MAHARASHTRA JEEVAN PRADHIKARAN

URBAN & RURAL SCHEMES CIRCLE AURANGABAD


(Government of Maharashtra Undertaking)

SCHEDULE OF RATES
FOR THE YEAR : 2012-2013
Effective from 24th December 2012 APPLICABLE FOR AURANGABAD REGION
Countersigned

sd/SUPERINTENDING ENGINEER

Maharashtra Jeevan Pradhikaran Urban & Rural Schemes Circle Aurangabad

MAHARASHTRA JEEVAN PRADHIKARAN URBAN & RURAL SCHEMES CIRCLE AURANGABAD SCHEDULE OF RATES FOR THE YEAR 2012 - 2013 INDEX Section No. Name of Section Government Resolutions General Notes Materials Labour and Machinery Transportation Cement Consumption & Weight of Pipes Excavation Iron & Structural Steel Work Plain Cement Concrete, Reinforced Cement Concrete Miscellaneous Page Nos. From To 8 1 11 9 13 12 15 14 25 16 32 26 37 33 39 38 43 40 48 44 49 57 62 67 69 70 74 79 83 88 93 100 105 118 123 137 141 153 168 171 176 183 187 190 191 209 56 61 66 68 69 73 78 82 87 92 99 104 117 122 136 140 152 167 170 175 182 186 189 190 208 214

A B C D E F G H I

Pipes
I C.I. / D.I. Pipes II A.C. Pipes III P.V.C. Pipes IV G.I. Pipes V Stone Ware Pipes VI R.C.C. Pipes VII P.S.C. Pipes VIII Bar Wrapped Steel Cylinder Pipes (BWSC) IX Glass Reinforced Plastic Pipes (GRP) X High Density Polyethelene Pipes (HDPE) XI Medium Density Polyethylene Pipes (MDPE) XII Prestressed Concrete Cylinder Pipes (PCCP) XIII Pipe Appurtenances XIV Mechanical Joints / Fittings XV M.S. Pipes XVI Fabrication of M.S. Pipes and Specials XVII M.S. Pipes Laying XVIII Treatment Plant (WTP & STP) XIX R.C.C. G.S.R.s and Sumps XX R.C.C. E.S.R. XXI Chambers, Manholes and Drainage Drops Well Sinking and River Infiltration Works Ancillary Items for Reservoirs Trial Run Type Designs Corrigendum No-1

J K L M

Government Resolutions

Page No. 1

Page No. 2

Page No. 3

Page No. 4

Page No. 5

Page No. 6

Page No. 7

Page No. 8

General Notes

MAHARASHTRA JEEVAN PRADHIKARAN URBAN AND RURAL CIRCLE AURANGABAD CSR 2012-13 FOR AURANGABAD REGION SCHEDULE OF RATES FOR THE YEAR 2012-2013 GENERAL NOTES
1 These rates are applicable to all MJP works in the AURANGABAD REGION with effect from

dated 24.12.2012.
2 Item of excavation is inclusive of normal manual dewatering, however, seperate item for dewatering

shall be proposed in the estimate where underground water is anticipated in significant magnitude.

3 The rates of excavation for O & M works where limited working space is available and work is

required to be carried out on emergency basis, the rate should be adopted as per actual rate analysis which shall be approved by concerned S.E. for that particular work only.

4 Rates for all items are inclusive of all taxess levied by Central Government, State

Government or Local Bodies.Labour rates are inclusive of EPF 12.5 % . These rates are applicable only for tendered works,these rates should be reduced by 12.5 % of labour part when works are to be carried out on piecemeal works and other small works without tendering. As per Govt. Notification No.25/2012/service tax Dtd. 20June 2012 point No. 12-E service tax is exempted for pipe line,conduit or plant for (i)water supply,(ii)water treatment or (iii)sewage treatment or disposal.

5 For all completed items, initial lead of 5 kms. is considered for collection of materials like sand,

bricks, metal, stone etc. Appropriate addition for lead charges excluding loading , unloading for these materials shall be done while estimation.
6 These rates are applicable to water supply and sewerage schemes and its allied works only. Rates,

for Items required for general construction, buildings, roads, Irrigation Works etc. shall be adopted from the current schedule of rates of P.W.D. or Irrigation Deptt. in respective areas. For bore wells, CSR. of GSDA shall be followed. Increase in percentage over normal schedule of rates will also be as per norms of respective C.S.R.
7 For mechanical and electrical items related to water supply and sewerage schemes, CSR for 2012-

13 prepared by Superintending Engineer (Mechanical ), Maharashtra Jeevan Pradhikaran shall be adopted.


8 Following increase in % over normal schedule of rates of M.J.P. for 2012-13 will be applicable. (Ref. PWD GR. No. DSR/1091/CR-6577/Planning-3,dated 08/07/2003) Area Works in Corporation area Works in Municipal areas Works in tribal area / hilly and inaccesible areas Suger cane area Prison / Jail area Defence area Excavation for pipeline work along National Highway % Increase 5% 2% 10% 5% 15% 20% 10% h Excavation for Dist.system pipe lines,Sewerage system in towns 10%

a b c d e f g

(General Notes)

Page No. 9

MAHARASHTRA JEEVAN PRADHIKARAN URBAN AND RURAL CIRCLE AURANGABAD CSR 2012-13 FOR AURANGABAD REGION SCHEDULE OF RATES FOR THE YEAR 2012-2013 GENERAL NOTES
9 In case more than one percentage increase on basic rates becomes admissible, instead of adding

both, the higher percentage only be taken. (e.g. if any Municipal Council falls in hilly area, then additional percentage in rates will be only 10 % and not with 2 % + 10 %). This additional percentage is only on completed item of work and not applicable to items of providing of materials like steel, pipes, valves, specials etc.

10 For hilly and inaccessible areas / Tribal areas approved by Government, Planning Department's

Circular Nos.(1)1089/CR-66/Plan-19,DT.23/11/1990 and (2) 1094/P-36/K-1455 dt.02/09/1994, shall be followed . In addition to amendment notification by the planning deptt. time to time.
11 For Action Plan Notified Area, Government's Circular in force from time to time shall be followed.

12 Whenever basic rates of completed items are increased by percentage given at Sr. No. 8, the issue

rates of materials to be supplied by the Department ( if any) shall be increased by same percentage.
13 This schedule of rates is based on following basic rates for important materials. Material Rate in Rs. Per MT. 6200 48000 48300 51000 48300 49000

a b c d e f

Cement Mild Steel Tor Steel/CTD bars Structural Steel Corrosion Resistant Steel (Fe 500) Basic rates of M.S. pipes Of SAIL , Rurkela

14 Details of standard cement consumption and standard weight of various pipes are incorporated in

this CSR .
15 Rates for supply of various types of pipes, specials and valves are inclusive of excise duty, central

sales tax and VAT, third party inspection charges, storage charges, overhead charges and transportation of materials upto divisional stores / sites and stacking.
16 Cost of carting of pipes and valves from departmental stores to site of work is not considered in

rate analysis, hence this item must be incorporated in each scheme. While inviting tenders if supply is from departmental store, then this item shall appear in the tender, and if the supply is by contractor then this item shall not appear in the tender, even though same is provided in sanctioned scheme, because the contractor is supposed to bring the pipes and valves directly at site.
17 Though the contractor is required to do refilling before hydraulic testing to avoid traffic hurdle, no

payment for refilling of the trenches of pipeline shall be payable till satisfactory hydraulic testing is given. Re-excavation required if any, during testing, shall be done by the contractor at his own cost.
18 10 % of cost of items of water retaining structures, such as GSR/ESR/MBR shall be retained till

satisfactory hydraulic testing is given as per IS code.


19 10 % of cost of total sub-work of pipeline work shall be retained, till satisfactory hydraulic test is

given, as per IS code.


20 In case of supply of pipes / valves etc. by contractor, only 85% payment shall be released after

supply and 15% after satisfactory hydraulic testing.

(General Notes)

Page No. 10

MAHARASHTRA JEEVAN PRADHIKARAN URBAN AND RURAL CIRCLE AURANGABAD CSR 2012-13 FOR AURANGABAD REGION SCHEDULE OF RATES FOR THE YEAR 2012-2013 GENERAL NOTES be used in Urban Areas.

21 AC / PVC/HDPE pipes shall not

22 Provision for octroi charges for pipes specials and valves is not considered in the CSR 2012-13.

Provision of 4 % of cost for pipes specials and valves to be used in corporation area shall be made while framing the estimate for works included in corporation limit. Octroi charges shall be reimbursed to contractor on production of receipt for payment for materials actully to be used in corporation area, if there specific provision to that effect in the contract.

23 For use of ready mix cement concrete, prior permission of the Chief Engineer must be obtained.

24 For Dams , Balancing Tanks , Aerated Lagoons and similar structures, the rates for Film membranes

as per prevailing rates for Irrigation Department will be followed.


25 Capacity of ESR / GSR to be constructed shall be rounded to nearest 1000 litres always on higher

side i.e. if required capacity is 1,23,570 litre, it shall be rounded to 1,24,000 litre. Similarly, if required capacity is 8,26,070 litre, it shall be rounded to 8,27,000 litre.
26 Capacity of Unconventional / conventional Treatment Plants shall be rounded to nearest 0.5 Mld-

always on higher side i.e. if WTP of 2.37 Mld is required; it shall be rounded to 2.5 Mld. For WTP having capacity less than 0.5 mld, package type WTP should be considered.
27 Provision for insurance @ 1% is considered in Rate analysis of CSR 2012-13. These rates are

applicable only for tendered works,these rates should be reduced by 1 % of total rate when works are to be carried out on piecemeal works and other small works without tendering.

28 Rates given in this CSR are for estimation purpose only. 29 The makes of Sluice / Butterfly valves etc. to be used for inlet / outlets of ESRs / GSRs / MBRs / Pumping

main / Rising main and WTP should be from approved makes of M.J.P .
30 Mechanical CSR rates for respective items shall be followed while estimation and the list of approved

makes shall be given in the item.


31 As per Govt.Circular No.859/50/2002-CX dt.6/9/2002 Notification No.6/2006-Central Excise Dt. 1-3-2006.

Notification No. 6/2007-Central Excise Dt.1.3.2007.and notification no 26/2009 central excise dtd.4.12.2009 1) All items of machienery, including instruments, apparatus & appliances, auxillary equipments & their components/parts required for setting of water treatment plant; 2) Pipes needed for delivery of water from its source to the plant (including the clear treated water reservoir, if any, thereof) and from there to the first storage point; 3) Pipes of outer diameter exceeding 100 mm, when such pipes are integral part of the wtaer supply project; Are exempted from excise duty. However, necessary certificate from Project Authority i.e. District Collector/Dy.Commissioner shall be obtained.
32 The royalty charges are considered in the rate analysis of CSR 2012-13 As per Government

Resolution No. Rev and forest Dept Gaukhani 10/1009/ Pra.Kra.309/Kha. Mantralaya dt.11.2.2010.

(General Notes)

Page No. 11

Section - A

Materials

SECTION - A - MATERIAL FOR 2012-13


S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 53 Material Description Acetylene Gas Alum Grade I Ex-factory Binding Wire Black enemal paint Anti corrosive Bricks Bullies, Struts (125 mm dia 1.5 M long) C.C.Teak wood planks(3" X 6") Cement (Bags) Cement (M.T.) Cement Sulphar Resistant Charcoal Corrosion Resistant steel Diesel Epoxy paint Fuse G.I.Washers Gun Powder Inferol 49 W thick Liquid chlorine 100 kg Deptt Containor . Liquid chlorine 100 kg supplier Containor Liquid chlorine 900 kg Deptt Containor Liquid chlorine 900 kg Supplier Containor LubricantOil M.S.angle(50x50x6mm) M.S.Bars (Delivery at site) M.S.Bars (in kgs) M.S.Flats (40 mm x 3 mm) M.S.plate Maganafloc coaghulant aid Mild steelGrill ready Mildsteel grill railing Mobile oil Murum Nails Nutbolts Oxygen Gas (Refill) Polling board R.S.Joist channel etc Rapid sand Gravity filter sand At Source (Godhara, Gokak, Kanhan, Yesagi sand) Rapid sand Gravity filter Gravel At Source Ready mixed Alluminium paint Ready mixed lead/zinc paint Ready mix oil paint Ready mixed synthetic enamel paint Ready mix primer for steel Rubber Gasket (6 mm thick) Sand Unit Nos Mt Kg Ltr No rmt Cum Bag Mt M.T. Kg Mt Lit Kg No Kg Kg Ltr No. No. No. No. lit Kg Mt Kg Kg Kg Mt Kg Kg Lit cum Kg Kg Cylinder cum MT Cum Cum Ltr Ltr Ltr Ltr Ltr Kg cum Rate 580.00 8500.00 60.00 176.00 5.00 170.00 72000.00 310.00 6200.00 6700.00 30.00 48300.00 51.75 416.00 16.50 160.00

14750.00 230.00 51.00 48000.00 48.00 48.30 49.00 69.00 66.70 225.00 250.00 64.00 90.00 340.00 18500.00 51000.00 1265.00 1265.00 220.00 231.00 160.00 165.00 90.00 900.00

(Section-A, Material)

Page No. 12

SECTION - A - MATERIAL FOR 2012-13


S.No. 54 55 56 57 58 59 60 61 62 63 64 65 66 67 73 74 75 76 Material Description Kasarde sand (for mortar lining work) @ source Spun Yarn Stone Aggregate 10 mm Stone Aggregate 20 mm Stone Aggregate 40 mm Stone at quarry Structural Steel T.C.L.(bleaching poweder Gr.I) (5kg pack) T.C.L.(bleaching poweder Gr.I) (10kg pack) T.C.L.(bleaching poweder Gr.I) (25kg pack) Teak wood Tor Steel Turpentine Walling ( 100x100mm) Welding Rod Having weight 5.25 kg White cement White lead Wire
Plywood Coomercial 12 mm thick Waterproof for centering

Unit cum Kg cum cum cum cum M.T. Kg Kg Kg Cum Mt Lit cum Box Kg Kg Kg sqm Cum

Rate 1000.00 83.00 800.00 770.00 740.00 370.00 51000.00

22.00 72600.00 48300.00 17000.00 1400.00 36.00 140.00 61.00 670.00 450.00

(Taken in analysis for RCC items only) 77 Coarse Sand

(Section-A, Material)

Page No. 13

Section - B

Labour and Machinery

SECTION - B - LABOUR FOR 2012-13


S.No. Description Unit No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. 2012-13 351.00 303.00 260.00 327.00 327.00 345.00 315.00 321.00 266.00 351.00 303.00 260.00 290.00 399.00 303.00 260.00 275.00 260.00 275.00 339.00 339.00 327.00 351.00 327.00 260.00 321.00 345.00 375.00 418.00 309.00 333.00 327.00 339.00 351.00 260.00 303.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

Asst Fitter Bhandhani Bhisti with pakahal Blacksmith IInd class Breaker Carpainter 1st class Carpainter 2nd class Chiseller Excavator Fitter 1st class Glazier Helper Hole Driller Mason 1st class Mason 2nd class MAZDOOR (FEMALE) Mazdoor(Heavy) Mazdoor (Light) MAZDOOR (MALE) Maistry Mukadam Painter (for coloring) Painter Polisher Pump Driver StoneCutter or dresser Tile layer Welder Welder for pipe line WhiteWasher TileTurner L.M.V. Driver Electrician Plumber Mali Wireman

(Section-B, Labour Machinery)

Page No. 14

HIRE CHARGES OF MACHINERIES 1 Rent for chain pully block with tripod 2 Rent for pump including operator & excluding fuel 3 Rent for Mech.Mixer with fuel & crew 4 Rent for vibrator with fuel and crew 5 Plate Bender 6 Rent for welding set with Electric set 7 Rent for welding set with Generator 8 Rent for Compressor with fuel 9 Rent for Concrete breaker & Compressor 10 Rent for poclain 11 Rent for Crane 12 Rent for JCB 13 Truck hire charges upto 20 km 14 Truck hire charges for 20 km to 50 km 15 Truck hire charges for 50 km & above 16 Pipe cutter with operator 17 De sludging/ De silting pump 18 Jeep hire charges with driver and fuel(Upto 300 KM.)

Day BHP-Day Day Day Day Day Day Day Day Hour Hour Hour Day Day Day Day Day Day

500 190 2400 900 1000 1150 2050 2300 2200 2350 1500 950 2400 2200 2000 1250 2400 3000

(Section-B, Labour Machinery)

Page No. 15

Section - C

Transportation

SECTION C TRANSPORTATION
Sr. No. Item of Work Unit Collecting the Lifting the railway receipt materials from etc. & unloading railway the consignment platform, from railway loading wagon & keeping into truck on railway platform 4 5 Loading the material into truck from Departmental stores or site of work.

Rate (Rs.) 2012-13

Unloading the material from truck including stacking in Departmental stores or site of work.

1 (A)

2 3 4 5

6 7 (B)

2 MANUAL HANDLING ( Weight upto and including 300 kg) C.I. / D.I. / M.S. / H.D.P.E. pipes of all classes upto and including 200 mm dia pipes of any length R.C.C. pipes of all classes upto and including 350 mm dia A.C. pipes of all classes and dia. P.V.C. pipes of all classes and dia. All other materials such as C.I. specials of individual weight upto 300 kg. Mild steel / Tor steel / R.S.J. Cement / Bleaching powder / Alum CRANE HANDLING (Materials having individual weight above 300 kg) C.I./ D.I./ B.W.S.C./ M.S./ R.C.C. pipes of all classes having individual weight more than 300 kg. and also other heavy materials, valves, machinery having individual weight more than 300 kg.

