.60
44.10
$1058.40
854.40
88.20
$66.60
53.75
67.85
$2001.00
Incl.
O&P
$1598.40
860.00
135.70
$40.86
$61.76
$2594.10
$40.86
$61.76
Daily
Bare
Costs
Incl.
O&P
$532.80
860.00
540.40
140.14
$40.01
$60.41
3.98
4.38
$2073.34
$43.99
$64.79
Daily
Bare
Costs
Incl.
O&P
$532.80
$44.10
$66.60
$532.80
$44.10
$66.60
Daily
Bare
Costs
Incl.
O&P
$1598.40
1290.00
135.70
$40.02
$60.48
$3024.10
$40.02
$60.48
Daily
Bare
Costs
Crew D-7
1 Tile Layer
1 Tile Layer Helper
Hr.
Daily
Hr.
Incl.
O&P
$40.75
32.10
$326.00
256.80
$59.85
47.15
$478.80
377.20
$36.42
$53.50
$582.80
$856.00
$36.42
$53.50
Daily
Bare
Costs
Hr.
Daily
Hr.
Incl.
O&P
$44.10
35.60
$1058.40
569.60
$66.60
53.75
$1598.40
860.00
$40.70
$61.46
$1628.00
$2458.40
$40.70
$61.46
Daily
Bare
Costs
Incl.
O&P
$1598.40
1290.00
$39.85
$60.17
$2888.40
$39.85
$60.17
Daily
Bare
Costs
Incl.
O&P
$556.80
532.80
430.00
577.20
493.02
$43.40
$65.53
14.01
15.41
$2589.82
$57.41
$80.93
Daily
Bare
Costs
Incl.
O&P
$556.80
532.80
430.00
$41.93
$63.32
$1519.60
$41.93
$63.32
Daily
Bare
Costs
Incl.
O&P
$556.80
532.80
860.00
$40.35
$60.92
$1949.60
$40.35
$60.92
$72.47
Daily
Bare
Costs
Incl.
O&P
$498.40
19.31
$42.35
2.19
$62.30
2.41
$44.54
$1407.80
Crew D-9
3 Bricklayers
3 Bricklayer Helpers
Hr.
Daily
Hr.
$44.10
35.60
$1058.40
854.40
$66.60
53.75
$1912.80
$64.71
Daily
Bare
Costs
Incl.
O&P
$432.00
69.30
$35.10
7.88
$54.00
8.66
$501.30
$42.98
$62.66
Daily
Bare
Costs
Incl.
O&P
$432.00
176.66
$35.10
20.07
$54.00
22.08
$608.66
$55.17
$76.08
Daily
Bare
Costs
Incl.
O&P
$532.80
430.00
$39.85
$60.17
$962.80
$39.85
$60.17
Daily
Bare
Costs
Incl.
O&P
$1598.40
860.00
271.40
$41.01
$62.04
$2729.80
$41.01
$62.04
Crew D-10
1 Bricklayer Foreman (outside)
1 Bricklayer
1 Bricklayer Helper
1 Equip. Oper. (crane)
1 S.P. Crane, 4x4, 11 MT
Hr.
Daily
Hr.
$46.10
44.10
35.60
47.80
$368.80
352.80
284.80
382.40
448.20
$69.60
66.60
53.75
72.15
$1837.00
Hr.
Daily
Hr.
$46.10
44.10
35.60
$368.80
352.80
284.80
$69.60
66.60
53.75
$1006.40
Hr.
Daily
Hr.
$46.10
44.10
35.60
$368.80
352.80
569.60
$69.60
66.60
53.75
$1291.20
Cost
Per Labor-Hour
Bare
Costs
Daily
$95.37
Incl.
O&P
$51.60
1 Bricklayer
Incl.
Subs O&P
Hr.
Bare
Costs
Daily
$517.71
Hr.
Incl.
O&P
$1159.60
Crew C-28
Bare
Costs
Daily
$7629.50
Hr.
Cost
Per Labor-Hour
Crews
Crew No.
Crew D-13
1 Bricklayer Foreman (outside)
1 Bricklayer
2 Bricklayer Helpers
1 Carpenter
1 Equip. Oper. (crane)
1 S.P. Crane, 4x4, 11 MT
Bare Costs
Incl.
Subs O&P
Hr.
Daily
Hr.
$46.10
44.10
35.60
44.10
47.80
$368.80
352.80
569.60
352.80
382.40
448.20
$69.60
66.60
53.75
67.85
72.15
$2474.60
Crew E-1
Hr.
Daily
Hr.
$51.35
49.35
44.75
$410.80
394.80
358.00
121.60
$91.80
88.25
67.55
$1285.20
Crew E-2
Hr.
Daily
Hr.
$51.35
49.35
47.80
41.25
$410.80
1579.20
382.40
330.00
1497.00
$91.80
88.25
72.15
62.25
$4199.40
Crew E-3
Hr.
Daily
Hr.
$51.35
49.35
49.35
$410.80
394.80
394.80
121.60
$91.80
88.25
88.25
$1322.00
Crew E-4
Hr.
Daily
Hr.
$51.35
49.35
$410.80
1184.40
121.60
$91.80
88.25
$1716.80
Crew E-5
Hr.
Daily
Hr.
$51.35
49.35
47.80
49.35
41.25
$821.60
1974.00
382.40
394.80
330.00
1497.00
121.60
$91.80
88.25
72.15
88.25
62.25
$5521.40
Crew E-6
Hr.
Daily
Hr.
$51.35
49.35
47.80
49.35
41.25
44.75
$1232.40
3553.20
382.40
394.80
330.00
358.00
1497.00
121.60
136.80
36.00
$91.80
88.25
72.15
88.25
62.25
67.55
$8042.20
Cost
Per Labor-Hour
Crew No.
Bare Costs
Incl.
