DAILY MANPOWER/EQUIPEMENTS REPORT

*MANPOWER STATUS

Wednesday, July 03, 2013

DESCRIPTION

NO.

PREVIOUS
TOTAL
Manhours

SURVEYOR

M/D

257

2595

10

2605

GENERAL FORMAN

M/D

206

2080

10

2090

FOREMAN

M/D

265

2646

10

2656

LEAD MAN

M/D

1207

12204

70

12274

CLADDING FORMAN

M/D

133

STEEL ERECTOR

M/D

4760

RIGGERS

M/D

1047

WELDER

M/D

LABOR /HELPER

M/D

10

FLAGMAN

M/D

132

1350

30

1380

11

SCAFFOLDER

M/D

740

7610

50

7660

12

ClLADDING INSTALLER

M/D

70

4990

50

5040

13

DRIVER

M/D

213

3246

14

MAN LIFT OPERATOR

M/D

1769

17990

15

TRUCK OPERATOR

M/D

16

FORK LIFT OPERATOR

M/D

309

17

CRANE OPERATOR

M/D

18

WATER TANK DRIVER

M/D

DIRECT SUBTOTAL
TOTAL MANPOWER(DIRECT+INDIRECT)

291
267
232
245
282
280
254
297
54
139
211
144
245
127
127
2506

632

2747
2661
2278
2243
2044
2486
1910
2986
560
1400
1976
1312
2466
1280
1280
29505

UNIT

144

114

EXPAT

SAUDI

Manhour

M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D

SAUDI

Total
Manhours

INDIRECT
SITE MANAGER
HSE MANAGER
SENIOR CONSTRUCTION ENGINEER
MECHANICAL QA/QC INSPECTOR
PURCHASING OFFICER
PUBLIC RELATION OFFICER
QA/QC SUPERVISOR
SAFETY OFFICER
SAFETY ASSISTANT
SECRETARY
DOCUMENT CONTROLLER
QA/QC ASSISTANT
STORE KEEPER/TIME KEEPER
MALE NURSE
OFFICE BOY
INDIRECT SUBTOTAL
DIRECT

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

UNIT

EXPAT /
total
days

1
1
1
1
1
1
1
1
1
1
1
1
1
1
11
EXPAT

3
LOCAL

10
10
10
10
0
8
10
10
8
10
8
0
10
10
10
124
TOTAL

2757
2671
2288
2253
2044
2494
1920
2996
568
1410
1984
1312
2476
1290
1290
29753

910

910

49648

20

200

49848

10760

40

10800
0
0

18

3264

70

18060

3135

10

3145

1256

12895

40

12935

12364

258

0
132,059
161,564

61

608

0
132,667
162,420

DESCRIPTION

QTY

*EQUIPMENT STATUS

S.No.

NAMES

TOTAL Days previous


Hours.

Today hours

TOTAL

CRANES (XCMG)

25 TON

234

2358

10

2368

CRANES (SANY)

100TON

263

2620

2620

3
4
5
6
7
8
9
10
11
12
13
14
15
16

CRANES (SANY)
CRANES (XCMG)
CRANES(XCMG)
FORK LIFTS
FORK LIFTS
MAN LIFT
MAN LIFT
MAN LIFT
MAN LIFT
POWER GENERATOR
AIR COMPRESSOR
HEAVY TRUCK
WELDING MACHINE
FUIL TANK

75TON
70 TON
50 TON
16 TON
7 TON
40 M. Ht..
38 M. Ht..
27 M.Ht.
20 M.Ht.
150 KVA
Benzene Type
12 m.

1
0
2
0
1
2
3
4
0
1
2

235
213
482
102
253
557
430
807
118
213
264

2358
2120
4617
1030
2520
4170
4340
8040
1180
2070
2660

10
0
20
0
10
20
30
40
0
10
20

2368
2120
4637
1030
2530
4190
4370
8080
1180
2080
2680

17
18

WATER TANK
POWER GENERATOR

6 m3
50 KVA

YASREF / TECHINT-SP-3, YANBU


SULFUR STORAGE BUILDING

J-3255 C Daily Progress Report


DATE
13-September-2012

Senior Site Engineer

QA/QC

SITE MANAGER

Ahmad Ghazal

Nabeel Al-Share

ASHRAF
M.YOUSEF

HIGH WIND

Weather
Temperature

1. Manpower Status

2. Safety Mileage

Today

Category
Indirect

Category

HSE Manager

Irfan Ahmed

3. Major Areas of Concerns

M/H

Direct

IBSF

SULFUR STORAGE BUILDING ERECTION

Others

Total

4. Work Activities
Actual OF 03 JUL 2013

Plan for 04 JULY 2013

Steel Erection, Alignment, Finishing works Steel Erection, Alignment, Finishing works and
and Mat'ls Unloading
Mat'ls Unloading
SL#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