MT

251.00

306.00

80.00

80.00

MT MT MT MT

251.00 133.00 133.00 251.00

306.00 186.00 186.00 306.00

80.00 48.00 48.00 80.00

80.00 48.00 48.00 80.00

MT MT

158.00 76.00 0.00

215.00 117.00 0.00

120.00 61.00 0.00

120.00 61.00 0.00

MT

178.00

226.00

161.00

161.00

1) The above rates in column 1 to 5 are applicable only for railway clearance purpose only and not for other carting. 2) The rates given in column 6 to 7 shall be adopted for estimate purpose only, however, actual quotations/ 'D' tender will prevail. 3) Irrespective of supply of CI / DI pipes as per rate contract, when pipes are directly supplied by the firms by road, railway freight upto destination station and carting as per schedule from railway station to work site is allowed. In such cases, rate of Mathadi Kamgar shall not be applicable for carting and normal loading, unloading, carting shall be allowed.

(Section-C, Transportation)

Page No. 16

Lead in km

Av. Speed

No. of Trips(N)= 8/ ((2L/S) +1) 3 7.5 7.11 6.77 6.48 6.2 5.96 5.74 5.54 5.36 5.19 4.88 4.61 4.36 4.17 4 3.64 3.08 2.67 2.35 2.4 2.18 2 1.85 1.6 1.41 1.26 1.14 1.12 1.1 0.94 0.82 0.73 0.59 0.56 0.41 0.32 0.26 0.22 0.2 0.17 0.15

Km. Done (2NL+6)

Litres of diesel cons umed 5 4.50 6.74 8.77 10.64 12.33 13.92 15.39 16.77 18.08 19.30 21.52 23.51 25.25 27.02 28.67 38.40 43.07 46.50 49.00 58.00 60.13 62.00 63.67 66.00 67.80 69.20 70.40 76.67 93.67 96.00 97.67 99.33 100.33 114.00 116.80 117.20 116.40 116.40 122.00 117.60 116.00

cost of diesel @ 51.75 / lit

STATEMENT II Including loading, unloading and stacking Lit. of cost of cost of 6 Mobile M.Oil @ mazdoor oil con225/lit sumed 7 0.096 0.144 0.188 0.228 0.264 0.298 0.330 0.359 0.387 0.414 0.461 0.504 0.541 0.579 0.614 0.823 0.923 0.996 1.050 1.243 1.289 1.329 1.364 1.414 1.453 1.483 1.509 1.643 2.007 2.057 2.093 2.129 2.150 2.443 2.503 2.511 2.494 2.494 2.614 2.520 2.486 8 21.60 32.40 42.30 51.30 59.40 67.05 74.25 80.78 87.08 93.15 103.73 113.40 121.73 130.28 138.15 185.18 207.68 224.10 236.25 279.68 290.03 299.03 306.90 318.15 326.93 333.68 339.53 369.68 451.58 462.83 470.93 479.03 483.75 549.68 563.18 564.98 561.15 561.15 588.15 567.00 559.35 9 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25 1856.25

1 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 6 7 8 9 10 15 20 25 30 35 40 45 50 60 70 80 90 100 125 150 175 200 250 300 420 540 660 780 900 1020 1140 Note:

2 15 16 16.5 17 17.25 17.5 17.75 18 18.25 18.5 18.75 19 19.183 19.6 20 25 25 25 25 30 30 30 30 30 30 30 30 40 40 40 40 40 40 45 45 45 45 45 45 45 45 1)

4 13.50 20.22 26.31 31.92 37.00 41.76 46.18 50.32 54.24 57.90 64.56 70.54 75.76 81.06 86.00 115.20 129.20 139.50 147.00 174.00 180.40 186.00 191.00 198.00 203.40 207.60 211.20 230.00 281.00 288.00 293.00 298.00 301.00 342.00 350.40 351.60 349.20 349.20 366.00 352.80 348.00

6 232.88 348.8 453.85 550.62 638.08 720.36 796.43 867.85 935.64 998.78 1113.66 1216.64 1306.69 1398.29 1483.67 1987.2 2228.87 2406.38 2535.75 3001.5 3111.73 3208.5 3294.92 3415.5 3508.65 3581.1 3643.2 3967.67 4847.42 4968 5054.42 5140.33 5192.08 5899.5 6044.4 6065.1 6023.7 6023.7 6313.5 6085.8 6003

Hire charges of truck Rs. Per day 10 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2200 2200 2200 2200 2200 2200 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000

Total cost (6+8+ 9+10)

Add 10% overhead charges

Total 11+12

cost per trip (13/3)

11 4510.73 4637.45 4752.40 4858.17 4953.73 5043.66 5126.93 5204.88 5278.97 5348.18 5473.64 5586.29 5684.67 5784.82 5878.07 6428.63 6692.80 6686.73 6828.25 7337.43 7458.01 7563.78 7658.07 7589.90 7691.83 7771.03 7838.98 8193.60 9155.25 9287.08 9381.60 9475.61 9532.08 10305.43 10463.83 10486.33 10441.10 10441.10 10757.90 10509.05 10418.60

12 451.07 463.75 475.24 485.82 495.37 504.37 512.69 520.49 527.9 534.82 547.36 558.63 568.47 578.48 587.81 642.86 669.28 668.67 682.83 733.74 745.8 756.38 765.81 758.99 769.18 777.1 783.9 819.36 915.53 928.71 938.16 947.56 953.21 1030.54 1046.38 1048.63 1044.11 1044.11 1075.79 1050.91 1041.86

13 4961.80 5101.20 5227.64 5343.99 5449.10 5548.03 5639.62 5725.37 5806.87 5883.00 6021.00 6144.92 6253.14 6363.30 6465.88 7071.49 7362.08 7355.40 7511.08 8071.17 8203.81 8320.16 8423.88 8348.89 8461.01 8548.13 8622.88 9012.96 10070.78 10215.79 10319.76 10423.17 10485.29 11335.97 11510.21 11534.96 11485.21 11485.21 11833.69 11559.96 11460.46

14 661.57 717.47 772.18 824.69 878.89 930.88 982.51 1033.46 1083.37 1133.53 1233.81 1332.95 1434.21 1525.97 1616.47 1942.72 2390.29 2754.83 3196.2 3362.99 3763.22 4160.08 4553.45 5218.06 6000.72 6784.23 7563.93 8047.29 9155.25 10867.86 12585.07 14278.32 17771.68 20242.8 28073.68 36046.75 44173.88 52205.5 59168.45 67999.76 76403.07

No. of trips in a working of 8 hours N=8 / (2(L+S) + 1) where L = Lead in km and S = speed, 1 hour is allowed for loading Consumption of diesel taken as 3 km / litre Consumption of Mobile oil taken as 140 km / litre In col. 4 6 hours has been added for movement from parking place to duty and back Hire charges will remain Rs. 1500.00 for 1200 and above km lead Labour required for loading unloading and stacking after the No. of trips reduced below 1 is factorised with actual number of trip.

2) 3) 4)

5)

(Section-C, Transportation)

6)

Page No. 17

Lead in km

Av. Speed

No. of Trips(N)= 8/ ((2L/S) +1)

Km. Done (2NL+6)

Litres of diesel cons umed

cost of diesel @ 51.75 / lit

STATEMENT III Excluding loading, unloading and stacking Lit. of cost of cost of 6 Mobile M.Oil @ mazdoor oil con225/lit sumed

Hire charges of truck Rs. Per day 10 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2200 2200 2200 2200 2200 2200 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000

Total cost (6+8+ 9+10)

Add 10% overhead charges

Total 11+12

cost per trip (13/3)

1 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 6 7 8 9 10 15 20 25 30 35 40 45 50 55 65 75 85 95 105 130 155 180 230 280 400 520 640 760 880 1000 1120

2 15 16 16.5 17 17.25 17.5 17.75 18 18.25 18.5 18.75 19 19.183 19.6 20 25 25 25 25 30 30 30 30 30 30 30 30 40 40 40 40 40 40 45 45 45 45 45 45 45 45

3 7.5 7.11 6.77 6.48 6.2 5.96 5.74 5.54 5.36 5.19 4.88 4.61 4.36 4.17 4 3.64 3.08 2.67 2.35 2.4 2.18 2 1.85 1.71 1.5 1.33 1.2 1.39 1.28 1.07 0.91 0.8 0.64 0.6 0.43 0.33 0.27 0.23 0.2 0.18 0.16

4 13.50 20.22 26.31 31.92 37.00 41.76 46.18 50.32 54.24 57.90 64.56 70.54 75.76 81.06 86.00 115.20 129.20 139.50 147.00 174.00 180.40 186.00 191.00 194.10 201.00 205.50 210.00 270.10 274.80 284.20 288.10 294.00 300.40 342.00 350.00 349.20 351.60 355.60 358.00 366.00 364.40

5 4.50 6.74 8.77 10.64 12.33 13.92 15.39 16.77 18.08 19.30 21.52 23.51 25.25 27.02 28.67 38.40 43.07 46.50 49.00 58.00 60.13 62.00 63.67 64.70 67.00 68.50 70.00 90.03 91.60 94.73 96.03 98.00 100.13 114.00 116.67 116.40 117.20 118.53 119.33 122.00 121.47

6 232.88 348.8 453.85 550.62 638.08 720.36 796.43 867.85 935.64 998.78 1113.66 1216.64 1306.69 1398.29 1483.67 1987.2 2228.87 2406.38 2535.75 3001.5 3111.73 3208.5 3294.92 3348.23 3467.25 3544.88 3622.5 4659.05 4740.3 4902.28 4969.55 5071.5 5181.73 5899.5 6037.67 6023.7 6065.1 6133.93 6175.33 6313.5 6286.07

7 0.096 0.144 0.188 0.228 0.264 0.298 0.330 0.359 0.387 0.414 0.461 0.504 0.541 0.579 0.614 0.823 0.923 0.996 1.050 1.243 1.289 1.329 1.364 1.386 1.436 1.468 1.500 1.929 1.963 2.030 2.058 2.100 2.146 2.443 2.500 2.494 2.511 2.540 2.557 2.614 2.603

8 21.60 32.40 42.30 51.30 59.40 67.05 74.25 80.78 87.08 93.15 103.73 113.40 121.73 130.28 138.15 185.18 207.68 224.10 236.25 279.68 290.03 299.03 306.90 311.85 323.10 330.30 337.50 434.03 441.68 456.75 463.05 472.50 482.85 549.68 562.50 561.15 564.98 571.50 575.33 588.15 585.68

9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11 2654.48 2781.20 2896.15 3001.92 3097.48 3187.41 3270.68 3348.63 3422.72 3491.93 3617.39 3730.04 3828.42 3928.57 4021.82 4572.38 4836.55 4830.48 4972.00 5481.18 5601.76 5707.53 5801.82 5660.08 5790.35 5875.18 5960.00 7093.08 7181.98 7359.03 7432.60 7544.00 7664.58 8449.18 8600.17 8584.85 8630.08 8705.43 8750.66 8901.65 8871.75

12 265.45 278.12 289.62 300.19 309.75 318.74 327.07 334.86 342.27 349.19 361.74 373 382.84 392.86 402.18 457.24 483.66 483.05 497.2 548.12 560.18 570.75 580.18 566.01 579.04 587.52 596 709.31 718.2 735.9 743.26 754.4 766.46 844.92 860.02 858.49 863.01 870.54 875.07 890.17 887.18

13 2919.93 3059.32 3185.77 3302.11 3407.23 3506.15 3597.75 3683.49 3764.99 3841.12 3979.13 4103.04 4211.26 4321.43 4424.00 5029.62 5320.21 5313.53 5469.20 6029.30 6161.94 6278.28 6382.00 6226.09 6369.39 6462.70 6556.00 7802.39 7900.18 8094.93 8175.86 8298.40 8431.04 9294.10 9460.19 9443.34 9493.09 9575.97 9625.73 9791.82 9758.93

14 389.32 430.28 470.57 509.58 549.55 588.28 626.79 664.89 702.42 740.1 815.4 890.03 965.89 1036.31 1106 1381.76 1727.34 1990.09 2327.32 2512.21 2826.58 3139.14 3449.73 3640.99 4246.26 4859.17 5463.33 5613.23 6172.02 7565.36 8984.46 10373 13173.5 15490.17 22000.44 28616.18 35159.59 41634.65 48128.65 54399 60993.31

(Section-C, Transportation)

Page No. 18

Lead in km 1 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 6 7 8 9 10 15 20 25 30 35 40 45 50 60 70 80 90 100 125 150 175 200 250 300 420 540 660 780 900 1020 1140

Cost / trip

Lime murum Earth building rubbish 3 6.0 cum 110.26 119.58 128.7 137.45 146.48 155.15 163.75 172.24 180.56 188.92 205.64 222.16 239.04 254.33 269.41 323.79 398.38 459.14 532.7 560.5 627.2 693.35 758.91 869.68 1000.12 1130.71 1260.66 1341.22 1525.88 1811.31 2097.51 2379.72 2961.95 3373.8 4678.95 6007.79 7362.31 8700.92 9861.41 11333.29 12733.85 4 4.8 cum 137.83 149.47 160.87 171.81 183.1 193.93 204.69 215.3 225.7 236.15 257.04 277.7 298.79 317.91 336.76 404.73 497.98 573.92 665.88 700.62 784 866.68 948.64 1087.1 1250.15 1413.38 1575.82 1676.52 1907.34 2264.14 2621.89 2974.65 3702.43 4217.25 5848.68 7509.74 9202.89 10876.15 12326.76 14166.62 15917.31

STATEMENT VI Including loading, unloading and stacking Manure or Excavated Sand stone Aggregate 40 Soling stone sludge rock aggregate 40 mm & above mm & below 5 5.52 cum 119.85 129.98 139.89 149.40 159.22 168.64 177.99 187.22 196.26 205.35 223.52 241.48 259.82 276.44 292.84 351.94 433.02 499.06 579.02 609.24 681.74 753.64 824.90 945.30 1087.09 1229.03 1370.28 1457.84 1658.56 1968.82 2279.90 2586.65 3219.51 3667.17 5085.81 6530.21 8002.51 9457.52 10718.92 12318.80 13841.14 6 3.0 cum 220.52 239.16 257.39 274.90 292.96 310.29 327.50 344.49 361.12 377.84 411.27 444.32 478.07 508.66 538.82 647.57 796.76 918.28 1065.40 1121.00 1254.41 1386.69 1517.82 1739.35 2000.24 2261.41 2521.31 2682.43 3051.75 3622.62 4195.02 4759.44 5923.89 6747.60 9357.89 12015.58 14724.63 17401.83 19722.82 22666.59 25467.69 7 5.75 cum 115.06 124.78 134.29 143.42 152.85 161.89 170.87 179.73 188.41 197.14 214.58 231.82 249.43 265.39 281.13 337.86 415.70 479.10 555.86 584.87 654.47 723.49 791.90 907.49 1043.60 1179.87 1315.47 1399.53 1592.22 1890.06 2188.71 2483.19 3090.73 3520.49 4882.38 6269.00 7682.41 9079.22 10290.17 11826.05 13287.49 8 5.5 cum 120.29 130.45 140.40 149.94 159.80 169.25 178.64 187.90 196.98 206.10 224.33 242.35 260.77 277.45 293.90 353.22 434.60 500.88 581.13 611.45 684.22 756.38 827.90 948.74 1091.04 1233.50 1375.26 1463.14 1664.59 1975.97 2288.19 2596.06 3231.21 3680.51 5104.31 6553.95 8031.61 9491.91 10757.90 12363.59 13891.47 9 4.7 cum 140.76 152.65 164.29 175.47 187.00 198.06 209.04 219.89 230.50 241.18 262.51 283.61 305.15 324.67 343.93 413.34 508.57 586.13 680.04 715.53 800.69 885.12 968.82 1110.23 1276.75 1443.45 1609.35 1712.19 1947.93 2312.31 2677.67 3037.94 3781.21 4306.98 5973.12 7669.52 9398.70 11107.55 12589.03 14468.03 16255.97

Concrete (form)

block Timber

2 Pay load 661.57 717.47 772.18 824.69 878.89 930.88 982.51 1033.46 1083.37 1133.53 1233.81 1332.95 1434.21 1525.97 1616.47 1942.72 2390.29 2754.83 3196.2 3362.99 3763.22 4160.08 4553.45 5218.06 6000.72 6784.23 7563.93 8047.29 9155.25 10867.86 12585.07 14278.32 17771.68 20242.8 28073.68 36046.75 44173.88 52205.5 59168.45 67999.76 76403.07

10 6.0 cum 110.26 119.58 128.70 137.45 146.48 155.15 163.75 172.24 180.56 188.92 205.64 222.16 239.04 254.33 269.41 323.79 398.38 459.14 532.70 560.50 627.20 693.35 758.91 869.68 1000.12 1130.71 1260.66 1341.22 1525.88 1811.31 2097.51 2379.72 2961.95 3373.80 4678.95 6007.79 7362.31 8700.92 9861.41 11333.29 12733.85