Subs O&P
Bare
Costs
Incl.
O&P
$556.80
532.80
860.00
542.80
577.20
493.02
$42.22
$63.95
9.34
10.27
$3562.62
$51.55
$74.22
Daily
Bare
Costs
Incl.
O&P
$734.40
706.00
540.40
133.76
$48.48
$82.53
5.07
5.57
$2114.56
$53.55
$88.11
Daily
Bare
Costs
Incl.
O&P
$734.40
2824.00
577.20
498.00
1646.70
$48.26
$82.74
26.73
29.41
$6280.30
$74.99
$112.15
Daily
Bare
Costs
Incl.
O&P
$734.40
706.00
706.00
133.76
$50.02
$89.43
5.07
5.57
$2280.16
$55.08
$95.01
Daily
Bare
Costs
Incl.
O&P
$734.40
2118.00
133.76
$49.85
$89.14
3.80
4.18
Crew E-10
Hr.
Daily
Hr.
$2986.16
$53.65
$93.32
Incl.
O&P
$48.78
$84.75
$410.80
394.80
121.60
264.40
$91.80
88.25
$1468.80
3530.00
577.20
706.00
498.00
1646.70
133.76
$51.35
49.35
Daily
Bare
Costs
20.23
22.26
$8560.46
$69.02
$107.01
Daily
Bare
Costs
Incl.
O&P
$2203.20
6354.00
577.20
706.00
498.00
540.40
1646.70
133.76
150.48
39.60
$48.83
$84.99
14.00
15.39
$12849.34
$62.83
$100.39
Daily
Crew E-7
Hr.
Daily
Hr.
$51.35
49.35
47.80
41.25
51.35
49.35
$410.80
1579.20
382.40
330.00
410.80
789.60
1497.00
243.20
$91.80
88.25
72.15
62.25
91.80
88.25
$5643.00
Crew E-8
Hr.
Daily
Hr.
$51.35
49.35
51.35
49.35
47.80
41.25
44.75
$410.80
1579.20
410.80
1579.20
382.40
330.00
358.00
1497.00
486.40
$91.80
88.25
91.80
88.25
72.15
62.25
67.55
$7033.80
Crew E-9
Hr.
Daily
Hr.
$51.35
49.35
51.35
49.35
47.80
41.25
44.75
$821.60
1974.00
410.80
1974.00
382.40
330.00
358.00
1497.00
608.00
$91.80
88.25
91.80
88.25
72.15
62.25
67.55
$8355.80
$1191.60
Crew E-11
Hr.
Daily
Hr.
$39.30
35.10
44.75
$628.80
280.80
358.00
177.00
20.40
13.35
$71.15
54.00
67.55
$1478.35
Crew E-12
Hr.
Daily
Hr.
$51.35
44.75
$410.80
358.00
121.60
$91.80
67.55
$890.40
Crew E-13
Hr.
Daily
Hr.
$51.35
44.75
$410.80
179.00
121.60
$91.80
67.55
$711.40
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$734.40
2824.00
577.20
498.00
734.40
1412.00
1646.70
267.52
$48.78
$84.75
21.75
23.93
$8694.22
$70.54
$108.68
Daily
Bare
Costs
Incl.
O&P
$734.40
2824.00
734.40
2824.00
577.20
498.00
540.40
1646.70
535.04
$48.56
$83.97
19.07
20.98
$10914.14
$67.63
$104.94
Daily
Bare
Costs
Incl.
O&P
$1468.80
3530.00
734.40
3530.00
577.20
498.00
540.40
1646.70
668.80
$48.83
$84.99
16.45
18.09
$13194.30
$65.28
$103.08
Daily
Bare
Costs
Incl.
O&P
$734.40
706.00
133.76
290.84
$50.35
$90.03
24.13
26.54
$1865.00
$74.47
$116.56
Daily
Bare
Costs
Incl.
O&P
$1138.40
432.00
540.40
194.70
22.44
14.69
$39.61
$65.96
6.59
7.24
$2342.63
$46.20
$73.21
Daily
Bare
Costs
Incl.
O&P
$734.40
540.40
133.76
$48.05
$79.67
7.60
8.36
$1408.56
$55.65
$88.03
Daily
Bare
Costs
Incl.
O&P
$734.40
270.20
133.76
$49.15
$83.72
10.13
11.15
$1138.36
$59.28
$94.86
Daily
819
Crews
Crew No.
Bare Costs
Incl.
Subs O&P
Crew E-14
Hr.
Daily
Hr.
$51.35
$410.80
121.60
$91.80
$532.40
Crew E-16
Hr.
Daily
Hr.
$51.35
49.35
$410.80
394.80
121.60
$91.80
88.25
$927.20
Crew E-17
Hr.
Daily
Hr.
$51.35
49.35
$410.80
394.80
$91.80
88.25
$805.60
Hr.
$51.35
49.35
46.55
Daily
$410.80
1184.40
372.40
950.65
Hr.
$91.80
88.25
70.25
$2918.25
Crew E-19
Hr.
Daily
Hr.
$49.35
51.35
44.75
$394.80
410.80
358.00
950.65
$88.25
91.80
67.55
$2114.25
Hr.
$51.35
49.35
47.80
41.25
Daily
$410.80
1974.00
382.40
330.00
1163.00
Hr.
$91.80
88.25
72.15
62.25
$4260.20
Crew E-22
Hr.
Daily
Hr.
$47.40
45.40
$379.20
726.40
$73.30
70.20
$1105.60
Hr.
Daily
Hr.
$49.35
46.55
$1184.40
372.40
697.20
$88.25
70.25
$2254.00
Hr.
Daily
Hr.
$51.35
$410.80
10.80
86.40
$91.80
820
$508.00
Hr.
Daily
Hr.
