*MANPOWER STATUS
DESCRIPTION
NO.
PREVIOUS
TOTAL
Manhours
SURVEYOR
M/D
257
2595
10
2605
GENERAL FORMAN
M/D
206
2080
10
2090
FOREMAN
M/D
265
2646
10
2656
LEAD MAN
M/D
1207
12204
70
12274
CLADDING FORMAN
M/D
133
STEEL ERECTOR
M/D
4760
RIGGERS
M/D
1047
WELDER
M/D
LABOR /HELPER
M/D
10
FLAGMAN
M/D
132
1350
30
1380
11
SCAFFOLDER
M/D
740
7610
50
7660
12
ClLADDING INSTALLER
M/D
70
4990
50
5040
13
DRIVER
M/D
213
3246
14
M/D
1769
17990
15
TRUCK OPERATOR
M/D
16
M/D
309
17
CRANE OPERATOR
M/D
18
M/D
DIRECT SUBTOTAL
TOTAL MANPOWER(DIRECT+INDIRECT)
291
267
232
245
282
280
254
297
54
139
211
144
245
127
127
2506
632
2747
2661
2278
2243
2044
2486
1910
2986
560
1400
1976
1312
2466
1280
1280
29505
UNIT
144
114
EXPAT
SAUDI
Manhour
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
SAUDI
Total
Manhours
INDIRECT
SITE MANAGER
HSE MANAGER
SENIOR CONSTRUCTION ENGINEER
MECHANICAL QA/QC INSPECTOR
PURCHASING OFFICER
PUBLIC RELATION OFFICER
QA/QC SUPERVISOR
SAFETY OFFICER
SAFETY ASSISTANT
SECRETARY
DOCUMENT CONTROLLER
QA/QC ASSISTANT
STORE KEEPER/TIME KEEPER
MALE NURSE
OFFICE BOY
INDIRECT SUBTOTAL
DIRECT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
UNIT
EXPAT /
total
days
1
1
1
1
1
1
1
1
1
1
1
1
1
1
11
EXPAT
3
LOCAL
10
10
10
10
0
8
10
10
8
10
8
0
10
10
10
124
TOTAL
2757
2671
2288
2253
2044
2494
1920
2996
568
1410
1984
1312
2476
1290
1290
29753
910
910
49648
20
200
49848
10760
40
10800
0
0
18
3264
70
18060
3135
10
3145
1256
12895
40
12935
12364
258
0
132,059
161,564
61
608
0
132,667
162,420
DESCRIPTION
QTY
*EQUIPMENT STATUS
S.No.
NAMES
Today hours
TOTAL
CRANES (XCMG)
25 TON
234
2358
10
2368
CRANES (SANY)
100TON
263
2620
2620
3
4
5
6
7
8
9
10
11
12
13
14
15
16
CRANES (SANY)
CRANES (XCMG)
CRANES(XCMG)
FORK LIFTS
FORK LIFTS
MAN LIFT
MAN LIFT
MAN LIFT
MAN LIFT
POWER GENERATOR
AIR COMPRESSOR
HEAVY TRUCK
WELDING MACHINE
FUIL TANK
75TON
70 TON
50 TON
16 TON
7 TON
40 M. Ht..
38 M. Ht..
27 M.Ht.
20 M.Ht.
150 KVA
Benzene Type
12 m.