11 5.75 cum 115.06 124.78 134.29 143.42 152.85 161.89 170.87 179.73 188.41 197.14 214.58 231.82 249.43 265.39 281.13 337.86 415.70 479.10 555.86 584.87 654.47 723.49 791.90 907.49 1043.60 1179.87 1315.47 1399.53 1592.22 1890.06 2188.71 2483.19 3090.73 3520.49 4882.38 6269.00 7682.41 9079.22 10290.17 11826.05 13287.49

(Section-C, Transportation)

Page No. 19

Lead in km

Cost / trip

STATEMENT VII Including loading, unloading and stacking Cement Tar Steam coal Matting Sheet & plate Bricks modular stone block, bitumenn thatching glass in packs bricks & GI CI CC AC Asphalt bambu Paints & Traditional Pipes below roofing felt & ceiling Distempers AC bricks 120 mm dia Flooring board Sheets & Asphalt etc. rubber PVC fittings iron pipes fittings and iron fittings sheets 3 7.0 Mt per 1 M.T. 94.51 102.50 110.31 117.81 125.56 132.98 140.36 147.64 154.77 161.93 176.26 190.42 204.89 218.00 230.92 277.53 341.47 393.55 456.60 480.43 537.60 594.30 650.49 745.44 857.25 969.18 1080.56 1149.61 1307.89 1552.55 1797.87 2039.76 2538.81 2891.83 4010.53 5149.54 6310.55 7457.93 8452.64 9714.25 10914.72 4 4.5 MT per 1 M.T. 147.02 159.44 171.60 183.26 195.31 206.86 218.34 229.66 240.75 251.90 274.18 296.21 318.71 339.10 359.22 431.72 531.18 612.18 710.27 747.33 836.27 924.46 1011.88 1159.57 1333.49 1507.61 1680.87 1788.29 2034.50 2415.08 2796.68 3172.96 3949.26 4498.40 6238.60 8010.39 9816.42 11601.22 13148.54 15111.06 16978.46 5 5.5 MT per 1 M.T. 120.29 130.45 140.40 149.94 159.80 169.25 178.64 187.90 196.98 206.10 224.33 242.35 260.77 277.45 293.90 353.22 434.60 500.88 581.13 611.45 684.22 756.38 827.90 948.74 1091.04 1233.50 1375.26 1463.14 1664.59 1975.97 2288.19 2596.06 3231.21 3680.51 5104.31 6553.95 8031.61 9491.91 10757.90 12363.59 13891.47 6 3.0 MT per 1 M.T. 220.52 239.16 257.39 274.90 292.96 310.29 327.50 344.49 361.12 377.84 411.27 444.32 478.07 508.66 538.82 647.57 796.76 918.28 1065.40 1121.00 1254.41 1386.69 1517.82 1739.35 2000.24 2261.41 2521.31 2682.43 3051.75 3622.62 4195.02 4759.44 5923.89 6747.60 9357.89 12015.58 14724.63 17401.83 19722.82 22666.59 25467.69 7 7.0 MT per 1 M.T. 94.51 102.50 110.31 117.81 125.56 132.98 140.36 147.64 154.77 161.93 176.26 190.42 204.89 218.00 230.92 277.53 341.47 393.55 456.60 480.43 537.60 594.30 650.49 745.44 857.25 969.18 1080.56 1149.61 1307.89 1552.55 1797.87 2039.76 2538.81 2891.83 4010.53 5149.54 6310.55 7457.93 8452.64 9714.25 10914.72

Tiles half Glass blocks Empty cement round tiles & (hollow) 200x200 bags Roofing tiles x120 mm cement flooring tiles

2 Pay load 661.57 717.47 772.18 824.69 878.89 930.88 982.51 1033.46 1083.37 1133.53 1233.81 1332.95 1434.21 1525.97 1616.47 1942.72 2390.29 2754.83 3196.20 3362.99 3763.22 4160.08 4553.45 5218.06 6000.72 6784.23 7563.93 8047.29 9155.25 10867.86 12585.07 14278.32 17771.68 20242.80 28073.68 36046.75 44173.88 52205.50 59168.45 67999.76 76403.07

0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 6 7 8 9 10 15 20 25 30 35 40 45 50 60 70 80 90 100 125 150 175 200 250 300 420 540 660 780 900 1020 1140

8 9 3500 No. 3200 No. per 1000 Nos. per 1000 Nos. 189.02 206.74 204.99 224.21 220.62 241.31 235.63 257.72 251.11 274.65 265.97 290.90 280.72 307.03 295.27 322.96 309.53 338.55 323.87 354.23 352.52 385.57 380.84 416.55 409.77 448.19 435.99 476.87 461.85 505.15 555.06 607.10 682.94 746.97 787.09 860.88 913.20 998.81 960.85 1050.93 1075.21 1176.01 1188.59 1300.03 1300.99 1422.95 1490.87 1630.64 1714.49 1875.23 1938.35 2120.07 2161.12 2363.73 2299.23 2514.78 2615.79 2861.02 3105.10 3396.21 3595.73 3932.83 4079.52 4461.98 5077.62 5553.65 5783.66 6325.88 8021.05 8773.03 10299.07 11264.61 12621.11 13804.34 14915.86 16314.22 16905.27 18490.14 19428.50 21249.93 21829.45 23875.96

10 1000 No. per 1000 Nos. 66.16 71.75 77.22 82.47 87.89 93.09 98.25 103.35 108.34 113.35 123.38 133.30 143.42 152.60 161.65 194.27 239.03 275.48 319.62 336.30 376.32 416.01 455.35 521.81 600.07 678.42 756.39 804.73 915.53 1086.79 1258.51 1427.83 1777.17 2024.28 2807.37 3604.68 4417.39 5220.55 5916.85 6799.98 7640.31

11 2000 No. per 1000 Nos. 330.79 358.74 386.09 412.35 439.45 465.44 491.26 516.73 541.69 566.77 616.91 666.48 717.11 762.99 808.24 971.36 1195.15 1377.42 1598.10 1681.50 1881.61 2080.04 2276.73 2609.03 3000.36 3392.12 3781.97 4023.65 4577.63 5433.93 6292.54 7139.16 8885.84 10121.40 14036.84 18023.38 22086.94 26102.75 29584.23 33999.88 38201.54

(Section-C, Transportation)

Page No. 20

STATEMENT VIII Including loading, unloading and stacking Lead C.I. Cost / trip UNREINFORCED CEMENT PIPES, PRECAST COCRETE PIPES R.C.C. STEEL CYLINDER, R.C PIPES, PIPES,, in km 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 300 mm Pay load in Rmt 1 2 UNIT PER 100 RMT 0.5 661.57 1 717.47 1.5 772.18 2 824.69 2.5 878.89 3 930.88 3.5 982.51 4 1033.46 4.5 1083.37 5 1133.53 6 1233.81 7 1332.95 8 1434.21 9 1525.97 10 1616.47 15 1942.72 20 2390.29 25 2754.83 30 3196.2 35 3362.99 40 3763.22 45 4160.08 50 4553.45 60 5218.06 70 6000.72 80 6784.23 90 7563.93 100 8047.29 125 9155.25 150 10867.86 175 12585.07 200 14278.32 250 17771.68 300 20242.8 420 28073.68 540 36046.75 660 44173.88 780 52205.5 900 59168.45 1020 67999.76 1140 76403.07 292.8 3 225.95 245.04 263.72 281.66 300.17 317.92 335.56 352.96 370 387.13 421.38 455.24 489.83 521.16 552.07 663.5 816.36 940.86 1091.6 1148.56 1285.25 1420.79 1555.14 1782.12 2049.43 2317.02 2583.31 2748.39 3126.79 3711.7 4298.18 4876.48 6069.56 6913.52 9588.01 12311.05 15086.71 17829.75 20207.8 23223.96 26093.94 219.6 4 301.26 326.72 351.63 375.54 400.22 423.9 447.41 470.61 493.34 516.18 561.84 606.99 653.1 694.89 736.1 884.66 1088.47 1254.48 1455.46 1531.42 1713.67 1894.39 2073.52 2376.17 2732.57 3089.36 3444.41 3664.52 4169.06 4948.93 5730.91 6501.97 8092.75 9218.03 12784.01 16414.73 20115.61 23773 26943.74 30965.28 34791.93 183 5 361.51 392.06 421.96 450.65 480.27 508.68 536.89 564.73 592.01 619.42 674.21 728.39 783.72 833.86 883.32 1061.6 1306.17 1505.37 1746.56 1837.7 2056.4 2273.27 2488.22 2851.4 3279.08 3707.23 4133.3 4397.43 5002.87 5938.72 6877.09 7802.36 9711.3 11061.64 15340.81 19697.68 24138.73 28527.6 32332.49 37158.34 41750.31 109.8 6 602.52 653.43 703.26 751.08 800.45 847.8 894.82 941.22 986.68 1032.36 1123.69 1213.98 1306.2 1389.77 1472.19 1769.33 2176.95 2508.95 2910.93 3062.83 3427.34 3788.78 4147.04 4752.33 5465.14 6178.72 6888.83 7329.04 8338.11 9897.87 11461.81 13003.93 16185.5 18436.07 25568.01 32829.46 40231.22 47545.99 53887.48 61930.56 69583.85 80.52 7 821.62 891.05 958.99 1024.21 1091.52 1156.09 1220.21 1283.48 1345.47 1407.76 1532.3 1655.43 1781.18 1895.14 2007.54 2412.72 2968.57 3421.3 3969.45 4176.59 4673.65 5166.52 5655.05 6480.45 7452.46 8425.52 9393.85 9994.15 11370.16 13497.09 15629.74 17732.64 22071.14 25140.09 34865.47 44767.45 54860.76 64835.44 73482.92 84450.77 94887.07 62.22 8 1063.28 1153.12 1241.05 1325.44 1412.55 1496.11 1579.09 1660.98 1741.19 1821.81 1982.98 2142.32 2305.06 2452.54 2597.99 3122.34 3841.67 4427.56 5136.93 5405 6048.25 6686.08 7318.31 8386.47 9644.36 10903.62 12156.75 12933.61 14714.32 17466.83 20226.73 22948.12 28562.65 32534.23 45120.03 57934.35 70996.27 83904.69 95095.55 109289.23 122795.03

&

400 450 & 500 mm

600, 700 & 750 800, 900 & 1200 & mm 1000 mm 1800 MM 18.183 11 3615.14 3920.6 4219.56 4506.5 4802.68 5086.78 5368.91 5647.32 5920.05 6194.15 6742.13 7283.88 7837.21 8338.63 8833.17 10615.96 13061.69 15053.72 17465.57 18376.99 20564.04 22732.68 24882.24 28513.99 32790.82 37072.3 41332.95 43974.26 50028.69 59387.21 68770.87 78023.61 97113.01 110616.39 153408.09 196976.78 241387.32 285275.96 323324.86 371583.39 417503.11 15 12 4410.47 4783.13 5147.87 5497.93 5859.27 6205.87 6550.07 6889.73 7222.47 7556.87 8225.4 8886.33 9561.4 10173.13 10776.47 12951.47 15935.27 18365.53 21308 22419.93 25088.13 27733.87 30356.33 34787.07 40004.8 45228.2 50426.2 53648.6 61035 72452.4 83900.47 95188.8 118477.9 134952 187157.9 240311.7 294492.5 348036.7 394456.3 453331.7 509353.8 5 13 13231.4 14349.4 15443.6 16493.8 17577.8 18617.6 19650.2 20669.2 21667.4 22670.6 24676.2 26659 28684.2 30519.4 32329.4 38854.4 47805.8 55096.6 63924 67259.8 75264.4 83201.6 91069 104361.2 120014.4 135684.6 151278.6 160945.8 183105 217357.2 251701.4 285566.4 355433.6 404856 561473.6 720935 883477.6 1044110 1183369 1359995 1528061

54.9 9 1205.05 1306.87 1406.52 1502.17 1600.89 1695.59 1789.64 1882.44 1973.35 2064.72 2247.38 2427.96 2612.4 2779.54 2944.39 3538.65 4353.9 5017.91 5821.86 6125.66 6854.68 7577.56 8294.08 9504.66 10930.27 12357.43 13777.65 14658.09 16676.23 19795.74 22923.62 26007.87 32371 36872.13 51136.03 65658.93 80462.44 95091.99 107774.95 123861.13 139167.7

29.28 10 2259.46 2450.38 2637.23 2816.56 3001.67 3179.23 3355.57 3529.58 3700.03 3871.35 4213.83 4552.42 4898.26 5211.65 5520.73 6634.97 8163.56 9408.57 10915.98 11485.62 12852.53 14207.92 15551.4 17821.24 20494.26 23170.18 25833.09 27483.91 31267.93 37117.01 42981.8 48764.75 60695.63 69135.25 95880.05 123110.48 150867.08 178297.47 202078.04 232239.62 260939.45

(Section-C, Transportation)

Page No. 21

Lead in km Cost/trip Pay Load 1 2 Unit Per 100 Rmt 0.5 661.57 1 717.47 1.5 772.18 2 824.69 2.5 878.89 3 930.88 3.5 982.51 4 1033.46 4.5 1083.37 5 1133.53 6 1233.81 7 1332.95 8 1434.21 9 1525.97 10 1616.47 15 1942.72 20 2390.29 25 2754.83 30 3196.2 35 3362.99 40 3763.22 45 4160.08 50 4553.45 60 5218.06 70 6000.72 80 6784.23 90 7563.93 100 8047.29 125 9155.25 150 10867.86 175 12585.07 200 14278.32 250 17771.68 300 20242.8 420 28073.68 540 36046.75 660 44173.88 780 52205.5 900 59168.45 1020 67999.76 1140 76403.07

100 mm 480 m 3 137.83 149.47 160.87 171.81 183.1 193.93 204.69 215.3 225.7 236.15 257.04 277.7 298.79 317.91 336.76 404.73 497.98 573.92 665.88 700.62 784 866.68 948.64 1087.1 1250.15 1413.38 1575.82 1676.52 1907.34 2264.14 2621.89 2974.65 3702.43 4217.25 5848.68 7509.74 9202.89 10876.15 12326.76 14166.62 15917.31

150 mm 240 m 4 275.65 298.95 321.74 343.62 366.2 387.87 409.38 430.61 451.4 472.3 514.09 555.4 597.59 635.82 673.53 809.47 995.95 1147.85 1331.75 1401.25 1568.01 1733.37 1897.27 2174.19 2500.3 2826.76 3151.64 3353.04 3814.69 4528.28 5243.78 5949.3 7404.87 8434.5 11697.37 15019.48 18405.78 21752.29 24653.52 28333.23 31834.61

STATEMENT IX Including loading, unloading and stacking STONEWARE PIPES 200 mm 230 mm 250 mm 135 m 105 m 84 m 5 6 7 490.05 531.46 571.99 610.88 651.03 689.54 727.79 765.53 802.5 839.65 913.93 987.37 1062.38 1130.35 1197.39 1439.05 1770.59 2040.61 2367.56 2491.1 2787.57 3081.54 3372.93 3865.23 4444.98 5025.36 5602.91 5960.96 6781.67 8050.27 9322.27 10576.53 13164.21 14994.67 20795.32 26701.3 32721.39 38670.74 43828.48 50370.19 56594.87 630.07 683.3 735.41 785.42 837.04 886.55 935.72 984.25 1031.78 1079.55 1175.06 1269.48 1365.91 1453.3 1539.5 1850.21 2276.47 2623.65 3044 3202.85 3584.02 3961.98 4336.62 4969.58 5714.97 6461.17 7203.74 7664.09 8719.29 10350.34 11985.78 13598.4 16925.41 19278.86 26736.84 34330.24 42070.36 49719.52 56350.9 64761.68 72764.83 787.58 854.13 919.26 981.77 1046.3 1108.19 1169.65 1230.31 1289.73 1349.44 1468.82 1586.85 1707.39 1816.63 1924.37 2312.76 2845.58 3279.56 3805 4003.56 4480.02 4952.48 5420.77 6211.98 7143.71 8076.46 9004.68 9580.11 10899.11 12937.93 14982.23 16998 21156.76 24098.57 33421.05 42912.8 52587.95 62149.4 70438.63 80952.1 90956.04

300 mm 66 m 8 1002.38 1087.08 1169.97 1249.53 1331.65 1410.42 1488.65 1565.85 1641.47 1717.47 1869.41 2019.62 2173.05 2312.08 2449.2 2943.52 3621.65 4173.98 4842.73 5095.44 5701.85 6303.15 6899.17 7906.15 9092 10279.14 11460.5 12192.86 13871.59 16466.45 19068.29 21633.82 26926.79 30670.91 42535.88 54616.29 66930.12 79099.24 89649.17 103029.94 115762.23

350 mm 43 m 9 1538.53 1668.53 1795.77 1917.88 2043.93 2164.84 2284.91 2403.4 2519.47 2636.12 2869.33 3099.88 3335.37 3548.77 3759.23 4517.95 5558.81 6406.58 7433.02 7820.91 8751.67 9674.6 10589.42 12135.02 13955.16 15777.28 17590.53 18714.63 21291.28 25274.09 29267.6 33205.4 41329.49 47076.28 65287.63 83829.65 102729.95 121408.14 137601.05 158138.98 177681.56