$44.10
47.80
$1411.20
382.40
612.00
$67.85
72.15
$2405.60
Cost
Per Labor-Hour
Daily
Bare
Costs
Incl.
O&P
$734.40
133.76
$51.35
15.20
$91.80
16.72
$868.16
$66.55
$108.52
Daily
Bare
Costs
Incl.
O&P
$734.40
706.00
133.76
$50.35
$90.03
7.60
8.36
$1574.16
$57.95
$98.39
Daily
Bare
Costs
Incl.
O&P
$734.40
706.00
$50.35
$90.03
$1440.40
$50.35
$90.03
Daily
Bare
Costs
Incl.
O&P
Crew F-4
4 Carpenters
1 Equip. Oper. (crane)
1 Equip. Oper. Oiler
1 Hyd. Crane, 50 metric ton
$49.19
$85.36
23.77
26.14
$4460.11
$72.96
$111.50
Daily
Bare
Costs
Incl.
O&P
$706.00
734.40
540.40
1045.71
$48.48
$82.53
39.61
43.57
$3026.51
$88.09
$126.10
Daily
Bare
Costs
Incl.
O&P
Crew F-6
2 Carpenters
2 Building Laborers
1 Equip. Oper. (crane)
1 Hyd. Crane, 11 metric ton
$48.39
$83.43
18.17
19.99
$6618.90
$66.57
$103.42
Daily
Bare
Costs
Incl.
O&P
$586.40
1123.20
$46.07
$71.23
$1709.60
$46.07
$71.23
Daily
Bare
Costs
Incl.
O&P
$2118.00
562.00
766.92
$48.65
$83.75
21.79
23.97
$3446.92
$70.44
$107.72
Crew G-1
1 Roofer Foreman (outside)
4 Roofers, Composition
2 Roofer Helpers
1 Application Equipment
1 Tar Kettle/Pot
1 Crew Truck
$734.40
11.88
95.04
$51.35
$91.80
12.15
13.37
$841.32
$63.50
$105.17
Daily
Bare
Costs
Incl.
O&P
$2171.20
577.20
673.20
$44.84
$68.71
15.30
16.83
$3421.60
$60.14
$85.54
$44.10
47.80
41.25
$1411.20
382.40
330.00
1100.00
$67.85
72.15
62.25
$3223.60
Hr.
Daily
Hr.
$46.10
44.10
$368.80
1058.40
$70.95
67.85
$1427.20
Hr.
Daily
Hr.
$44.10
35.10
47.80
$705.60
561.60
382.40
612.00
$67.85
54.00
72.15
$2261.60
Hr.
Daily
Hr.
$44.10
35.10
$705.60
561.60
$67.85
54.00
$1267.20
Hr.
Daily
Hr.
$39.40
37.40
27.85
$315.20
1196.80
445.60
179.20
91.00
182.40
$66.05
62.70
46.70
1 Plasterer
1 Plasterer Helper
1 Building Laborer
1 Grout Pump, 1.5 m3/hr.
$2410.20
Hr.
Daily
Hr.
$40.35
35.75
35.10
$322.80
286.00
280.80
127.40
$60.40
53.50
54.00
Incl.
O&P
Hr.
Crew G-2
Bare
Costs
Daily
2 Carpenters
2 Building Laborers
1 Roofer, composition
1 Roofer Helper
1 Building Laborer
1 Foam spray rig, trailer-mtd.
1 Pickup Truck, 0.7 MT
$1017.00
Hr.
Daily
Hr.
$37.40
27.85
35.10
$299.20
222.80
280.80
503.85
127.00
$62.70
46.70
54.00
Incl.
Subs O&P
Hr.
Crew F-7
$734.40
3530.00
577.20
498.00
1279.30
Bare Costs
$734.40
2118.00
562.00
1045.71
Daily
Crew No.
$1433.65
Hr.
Daily
Hr.
$52.15
35.10
$834.40
561.60
$79.50
54.00
$1396.00
Crew G-4
Hr.
Daily
Hr.
$37.10
35.10
$296.80
561.60
211.00
136.80
$57.10
54.00
$1206.20
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$2171.20
577.20
498.00
1210.00
$44.24
$67.63
22.92
25.21
$4456.40
$67.16
$92.84
Daily
Bare
Costs
Incl.
O&P
$567.60
1628.40
$44.60
$68.63
$2196.00
$44.60
$68.63
Daily
Bare
Costs
Incl.
O&P
$1085.60
864.00
577.20
673.20
$41.24
$63.17
15.30
16.83
$3200.00
$56.54
$80.00
Daily
Bare
Costs
Incl.
O&P
$1085.60
864.00
$39.60
$60.92
$1949.60
$39.60
$60.92
Daily
Bare
Costs
Incl.
O&P
$528.40
2006.40
747.20
197.12
100.10
200.64
$34.96
$58.61
8.08
8.89
$3779.86
$43.04
$67.50
Daily
Bare
Costs
Incl.
O&P
$483.20
428.00
432.00
140.14
$37.07
$55.97
5.31
5.84
$1483.34
$42.38
$61.81
Daily
Bare
Costs
Incl.
O&P
$501.60
373.60
432.00
554.24
139.70
$33.45
$54.47
26.29
28.91
$2001.14
$59.74
$83.38
Daily
Bare
Costs
Incl.
O&P
$1272.00
864.00
$43.63
$66.75
$2136.00
$43.63
$66.75
Daily
Bare
Costs
Incl.
O&P
$456.80
864.00
232.10
150.48
$35.77
$55.03
14.49
15.94
$1703.38
$50.26
$70.97
Daily
Crews
Crew No.
Crew G-5
1 Roofer Foreman (outside)
2 Roofers, Composition
2 Roofer Helpers
1 Application Equipment
Bare Costs
Hr.
Daily
Hr.
