ANNEX 2-17 IMPACT MANAGEMENT PLAN (IMP) TEMPLATE IMPACT MANAGEMENT PLAN (IMP) TEMPLATE

Project Phase / Environmental Aspect (Project Activity Which Will Likely Impact the Environmental Component)
I. PRE-CONSTRUCTION PHASE Environmental Aspect # 1 Environmental Aspect # 4 II. CONSTRUCTION PHASE Environmental Aspect # 1 Environmental Aspect # 2 Environmental Aspect # 3 Environmental Aspect # 4 III. OPERATION PHASE Environmental Aspect # 1 Environmental Aspect # 2 Environmental Aspect # 3 Environmental Aspect # 4 IV. ABANDONMENT PHASE Environmental Aspect # 1 Environmental Aspect # 2 Environmental Aspect # 3 Environmental Aspect # 4

Environmental Component Likely to be Affected


(include only applicable modules ) A. The Land B. The People (include only applicable modules) A. The Land B. The Water C. The Air D. The People (include only applicable modules) A. The Land B. The Water C. The Air D. The People (include only applicable modules) A. The Land B. The Water C. The Air D. The People

Potential Impact

Options for Prevention or Mitigation* or Enhancement

Responsible Entity

Cost

Guarantee / Financial Arrangements

162

*At the FS/pre-ECC stage, mitigation measures shall aim to comply with air/water environmental standards which is the 3 rd or limit level in the EMB system of management and monitoring of Environmental Quality Performance. The Proponent is referred to the Technical Procedures Handbook of the SEPMES Project available with the EMB on the technical details of EQPLs. See Annex 220 on Environmental Monitoring Plan with Environmental Quality Performance Levels for the formulation of the EQPL scheme.