400 mm 27 m 10 2450.26 2657.3 2859.93 3054.41 3255.15 3447.7 3638.93 3827.63 4012.48 4198.26 4569.67 4936.85 5311.89 5651.74 5986.93 7195.26 8852.93 10203.07 11837.78 12455.52 13937.85 15407.7 16864.63 19326.15 22224.89 25126.78 28014.56 29804.78 33908.33 40251.33 46611.37 52882.67 65821.04 74973.33 103976.59 133506.48 163606.96 193353.7 219142.41 251850.96 282974.33

(Section-C, Transportation)

Page No. 22

STATEMENT IV Including loading, unloading and stacking Lead in km Cost per trip Cement pay Steel load 9.00 load MT MT 1 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 6.00 7.00 8.00 9.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 60.00 70.00 80.00 90.00 100.00 125.00 150.00 175.00 200.00 250.00 300.00 420.00 540.00 660.00 780.00 900.00 1020.00 1140.00 2 661.57 717.47 772.18 824.69 878.89 930.88 982.51 1033.46 1083.37 1133.53 1233.81 1332.95 1434.21 1525.97 1616.47 1942.72 2390.29 2754.83 3196.2 3362.99 3763.22 4160.08 4553.45 5218.06 6000.72 6784.23 7563.93 8047.29 9155.25 10867.86 12585.07 14278.32 17771.68 20242.8 28073.68 36046.75 44173.88 52205.5 59168.45 67999.76 76403.07 3 73.51 79.72 85.80 91.63 97.65 97.65 109.17 114.83 120.37 125.95 137.09 148.11 159.36 169.55 179.61 215.86 265.59 306.09 355.13 373.67 418.14 462.23 505.94 579.78 666.75 753.80 840.44 894.14 1017.25 1207.54 1398.34 1586.48 1974.63 2249.20 3119.30 4005.19 4908.21 5800.61 6574.27 7555.53 8489.23 4 73.51 79.72 85.80 91.63 97.65 97.65 109.17 114.83 120.37 125.95 137.09 148.11 159.36 169.55 179.61 215.86 265.59 306.09 355.13 373.67 418.14 462.23 505.94 579.78 666.75 753.80 840.44 894.14 1017.25 1207.54 1398.34 1586.48 1974.63 2249.20 3119.30 4005.19 4908.21 5800.61 6574.27 7555.53 8489.23 pay Bulk Asphalt in M.S.Bar 9.0 MT 9.00 Bouzer pay load 4.50 MT 5 147.02 159.44 171.60 183.26 195.31 195.31 218.34 229.66 240.75 251.90 274.18 296.21 318.71 339.10 359.22 431.72 531.18 612.18 710.27 747.33 836.27 924.46 1011.88 1159.57 1333.49 1507.61 1680.87 1788.29 2034.50 2415.08 2796.68 3172.96 3949.26 4498.40 6238.60 8010.39 9816.42 11601.22 13148.54 15111.06 16978.46 6 73.51 79.72 85.80 91.63 97.65 103.43 109.17 114.83 120.37 125.95 137.09 148.11 159.36 169.55 179.61 215.86 265.59 306.09 355.13 373.67 418.14 462.23 505.94 579.78 666.75 753.80 840.44 894.14 1017.25 1207.54 1398.34 1586.48 1974.63 2249.20 3119.30 4005.19 4908.21 5800.61 6574.27 7555.53 8489.23 Sand 5.75 cum

7 115.06 124.78 134.29 143.42 152.85 161.89 170.87 179.73 188.41 197.14 214.58 231.82 249.43 265.39 281.13 337.86 415.70 479.10 555.86 584.87 654.47 723.49 791.90 907.49 1043.60 1179.87 1315.47 1399.53 1592.22 1890.06 2188.71 2483.19 3090.73 3520.49 4882.38 6269.00 7682.41 9079.22 10290.17 11826.05 13287.49

(Section-C, Transportation)

Page No. 23

STATEMENT V Excluding loading, unloading and stacking Lead in km Cost per trip Cement pay Steel load 9.00 load MT MT 1 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 6 7 8 9 10 15 20 25 30 35 40 45 50 55 65 75 85 95 105 130 155 180 230 280 400 520 640 760 880 1000 1120 2 389.32 430.28 470.57 509.58 549.55 588.28 626.79 664.89 702.42 740.1 815.4 890.03 965.89 1036.31 1106 1381.76 1727.34 1990.09 2327.32 2512.21 2826.58 3139.14 3449.73 3640.99 4246.26 4859.17 5463.33 5613.23 6172.02 7565.36 8984.46 10373 13173.5 15490.17 22000.44 28616.18 35159.59 41634.65 48128.65 54399 60993.31 3 43.26 47.81 52.29 56.62 61.06 61.06 69.64 73.88 78.05 82.23 90.60 98.89 107.32 115.15 122.89 153.53 191.93 221.12 258.59 279.13 314.06 348.79 383.30 404.55 471.81 539.91 607.04 623.69 685.78 840.60 998.27 1152.56 1463.72 1721.13 2444.49 3179.58 3906.62 4626.07 5347.63 6044.33 6777.03 4 43.26 47.81 52.29 56.62 61.06 61.06 69.64 73.88 78.05 82.23 90.60 98.89 107.32 115.15 122.89 153.53 191.93 221.12 258.59 279.13 314.06 348.79 383.30 404.55 471.81 539.91 607.04 623.69 685.78 840.60 998.27 1152.56 1463.72 1721.13 2444.49 3179.58 3906.62 4626.07 5347.63 6044.33 6777.03 pay Bulk Asphalt in 9.00 Bouzer pay load 4.50 MT 5 86.52 95.62 104.57 113.24 122.12 122.12 139.29 147.75 156.09 164.47 181.20 197.78 214.64 230.29 245.78 307.06 383.85 442.24 517.18 558.27 628.13 697.59 766.61 809.11 943.61 1079.82 1214.07 1247.38 1371.56 1681.19 1996.55 2305.11 2927.44 3442.26 4888.99 6359.15 7813.24 9252.14 10695.26 12088.67 13554.07

(Section-C, Transportation)

Page No. 24

STATEMENT E Including loading, unloading & stacking.

Lead in km

Cost per trip. 50mm dia. Pay Load. M 2 661.57 717.47 772.18 824.69 878.89 930.88 982.51 1033.46 1083.37 1133.53 1233.81 1332.95 1434.21 1525.97 1616.47 1942.72 2390.29 2754.83 3196.2 3362.99 3763.22 4160.08 4553.45 5218.06 6000.72 6784.23 7563.93 8047.29 9155.25 10867.86 12585.07 14278.32 17771.68 20242.8 28073.68 36046.75 44173.88 52205.5 59168.45 67999.76 76403.07 960.00 3 68.91 74.74 80.44 85.91 91.55 96.97 102.34 107.65 112.85 118.08 128.52 138.85 149.40 158.96 168.38 202.37 248.99 286.96 332.94 350.31 392.00 433.34 474.32 543.55 625.08 706.69 787.91 838.26 953.67 1132.07 1310.94 1487.33 1851.22 2108.63 2924.34 3754.87 4601.45 5438.07 6163.38 7083.31 7958.65

Asbestos cement pipes 80mm dia. 576.00 4 Unit : Per 100 RMT. 114.86 124.56 134.06 143.18 152.59 161.61 170.57 179.42 188.09 196.79 214.20 231.41 248.99 264.93 280.64 337.28 414.98 478.27 554.90 583.85 653.34 722.24 790.53 905.91 1041.79 1177.82 1313.18 1397.10 1589.45 1886.78 2184.91 2478.88 3085.36 3514.38 4873.90 6258.12 7669.08 9063.45 10272.30 11805.51 13264.42 100mm dia. 512.00 5 129.21 140.13 150.82 161.07 171.66 181.81 191.90 201.85 211.60 221.39 240.98 260.34 280.12 298.04 315.72 379.44 466.85 538.05 624.26 656.83 735.00 812.52 889.35 1019.15 1172.02 1325.04 1477.33 1571.74 1788.13 2122.63 2458.02 2788.73 3471.03 3953.67 5483.14 7040.38 8627.71 10196.39 11556.34 13281.20 14922.47 150mm dia. 288.00 6 229.71 249.12 268.12 286.35 305.17 323.22 341.15 358.84 376.17 393.59 428.41 462.83 497.99 529.85 561.27 674.56 829.96 956.54 1109.79 1167.70 1306.67 1444.47 1581.06 1811.83 2083.58 2355.64 2626.36 2794.20 3178.91 3773.56 4369.82 4957.75 6170.72 7028.75 9747.81 12516.23 15338.15 18126.91 20544.60 23611.03 26528.84

1 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 6 7 8 9 10 15 20 25 30 35 40 45 50 60 70 80 90 100 125 150 175 200 250 300 420 540 660 780 900 1020 1140

(Section-C, Transportation)

Page No. 25

Section - D

Cement Consumption & Weight of Pipes

Page No. 26

Page No. 27

Page No. 28

Page No. 29

Page No. 30

Page No. 31

Page No. 32

Section - E

Excavation

SECTION - E - EXCAVATION
Sr. No. 1 Description Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259) Lift 0 to 1.5 M Cum Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-incharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-2/259) Lift 0 to 1.5 M Cum Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-3/259) Lift 0 to 1.5 M Cum Add for every additional lift of 1.5 M Cum beyond initial lift of 1.5 M for Item Nos. 1 to 3 Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road by all means including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-4/259) Lift 0 to 1.5 M Cum Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259) Unit Rate (Rs.) 2012-13 Complete Labour Rate (Rs.) 2013-14 Complete Labour

128.00

128.00

143.00

143.00

161.00 12.00

159.00 12.00

449.00

398.00

(Section-E, Excavation)

Page No.33

Sr. No.

Description

Unit

Lift 0 to 1.5 M Cum Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-incharge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259) Lift 0 to 1.5 M Cum Excavation for foundation / pipe trenches in slush muddy / marshy / slushy / soil including use of poclain, labour for dewatering during execution including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, preparing the bed by cleaning the mud, labour required for execution for shuttering item but excluding backfilling, etc. complete. Providing and fixing shuttering shall be paid separately. Lift 0 to 1.5 M Cum Add for every additional lift of 1.5 M Cum beyond initial lift of 1.5 M for Item Nos. 5 to 8

Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Complete Labour Complete Labour 599.00 489.00

779.00

749.00

312.00 21.00

158.00 21.00

HEAD WORKS
10 Excavation in general in soft material comprising of soft soil, soft murum, sand, hard murum with boulders in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, Supply Well, etc. for lift 0 to 1.5M and lead of 150 M including barricading, guarding, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in-charge, etc. complete excluding refilling. For Head Works on river or dam Cum submergence for initial lift of 0 to 1.5 M For Head Works on nalla or any other site Cum of GSDA for initial lift of 0 to 1.5 M Add for each additional lift of 1.5 M Cum beyond initial lift 1.5 M 351.00 246.00 21.00 350.00 244.00 21.00

a) b) c)

(Section-E, Excavation)

Page No.34

Sr. No. 11

Description Excavation in general in hard material comprising of soft rock, hard rock, Manjara rock, etc. by blasting / controlled blasting, chiselling as required in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, Supply Well, etc. for lift 0 to 1.5 M and lead of 150 M including barricading, guarding, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in-charge, excluding refilling.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

a) b) c) 12

a) b) 13

For Head Works on river or dam submergence for initial lift of 0 to 1.5 M For Head Works on nalla or any other site of GSDA for initial lift of 0 to 1.5 M Add for each additional lift of 1.5 M beyond initial lift 1.5 M Excavation in general in soft material comprising of soft soil, soft murum, sand, hard murum with boulders in wet or dry condition for Head Works and allied works by well sinking process for average depth of 12 M and lead of 150 M including shoring, barricading, guarding, refilling, disposing off surplus excavated stuff as directed by Engineer-in-charge, etc. complete. Diameter upto and including 3 M Diameter more than 3 M Desilting the Supply Well, Intake Well / Head Works, Sump of water supply / sewerage works etc. in wet or dry condition including lifts upto 9 M and lead upto 150 M as required beyond the work site, stacking, spreading, including necessary guarding, etc. complete, as directed by Engineer-in-charge.

Cum Cum Cum

779.00 539.00 21.00

608.00 389.00 21.00

Cum Cum Cum

719.00 599.00 599.00

689.00 572.00 574.00

14

Add for each additional lift of 1.5 M Cum beyond initial lift 9.0 M Dewatering the excavated trenches and HP/ Hr. pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A-9/261) (i) The Contractor at his request may be allowed to start construction of masonry steining so as not to allow silting of well in oncoming monsoon and while paying masonry, 25% amount shall be withheld and released only when excavation to the full depth is completed.

19.00 60.00

19.00 12.00

(Section-E, Excavation)

Page No.35

Sr. No.

Description (ii) Dewatering : Total dewatering charges are to be proposed in the tender as lumpsum amount and 75% is payable for excavation and 25% is payable for construction of well / gallery. Out of 75% excavation, break-up shall be as under

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

15

25% for last 1 M depth. 20% for 2 M depth which is just above last 1 M depth. 15% for 2 M depth which is just above last 3 M depth. 15% for the rest of depth from water table level. The above conditions will restrict the tendencies of agencies to avoid deepening of wells, etc. to the required depth. Refilling the trenches with available Cum excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. Filling in plinth and floors murum bedding Cum in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) Filling in plinth and floors / trenches with Cum contractor's murum for bedding in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-11/263) Providing dry trap/ granite/ quartzite/ Cum gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264) Providing and filling in sand boxing in Cum pipeline or for foundation with sand of approved quality including watering and compaction, etc. complete. (Bd-A-13/264) Open timbering in trenches of depth more than 1.5 M for shoring and strutting including use of and waste of all necessary timber works including walling, strutts, open polling boards / horizontal sheeting, runners, etc. as may be necessary and fixing and removal complete. (Measurements to be taken of the face area timbered) (N.B.O. Item No. 4-15, P.No. 59) a) Lift 0 to 1.5 M for non-water logged Sqm area Additional per Sqm for further lifts of 1.5 Sqm M each

60.00

58.00

16

60.00

58.00

17

629.00

58.00

18

869.00

292.00

19

789.00

126.00

20

194.00 27.00

7.00 17.00

(Section-E, Excavation)

Page No.36

Sr. No.

Description

Unit

b) Lift 0 to 1.5 for water logged area Sqm Additional per Sqm for further lifts of 1.5 Sqm M each Note : For the trenches with more than 1.5 M depth, shoring if required from GL is to be done and is payable from GL.

Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Complete Labour Complete Labour 202.00 14.00 23.00 14.00

(Section-E, Excavation)

Page No.37

Section - F

Iron & Structural Steel Work

SECTION - F - IRON & STRUCTURAL STEEL WORK


Sr. No. Description Unit 1 Providing and fixing mild steel grill work Sqm for windows/ ventilators of 20 Kg/Sqm. as per drawings including necessary welding and painting with one coat of anticorrosive paint and two coats of oil painting, etc. complete. (Bd-U-1/537) 2 Providing and fixing mild steel grill railing Sqm of 20 Kg/Sqm with teak wood hand railing, still and newel posts for staircase and including fabricating, fixtures, erecting, painting the grill work with approved oil paint and polishing the hand rail and newel posts with French polish two coats, etc. complete. (Bd-U-2/537) 3 Providing structural steel work in rolled MT stanchions fixed with connecting plates or angle cleats as in main and cross beams, hip and jack rafters, purlins connecting to truss members and like as per detailed designs and drawings or as directed by Engineer-in-charge including cutting, fabricating, hoisting, erecting, fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. (Bd-C-3/275) 4 Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineer-incharge including cutting, fabrication, hoisting, erecting, fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. (Bd-C-6/277) 5 Providing structural steel work in rolled sections like joists, channels, angles, tees, etc. as per detailed designs and drawings including fixing in position without connecting plates, braces, etc. and one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade, etc. complete. (Bd-C-2/275) Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Complete Labour Complete Labour 1557.00 87.00

2416.00

226.00

60671.00

5845.00

MT

59752.00

5466.00

MT

62638.00

5976.00

(Section-F, Iron Steel)

Page No. 38

Sr. No.

Description

Unit MT

6 Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates, etc. as per detailed design and drawing or as directed by Engineer-in-charge including cutting, fabricating, hoisting, erecting and fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. (Bd-C-8/278)

Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Complete Labour Complete Labour 73578.00 13692.00

(Section-F, Iron Steel)

Page No. 39

Section - G

Plain Cement Concrete, Reinforced Cement Concrete

SECTION - G - PLAIN CEMENT CONCRETE, REINFORCED CEMENT CONCRETE


Sr. No. Description Unit Rate (Rs.) 2012-13 Complete Labour Rate (Rs.) 2013-14 Complete Labour 1 Providing and laying in situ following grades of Cement Concrete of trap/ granite / quartzite / gneiss metal for foundation and bedding including dewatering, form work, compaction, curing, finishing etc. complete. Spec. No. - Bd E /1 Page No. 287 and B-7, Page No. 38 a) M-100 Cum b) M-150 Cum 2 Providing and laying in situ Cement Concrete of trap/ granite / quartzite / gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, form work, bally, steel propups compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement)

3556.00 4006.00

709.00 709.00

a) In RCC M-150 b) In RCC M-200 c) In RCC M-250 d) In RCC M-300 3 Providing and casting in situ Cement Concrete of trap/ granite / quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, bally, steel propups, compaction, finishing the formed surfaces with CM 1:3 of sufficient minimum thickness to give a smooth and even surface whereever necessary or roughning if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) For all types of Columns a) In RCC M-200 b) In RCC M-250 c) In RCC M-300

Cum Cum Cum Cum

4818.00 4910.00 5447.00 5688.00

851.00 852.00 853.00 855.00

Cum Cum Cum

6615.00 7154.00 7393.00

853.00 878.00 856.00

(Section-G, PCC / RCC)

Page No. 40

Sr. No.