1
0
2
0
1
2
3
4
0
1
2
235
213
482
102
253
557
430
807
118
213
264
2358
2120
4617
1030
2520
4170
4340
8040
1180
2070
2660
10
0
20
0
10
20
30
40
0
10
20
2368
2120
4637
1030
2530
4190
4370
8080
1180
2080
2680
17
18
WATER TANK
POWER GENERATOR
6 m3
50 KVA
QA/QC
SITE MANAGER
Ahmad Ghazal
Nabeel Al-Share
ASHRAF
M.YOUSEF
HIGH WIND
Weather
Temperature
1. Manpower Status
2. Safety Mileage
Today
Category
Indirect
Category
HSE Manager
Irfan Ahmed
M/H
Direct
IBSF
Others
Total
4. Work Activities
Actual OF 03 JUL 2013
Steel Erection, Alignment, Finishing works Steel Erection, Alignment, Finishing works and
and Mat'ls Unloading
Mat'ls Unloading
SL#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
GRIDLINE
PIECE MARK #
QA/QC
SITE MANAGER
Ahmad Ghazal
Nabeel AlShare
ASHRAF
M.YOUSEF
13-September-2012
Weather
Temperature
1. Manpower Status
2. Safety Mileage
Today
Category
Category
Indirect
IBSF
Others
Total
4. Work Activities
SL#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
GRIDLINE
A/E 26/27
A/E 27/28
A/E 27/28
A/E 27/28
A/E 27/28
A/E 11/12
A/E 11/12
A/E 11/12
A/E 12/13
A/E 12/13
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 12/13
A/E 12/13
A/E 12/13
A/E 12/13
A/E 32/33
A/E 32/33
A/E 33/34
A/E 31/32
PU 70
PU 71
PU 72
PU 69
PU 70
SR 27
SR 28
SR 32
SR 32
SR 27
SR 29
SR 27
SR 38
SR 32
SR 29
SA 12
SA 13
SA 14
SA 16
SA 12
SA 13
SA 14
SA 16
PU 61
SR 29
PU 70
SR 29
PIECE MARK #
(6 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(12 PCS)
(16 PCS)
(2 PCS)
(2 PCS)
(2 PCS)
(2 PCS)
(16 PCS)
(26 PCS)
(16 PCS)
(2 PCS)
(2 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(7 PCS)
(6 PCS)
(2 PCS)
(6 PCS)
S.No.
Description
Total
Qty.
COLUMNS
254.640
228.497
228.497
26.143
89.73%
254.640
254.640
TRUSS FRAMES
370.440
324.560
324.560
45.880
87.61%
370.440
370.440
BEAMS
93.800
78.139
78.139
15.661
83.30%
93.400
93.400
53.880
42.627
42.627
11.253
79.11%
53.850
53.850
ROOF STRUTS
95.200
74.217
74.217
20.983
77.96%
95.020
95.020
VERTICAL BRACE
21.820
13.212
13.212
8.608
60.55%
21.730
21.730
ANGLES
16.520
9.980
9.980
6.540
60.41%
16.520
16.520
FASTENER
16.300
11.410
11.410
4.890
70.00%
16.290
16.290
MISC.
1.220
1.220
1.220
3.324
3.324
4.696
41.45%
8.020
8.020
11
GIRT
65.940
31.164
31.164
34.776
47.26%
65.940
65.940
12
SAG RODS
8.950
5.835
6.031
2.919
67.39%
8.910
8.910
13
FRAME
12.230
11.694
11.694
0.536
95.62%
12.230
12.230
14
POST
8.500
7.088
7.088
1.412
83.39%
8.500
8.500
15
JACK BEAM
5.320
1.071
1.071
4.249
20.13%
5.320
5.320
16
RAFTER
7.790
2.036
#REF!
#REF!
#REF!
7.790
7.790
17
PURLINS
160.560
122.860
125.560
35.000
78.20%
160.560
160.560
18
Grating
17.620
0.034
0.034
17.586
0.19%
17.620
17.620
19
Handrails
12.410
3.028
3.028
9.382
24.40%
11.450
11.450
20
Safety Gate
0.090
0.020
0.020
21
Ladder
1.980
0.917
0.917
1.063
46.31%
1.980
1.980
22
Bracket
1.910
1.365
1.365
0.545
71.47%
1.910
1.910
#REF!
#REF!
ANCHOR BOLT
973.058
0.000
26.470
26.470
0.875
1,233.360
100.00%
0.000
1233.360
26.470
26.470
3.900
3.900
4.920
4.920
44.610
44.610
CLADDING MATERIALS.
24
3.900
25
Trims
4.930
26
Roof Panel
44.610
27
15.840
15.840
15.840
28
7.130
7.130
7.130
#######
22.410
49.755
102.870
102.870
#REF!