$39.40
37.40
27.85
$315.20
598.40
445.60
179.20
$66.05
62.70
46.70
$1538.40
Hr.
Daily
Hr.
$37.40
$598.40
10.10
45.70
$62.70
$654.20
Hr.
Daily
Hr.
$44.10
$352.80
10.10
22.85
$67.85
$385.75
Hr.
Daily
Hr.
$42.75
49.35
$684.00
789.60
$64.75
88.25
$1473.60
Hr.
Daily
Hr.
$42.75
35.10
$684.00
280.80
$64.75
54.00
$964.80
Hr.
Daily
Hr.
$42.75
33.30
$342.00
266.40
$64.75
51.20
$608.40
Hr.
Daily
Hr.
$44.10
33.30
51.55
$352.80
266.40
206.20
$67.85
51.20
77.05
$825.40
Hr.
Daily
Hr.
$40.35
35.75
$968.40
572.00
130.80
$60.40
53.50
$1671.20
Hr.
Daily
Hr.
$40.35
35.75
39.25
$968.40
572.00
314.00
130.80
$60.40
53.50
57.60
Incl.
Subs O&P
$1985.20
Hr.
Daily
Hr.
$40.40
33.75
$323.20
270.00
84.70
177.00
$59.35
49.60
$854.90
Cost
Per Labor-Hour
Crew No.
Bare
Costs
Incl.
O&P
$528.40
1003.20
747.20
197.12
$33.98
$56.97
4.48
4.93
$2475.92
$38.46
$61.90
Daily
Bare
Costs
Incl.
O&P
$1003.20
11.11
50.27
$37.40
$62.70
3.49
3.84
$1064.58
$40.89
$66.54
Daily
Bare
Costs
Incl.
O&P
$542.80
11.11
25.14
$44.10
$67.85
4.12
4.53
$579.04
$48.22
$72.38
Crew J-4B
Daily
Bare
Costs
Incl.
O&P
1 Laborer
1 Floor Auto Scrubber
$1036.00
1412.00
$46.05
$76.50
$2448.00
$46.05
$76.50
Daily
Bare
Costs
Incl.
O&P
$1036.00
432.00
$40.20
$61.17
$1468.00
$40.20
$61.17
Daily
Bare
Costs
Incl.
O&P
$518.00
409.60
$38.02
$57.98
$927.60
$38.02
$57.98
Daily
Bare
Costs
Incl.
O&P
$542.80
409.60
308.20
$41.27
$63.03
$1260.60
$41.27
$63.03
Daily
Bare
Costs
Incl.
O&P
$1449.60
856.00
143.88
$38.51
$57.64
3.27
3.60
$2449.48
$41.78
$61.24
Daily
Bare
Costs
Incl.
O&P
$1449.60
856.00
460.80
143.88
$38.63
$57.63
2.73
3.00
$2910.28
$41.36
$60.63
Daily
Bare
Costs
Incl.
O&P
$474.80
396.80
93.17
194.70
$37.08
$54.48
16.36
17.99
$1159.47
$53.43
$72.47
Daily
Crew J-4
2 Cement Finishers
1 Laborer
1 Floor Grinder, 550 mm path
1 Floor Edger, 175 mm path
1 Vacuum Pick-Up System
Bare Costs
Hr.
Daily
Hr.
$42.35
35.10
$677.60
280.80
84.70
38.20
59.80
$62.30
54.00
Incl.
Subs O&P
$1141.10
Hr.
Daily
Hr.
$42.35
35.10
$677.60
561.60
84.70
38.20
59.80
178.10
$62.30
54.00
$1600.00
Hr.
Daily
Hr.
$35.10
$280.80
178.10
$54.00
$458.90
Crew J-6
Hr.
Daily
Hr.
2 Painters
1 Building Laborer
1 Equip. Oper. (light)
1 Air Compressor, 0.118 m3/s
1 Sandblaster, portable, 85 L
1 Set Sand Blasting Accessories
$38.25
35.10
44.75
$612.00
280.80
358.00
177.00
20.40
13.35
$57.20
54.00
67.55
$1461.55
Hr.
Daily
Hr.
$44.10
34.35
$352.80
274.80
264.40
$67.85
52.10
$892.00
Crew K-2
Hr.
Daily
Hr.
$51.35
49.35
34.35
$410.80
394.80
274.80
264.40
$91.80
88.25
52.10
$1344.80
Hr.
Daily
Hr.
$51.55
54.60
$412.40
436.80
$77.05
82.35
$849.20
Hr.
Daily
Hr.
$44.10
33.30
$352.80
266.40
$67.85
51.20
$619.20
Hr.
Daily
Hr.
$44.10
51.55
52.15
$352.80
206.20
208.60
$67.85
77.05
79.50
$767.60
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$996.80
432.00
93.17
42.02
65.78
$39.93
$59.53
7.61
8.37
$1629.77
$47.55
$67.91
Daily
Bare
Costs
Incl.
O&P
$996.80
864.00
93.17
42.02
65.78
195.91
$38.73
$58.15
11.28
12.40
$2257.68
$50.00
$70.55
Daily
Bare
Costs
Incl.
O&P
$432.00
195.91
$35.10
22.26
$54.00
24.49
$627.91
$57.36
$78.49
Daily
Bare
Costs
Incl.
O&P
$915.20
432.00
540.40
194.70
22.44
14.69
$39.09
$58.99
6.59
7.24
$2119.43
$45.67
$66.23
Daily
Bare
Costs
Incl.
O&P
$542.80
416.80
290.84
$39.23
$59.98
16.52
18.18
$1250.44
$55.75
$78.15
Daily
Bare
Costs
Incl.
O&P
$734.40
706.00
416.80
290.84
$45.02
$77.38
11.02
12.12
$2148.04
$56.03
$89.50
Daily
Bare
Costs
Incl.