Description

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

4 Providing and casting in situ C.C. of trap / granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, bally, steel propups, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) For Beams / Braces / Lintels a) In RCC M-200 Cum b) In RCC M-250 Cum c) In RCC M-300 Cum 5 Providing and casting in situ C.C. of trap / granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, bally, steel propups, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) Slabs / Landings / Vertical Walls / Waist Slabs / Steps for Staircase a) In RCC M-200 Cum b) In RCC M-250 Cum c) In RCC M-300 Cum 6 Providing and casting in situ C.C. of trap / granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, bally, steel propups, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) Chajjas / Parapets / Curtain Walls / Partition Walls / Pardies (Section-G, PCC / RCC) Page No. 41

6570.00 7073.00 7313.00

853.00 855.00 856.00

7154.00 7691.00 7932.00

853.00 855.00 880.00

Sr. No.

Description

Unit Cum Cum Cum

a) In RCC M-200 b) In RCC M-250 c) In RCC M-300 7 Providing and laying in situ R.C.C. of trap / granite/ quartzite / gneiss metal of approved quality for RCC works of domes as per detailed drawings and designs approved by Engineer-in-charge including centering, finishing, roughening the surfaces with special finish or plaster to be provided separately, curing, etc. complete. (By weigh batching and mix design for M-250 and M300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) Domes a) In RCC M-200 b) In RCC M-250 - Bottom Domes only c) In RCC M-300 - Bottom Domes only 8 Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required, etc. complete (including cost of binding wire). (Bd-F-17/306) a) Mild Steel b) Tor Steel c) Corrosion Resistant Steel (Fe 500) d) Only fabrication (Labour) (For all types of steel) 9 Providing fusion bonded epoxy coating to reinforcement bars as per IS-13620/1993 specification for a thickness of 175 (50) microns including extra cost on account of careful handling, extra cost on account of using PVC coated binding wire instead of G.I. wire, extra cost on account of touch-up material supplied by coating agency and repair work, extra cost on account of transportation, loading, unloading, including all taxes (Central and local), etc. complete. A For Reinforcement Diameterwise Rates 1) 8 mm dia 2) 10 mm dia 3) 12 mm dia 4) 16 mm dia 5) 20 mm dia 6) 25 mm dia 7) 28 mm dia 8) 32 mm dia

Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Complete Labour Complete Labour 7245.00 853.00 7783.00 855.00 8023.00 856.00

Cum Cum Cum

7574.00 8126.00 8366.00

853.00 855.00 856.00

MT MT MT MT

58212.00 58212.00 6183.00

MT MT MT MT MT MT MT MT

18160.00 16022.00 14618.00 14084.00 12947.00 11744.00 11209.00 10407.00

(Section-G, PCC / RCC)

Page No. 42

Sr. No.

Description

Unit

Rate (Rs.) 2012-13 Complete Labour 15166.00 11120.00

Rate (Rs.) 2013-14 Complete Labour

B Average Rates ( For estimation only) 1) For 8 mm to 20 mm dia 2) For above 20 mm dia Notes for Estimation 1) All the rates of Reinforced Cement Concrete Items from 1 to 6 shall be increased by 10% for each brace height above 1st brace for R.C.C. E.S.R.s. e.g. For a R.C.C. E.S.R. with 7 M staging and first brace at 3.50 M above ground, the concrete in columns above first brace, concrete of ring beam and bottom slab is entitled for 10% increase, concrete of vertical wall, roof slab and roof beams, columns in container are entitled for 20% increase. 2) These rates are applicable for R.C.C. well works also. These rates shall be increased by 10% for every 5 M depth below initial 5 M depth. 3) Rates for Item Nos. 8 and 9 shall be increased by 5% for each brace height above first brace for R.C.C. E.S.R.s. By 5% for every ring beam below first ring beam for R.C.C. wells. By 1% building works for every floor height. 4) Volumetric mix as per 1:1:3 shall be adopted with 56.5 kg of cement for RCC-250 and 59.5 kg of cement for RCC-300, per load of mixer of 1 bag capacity. 5) Fusion bonded epoxy coating to be proposed only in Coastal Area with prior approval of the Chief Engineer. 6) For estimation purpose, average rates as per Item No. 9b shall be considered wherever necessary.

MT MT

(Section-G, PCC / RCC)

Page No. 43

Section - H

Miscellaneous

SECTION - H - MISCELLANEOUS
Sr. No. Description Unit RM 1 Providing and fixing G.I. pipe railing having 1.0 M height consisting 50 x 50 x 6 mm thick M.S. angles as verticals at 1.5 M c/c and additional posts at every corner with 3 rows of 25 mm dia G.I. pipes of medium class variety as horizontal and painting 3 coats of oil paint over 1 coat of anticorrosive paint of approved colour and shade including cost of all labour, transporting bends to curved shape, etc. complete. A As above but with only 2 rows. 2 Dismantling of ESRs of various capacities and heights using crane (10 MT capacity) and handing over M.S./ C.I./G.I. pipes, valves, bends, etc. to the Department. However taking steel reinforcement by the dismantling agency including removing dismantled materials from site and disposing them at suitable place as directed, etc. complete. A Capacity of E.S.R. upto 2 lakh litres and staging upto 12 M height. i) Congested Area ii) Open Area B Capacity of E.S.R. above 2 lakh litres and staging upto 12 M height. i) Congested Area ii) Open Area Note : Above 12 M staging height, add 5% per metre staging of E.S.R. of any capacity. 3 Providing and fixing M.S. gate 2.5 M wide for compound with 40 mm dia G.I. pipe medium class, approved grill work, RCC M-150 side pillars of 25 cm x 40 cm x 2.5 M height, its foundation, finishing, painting, etc. complete. 4 Providing and fixing Wicket gate 1.0 M wide for compound with 40 mm dia G.I. pipe medium class, approved grill work, RCC M-150 side pillars of 25 cm x 40 cm x 2.5 M height, its foundation, finishing, painting, etc. complete. Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Complete Labour Complete Labour 927.00 49.00

RM

748.00

33.00

Lit Lit

2.16 1.08

2.16 1.08

Lit Lit

1.08 1.08

1.08 1.08

No.

27324.00

3443.00

No.

16101.00

2147.00

(Section-H, Miscellaneous)

Page No. 44

Sr. No.

Description

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

5 Taking trial bore (Core Bore Sampling) by Callyx machine with TCT/NX bits to gather undisturbed strata samples for investigation in all types of strata, soft soil, murum, hard murum with boulders, soft rock, hard rock and quartzite, etc. The item includes all hire and running cost of Callyx machine, conveying all materials to site of work excluding conveyance of callyx machine and back sampling all over burden strata in glass jar and core samples serially numbered at site in a wooden core box, samples to be taken at 1.0 M interval and conveying to the place as directed by Engineer-in-charge. The diameter of bore in overburden shall be 100 mm and of NX size (50 mm) in other strata. The item shall also include M.S. casing pipe of 2.5 mm thick plate in overburden only and shall be 1.0 M above GL with cap over it. a) In overburden (soft soil, murum) b) In weathered rock with boulders c) In weathered rock / soft rock d) In hard rock other than quartzite e) In hard rock quartzite 6 Providing pressure grouting at a pressure of 5.6 kg/sqcm in required row / zigzag fashion as specified at 1.5 M interval as per site conditions to stop leakages through water retaining structures to the entire satisfaction of the Engineer-incharge including material compound, hardening materials, compressor equipment including scaffolding, smooth finishing, etc. complete. i) For masonry structure ii) For concrete structure 7 Drilling 40 mm dia holes in masonry or concrete structure with providing and fixing 0.5 M long G.I. pipeline for pressure grouting including all material, labour cost and machinery charges, etc. complete. 8 Providing and casting ferrocrate water tank at site including all cost of labour and material, etc. complete upto 25,000 litres (for foundation and providing and fixing taps, etc. shall be considered separately). RMT RMT RMT RMT RMT 1156.00 4568.00 2338.00 3110.00 6969.00 126.00 731.00 364.00 524.00 746.00

Bag Bag RM

825.00 815.00 731.00

127.00 127.00 190.00

Lit

4.32

(Section-H, Miscellaneous)

Page No. 45

Sr. No.

Description

Unit

9 Providing and applying one coat of Sqm gamma coating or equivalent such as Dr.Bake, Krishna Conchem, Asian Paint, Atul Limited, Burger Paint, epoxy primer 50 to 60 microns thick and covering two coats of gamma coatings or equivalent such as Dr. Bake, Krishna Conchem, Asian Paint, Atul Limited, Burger Paints 30 microns thick each to new M.S. pipes and structural steel or concrete surface including repainting the surface by finishing by solvent degreasing and derusting by applying chemical method and scaffolding if necessary, etc. complete as per manufacturer's specifications. 10 Making cross connection to existing distribution main of any type including excavation, breaking and removing existing pipes, lowering, laying of specials and pipes in their position, refilling, closing the water supply in that area, dewatering and restarting the water supply, etc. complete as directed by Engineer-incharge for following diameters of existing pipeline, irrespective of diameter of branch line. (The number of joints involved will be paid separately depending upon the nature of joints and required pipes, valves and specials will be supplied free of cost at stores.) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm Note : Only 75% rate shall be payable till satisfactory hydraulic testing is given. No No No No No No No No No No No No No No No No No

Rate (Rs.) 2012-13 Complete Labour 292.00

Rate (Rs.) 2013-14 Complete Labour

1606.00 1833.00 2017.00 2307.00 2422.00 2878.00 3504.00 4277.00 4990.00 5756.00 7097.00 11971.00 14837.00 18736.00 23943.00 31517.00 43788.00

1365.00 1557.00 1714.00 1960.00 2058.00 2446.00 2978.00 3635.00 4241.00 4892.00 6032.00 10174.00 12611.00 15767.00 20148.00 26524.00 36851.00

(Section-H, Miscellaneous)

Page No. 46

Sr. No.

Description

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

11 Dismantling dead pipeline of M.S./ R.C.C./ C.I./ P.S.C. and G.I./ A.C./ P.V.C./ S.W./ H.D.P.E. pipe including cost of necessary excavation and refilling of trenches, breaking the joints, lifting the pipes and stacking to the place as directed by Engineer-in-charge with all leads and lifts including cleaning the surface, etc. complete. A For M.S. / R.C.C. / C.I. / P.S.C. / D.I. i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm viii) 350 mm ix) 400 mm x) 450 mm xi) 500 mm xii) 600 mm xiii) 700 mm xiv) 750 mm B For G.I. / A.C. / P.V.C. / S.W. / H.D.P.E. i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

122.00 134.00 137.00 140.00 154.00 170.00 185.00 206.00 226.00 257.00 269.00 329.00 384.00 431.00

29.00 43.00 46.00 49.00 58.00 68.00 77.00 95.00 108.00 119.00 126.00 159.00 185.00 210.00

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

73.00 81.00 82.00 84.00 93.00 103.00 110.00 125.00 135.00 153.00 162.00 198.00 230.00 259.00

18.00 26.00 27.00 29.00 35.00 41.00 46.00 57.00 65.00 72.00 75.00 95.00 111.00 126.00

(Section-H, Miscellaneous)

Page No. 47

Sr. No.

Description

Unit No

12 Providing and constructing two taps standpost as per type design with excavation 15 cm thick PCC 1:2:4 bedding 20 cm thick PCC 1:2:4 concrete for platform of 1.75 M dia. with side curb and bucket rest, 80 mm dia, heavy duty GI pipe central post duly filled therein with C.C. 1:2:4, 5 M long, 20 mm dia. medium G.I. pipe from point of tapping to standpost, additional 20 mm dia G.I. pipe fixed vertically and horizontally upto 15 mm dia self closing water taps and providing and fixing to 15 mm dia G.I. self closing water tapsone brass ferrule, etc. complete together with all labour and material charges as per drawing and as directed by Engineer-in-charge when good foundation is available. Rate includes draining arrangement by excavating open gutters. A As above but when precast RCC platform or precast standpost is issued free of cost at departmental stores including cost of transportation and fixing, etc. complete. 13 Providing and constructing two taps standpost as per type design with excavation 30 cm thick boulder filling 15 cm thick PCC in 1:2:4 bedding, 20 cm thick PCC, 1:2:4 platform of 1.75 M dia. with side curb and bucket rest, 80 mm dia, heavy duty GI pipe central post duly filled therein with C.C. 1:2:4, 5 M long, 20 mm dia. medium G.I. pipe from point of tapping to standpost, additional 20 mm dia G.I. pipe fixed horizontally and vertically upto 15 mm dia self closing water taps and providing and fixing two 15 mm dia GI self closing water taps, one brass ferrule, etc. complete together with all labour and material charges as per drawing and as directed by Engineer-in-charge when B.C. soil is available. Rate includes draining arrangement by excavating open gutters.

Rate (Rs.) 2012-13 Complete Labour 7360.00

Rate (Rs.) 2013-14 Complete Labour

No

4456.00

No

7483.00

A As above but when precast RCC platform or precast standpost is issued free of cost at departmental stores including cost of transportation and fixing, etc. complete.

No

4581.00

(Section-H, Miscellaneous)

Page No. 48

Section - I (I)

C.I. / D.I. Pipes

SECTION - I - (I) CAST IRON / DUCTILE IRON PIPES


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Providing and supplying ISI mark C.I. S&S pipes (push on joints pressure pipes) of CI of following class and diameters confirming to the IS specification inclusive cost of jointing materials (rubber gasket of EPDM quality) including all statutary duties and taxes levied by GOI & GOM in all respect, education cess, VAT, third party inspection charges of TPI agency approved by MJP including transit insurance, railway freight, unloading from railway wagon, loading into truck, transportation to departmental store/site of work, unloading, stacking etc. complete as directed by engineer incharge. (IS-1536/2001 for Pipes & IS158/1969 & IS-12820/1989 or latest edition/revision with amendments for rubber gasket.) A i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) B i) ii) iii) iv) v) vi) vii) Class 'LA' 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm Class 'A' 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm
With E.D. Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

900.00 1128.00 1425.00 1831.00 2636.00 3555.00 4594.00 4537.00 5522.00 6658.00 7696.00 10253.00 13232.00 14820.00 16589.00 20206.00 24274.00 956.00 1193.00 1552.00 1912.00 2763.00 3735.00 4833.00

844.00 1058.00 1270.00 1718.00 2484.00 3348.00 4317.00 3948.00 4806.00 5794.00 6698.00 8921.00 11514.00 12897.00 14435.00 17582.00 21122.00 852.00 1063.00 1383.00 1703.00 2461.00 3327.00 4306.00

(SECTION - I : (I) C.I. / D.I. PIPES)

Page No. 49

Sr. No. viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) C i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) 2

Description 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm Class 'B' 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm Lowering, laying and jointing with SBR rubber gaskets C.I. S/S pipes of various classes with CI / MS specials of following diameters in proper position, grade and alignment as directed by Engineer-in-charge including conveyance of materials from stores to site of work, including cost of jointing materials and rubber rings, labour, giving hydraulic testing, etc. complete. Note : Only SBR rubber gaskets to be used as per IS-5382 & 12820. CI Class 'LA' / Mortar inlined D.I. K-9 / K-7 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 6043.00 5384.00 7410.00 6602.00 8976.00 7998.00 10292.00 9170.00 13744.00 12245.00 17911.00 15958.00 19896.00 17725.00 22241.00 19815.00 27072.00 24119.00 32562.00 29010.00 1016.00 1272.00 1670.00 2058.00 2987.00 4039.00 5237.00 6554.00 7567.00 9689.00 11136.00 14671.00 19165.00 21583.00 24058.00 29330.00 35189.00 905.00 1134.00 1489.00 1834.00 2661.00 3598.00 4666.00 5840.00 6742.00 8631.00 9921.00 13070.00 17085.00 19229.00 21435.00 26132.00 31352.00

Rate (Rs.) 2013-14

A i) ii) iii) iv) v) vi) vii) viii) ix) x)

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Without With rubber ring rubber ring 44.00 50.00 53.00 59.00 66.00 73.00 70.00 79.00 94.00 104.00 123.00 135.00 133.00 152.00 166.00 186.00 199.00 230.00 199.00 243.00 Page No. 50

(SECTION - I : (I) C.I. / D.I. PIPES)

Sr. No. xi) xii) xiii) xiv) xv) xvi) 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm xvii) 1000 mm B Class 'A' i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm xvii) 1000 mm C Class 'B' i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi)

Description

Unit RMT RMT RMT RMT RMT RMT RMT

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm xvii) 1000 mm Note : Only 85% rate shall be payable till satisfactory hydraulic testing is given.