1,336.230
1336.230
AS OF 03 JUL 2013
2. COKE STORAGE BUILDING ERECTION & DELIVERY
PREVIOUSEL
Y ERECTED
TODAY
Erected
TOTAL
Erected
S.No.
Description
Total Qty.
1
2
3
4
5
6
COLUMNS
TRUSS FRAMES
BEAMS
ROOF HORIZONTAL BRACE
FLANGE BRACE
VERTICAL BRACE
Rafter
ROOF STRUTS
ANGLES
FASTENER
MISC.
CF-CHANNELS / EAVE STRUTS
GIRT
SAG RODS
FRAME
POST
JACK BEAM
PURLINS
1011.350
1237.430
139.190
136.030
32.100
91.060
13.880
376.860
12.210
43.750
13.500
12.760
174.340
19.910
17.910
9.450
4.160
335.670
823.720
1016.210
59.629
98.951
7.063
50.550
Grating
Handrails
Safety Gate
Ladder
Bracket
43.340
0.000
0.000
23.860
0.000
0.160
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
24.76%
48.74%
36.26%
43.80%
37.52%
376.620
11.220
43.750
13.480
9.410
137.190
19.910
8.960
4.430
64.99%
322.610
322.610
41.750
41.750
0.000
22.760
22.760
0.000
0.000
0.110
0.110
2.710
0.000
0.000
1.360
1.360
1.570
0.346
0.346
ANCHOR BOLT
53.990
3.160
84.972
7.024
7.844
3.546
0.000
215.441
2,696.988
0.196
2.700
2.968
53.99
297.410
2.164
19.030
79.450
10.046
24.720
81.45%
82.12%
42.84%
72.74%
22.00%
55.51%
0.00%
78.92%
17.72%
43.50%
3.160
84.972
7.220
7.844
3.546
0.000
218.141
9.600
89.368
12.690
10.066
5.904
117.529
TOTAL
Delivered
376.620
11.220
43.750
13.480
9.410
137.190
19.910
8.960
4.430
0.072
187.630
221.220
79.561
37.079
25.037
40.510
DELIVERY
TODAY
898.690
1087.600
81.920
131.930
23.800
86.470
297.410
2.092
19.03
823.720
1016.210
59.629
98.951
7.063
50.550
DELIVERY AS OF
yesterday
898.690
1087.600
81.920
131.930
23.800
86.470
Remaining Qty.
Progress %
to Erect
1.224
2699.956 1,053.244
53.990
0.000
22.04%
1.190
71.94%
3,325.160
100.00%
53.990
1.190
0.000
3325.160
53.990
CLADDING MATERIALS.
24
25
26
27
28
29
0.740
0.740
0.740
11.480
12.330
12.330
9.160
9.160
9.160
86.390
89.510
89.510
39.050
44.260
44.260
95.870
96.700
96.700
242.690
4049.880
252.700
3631.850
252.700
3631.850
2,750.978
2.968
2753.946 1,295.934
68.00%
0.000
CLADDING
MATERIALS.
ROOF PANEL
SIDE WALL PANEL
END WALL PANEL
Angles For Sheeting
Trims
GUTTER
TODAY
Installed
PREVIOUSELY TOTAL
Installed
Installed
Remaining Qty.
to Install
Progress DELIVERY
%
Status M.T.
7.130
21046.31
6709.73
2715.02
3.900
N/A
3.900
4.930
N/A
4.920
590 L.M.
590 L.M.
44.610
15.840
76.410
15,725.080
15,725.080
5,321.230
74.72%
44.610
15.840
7.130
CLADDING
MATERIALS.
ROOF PANEL
SIDE WALL PANEL
END WALL PANEL
Angles For Sheeting
Trims
GUTTER
TOTAL CLADDING
TODAY
Installed
PREVIOUSELY TOTAL
Installed
Installed
Remaining Qty.
to Install
Progress DELIVERY
%
Status M.T.
96.700
41686
7097.82
5153.3
0.740
N/A
0.740
11.480
N/A
11.480
89.510
44.260
326.26
6,941.395
7,267.655
34,418.345
21.12%
86.390
39.050
95.870
1030 L. M.
233.530