O&P
$616.40
658.80
$53.08
$79.70
$1275.20
$53.08
$79.70
Daily
Bare
Costs
Incl.
O&P
$542.80
409.60
$38.70
$59.52
$952.40
$38.70
$59.52
Daily
Bare
Costs
Incl.
O&P
$542.80
308.20
318.00
$47.98
$73.06
$1169.00
$47.98
$73.06
Daily
821
Crews
Crew No.
Crew L-3A
1 Carpenter Foreman (outside)
.5 Sheet Metal Worker
Bare Costs
Hr.
Daily
Hr.
$46.10
52.15
$368.80
208.60
$70.95
79.50
Incl.
Subs O&P
$577.40
Hr.
Daily
Hr.
$45.40
33.30
$726.40
266.40
$70.20
51.20
$992.80
Crew L-5
Hr.
Daily
Hr.
$51.35
49.35
47.80
$410.80
1974.00
382.40
697.20
$91.80
88.25
72.15
$3464.40
Crew L-5A
Hr.
Daily
Hr.
$51.35
49.35
47.80
$410.80
789.60
382.40
565.20
$91.80
88.25
72.15
$2148.00
Crew L-5B
Hr.
Daily
Hr.
$51.35
49.35
51.55
55.70
47.80
41.25
$410.80
789.60
824.80
891.20
382.40
330.00
1554.00
$91.80
88.25
77.05
84.00
72.15
62.25
$5182.80
Hr.
Daily
Hr.
$54.60
51.55
$436.80
206.20
$82.35
77.05
$643.00
Hr.
Daily
Hr.
$44.10
35.10
51.55
$705.60
280.80
206.20
$67.85
54.00
77.05
$1192.60
Hr.
Daily
Hr.
$44.10
54.60
$705.60
218.40
$67.85
82.35
$924.00
Hr.
Daily
Hr.
$35.60
35.10
49.35
51.55
$284.80
561.60
394.80
206.20
$54.80
54.00
88.25
77.05
$1447.40
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$567.60
318.00
$48.12
$73.80
$885.60
$48.12
$73.80
Daily
Bare
Costs
Incl.
O&P
$1123.20
409.60
$41.37
$63.87
$1532.80
$41.37
$63.87
Daily
Bare
Costs
Incl.
O&P
$734.40
3530.00
577.20
766.92
$49.41
$86.46
12.45
13.70
$5608.52
$61.86
$100.15
Daily
Bare
Costs
Incl.
O&P
$734.40
1412.00
577.20
621.72
$49.46
$85.11
17.66
19.43
$3345.32
$67.13
$104.54
Daily
Bare
Costs
Incl.
O&P
$734.40
1412.00
1232.80
1344.00
577.20
498.00
1709.40
$50.40
$80.53
21.58
23.74
$7507.80
$71.98
$104.28
Daily
Bare
Costs
Incl.
O&P
$658.80
308.20
$53.58
$80.58
$967.00
$53.58
$80.58
Daily
Bare
Costs
Incl.
O&P
$1085.60
432.00
308.20
$42.59
$65.21
$1825.80
$42.59
$65.21
Daily
Crew No.
Incl.
Subs O&P
Crew L-10
Hr.
Daily
Hr.
$51.35
49.35
47.80
$410.80
394.80
382.40
612.00
$91.80
88.25
72.15
$1800.00
Hr.
Daily
Hr.
$35.10
47.80
44.75
$561.60
382.40
358.00
1652.00
281.20
$59.40
72.15
67.55
$3235.20
Hr.
Daily
Hr.
$70.85
56.70
$1700.40
453.60
46.00
$106.15
84.95
$2200.00
Crew M-3
Hr.
Daily
Hr.
$53.55
35.10
46.55
70.85
56.70
$428.40
280.80
93.10
566.80
453.60
129.85
$80.05
54.00
70.25
106.15
84.95
$1952.55
Crew M-4
Hr.
Daily
Hr.
$53.55
35.10
47.80
41.25
70.85
56.70
$428.40
280.80
95.60
82.50
566.80
453.60
166.00
$80.05
54.00
72.15
62.25
106.15
84.95
$2073.70
Hr.
Daily
Hr.
$54.60
43.70
$436.80
349.60
$82.35
65.90
$786.40
Bare
Costs
Incl.
O&P
Crew Q-1A
Hr.
Daily
Hr.
$1085.60
329.40
$46.20
$70.75
$56.60
54.60
$113.20
436.80
$85.35
82.35
$1415.00
$46.20
$70.75
Daily
Bare
Costs
Incl.
O&P
$438.40
864.00
706.00
308.20
$40.21
$64.35
$2316.60
$40.21
Daily
$64.35
$550.00
Hr.
Daily
Hr.
$54.60
43.70
46.55
$436.80
349.60
372.40
2848.00
$82.35
65.90
70.25
822
Bare Costs
$4006.80
Hr.
Daily
Hr.
$54.60
43.70
$873.60
349.60
$82.35
65.90
$1223.20
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$734.40
706.00
577.20
673.20
$49.50
$84.07
25.50
28.05
$2690.80
$75.00
$112.12
Daily
Bare
Costs
Incl.
O&P
$950.40
577.20
540.40
1817.20
309.32
$40.69
$64.63
60.41
66.45
$4194.52
$101.10
$131.08
Daily
Bare
Costs
Incl.
O&P
$2547.60
679.60
50.60
$67.31
$100.85
1.44
1.58
$3277.80
$68.75
$102.43
Daily
Bare
Costs
Incl.
O&P
$640.40
432.00
140.50
849.20
679.60
142.84
$53.61
$80.64
3.82
4.20
$2884.53
$57.43
$84.84
Daily
Bare
Costs
Incl.
O&P
$640.40
432.00
144.30
124.50
849.20
679.60
182.60
$52.99
$79.72
4.61
5.07
$3052.60
$57.60
$84.79
Daily
Bare
Costs
Incl.