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 230.00 280.00 303.00 373.00 390.00 525.00 437.00 574.00 535.00 674.00 639.00 846.00 756.00 1026.00 Without With rubber ring rubber ring 46.00 56.00 56.00 66.00 71.00 79.00 78.00 86.00 102.00 110.00 133.00 146.00 145.00 163.00 179.00 200.00 201.00 231.00 211.00 245.00 249.00 298.00 329.00 398.00 423.00 556.00 475.00 610.00 561.00 698.00 676.00 882.00 789.00 1058.00 Without With rubber ring rubber ring 50.00 59.00 60.00 71.00 77.00 86.00 87.00 96.00 110.00 124.00 144.00 164.00 157.00 175.00 193.00 225.00 225.00 255.00 228.00 262.00 268.00 316.00 355.00 423.00 457.00 588.00 516.00 650.00 602.00 737.00 714.00 918.00 814.00 1082.00

Rate (Rs.) 2013-14

(SECTION - I : (I) C.I. / D.I. PIPES)

Page No. 51

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

3 Providing and supplying ISI mark D.I. S&S pipes (push on joints pressure pipes) of DI of following class and diameters confirming to the IS specification inclusive cost of jointing materials (rubber gasket of EPDM quality) including all statutary duties and taxes levied by GOI & GOM in all respect, education cess, VAT, third party inspection charges of TPI agency approved by MJP including transit insurance, railway freight, unloading from railway wagon, loading into truck, transportation to departmental store/site of work, unloading, stacking etc. complete as directed by engineer incharge. (IS-1536/2001 for Pipes & IS158/1969 & IS-12820/1989 or latest edition/revision with amendments for rubber gasket.) A D.I. K-9 grade i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) B i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) 100 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm D.I. K-7 grade 100 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT With E.D. 1145.00 1670.00 2076.00 2768.00 3519.00 4405.00 5208.00 6288.00 7308.00 9664.00 12403.00 14102.00 15339.00 18933.00 22098.00 With E.D. 977.00 1434.00 1692.00 2242.00 2826.00 3480.00 4143.00 5000.00 5859.00 7717.00 10409.00 12097.00 13989.00 16779.00 Without E.D. 1041.00 1518.00 1888.00 2516.00 3200.00 4010.00 4730.00 5716.00 6644.00 8773.00 11276.00 12819.00 13949.00 17212.00 20089.00 Without E.D. 888.00 1304.00 1538.00 2038.00 2569.00 3164.00 3766.00 4545.00 5326.00 7015.00 9463.00 10997.00 12717.00 15264.00 Page No. 52

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

(SECTION - I : (I) C.I. / D.I. PIPES)

Sr. No.

Description

Unit

xv) 1000 mm RMT 4 Providing and making lead caulked joint with molten lead to Cast Iron pipes and/or specials of all classes and fitting of following dia including cost of lead and all jointing material, labour, hydraulic testing, etc. complete. i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi)
xvii)

Rate (Rs.) 2012-13 19646.00 17860.00

Rate (Rs.) 2013-14

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv)

80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900mm 1000 mm Note : Only 85% rate shall be payable till satisfactory hydraulic testing is given. Providing and supplying ISI standard CI double flanged pipes including all taxes (Central and local), railway freight, insurance, unloading from railway wagon, loading into truck, transport to stores / site, unloading, stacking, etc. complete as directed by Engineer-incharge. 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm

Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint

657.00 812.00 968.00 1200.00 1750.00 2126.00 2564.00 2906.00 3389.00 4707.00 5060.00 6501.00 7637.00 8675.00 9316.00 9936.00 10594.00

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

1419.00 1753.00 2284.00 2849.00 4371.00 5890.00 7573.00 9885.00 12053.00 14473.00 16986.00 24162.00 32371.00 35221.00

(SECTION - I : (I) C.I. / D.I. PIPES)

Page No. 53

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

6 Providing and supplying ISI standard C.I. flanged / S&S specials including all taxes (Central and local), railway freight, insurance, unloading from railway wagon, loading into truck, transport to departmental stores / site, unloading, stacking, etc. complete. A i) ii) iii) B i) ii) iii) C i) ii) iii) 7 D/F Specials 80 mm dia to 300 mm dia KG 350 mm dia to 600 mm dia KG Above 600 mm dia KG S/S Specials / Socketed Branch Flanged Specials 80 mm dia to 300 mm dia KG 350 mm dia to 600 mm dia KG Above 600 mm dia KG Plain ended / plain ended branch flanged specials 80 mm dia to 300 mm dia KG 350 mm dia to 600 mm dia KG Above 600 mm dia KG Providing and supplying ISI standard MS specials of required thickness with 3 coats of approved make epoxy paint (Shalimar, Ciba or Mahindra & Mahindra make) from inside and outside including all taxes (Central and Local), octroi, inspection charges, transportation to stores/ site and stacking, etc. complete. Machine ends suitable for PSC pipes of KG all diameters as per detailed drawing with 10 mm thick x 0.7 M long barrel welded to it. Only flanges with machining and drilling KG holes, etc. complete more than 40 mm thick. Double flanged specials of all KG diameters All socketed specials or socketed KG branch flanged specials of all diameters. Plain ended specials or plain ended KG branch flanged specials of all diameters. MS barrels (pipe pieces) locally KG manufactured (for small quantities) Providing and making flanged joints to flanged C.I./ M.S. pipes of all classes / specials etc. including cost of all jointing materials (rubber packing, nut bolts, etc.), labour, hydraulic testing, etc. complete. 80 mm Joint 100 mm Joint 125 mm Joint

73.60 78.20 83.90

71.30 75.90 80.50

69.00 75.90 80.50

a)

76.50

b)

74.30

c) d)

72.10 72.10

e)

72.10

f) 8

70.00

i) ii) iii)

174.00 301.00 314.00 Page No. 54

(SECTION - I : (I) C.I. / D.I. PIPES)

Sr. No. iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi)
xvii)

Description 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900mm 1000 mm Note : Only 85% rate shall be payable till satisfactory hydraulic testing is given. Erecting, hoisting in position, jointing and testing M.S./C.I. D/F pipes and specials in vertical position including cost of all jointing materials (rubber packing, nut bolts, etc.), labour, scaffolding, hydraulic testing, etc. complete. 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900mm 1000 mm Note : Only 85% rate shall be payable till satisfactory hydraulic testing is given. Providing and supplying ISI standard D.I. specials and fittings with sealing rubber gasket of S.B.R. complete with Cast Iron follower gland and M.S. nut bolts coated or otherwise protected from rusting and suitable for D.I. pipes including cost of labour, material and transportation to stores/ site, loading, unloading including all taxes, etc. complete as per IS-9523.

Unit Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint

Rate (Rs.) 2012-13 603.00 626.00 897.00 931.00 1213.00 1511.00 1848.00 1912.00 2052.00 3093.00 3179.00 4398.00 4560.00 4721.00

Rate (Rs.) 2013-14

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi)
xvii)

Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint

193.00 326.00 344.00 640.00 680.00 970.00 1025.00 1331.00 1655.00 2022.00 2115.00 2323.00 3445.00 3576.00 4843.00 5098.00 5373.00

10

(SECTION - I : (I) C.I. / D.I. PIPES)

Page No. 55

Sr. No.

Description For all types of specials, bends, tees, etc. 80 to 300 mm dia 350 mm and above dia Providing and supplying ISI standard Welded D.I. double flanged pipes including all taxes (central & local), railway freight, insurance, unloading from railway wagon, loading into truck, transport to store/site, unloading, stacking, etc. complete as directed by Engineer-in-charge (for 2.75 M bare pipe). 100 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

a) b) 11

KG KG

107.00 130.00

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv)

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

1863.00 2530.00 3238.00 4394.00 5531.00 7203.00 8720.00 10419.00 12110.00 15946.00 21457.00 26228.00 32555.00 38225.00

(SECTION - I : (I) C.I. / D.I. PIPES)

Page No. 56

Section - I (II)

A.C. Pipes

SECTION - I - (II) ASBESTOS CEMENT PIPES


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Providing and supplying Asbestos Cement pressure pipes manufactured and tested as per ISO-160 standards of following class and diameter in standard lengths including cost of all taxes (Central and local), insurance, railway freight, inspection charges, unloading from railway wagon, loading into truck, transporting to departmental stores / site, unloading, stacking, etc. complete.

A Class 15 (Test Pressure 1.5 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm B Class 20 (Test Pressure 2.0 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm C Class 25 (Test Pressure 2.5 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm

With E.D. RMT RMT RMT RMT RMT RMT RMT 139.00 179.00 214.00 376.00 0.00 0.00 0.00 With E.D. 153.00 229.00 269.00 475.00 0.00 0.00 0.00 With E.D. 173.00 288.00 334.00 598.00 0.00 0.00 0.00

RMT RMT RMT RMT RMT RMT RMT

RMT RMT RMT RMT RMT RMT RMT

Without E.D. 126.00 162.00 194.00 341.00 497.00 719.00 1052.00 Without E.D. 139.00 208.00 244.00 431.00 612.00 906.00 1119.00 Without E.D. 190.00 317.00 367.00 658.00 789.00 1184.00 1298.00

(SECTION - I : (II) A.C. PIPES)

Page No. 57

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

2 Providing and supplying C.I. detachable joints suitable for A.C. pressure pipes manufactured as per IS-1538/1993 standards of following class and diameter including cost of all taxes (Central and local), insurance, railway freight, inspection charges, unloading from railway wagon, loading into truck, transporting to departmental store / site, unloading, stacking and cost of rubber rings, nut bolts, etc. complete. (IS-1538/1993) A Class 10 (Test Pressure 1.0 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm viii) 350 mm ix) 400 mm x) 450 mm xi) 500 mm xii) 600 mm A Class 15 (Test Pressure 1.5 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm B Class 20 (Test Pressure 2.0 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm

With E.D. No No No No No No No No No No No No 255.00 323.00 408.00 519.00 791.00 1080.00 1360.00 2338.00 2678.00 3655.00 5185.00 8840.00 With E.D. 300.00 380.00 510.00 636.00 960.00 1204.00 1650.00 With E.D. 325.00 425.00 550.00 659.00 886.00 1250.00 1790.00

With E.D.

No No No No No No No

No No No No No No No

(SECTION - I : (II) A.C. PIPES)

Page No. 58

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

3 Providing and supplying A.C. pressure coupler suitable for A.C. pressure pipes manufactured as per ISO-160 standards of following class and diameter including cost of all taxes (Central and local), insurance, railway freight, inspection charges, and cost of rubber rings, nut bolts, etc. complete (supply at stores / site).

A Class 15 (Test Pressure 1.5 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm B Class 20 (Test Pressure 2.0 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm 4 Lowering, laying and jointing with C.I.D. joints, A.C. pressure pipes and C.I. or M.S. specials of following class and diameters including conveyance from stores to site of works, cost of labour and material, giving satisfactory hydraulic testing, etc. as per ISI code, etc. complete but excluding cost of C.I.D. joints, nut bolts, rubber rings. A Class 15 (Test Pressure 1.5 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm B Class 20 (Test Pressure 2.0 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm

With E.D. No No No No 39.00 50.00 69.00 84.00

No No No No

42.00 56.00 72.00 98.00

RMT RMT RMT RMT RMT RMT RMT

31.00 43.00 46.00 57.00 73.00 92.00 113.00

RMT RMT RMT RMT RMT RMT RMT

32.00 46.00 50.00 63.00 83.00 104.00 129.00 Page No. 59

(SECTION - I : (II) A.C. PIPES)

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

5 Lowering, laying and jointing with C.I.D. jointing with A.C. couplers, A.C. pressure pipes and C.I. or M.S. specials of following class and diameters including conveyance from stores to site of works, cost of labour and material, giving satisfactory hydraulic testing, etc. as per ISI code, etc. complete but excluding cost of A.C. couplers and rubber rings. A Class 15 (Test Pressure 1.5 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm B Class 20 (Test Pressure 2.0 MPa) i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm Notes 1) 85% payment for lowering, laying, jointing shall be provided till satisfactory hydraulic testing is given. 2) Without any extra cost every pipe in the factory shall be hydraulically tested for one higher class i.e. when Class-15 pipe is ordered, every pipe shall be tested for 20 kg/cm at factory, but pipe shall be branded and paid as Class-15. This foot note shall appear in tender conditions.

RMT RMT RMT RMT RMT RMT RMT

21.00 28.00 33.00 42.00 58.00 74.00 96.00

RMT RMT RMT RMT RMT RMT RMT

22.00 33.00 37.00 48.00 69.00 86.00 113.00

(SECTION - I : (II) A.C. PIPES)

Page No. 60

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

3) Whenever manufacturer is separate and contractor for lowering, laying, jointing and testing is separate, the principal contractor shall enter into an agreement with A.C. pipe manufacturer for satisfactory manufacturing, transporting, lowering, laying, jointing and testing of pipes. This foot note shall appear into the tender conditions.

(SECTION - I : (II) A.C. PIPES)

Page No. 61

Section - I (III)

P.V.C. Pipes

SECTION - I - (III) POLYVINYL CHLORIDE PIPES (PVC)


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no. 4985/1988 including all local and central taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to the departmental stores / site and stacking the same in closed shed duly protected from sun rays and rains including cost of jointing material i.e. solvent cement, etc. complete (selffit type to be jointed with cement solvent).

Notes 1) 10% of cost of pipes shall be considered for cost of PVC specials for estimate purpose only. 2) One coupler and required cement solvent shall be provided with each full length pipe, cost of which is included in rates below. A Working Pressure 4 Kg/cm i) 63 mm ii) 75 mm iii) 90 mm iv) 110 mm v) 140 mm vi) 160 mm vii) 180 mm vii) 200 mm ix) 225 mm x) 250 mm xi) 280 mm xii) 315 mm xiii) 355 mm xiv) 400 mm B Working Pressure 6 Kg/cm i) 63 mm ii) 75 mm iii) 90 mm iv) 110 mm v) 140 mm vi) 160 mm vii) 180 mm viii) 200 mm ix) 225 mm x) 250 mm xi) 280 mm xii) 315 mm xiii) 355 mm xiv) 400 mm C Working Pressure 8 Kg/cm

With E.D.

Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

46.00 65.00 91.00 124.00 208.00 274.00 372.00 460.00 589.00 719.00 953.00 1213.00 1626.00 2074.00
With E.D.

41.00 58.00 81.00 110.00 184.00 243.00 331.00 408.00 522.00 638.00 847.00 1078.00 1445.00 1844.00
Without E.D.

66.00 93.00 133.00 185.00 307.00 397.00 528.00 673.00 851.00 1061.00 1401.00 1786.00 2384.00 3046.00
With E.D.

58.00 83.00 119.00 164.00 273.00 353.00 469.00 599.00 755.00 944.00 1244.00 1587.00 2118.00 2706.00
Without E.D.

(SECTION - I : (III) P.V.C. PIPES)

Page No. 62

Sr. No. i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) D i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) E i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) 2

Description 63 mm 75 mm 90 mm 110 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm Working Pressure 10 Kg/cm 63 mm 75 mm 90 mm 110 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm Working Pressure 12.5 Kg/cm 63 mm 75 mm 90 mm 110 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes for potable water with rubber ring joints including cost of rubber ring as per IS-4985/1998, all local and central taxes, transportation, freight charges, transit insurance, inspection charges, loading, unloading, conveyance to store / site and stacking the same in closed shed duly protected from sun rays and rains, etc. (with third party inspection) (socketed).

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 91.00 80.00 129.00 114.00 183.00 162.00 257.00 229.00 427.00 379.00 557.00 496.00 740.00 658.00 931.00 827.00 1181.00 1050.00 1478.00 1313.00 1946.00 1729.00 2464.00 2191.00 3315.00 2945.00 4293.00 3814.00
With E.D. Without E.D.

Rate (Rs.) 2013-14

108.00 154.00 223.00 315.00 508.00 666.00 915.00 1131.00 1445.00 1826.00 2294.00 2916.00 3920.00 4999.00
With E.D.

96.00 138.00 197.00 278.00 452.00 590.00 813.00 1005.00 1283.00 1621.00 2039.00 2590.00 3484.00 4442.00
Without E.D.

138.00 195.00 281.00 399.00 648.00 851.00 1164.00 1446.00 1837.00 2322.00 2920.00 3724.00 4977.00 6449.00

123.00 173.00 250.00 354.00 575.00 757.00 1035.00 1284.00 1632.00 2063.00 2596.00 3310.00 4423.00 5730.00

(SECTION - I : (III) P.V.C. PIPES)

Page No. 63

Sr. No. A i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) B i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) C i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) D i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) E

Description Working Pressure 4 Kg/cm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm Working Pressure 6 Kg/cm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm Working Pressure 8 Kg/cm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm Working Pressure 10 Kg/cm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm Working Pressure 12.5 Kg/cm

Unit

Rate (Rs.) 2012-13


With E.D. Without E.D.

Rate (Rs.) 2013-14

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

48.00 69.00 96.00 131.00 181.00 219.00 291.00 395.00 487.00 623.00 763.00 1011.00 1287.00
With E.D.

43.00 60.00 85.00 117.00 161.00 195.00 257.00 350.00 434.00 554.00 678.00 899.00 1142.00
Without E.D.

69.00 98.00 142.00 197.00 271.00 325.00 421.00 560.00 714.00 902.00 1126.00 1484.00 1892.00
With E.D.

61.00 88.00 126.00 173.00 239.00 290.00 373.00 498.00 634.00 800.00 1001.00 1319.00 1682.00
Without E.D.

95.00 137.00 193.00 272.00 376.00 454.00 591.00 785.00 988.00 1252.00 1565.00 2063.00 2613.00
With E.D.