GRIDLINE

PIECE MARK #

YASREF / TECHINT-SP-3, YANBU


COKE STORAGE BUILDING

J-3255 B Daily Progress Report


DATE
Senior Site Engineer

QA/QC

SITE MANAGER

Ahmad Ghazal

Nabeel AlShare

ASHRAF
M.YOUSEF

13-September-2012
Weather
Temperature

1. Manpower Status

2. Safety Mileage

Today
Category

Category

3. Major Areas of Concerns


M/H

Indirect

COKE STORAGE BUILDING


ERECTION

IBSF
Others

Total

4. Work Activities

SL#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

Actual OF 03 JUN 2013

Plan for 04 JULY 2013

Steel Erection,Truss Assembly and


Mat'ls Unloading

Steel Erection,Truss Assembly and


Mat'ls Unloading

GRIDLINE
A/E 26/27
A/E 27/28
A/E 27/28
A/E 27/28
A/E 27/28
A/E 11/12
A/E 11/12
A/E 11/12
A/E 12/13
A/E 12/13
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 13/14
A/E 12/13
A/E 12/13
A/E 12/13
A/E 12/13
A/E 32/33
A/E 32/33
A/E 33/34
A/E 31/32

PU 70
PU 71
PU 72
PU 69
PU 70
SR 27
SR 28
SR 32
SR 32
SR 27
SR 29
SR 27
SR 38
SR 32
SR 29
SA 12
SA 13
SA 14
SA 16
SA 12
SA 13
SA 14
SA 16
PU 61
SR 29
PU 70
SR 29

PIECE MARK #
(6 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(12 PCS)
(16 PCS)
(2 PCS)
(2 PCS)
(2 PCS)
(2 PCS)
(16 PCS)
(26 PCS)
(16 PCS)
(2 PCS)
(2 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(1 PCS)
(7 PCS)
(6 PCS)
(2 PCS)
(6 PCS)

J-3255C, DAILY PROGRESS REPORT


AS OF 03 JUL 2013
1. SULFUR STORAGE BUILDING ERECTION & DELIVERY
PREVIOUSE TODA
Remaining
DELIVER
TOTAL
Progres
DELIVER TOTAL
LY
Y
Qty. to
Y AS OF
Erected
s%
Y TODAY Delivered
ERECTED Erected
Erect
yesterday

S.No.

Description

Total
Qty.

COLUMNS

254.640

228.497

228.497

26.143

89.73%

254.640

254.640

TRUSS FRAMES

370.440

324.560

324.560

45.880

87.61%

370.440

370.440

BEAMS

93.800

78.139

78.139

15.661

83.30%

93.400

93.400

ROOF HORIZONTAL BRACE

53.880

42.627

42.627

11.253

79.11%

53.850

53.850

ROOF STRUTS

95.200

74.217

74.217

20.983

77.96%

95.020

95.020

VERTICAL BRACE

21.820

13.212

13.212

8.608

60.55%

21.730

21.730

ANGLES

16.520

9.980

9.980

6.540

60.41%

16.520

16.520

FASTENER

16.300

11.410

11.410

4.890

70.00%

16.290

16.290

MISC.

1.220

1.220

1.220

10 CF-CHANNELS / EAVE STRUTS 8.020

3.324

3.324

4.696

41.45%

8.020

8.020

11

GIRT

65.940

31.164

31.164

34.776

47.26%

65.940

65.940

12

SAG RODS

8.950

5.835

6.031

2.919

67.39%

8.910

8.910

13

FRAME

12.230

11.694

11.694

0.536

95.62%

12.230

12.230

14

POST

8.500

7.088

7.088

1.412

83.39%

8.500

8.500

15

JACK BEAM

5.320

1.071

1.071

4.249

20.13%

5.320

5.320

16

RAFTER

7.790

2.036

#REF!

#REF!

#REF!

7.790

7.790

17

PURLINS

160.560

122.860

125.560

35.000

78.20%

160.560

160.560

18

Grating

17.620

0.034

0.034

17.586

0.19%

17.620

17.620

19

Handrails

12.410

3.028

3.028

9.382

24.40%

11.450

11.450

20

Safety Gate

0.090

0.020

0.020

21

Ladder

1.980

0.917

0.917

1.063

46.31%

1.980

1.980

22

Bracket

1.910

1.365

1.365

0.545

71.47%

1.910

1.910

#REF!

#REF!

TOTAL STEEL Materials #######


23

ANCHOR BOLT

973.058

0.000

26.470

26.470

0.875

1,233.360
100.00%

0.000

1233.360

26.470

26.470

3.900

3.900

4.920

4.920

44.610

44.610

CLADDING MATERIALS.
24

Angles For Sheeting

3.900

25

Trims

4.930

26

Roof Panel

44.610

27

Side Wall Panel

15.840

15.840

15.840

28

End Wall Panel

7.130

7.130

7.130

TOTAL CLADDING MAT. 76.410


GRAND TOTAL

#######

22.410

49.755

102.870

102.870

#REF!