O&P
$658.80
527.20
$49.15
$74.13
$1186.00
$49.15
$74.13
Daily
Bare
Costs
Incl.
O&P
$170.70
658.80
$55.00
$82.95
$829.50
$55.00
$82.95
Daily
Bare
Costs
Incl.
O&P
$658.80
527.20
562.00
3132.80
$48.28
$72.83
118.67
130.53
$4880.80
$166.95
$203.37
Daily
Bare
Costs
Incl.
O&P
$1317.60
527.20
$50.97
$76.87
$1844.80
$50.97
$76.87
Daily
Crews
Crew No.
Crew Q-3
1 Plumber Foreman (inside)
2 Plumbers
1 Plumber Apprentice
Bare Costs
Hr.
Daily
Hr.
$55.10
54.60
43.70
$440.80
873.60
349.60
$83.10
82.35
65.90
$1664.00
Hr.
Daily
Hr.
$55.10
54.60
54.60
43.70
$440.80
436.80
436.80
349.60
36.90
$83.10
82.35
82.35
65.90
$1700.90
Hr.
Daily
Hr.
$55.70
44.55
$445.60
356.40
$84.00
67.20
$802.00
Hr.
Daily
Hr.
$55.70
44.55
$891.20
356.40
$84.00
67.20
$1247.60
Hr.
Daily
Hr.
$56.20
55.70
44.55
$449.60
891.20
356.40
$84.75
84.00
67.20
$1697.20
Hr.
Daily
Hr.
$56.20
55.70
55.70
44.55
$449.60
445.60
445.60
356.40
36.90
$84.75
84.00
84.00
67.20
$1734.10
Hr.
Daily
Hr.
$52.15
41.70
$417.20
333.60
$79.50
63.55
Incl.
Subs O&P
$750.80
Hr.
Daily
Hr.
$52.15
41.70
$834.40
333.60
$79.50
63.55
$1168.00
Crew Q-11
Hr.
Daily
Hr.
$52.65
52.15
41.70
$421.20
834.40
333.60
$80.25
79.50
63.55
$1589.20
Hr.
Daily
Hr.
$54.05
43.25
$432.40
346.00
$81.55
65.25
$778.40
Cost
Per Labor-Hour
Crew No.
Bare
Costs
Incl.
O&P
$664.80
1317.60
527.20
$52.00
$78.42
$2509.60
$52.00
$78.42
Daily
Bare
Costs
Incl.
O&P
$664.80
658.80
658.80
527.20
40.59
$52.00
$78.42
1.15
1.27
$2550.19
$53.15
$79.69
Daily
Bare
Costs
Incl.
O&P
$672.00
537.60
$50.13
$75.60
$1209.60
$50.13
$75.60
Daily
Bare
Costs
Incl.
O&P
$1344.00
537.60
$51.98
$78.40
$1881.60
$51.98
$78.40
Daily
Bare
Costs
Incl.
O&P
$678.00
1344.00
537.60
$53.04
$79.99
$2559.60
$53.04
$79.99
Daily
Bare
Costs
Incl.
O&P
$678.00
672.00
672.00
537.60
40.59
$53.04
$79.99
1.15
1.27
$2600.19
$54.19
$81.26
Daily
Bare
Costs
Incl.
O&P
$636.00
508.40
$46.92
$71.53
2 Steamfitters
1 Steamfitter Apprentice
1 Welder, electric, 300 amp
$1144.40
$46.92
$71.53
Daily
Bare
Costs
Incl.
O&P
$1272.00
508.40
$48.67
$74.18
$1780.40
$48.67
$74.18
Daily
Bare
Costs
Incl.
O&P
$642.00
1272.00
508.40
$49.66
$75.70
$2422.40
$49.66
$75.70
Daily
Bare
Costs
Incl.
O&P
$652.40
522.00
$48.65
$73.40
$1174.40
$48.65
$73.40
Daily
Crew Q-13
Crew Q-14
1 Asbestos Worker
1 Asbestos Apprentice
Bare Costs
Hr.
Daily
Hr.
$54.55
54.05
43.25
$436.40
864.80
346.00
$82.30
81.55
65.25
$1647.20
Hr.
Daily
Hr.
$48.85
39.10
$390.80
312.80
$76.10
60.90
$703.60
Hr.
Daily
Hr.
$54.60
43.70
$436.80
349.60
36.90
$82.35
65.90
$823.30
Hr.
Daily
Hr.
$54.60
43.70
$873.60
349.60
36.90
$82.35
65.90
$1260.10
Hr.
Daily
Hr.
$55.70
44.55
$445.60
356.40
36.90
$84.00
67.20
$838.90
Hr.
Daily
Hr.
$55.70
44.55
47.80
$445.60
356.40
382.40
612.00
36.90
$84.00
67.20
72.15
Crew Q-19
1 Steamfitter
1 Steamfitter Apprentice
1 Electrician
$1833.30
Hr.
Daily
Hr.
$55.70
44.55
$891.20
356.40
36.90
$84.00
67.20
$1284.50
Hr.
Daily
Hr.
$55.70
44.55
51.55
$445.60
356.40
412.40
$84.00
67.20
77.05
$1214.40
Hr.
Daily
Hr.
$52.15
41.70
51.55
$417.20
333.60
206.20
$79.50
63.55
77.05
Incl.
Subs O&P
$957.00
Hr.
Daily
Hr.
$55.70
44.55
51.55
$891.20
356.40
412.40
$84.00
67.20
77.05
$1660.00
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$658.40
1304.80
522.00
$51.48
$77.66
$2485.20
$51.48
$77.66
Daily
Bare
Costs
Incl.
O&P
$608.80
487.20
$43.98
$68.50
$1096.00
$43.98
$68.50
Daily
Bare
Costs
Incl.