84.00 122.00 171.00 243.00 334.00 402.00 526.00 697.00 877.00 1113.00 1390.00 1834.00 2323.00
Without E.D.

114.00 165.00 236.00 333.00 460.00 538.00 705.00 969.00 1199.00 1531.00 1935.00 2432.00 3090.00
With E.D.

103.00 146.00 209.00 296.00 406.00 478.00 626.00 862.00 1065.00 1360.00 1720.00 2161.00 2746.00
Without E.D.

(SECTION - I : (III) P.V.C. PIPES)

Page No. 64

Sr. No. i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) 3

Description 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm Lowering, laying and jointing PVC pipes and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material, except cement solvent, rubber ring, giving satisfactory hydraulic testing as per IS code, etc. complete (with cement solvent joint / ring fit joint). Working Pressure 4 Kg/cm 63 mm 75 mm 90 mm 110 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm Working Pressure 6 to 12.5 Kg/cm 63 mm 75 mm 90 mm 110 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm Notes

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 146.00 129.00 207.00 183.00 297.00 265.00 424.00 376.00 584.00 518.00 687.00 611.00 903.00 801.00 1235.00 1097.00 1531.00 1361.00 1946.00 1730.00 2462.00 2186.00 3096.00 2751.00 3946.00 3507.00

Rate (Rs.) 2013-14

A i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) B i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv)

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

16.00 21.00 25.00 29.00 34.00 38.00 42.00 46.00 53.00 57.00 63.00 70.00 77.00 84.00

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

22.00 29.00 33.00 37.00 44.00 47.00 53.00 58.00 63.00 69.00 78.00 87.00 96.00 106.00

(SECTION - I : (III) P.V.C. PIPES)

Page No. 65

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

1) Only 85% rate shall be payable till satisfactory hydraulic testing is given. 2) Third party inspecting agency shall invariably carry out (1) Specific Gravity Test, (2) Weight / RMT (3) Ash Content Test and confirm in writing that those are within prescribed limits. This condition shall appear in tender conditions. 3) After receipt of pipes at site, concerned Deputy Engineer shall confirm that weight of pipe for every class and diameter is not less than the prescribed standard weight as per IS-4985/1998 (which is given in CSR). Underweight pipes shall be rejected. This condition shall appear in the tender conditions.

(SECTION - I : (III) P.V.C. PIPES)

Page No. 66

Section - I (IV)

G.I. Pipes

SECTION - I - (IV) GALVANIZED IRON PIPES (GI)


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Providing ISI mark G.I. pipes of following class and dia. including all local and central taxes, octroi, inspection charges, transportation to stores, etc. complete. (IS1239/2004) Note : One coupler shall be provided with each full length pipe, cost of which is included in rates below. A Light i) 15 mm (0.96 kg/m) ii) 20 mm (1.42 kg/m) iii) 25 mm (2.03 kg/m) iv) 32 mm (2.61 kg/m) v) 40 mm (3.29 kg/m) vi) 50 mm (4.18 kg/m) vii) 65 mm (5.92 kg/m) viii) 80 mm (6.98 kg/m) ix) 100 mm (10.20 kg/m) B Medium i) 15 mm (1.23 kg/m) ii) 20 mm (1.59 kg/m) iii) 25 mm (2.40 kg/m) iv) 32 mm (3.17 kg/m) v) 40 mm (3.65 kg/m) vi) 50 mm (5.16 kg/m) vii) 65 mm (6.63 kg/m) viii) 80 mm (8.64 kg/m) ix) 100 mm (12.40 kg/m) x) 125 mm (16.70 kg/m) xi) 150 mm (19.70 kg/m) C Heavy i) 15 mm (1.46 kg/m) ii) 20 mm (1.91 kg/m) iii) 25 mm (2.99 kg/m) iv) 32 mm (3.97 kg/m) v) 40 mm (4.47 kg/m) vi) 50 mm (6.24 kg/m) vii) 65 mm (8.02 kg/m) viii) 80 mm (10.30 kg/m) ix) 100 mm (14.70 kg/m) x) 125 mm (18.30 kg/m) xi) 150 mm (21.80 kg/m) 2 Lowering, laying and jointing G.I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, giving satisfactory hydraulic test, etc. complete, either underground or in vertical position, as directed by Engineer-in-charge. A Light i) 15 mm

With E.D.

Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

71.00 106.00 146.00 183.00 229.00 288.00 397.00 477.00 680.00


With E.D.

65.00 95.00 131.00 166.00 208.00 255.00 349.00 420.00 596.00


Without E.D.

85.00 108.00 165.00 209.00 240.00 342.00 424.00 556.00 820.00 1097.00 1311.00
With E.D.

77.00 98.00 150.00 189.00 218.00 301.00 384.00 503.00 719.00 978.00 1151.00
Without E.D.

96.00 125.00 196.00 246.00 285.00 395.00 508.00 649.00 936.00 1159.00 1396.00

87.00 113.00 177.00 223.00 259.00 359.00 461.00 589.00 849.00 1052.00 1266.00

RMT

23.00 Page No. 67

(SECTION - I : (IV) G.I. PIPES)

Sr. No. ii) iii) iv) v) vi) vii) viii) ix) B i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) C i) ii) iii) iv) v) vi) vii) viii) ix) x) xi)

Description 20 mm 25 mm 32 mm 40 mm 50 mm 65 mm 80 mm 100 mm Medium 15 mm 20 mm 25 mm 32 mm 40 mm 50 mm 65 mm 80 mm 100 mm 125 mm 150 mm Heavy 15 mm 20 mm 25 mm 32 mm 40 mm 50 mm 65 mm 80 mm 100 mm 125 mm 150 mm Note : Only 85% rate shall be payable till satisfactory hydraulic testing is given.

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 26.00 32.00 37.00 46.00 55.00 80.00 89.00 106.00 25.00 28.00 34.00 39.00 50.00 59.00 86.00 97.00 106.00 113.00 119.00 27.00 30.00 36.00 43.00 54.00 67.00 94.00 113.00 106.00 118.00 128.00

Rate (Rs.) 2013-14

(SECTION - I : (IV) G.I. PIPES)

Page No. 68

Section - I (V)

Stone Ware Pipes

SECTION - I - (V) STONEWARE PIPES


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-142 1 Providing ISI standard Stoneware pipes including all taxes (Central and local), inspection charges, railway freight, unloading from railway wagons, loading into trucks, transport to departmental stores, unloading, stacking, etc. complete. (IS-651) i) 100 mm ii) 150 mm iii) 200 mm iv) 225 mm v) 250 mm vi) 300 mm 2 Lowering, laying and jointing in proper grade and alignment Stoneware pipes with cement joints in C.M. (1:1) proportion of following diameters including cost of conveyance from stores to site of work, jointing material, labour, giving satisfactory hydraulic testing, etc. complete. (IS-1742) i) ii) iii) iv) v) vi) 100 mm 150 mm 200 mm 225 mm 250 mm 300 mm Note : Only 85% rate shall be payable till satisfactory hydraulic testing is given.

RMT RMT RMT RMT RMT RMT

122.00 167.00 223.00 269.00 300.00 352.00

RMT RMT RMT RMT RMT RMT

64.00 105.00 131.00 143.00 156.00 183.00

(SECTION - I : (V) STONEWARE PIPES)

Page No. 69

Section - I (VI)

R.C.C. Pipes

SECTION - I - (VI) REINFORCED CONCRETE PIPES (RCC)


Sr. No. Description Unit Rate (Rs.) 2012-13 1 Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, including all taxes (Central and local), inspection charges, transport to departmental stores / site, unloading and stacking, etc. complete. (IS458/1988) Notes 1) One collar should be supplied with each full length plain ended RCC pipe, cost included in rates below. 2) One rubber ring should be supplied with each full length of socketed pipe, cost included in rates below. A Class 'P-I' i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) B i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) C 80 mm 100 mm 150 mm 200 mm 225 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm Class 'P-II' 80 mm 100 mm 150 mm 200 mm 225 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm Class 'P-III' RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Collar Joints
With E.D. Without E.D.

Rubber Ring Joints


With E.D.
Without E.D.

309 324 339 396 452 494 632 681 864 1064 1280 1615 2103 2428 3056 3580 4068 4887
Collar Joints
With E.D.

281 294 309 360 411 449 575 619 785 966 1163 1466 1910 2205 2775 3252 3694 4438
Without E.D.

273 293 304 355 407 443 567 613 782 962 1153 1456 1892 2184 2751 3225 3662 4402
With E.D.

247 267 275 322 369 403 514 556 710 873 1046 1322 1719 1983 2498 2928 3326 3998
Without E.D.

Rubber Ring Joints

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

329 351 420 566 670 725 956 1193 1332 1616 2256 2797 3811 4583 5163 6249
Collar Joints

299 319 381 513 608 659 869 1084 1210 1467 2049 2541 3461 4163 4689 5675

293 316 379 513 604 658 914 1080 1213 1450 2056 2521 3466 4177 5202 5626

265 286 344 465 547 598 829 981 1101 1317 1867 2290 3148 3794 4724 5109

Rubber Ring Joints

(SECTION - I : (VI) R.C.C. PIPES)

Page No. 70

Sr. No.

Description

Unit
With E.D.

Rate (Rs.) 2012-13


Without E.D. With E.D.
Without E.D.

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) D i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) E i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv)

80 mm 100 mm 150 mm 200 mm 225 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm Class 'NP-II' (For 2.00 M length) 80 mm 100 mm 150 mm 200 mm 225 mm 250 mm 300 mm (For 2.50 M length) 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1400 mm 1600 mm 1800 mm Class 'NP-III' (For 2.00 M length) 80 mm 100 mm 150 mm 200 mm 225 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

355 383 437 594 709 829 1151 1502 2067 2372 2895 3719 5305 6738
Collar Joints

322 348 397 540 643 753 1046 1364 1878 2155 2630 3378 4819 6119

351 379 438 595 709 830 1151 1502 2067 2373 2896 3720 5305 6738
Rubber Ring Joints

318 343 397 540 643 752 1045 1364 1878 2156 2629 3378 4818 6119

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

290 298 348 407 454 488 652 799 928 1088 1272 1679 2422 2767 3545 4243 5327 5703 6778 7782 10901
Collar Joints

293 304 354 415 463 498 665 815 947 1110 1297 1713 2470 2822 3616 4328 5434 5817 6914 7938 11119
Rubber Ring Joints

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

328 372 410 612 713 763 868 1537 1722 2047 2274 2996 4072 4851

335 379 418 624 727 778 885 1568 1756 2088 2319 3056 4153 4948 Page No. 71

(SECTION - I : (VI) R.C.C. PIPES)

Sr. No. xv) xvi) xvii) xviii) xix) xx) xxi) F i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) 2 900 mm 1000 mm 1100 mm 1200 mm 1400 mm 1600 mm 1800 mm Class 'NP-IV'

Description

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT 5603 6855 7930 9304 11180 16292 21550
Collar Joints

Rate (Rs.) 2012-13 5715 6992 8089 9490 11404 16618 21981
Rubber Ring Joints

80 mm 100 mm 150 mm 200 mm 225 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1400 mm 1600 mm 1800 mm Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in CM 1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar), including cost of conveyance from stores to site of works, cost of jointing material, labour, giving hydraulic testing, etc. complete as directed by Engineer-in-charge. (IS-783/1985) (For all class of pipes)

353 414 469 655 774 872 1111 1687 1807 2131 2604 3185 4767 5444 6376 9026 9792 9836 15359 19148 26249

360 422 478 668 789 889 1133 1721 1843 2174 2656 3249 4862 5553 6504 9207 9988 10033 15666 19531 26774

Collar Joints

Rubber Ring Joints

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii)

80 mm 100 mm 150 mm 200 mm 225 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

44 53 80 106 124 140 168 173 220 266 290 367 416

31 37 56 75 88 98 118 121 155 185 203 254 289 Page No. 72

(SECTION - I : (VI) R.C.C. PIPES)

Sr. No. xiv) xv) xvi) xvii) xviii) xix) xx) xxi)

Description 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1400 mm 1600 mm 1800 mm Note : Only 85% rate shall be payable till satisfactory hydraulic testing is given.

Unit RMT RMT RMT RMT RMT RMT RMT RMT 482 530 580 806 856 954 1052 1150

Rate (Rs.) 2012-13 334 369 404 547 582 652 722 792

(SECTION - I : (VI) R.C.C. PIPES)

Page No. 73

Section - I (VII)

P.S.C. Pipes

SECTION - I - (VII) PRESTRESSED CONCRETE PIPES (PSC)


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Providing ISI standard Pre-stressed Cement concrete pipes of following class and diameter including cost of all material and labour required, cost of all taxes (Central and local), inspection charges, transportation to stores / site, unloading and stacking, etc. complete. (IS784/2001) i) Factory Test Pressurea) Site test pressure + 0.1 N/mm2, for working pressure upto 1N/mm2. b) Site test pressure + 0.2 N/mm2, for working pressure above 1N/mm2. ii) Site Test Pressure- 1.5 times working pressure pertaining to the section or 1.1 times static pressure, whichever is more (such pressure is to be controlled within 25 % of pump head in case of pumping main) iii) Working Pressure- The maximum sustained internal pressure excluding surge to which each portion of pipeline may be subjected when installed. Notes : One rubber ring should be supplied with each pipe, cost included in rates below. Factory Test Pressure 2 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 4 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm

A i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) B i) ii) iii) iv) v) vi) vii) viii) ix) x) xi)

With E.D.

Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

3400 3657 3837 4225 5078 5654 6983 8684 10121 11560 13358 15447 16996 19452 21575 23699 25823
With E.D.

3085 3318 3481 3833 4608 5130 6335 7878 9184 10488 12119 14014 15419 17648 19574 21501 23427
Without E.D.

3400 3658 3837 4225 5080 5656 6984 8685 10124 11562 13358

3085 3319 3481 3833 4609 5131 6336 7879 9186 10490 12120

(SECTION - I : (VII) P.S.C. PIPES)

Page No. 74

Sr. No. xii) xiii) xiv) xv) xvi) xvii) C i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) D i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) E i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi)

Description 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 6 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 8 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 10 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 15451 16998 19455 21578 23703 25825


With E.D.

Rate (Rs.) 2013-14 14017 15420 17651 19577 21504 23430 3089 3338 3490 3861 4670 5310 6570 8189 9552 10877 12599 14555 16014 18344 20373 22402 24432

Without E.D.

3404 3678 3847 4255 5148 5851 7242 9027 10529 11988 13888 16044 17652 20220 22456 24693 26929
With E.D.

Without E.D.

3411 3705 3871 4315 5321 6146 7548 9409 11004 12590 14576 16861 18637 21355 24097 26838 29579
With E.D.

3094 3362 3513 3915 4827 5577 6848 8537 9983 11423 13226 15299 16909 19376 21861 24348 26836
Without E.D.

3428 3757 4007 4489 5550 6396 7933 9886 11577 13285 15392 17821 20144 23092 25733 28372

3110 3407 3635 4071 5035 5802 7197 8969 10505 12053 13964 16168 18275 20951 23347 25742 Page No. 75

(SECTION - I : (VII) P.S.C. PIPES)

Sr. No. xvii) F i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) G i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) H i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) I i) ii) iii)

Description 1800 mm Factory Test Pressure 12 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 14 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 16 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 18 Kg/cm 350 mm 400 mm 450 mm

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 31012 28138


With E.D. Without E.D.

Rate (Rs.) 2013-14

3512 3855 4134 4642 5771 6683 8309 10333 12105 13879 16357 18944 20960 24004 26746 29490 32232
With E.D.

3185 3498 3750 4211 5235 6064 7539 9375 10984 12592 14842 17089 19017 21777 24266 26754 29243
Without E.D.

3598 3957 4262 4792 5993 6972 8688 10827 12915 14840 17205 19860 22633 25936 29004 32072 35141
With E.D.

3263 3591 3866 4348 5437 6326 7882 9823 11717 13464 15610 18018 20534 23531 26315 29099 31883
Without E.D.

3675 4064 4391 4950 6213 7266 9063 12030 13539 16249 18754 21585 23826 28302 31744 35186 38627
With E.D.

3335 3687 3985 4492 5637 6592 8222 10915 12283 14740 17015 19584 21617 25677 28800 31923 35044
Without E.D.

3761 4176 4518

3412 3788 4099 Page No. 76

(SECTION - I : (VII) P.S.C. PIPES)

Sr. No. iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) J i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) 2

Description 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 20 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Lowering, laying and jointing in proper grade and alignment Pre-Stressed Cement concrete pipes with rubber ring joints including cost of conveyance from stores to site of works, all labour involved, giving hydraulic testing, etc. complete but excluding cost of rubber rings. For all class of pipes 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Notes

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 5105 6434 7946 9916 12542 14738 17008 19658 22642 29877 33689 37971 42252 46533
With E.D.

Rate (Rs.) 2013-14 4631 5837 7210 8996 11378 13371 15430 17835 20542 27107 30564 34450 38334 42218 3491 3881 4219 4776 6044 7986 10624 12559 15109 17961 22588 24853 29033 32915 36812 40708 44605

Without E.D.