1,336.230

1336.230

AS OF 03 JUL 2013
2. COKE STORAGE BUILDING ERECTION & DELIVERY
PREVIOUSEL
Y ERECTED

TODAY
Erected

TOTAL
Erected

S.No.

Description

Total Qty.

1
2
3
4
5
6

COLUMNS
TRUSS FRAMES
BEAMS
ROOF HORIZONTAL BRACE
FLANGE BRACE
VERTICAL BRACE
Rafter
ROOF STRUTS
ANGLES
FASTENER
MISC.
CF-CHANNELS / EAVE STRUTS
GIRT
SAG RODS
FRAME
POST
JACK BEAM
PURLINS

1011.350
1237.430
139.190
136.030
32.100
91.060
13.880
376.860
12.210
43.750
13.500
12.760
174.340
19.910
17.910
9.450
4.160
335.670

823.720
1016.210
59.629
98.951
7.063
50.550

Grating
Handrails
Safety Gate
Ladder
Bracket

43.340

0.000

0.000

23.860

0.000

0.160

7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

24.76%
48.74%
36.26%
43.80%
37.52%

376.620
11.220
43.750
13.480
9.410
137.190
19.910
8.960
4.430

64.99%

322.610

322.610

41.750

41.750

0.000

22.760

22.760

0.000

0.000

0.110

0.110

2.710

0.000

0.000

1.360

1.360

1.570

0.346

0.346

ANCHOR BOLT

53.990

3.160
84.972
7.024
7.844
3.546
0.000
215.441

2,696.988

0.196

2.700

2.968

53.99

297.410
2.164
19.030

79.450
10.046
24.720

81.45%
82.12%
42.84%
72.74%
22.00%
55.51%
0.00%
78.92%
17.72%
43.50%

3.160
84.972
7.220
7.844
3.546
0.000
218.141

9.600
89.368
12.690
10.066
5.904
117.529

TOTAL
Delivered

376.620
11.220
43.750
13.480
9.410
137.190
19.910
8.960
4.430

0.072

187.630
221.220
79.561
37.079
25.037
40.510

DELIVERY
TODAY

898.690
1087.600
81.920
131.930
23.800
86.470

297.410
2.092
19.03

823.720
1016.210
59.629
98.951
7.063
50.550

DELIVERY AS OF
yesterday

898.690
1087.600
81.920
131.930
23.800
86.470

TOTAL STEEL MATERIALS 3753.200


23

Remaining Qty.
Progress %
to Erect

1.224

2699.956 1,053.244
53.990

0.000

22.04%

1.190

71.94%

3,325.160

100.00%

53.990

1.190
0.000

3325.160
53.990

CLADDING MATERIALS.
24
25
26
27
28
29

ANGLES FOR SHEETING


TRIMS
SKY LIGHT
ROOF PANEL
SIDE WALL PANEL
END WALL PANEL
TOTAL CLADDING MAT.
TOTAL

0.740

0.740

0.740

11.480

12.330

12.330

9.160

9.160

9.160

86.390

89.510

89.510

39.050

44.260

44.260

95.870

96.700

96.700

242.690
4049.880

252.700
3631.850

252.700
3631.850

2,750.978

2.968

2753.946 1,295.934

68.00%

0.000

J-3255C, CLADDING DAILY PROGRESS REPORT


AS OF 03 JUL 2013
SULFUR STORAGE BUILDING CLADDING INSTALLATION
S.No.
2
3
4
5
6
7
8

CLADDING
MATERIALS.
ROOF PANEL
SIDE WALL PANEL
END WALL PANEL
Angles For Sheeting
Trims
GUTTER

TOTAL Qty. TOTAL


M. TONS. Qty. SQ. M.

TODAY
Installed

PREVIOUSELY TOTAL
Installed
Installed

Remaining Qty.
to Install

Progress DELIVERY
%
Status M.T.

7.130

21046.31
6709.73
2715.02

3.900

N/A

3.900

4.930

N/A

4.920

590 L.M.

590 L.M.

44.610
15.840

76.410

15,725.080

15,725.080

5,321.230

74.72%

44.610
15.840
7.130

J-3255B, CLADDING DAILY PROGRESS REPORT


AS OF 03 JUL 2013
COKE STORAGE BUILDING CLADDING INSTALLATION
S.No.
2
3
4
5
6
7
8

CLADDING
MATERIALS.

TOTAL Qty. TOTAL


M. TONS. Qty. SQ. M.

ROOF PANEL
SIDE WALL PANEL
END WALL PANEL
Angles For Sheeting
Trims
GUTTER
TOTAL CLADDING

TODAY
Installed

PREVIOUSELY TOTAL
Installed
Installed

Remaining Qty.
to Install

Progress DELIVERY
%
Status M.T.

96.700

41686
7097.82
5153.3

0.740

N/A

0.740

11.480

N/A

11.480

89.510
44.260

326.26

6,941.395

7,267.655

34,418.345

21.12%

86.390
39.050
95.870

1030 L. M.
233.530

You might also like