TUTE-5

Q1. The Tit-Fit Scientific Laboratories is engaged in producing different types of high equipment for use in science laboratories. The company has two different assembly lines to produce its most popular product 'Pressurex'. The processing time for each of the assembly lines is regarded as a random variable and is described by the following distributions.
Process Time (minutes)
10 11 12 13 14

Assembly A1
0.10 0.15 0.40 0.25 0.10

Assembly A2
0.20 0.40 0.20 0.15 0.05

Using the following random numbers, generate data on the process times for 15 units of the item compute the expected process time for the product. For the purpose, read the numbers vertically taking first two digits for the processing time on assembly A1 and the last two digits for processing time on assembly
4134 7476 4943 8343 1183 1915 3602 9445 5415 7505 0089 0880 7428 3424 9309

Q.2 A company manufactures around 150 mopeds. The daily production varies from 146 to 154 depending upon the availability of raw materials and other working conditions. Production per Day Probability 146 0.04 147 0.09 148 0.12 149 0.14 150 0.11 151 0.10 152 0.20 153 0.12 154 0.08 The finished mopeds are transported in a specially arranged lorry accommodating only 150 mopeds. Using following random numbers 80, 81, 76, 75, 64, 43,18,26,10,12,65,68,69,61,57, simulate the process to find out: (i) (ii) What will be the average number of mopeds waiting in the factory? What will be the average number of empty spaces on the lorry?

You might also like