O&P
$658.80
527.20
40.59
$49.15
$74.13
2.31
2.54
$1226.59
$51.46
$76.66
Daily
Bare
Costs
Incl.
O&P
$1317.60
527.20
40.59
$50.97
$76.87
1.54
1.69
$1885.39
$52.50
$78.56
Daily
Bare
Costs
Incl.
O&P
$672.00
537.60
40.59
$50.13
$75.60
2.31
2.54
$1250.19
$52.43
$78.14
Daily
Bare
Costs
Incl.
O&P
$672.00
537.60
577.20
673.20
40.59
$49.35
$74.45
27.04
29.74
$2500.59
$76.39
$104.19
Daily
Bare
Costs
Incl.
O&P
$1344.00
537.60
40.59
$51.98
$78.40
1.54
1.69
$1922.19
$53.52
$80.09
Daily
Bare
Costs
Incl.
O&P
$672.00
537.60
616.40
$50.60
$76.08
$1826.00
$50.60
$76.08
Daily
Bare
Costs
Incl.
O&P
$636.00
508.40
308.20
$47.85
$72.63
$1452.60
$47.85
$72.63
Daily
Bare
Costs
Incl.
O&P
$1344.00
537.60
616.40
$51.88
$78.06
$2498.00
$51.88
$78.06
Daily
823
Crews
Crew No.
Crew Q-22
1 Plumber
1 Plumber Apprentice
1 Hyd. Crane, 11 metric ton
Bare Costs
Hr.
Daily
Hr.
$54.60
43.70
$436.80
349.60
612.00
$82.35
65.90
$1398.40
Hr.
Daily
Hr.
$54.60
43.70
35.10
47.80
$436.80
349.60
280.80
382.40
612.00
$82.35
65.90
54.00
72.15
$2061.60
Hr.
Daily
Hr.
$56.60
54.60
46.55
$452.80
436.80
372.40
950.65
$85.35
82.35
70.25
$2212.65
Hr.
Daily
Hr.
$52.05
51.55
33.30
$416.40
1237.20
532.80
$77.80
77.05
51.20
$2186.40
Hr.
Daily
Hr.
$51.55
33.30
$412.40
266.40
$77.05
51.20
$678.80
Hr.
Daily
Hr.
$52.05
51.55
33.30
47.80
$416.40
1237.20
532.80
382.40
264.60
$77.80
77.05
51.20
72.15
Incl.
Subs O&P
$2833.40
Hr.
Daily
Hr.
$52.05
51.55
47.80
$416.40
412.40
191.20
132.30
$77.80
77.05
72.15
$1152.30
Crew R-4
Hr.
Daily
Hr.
$51.35
49.35
51.55
$410.80
1184.40
412.40
121.60
$91.80
88.25
77.05
$2129.20
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$658.80
527.20
673.20
$49.15
$74.13
38.25
42.08
$1859.20
$87.40
$116.20
Daily
Bare
Costs
Incl.
O&P
$658.80
527.20
432.00
577.20
673.20
$45.30
$68.60
19.13
21.04
$2868.40
$64.42
$89.64
Daily
Bare
Costs
Incl.
O&P
$682.80
658.80
562.00
1045.71
$52.58
$79.32
39.61
43.57
$2949.32
$92.19
$122.89
Daily
Bare
Costs
Incl.
O&P
$622.40
1849.20
819.20
$45.55
$68.56
$3290.80
$45.55
$68.56
Daily
Bare
Costs
Incl.
O&P
$616.40
409.60
$42.42
$64.13
$1026.00
$42.42
$64.13
Daily
Bare
Costs
Incl.
O&P
$622.40
1849.20
819.20
577.20
291.06
$45.87
$69.07
4.72
5.20
$4159.06
$50.60
$74.27
Daily
Bare
Costs
Incl.
O&P
$622.40
616.40
288.60
145.53
$51.00
$76.37
6.62
7.28
$1672.93
$57.62
$83.65
Daily
Bare
Costs
Incl.
O&P
$734.40
2118.00
616.40
133.76
$50.19
$86.72
3.04
3.34
$3602.56
$53.23
$90.06
Daily
Crew No.
Incl.
Subs O&P
Crew R-5
Hr.
Daily
Hr.
1 Electrician Foreman
4 Electrician Linemen
2 Electrician Operators
4 Electrician Groundmen
1 Crew Truck
1 Flatbed Truck, 9200 kg GVW
1 Pickup Truck, 0.7 MT
.2 Hyd. Crane, 50 metric ton
.2 Hyd. Crane, 11 metric ton
.2 Earth Auger, Truck-Mtd.
1 Tractor w/Winch
$52.05
51.55
51.55
33.30
$416.40
1649.60
824.80
1065.60
182.40
215.80
127.00
220.00
122.40
80.68
382.20
$77.80
77.05
77.05
51.20
$5286.88
Crew R-6
Hr.
Daily
Hr.
1 Electrician Foreman
4 Electrician Linemen
2 Electrician Operators
4 Electrician Groundmen
1 Crew Truck
1 Flatbed Truck, 9200 kg GVW
1 Pickup Truck, 0.7 MT
.2 Hyd. Crane, 50 metric ton
.2 Hyd. Crane, 11 metric ton
.2 Earth Auger, Truck-Mtd.
1 Tractor w/Winch
3 Cable Trailers
.5 Tensioning Rig
.5 Cable Pulling Rig
$52.05
51.55
51.55
33.30
$416.40
1649.60
824.80
1065.60
182.40
215.80
127.00
220.00
122.40
80.68
382.20
563.70
186.88
1092.50
$77.80
77.05
77.05
51.20
$7129.95
Hr.
Daily
Hr.
$52.05
33.30
$416.40
1332.00
182.40
$77.80
51.20
$1930.80
Hr.
