No : AAPRPY8195PST001
Water system facility consisting of cooling tower and pump house at SBM site VSP
WO no: SO: 3503/12-13/759-A dated : 04-01-2013
Invoice raised to M/S TECHNOFAB ENGINEERING Ltd
ABSTRACT
S.NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
DESCRIPTION
Excavation 0 to - 1500 level
Excavation - 1500 to -1500 level
Backfilling
Pcc
RCC level +0.00 to +4.00 M
RCC level +4.00 to +8.00 M
Footing GP2 Grouting
Shuttering +0.00 to +4.00 M
Shuttering +4.00 to +8.00 M
Steel 0.00 to +4.00
Steel +4.00 to +8.00
Paving M-15 with 100 mm & down aggregate
Plastering Internal Wall 3% waterproofing
Bitumen Paint
Chipping
Cement Wash for Cooling Tower DCW
Louvre Concreting RCC M25 Including Scaffolding,
17 (outside)
18 Rod Cutting
UNITS
RATE
QTY
M
M3
M3
M3
M3
M3
M3
M2
M2
MT
MT
M3
M2
M2
M3
M2
200.00
250.00
120.00
5000.00
7000.00
7500.00
23500.00
350.00
650.00
7500.00
8500.00
6500.00
350.00
90.00
2000.00
100.00
42.000
44.800
128.628
2.002
12.496
5.566
1.283
73.240
140.745
3.962
1.418
8.937
834.415
50.945
11.200
473.200
8,400.00
11,200.00
15,435.36
10,010.00
87,472.00
41,745.00
30,150.50
25,634.00
91,484.25
29,715.00
12,053.00
58,090.50
292,045.25
4,585.05
22,400.00
47,320.00
M3
NOS
9500.00
50.00
TOTAL
17.014
20.000
161,633.00
1,000.00
950,372.91
117,466.09
1,067,839.00
AMOUNT