Daily
Hr.
$52.05
51.55
33.30
$416.40
1237.20
532.80
127.00
182.40
$77.80
77.05
51.20
$2495.80
Hr.
Daily
Hr.
$52.05
51.55
51.55
33.30
$416.40
412.40
824.80
1065.60
127.00
182.40
$77.80
77.05
77.05
51.20
824
Bare Costs
$3028.60
Hr.
Daily
Hr.
$52.05
51.55
33.30
$416.40
1649.60
266.40
182.40
345.90
$77.80
77.05
51.20
$2860.70
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$622.40
2465.60
1232.80
1638.40
200.64
237.38
139.70
242.00
134.64
88.75
420.42
$44.96
$67.72
15.12
16.63
$7422.73
$60.08
$84.35
Daily
Bare
Costs
Incl.
O&P
$622.40
2465.60
1232.80
1638.40
200.64
237.38
139.70
242.00
134.64
88.75
420.42
620.07
205.56
1201.75
$44.96
$67.72
36.06
39.67
$9450.11
$81.02
$107.39
Daily
Bare
Costs
Incl.
O&P
$622.40
2048.00
200.64
$36.42
$55.63
3.80
4.18
$2871.04
$40.23
$59.81
Daily
Bare
Costs
Incl.
O&P
$622.40
1849.20
819.20
139.70
200.64
$45.55
$68.56
6.45
7.09
$3631.14
$52.00
$75.65
Daily
Bare
Costs
Incl.
O&P
$622.40
616.40
1232.80
1638.40
139.70
200.64
$42.49
$64.22
4.83
5.32
$4450.34
$47.32
$69.54
Daily
Bare
Costs
Incl.
O&P
$622.40
2465.60
409.60
200.64
380.49
$48.59
$72.87
11.01
12.11
$4078.73
$59.60
$84.97
Daily
Crews
Crew No.
Crew R-11
1 Electrician Foreman
4 Electricians
1 Equip. Oper. (crane)
1 Common Laborer
1 Crew Truck
1 Hyd. Crane, 11 metric ton
Bare Costs
Hr.
Daily
Hr.
$52.05
51.55
47.80
35.10
$416.40
1649.60
382.40
280.80
182.40
612.00
$77.80
77.05
72.15
54.00
$3523.60
Hr.
Daily
Hr.
$44.60
44.10
35.10
46.55
49.35
$356.80
1411.20
1123.20
372.40
394.80
1243.00
127.00
$68.65
67.85
54.00
70.25
88.25
$5028.40
Hr.
Daily
Hr.
$52.05
51.55
47.80
41.25
$416.40
1237.20
95.60
330.00
177.90
$77.80
77.05
72.15
62.25
$2257.10
Hr.
Daily
Hr.
$52.05
51.55
44.75
$416.40
1649.60
358.00
324.20
$77.80
77.05
67.55
$2748.20
Hr.
Daily
Hr.
$52.05
51.55
33.30
$104.10
412.40
532.80
$77.80
77.05
51.20
$1049.30
Hr.
Daily
Hr.
$52.05
51.55
$208.20
824.80
$77.80
77.05
$1033.00
Hr.
Daily
Hr.
$52.05
51.55
46.55
$416.40
1237.20
37.24
56.52
$77.80
77.05
70.25
Incl.
Subs O&P
$1747.36
Hr.
Daily
Hr.
$52.05
33.30
51.55
$274.82
532.80
824.80
$77.80
51.20
77.05
$1632.42
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$622.40
2465.60
577.20
432.00
200.64
673.20
$48.74
$73.16
14.19
15.60
$4971.04
$62.92
$88.77
Daily
Bare
Costs
Incl.
O&P
$549.20
2171.20
1728.00
562.00
706.00
1367.30
139.70
$41.57
$64.96
15.57
17.13
$7223.40
$57.14
$82.08
Daily
Bare
Costs
Incl.
O&P
$622.40
1849.20
144.30
498.00
195.69
$49.50
$74.14
4.24
4.66
$3309.59
$53.74
$78.80
Daily
Bare
Costs
Incl.
O&P
$622.40
2465.60
540.40
356.62
$50.50
$75.59
6.75
7.43
$3985.02
$57.25
$83.02
Daily
Bare
Costs
Incl.
O&P
$155.60
616.40
819.20
$40.36
$61.20
$1591.20
$40.36
$61.20
Daily
Bare
Costs
Incl.
O&P
$311.20
1232.80
$51.65
$77.20
$1544.00
$51.65
$77.20
Daily
Bare
Costs
Incl.
O&P
$622.40
1849.20
56.20
62.17
$51.55
$77.07
1.72
1.90
$2589.97
$53.27
$78.96
Daily
Bare
Costs
Incl.
O&P
$410.78
819.20
1232.80
$43.79
$66.06
$2462.78
$43.79
$66.06
Daily
Crew No.
Bare Costs
Incl.
Subs O&P
Crew R-30
Hr.
Daily
Hr.
$53.55
51.55
35.10
$107.10
412.40
561.60
$80.05
77.05
54.00
$1081.10
Hr.
Daily
Hr.
$51.55
$412.40
47.00
$77.05
$459.40
Hr.
Daily
Hr.
$56.60
54.60
35.10
$226.40
436.80
280.80
$85.35
82.35
54.00
$944.00
Cost
Per Labor-Hour
Bare
Costs
Incl.
O&P
$160.10
616.40
864.00
$41.58
$63.10
$1640.50
$41.58
$63.10
Daily
Bare
Costs
Incl.
O&P
$616.40
51.70
$51.55
5.88
$77.05
6.46
$668.10
$57.42
$83.51
Daily
Bare
Costs
Incl.
O&P
$341.40
658.80
432.00
$47.20
$71.61
$1432.20
$47.20
$71.61
Daily
825