3849 4277 4649 5265 6661 8803 11711 13843 16654 19796 24895 27394 32000 36169 40452 44734 49015

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii)

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

105 148 179 203 270 297 334 345 445 585 626 743 784 989 1112 1239 1310

(SECTION - I : (VII) P.S.C. PIPES)

Page No. 77

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

1) Only 85% rate is payable till satisfactory hydraulic testing is given. 2) Whenever manufacturer is separate and contractor for lowering, laying, jointing and testing is separate, the principal contractor shall enter into an agreement with P.S.C. pipe manufacturer for satisfactory manufacturing, transporting, lowering, laying, jointing and testing of pipes. This foot note shall appear into the tender conditions.

(SECTION - I : (VII) P.S.C. PIPES)

Page No. 78

Section - I (VIII)

Bar Wrapped Steel Cylinder Pipes (BWSC)

SECTION - I - (VIII) BAR WRAPPED STEEL CYLINDER PIPES (BWSC)


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Providing and supplying European Standard EN-639/1994 & EN-641/1994 or AWWA C303 standard and reinforced concrete pressure pipes cylinder type or IS-15155/2002 (Bar wrapped steel cylinder pipes suitable for overlapping steel welded joint or butt welded steel joints) of following class and diameter including cost of all material and labour required, cost of all taxes (Central and State Govt.), inspection charges, transportation to stores / site, transit insurance, loading, unloading and stacking, etc. complete. i) Factory Test Pressure2 a) Site test pressure + 0.1 N/mm , for working 2 pressure upto 1N/mm . 2 b) Site test pressure + 0.2 N/mm , for working 2 pressure above 1N/mm . ii) Site Test Pressure- 1.5 times working pressure pertaining to the section or 1.1 times static pressure, whichever is more (such pressure is to be controlled within 25 % of pump head in case of pumping main) iii) Working Pressure- The maximum sustained internal pressure excluding surge to which each portion of pipeline may be subjected when installed. Notes 1) For external coating at site to the joints, necessary polythene wrapping for pouring cement slurry shall also be given free with each pipe. A Factory Test Pressure 4 Kg/cm i) 350 mm ii) 400 mm iii) 450 mm iv) 500 mm v) 600 mm vi) 700 mm vii) 800 mm viii) 900 mm ix) 1000 mm x) 1100 mm xi) 1200 mm xii) 1300 mm xiii) 1400 mm xiv) 1500 mm xv) 1600 mm xvi) 1700 mm xvii) 1800 mm B Factory Test Pressure 6 Kg/cm i) 350 mm ii) 400 mm iii) 450 mm iv) 500 mm v) 600 mm vi) 700 mm vii) 800 mm viii) 900 mm

With E.D.

Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

3706 4064 4499 5006 6510 7522 8168 11414 13155 18907 21085 24621 26410 28184 30364 32213 34393
With E.D.

3366 3691 4086 4546 5912 6831 7418 10367 11947 17171 19149 22362 23986 25598 27577 29256 31237
Without E.D.

3710 4068 4501 5013 6517 7528 8175 11421

3369 3694 4089 4554 5920 6838 7425 10373

(SECTION - I : (VIII) B.W.S.C. PIPES)

Page No. 79

Sr. No. ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) C i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) D i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) E i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv)

Description 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 8 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 10 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 12 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 13160 18913 21090 24627 26416 28192 30370 32219 34399
With E.D.

Rate (Rs.) 2013-14 11953 17179 19157 22367 23992 25604 27584 29262 31243 3373 3698 4092 4564 5928 6847 7434 10383 11964 17187 19165 22378 24002 25614 27594 29272 31253

Without E.D.

3713 4071 4506 5025 6528 7540 8186 11432 13172 18925 21102 24638 26427 28203 30382 32230 34411
With E.D.

Without E.D.

3717 4075 4509 5040 6544 7555 8202 11437 13187 18941 21117 24653 26443 28218 30397 32245 34426
With E.D.

3375 3702 4095 4577 5943 6862 7449 10398 11978 17202 19180 22392 24016 25629 27608 29286 31268
Without E.D.

3720 4079 4513 5059 6564 7575 9368 11448 14231 18960 21138 24675 26464 28538 31570

3379 3704 4099 4597 5961 6880 8507 10398 12925 17221 19200 22411 24036 25921 28673

(SECTION - I : (VIII) B.W.S.C. PIPES)

Page No. 80

Sr. No. xvi) xvii) F i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) G i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) H i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) I i) ii) iii) iv)

Description 1700 mm 1800 mm Factory Test Pressure 14 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 16 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 18 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 20 Kg/cm 350 mm 400 mm 450 mm 500 mm

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 34171 31036 38004 34516


With E.D. Without E.D.

Rate (Rs.) 2013-14

3724 4083 4526 5152 6683 8695 10196 12574 15138 19037 21130 25286 28572 31792 35451 38923 42585
With E.D.

3383 3707 4110 4679 6069 7898 9259 11420 13750 17291 19191 22965 25951 28874 32197 35351 38678
Without E.D.

3728 4087 4684 5525 7173 9254 11090 13717 16673 20080 23418 27896 31490 35119 39052 43349 48369
With E.D.

3386 3712 4255 5018 6515 8407 10073 12458 15143 18238 21269 25337 28601 31896 35470 39371 43932
Without E.D.

3732 4148 4833 5691 7444 9785 11550 14275 17415 20957 24417 28992 33132 36595 41512 46039 50958
With E.D.

3391 3767 4389 5168 6761 8888 10491 12966 15817 19033 22177 26333 30092 33237 37703 41816 46283
Without E.D.

3719 4380 5004 6065

3379 3979 4544 5509

(SECTION - I : (VIII) B.W.S.C. PIPES)

Page No. 81

Sr. No. v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii)

Description

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Notes 1) For lowering and laying and for pouring of cement mortar in the field on joints (after laying and welding), rates as per PSC pipes lowering, laying and jointing shall be adopted. 2) For field welding, rates applicable for similar welding in M.S. pipes given in that section shall be adopted. 3) Whenever manufacturer is separate and contractor for lowering, laying, jointing and testing is separate, the principal contractor shall enter into an agreement with B.W.S.C. pipe manufacturer for satisfactory manufacturing, transporting, lowering, laying, jointing and testing of pipes. This foot note shall appear into the tender conditions. 4) No negative tolerance shall be accepted for the M.S. shell thickness of B.W.S.C. pipes over the thickness mentioned in EN-641 of AWWA C-303.

Rate (Rs.) 2012-13 7935 10317 12595 15551 19029 22835 26549 31538 36348 40934 45721 51075 56537

Rate (Rs.) 2013-14 7207 9371 11439 14125 17282 20741 24114 28644 33012 37179 41525 46389 51351

(SECTION - I : (VIII) B.W.S.C. PIPES)

Page No. 82

Section - I (IX)

Glass Reinforced Plastic Pipes (GRP)

SECTION - I - (IX) GLASS REINFORCED PLASTIC PIPES (GRP)


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Providing and supplying Glass Fibre Reinforced Polyester Pipes conforming to BIS-12709 / BIS14402 with double bell REKA GRP couplings, EPDM rubber gaskets for sealing of following pressure, diameter and stiffness, class including cost of all material and labour, required, cost of all taxes (Central and state govt.), insurance, transportation to site of work / stores, unloading and stacking, etc. complete. A a) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) xxii) xxiii) xxiv) b) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) Class (SN) 2500 3 Kg/cm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm 2100 mm 2200 mm 2300 mm 2400 mm 6 Kg/cm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm

With E.D.

Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

1371 1586 1745 1965 2222 2855 3548 4357 5324 6315 7677 8938 10121 11685 13280 15466 18269 19935 22284 24092 26923 28899 31232 33384
With E.D.

1229 1422 1565 1761 1992 2559 3181 3906 4773 5662 6883 8013 9074 10477 11907 13867 16573 18085 20216 21856 24424 26217 28333 30286
Without E.D.

1422 1626 1827 2029 2307 2988 3715 4552 5545 6595 7992 9249 10583 12109

1275 1458 1638 1819 2068 2679 3331 4081 4972 5913 7166 8293 9489 10857

(SECTION - I : (IX) G.R.P. PIPES)

Page No. 83

Sr. No. xv) xvi) xvii) xviii) xix) xx) xxi) xxii) xxiii) xxiv) c) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) xxii) xxiii) xxiv) d) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm 2100 mm 2200 mm 2300 mm 2400 mm 9 Kg/cm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm 2100 mm 2200 mm 2300 mm 2400 mm 12 Kg/cm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm 2100 mm

Description

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 13814 16111 19038 20715 23181 25033 27987 30159 32504 34710
With E.D.

Rate (Rs.) 2013-14 12385 14445 17271 18793 21029 22710 25389 27360 29488 31489 1316 1530 1705 1933 2192 2843 3541 4410 5387 6378 7708 8950 10335 11875 13488 15747 18867 20633 22921 24872 27678 29755 32129 34649

Without E.D.

1468 1706 1902 2157 2445 3171 3949 4919 6009 7114 8598 9983 11527 13245 15044 17564 20797 22744 25266 27416 30510 32799 35415 38193
With E.D.

Without E.D.

1556 1796 2000 2613 2264 3407 4225 5234 6418 7650 9377 10936 12378 14246 16289 18892 22414 24573 27200 29580 32976

1395 1610 1793 2342 2029 3054 3788 4693 5754 6859 8406 9805 11097 12772 14604 16938 20334 22293 24676 26835 29916

(SECTION - I : (IX) G.R.P. PIPES)

Page No. 84

Sr. No. xxii) e) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) B a) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) xxii) b) i) ii) iii) iv) v) vi) vii) viii) ix) x)

Description 2200 mm 15 Kg/cm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm Class (SN) 5000 3 Kg/cm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm 2100 mm 2200 mm 6 Kg/cm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 35587 32284


With E.D. Without E.D.

Rate (Rs.) 2013-14

1620 1871 2080 2398 2756 3642 4543 5669 6987 8292 10173 11804 13549 15595 17692 20527 24695 26988 30134 32796
With E.D.

1452 1677 1865 2150 2471 3265 4073 5082 6264 7434 9121 10583 12147 13982 15862 18404 22403 24483 27338 29752
Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

1470 1724 1965 2234 2472 3222 4033 4999 6155 7321 8874 10401 11843 13612 15533 18058 21385 23454 26105 28394 31611 34120
With E.D.

1317 1546 1761 2004 2216 2889 3616 4482 5519 6564 7956 9325 10618 12204 13926 16190 19400 21277 23682 25758 28677 30954
Without E.D.

1492 1753 1938 2209 2545 3292 4136 5119 6305 7485

1338 1572 1737 1980 2282 2952 3708 4589 5653 6711

(SECTION - I : (IX) G.R.P. PIPES)

Page No. 85

Sr. No. xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) xxii) c) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) d) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) e) i) ii) iii) iv) v) 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm 2100 mm 2200 mm 9 Kg/cm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 12 Kg/cm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 15 Kg/cm 300 mm 350 mm 400 mm 450 mm 500 mm

Description

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 9154 10641 12160 13952 15896 18502 21907 24020 26757 29152 32429 35057
With E.D.

Rate (Rs.) 2013-14 8208 9540 10902 12509 14252 16589 19874 21791 24274 26446 29420 31804 1387 1625 1829 2082 2382 3273 3886 5005 5909 7049 11381 12948 14588 16330 18707 21252 25586 27880

Without E.D.

1547 1813 2040 2323 2657 3650 4334 5582 6590 7861 12694 14442 16271 18213 20866 23703 28204 30732
With E.D.

Without E.D.

1591 1887 2086 2415 2758 3642 4591 5666 7076 8322 10229 11886 13623 15698 17831 20607 24516 26951 29866
With E.D.

1426 1692 1870 2165 2473 3265 4116 5080 6344 7461 9170 10657 12214 14074 15986 18476 22241 24450 27095
Without E.D.

1647 1962 2193 2533 2890

1477 1758 1966 2271 2591

(SECTION - I : (IX) G.R.P. PIPES)

Page No. 86

Sr. No. vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii)

Description

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Notes 1) For lowering, laying and jointing rates of G.R.P. pipes, 50% rates for lowering, laying and jointing of P.S.C. pipes of corresponding dia. shall be adopted. 2) Whenever manufacturer is separate and contractor for lowering, laying, jointing and testing is separate, the principal contractor shall enter into an agreement with G.R.P. pipe manufacturer for satisfactory manufacturing, transporting, lowering, laying, jointing and testing of pipes. This foot note shall appear into the tender conditions. 3) Only 85% rate is payable till satisfactory hydraulic testing is given.

Rate (Rs.) 2012-13 3836 4827 6040 7450 8882 10802 12657 14463 16688 18981 21975 26079 28722

Rate (Rs.) 2013-14 3439 4328 5415 6679 7963 9685 11348 12967 14962 17018 19703 23659 26057

(SECTION - I : (IX) G.R.P. PIPES)

Page No. 87

Section - I (X)

High Density Polyethelene Pipes (HDPE)

SECTION - I : (X) HIGH DENSITY POLYETHELENE PIPES (HDPE)


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Providing and supplying in standard lengths Polyethelene Pipes conforming to IS4984/14151/12786/13488 with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint, including all taxes (Central and local), transportation and freight charges, inspection charges, loading/ unloading charges, conveyance to the departmental stores/ site and stacking the same in closed shade duly protecting from sunrays and rains, etc. complete. A a) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xix) xx) xix) b) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) P.E. 100 6 Kg/cm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm 710 mm 800 mm 900 mm 1000 mm 8 Kg/cm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm

With E.D.

Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

91 132 184 267 364 457 592 746 876 1129 1385 1737 2201 2790 3654 4814 5953 7451 9385 11891 14336 18161 22394
With E.D.

84 119 167 242 330 415 538 678 794 1024 1257 1576 1997 2531 3315 4368 5400 6760 8509 10986 13244 16778 20690
Without E.D.

116 172 231 340 461 576 750 945 1113 1430 1762

105 156 209 308 418 524 680 857 1010 1297 1598

(SECTION - I : (X) H.D.P.E. PIPES)

Page No. 88

Sr. No. xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xix) xx) xix) c) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xix) xx) xix) d) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx)

Description 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm 710 mm 800 mm 900 mm 1000 mm 10 Kg/cm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm 710 mm 800 mm 900 mm 1000 mm 12.5 Kg/cm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm 710 mm

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 2210 2794 3537 4645 6212 7663 9618 12109 15344 18509 23430 22868
With E.D.

Rate (Rs.) 2013-14 2004 2536 3209 4215 5635 6951 8725 10978 14176 17100 21646 21127 131 185 264 389 501 625 813 1031 1208 1547 1931 2385 3062 3843 5118 6811 8418 10124 13289 16880 20346 20589 25445

Without E.D.

145 204 290 428 552 690 895 1136 1331 1704 2129 2628 3376 4236 5643 7509 9280 11161 14659 18618 22441 22710 28067
With E.D.

Without E.D.

169 239 345 508 656 822 1070 1354 1591 2053 2525 3166 4007 5089 6688 8938 11015 13808 17623 18175

154 217 314 461 595 746 971 1228 1443 1862 2290 2872 3636 4617 6068 8108 9994 12528 15978 16478

(SECTION - I : (X) H.D.P.E. PIPES)

Page No. 89

Sr. No. xix) xx) xix) e) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xix) xx) xix) 800 mm 900 mm 1000 mm 16 Kg/cm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm 710 mm 800 mm 900 mm 1000 mm

Description

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 21902 19857 27748 25156 33795 30639


With E.D. Without E.D.

Rate (Rs.) 2013-14

205 288 414 612 790 986 1293 1627 2808 3550 4379 5493 6943 8809 11410 14463 17835 13650 17294 22006 26511 33558 41199

185 262 375 554 717 894 1173 1476 2549 3221 3973 4983 6300 7990 10352 13120 16180 12375 15679 19951 24035 30424 37353

2 Providing and Supplying in standard length Polyethylene (PE) pipes for non pressure underground drainage and sewerage with smooth internal and corrugated (profiled) external surface with Anti rodent property confirming to ISO-211383:2007with necessary jointing material like mechanical connector i.e. thread/insert joint/quick release coupler/compression fitting joint/ or flanged joint including all local and central taxes, transportation and freight charges, inspection charges, loading and unloading charges, conveyance to the departmental stores /site and stacking the same in closed shade duly protecting from sunrays and rains etc complete

i) ii) iii) iv)

HDPE PIPES FOR DRAINAGE Class SN4 160 mm (OD) 175 mm(OD) 200 mm(OD) 250 mm(OD)

Rmt Rmt Rmt Rmt

SN4 280 320 400 592

(SECTION - I : (X) H.D.P.E. PIPES)

Page No. 90

Sr. No.

Description

Unit Rmt

v) 315 mm(OD) Class SN8 160 mm (OD) 175 mm(OD) 200 mm(OD) 250 mm(OD) 315 mm(OD)

Rate (Rs.) 2012-13 840 SN8 304 365 440 840 1056

Rate (Rs.) 2013-14

i) ii) iii) iv) v)

Rmt Rmt Rmt Rmt Rmt

3 Lowering laying and jointing HDPE /MDPE pipes in proper position including all specials by Compression fitting /Electrofusion and But fusion jointing procedure including hydraulic testing as per relevent IS Code complete with all materials for jointing procedures like Electrofusion machine, Electric mirror/heater /But fusion welding machine with hydraulic jack, top laoding clamp etc pump and accessories for hydraulic testing and all labours as directe by engineer incharge as per IS - 7634 Part II. i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xvi) xvii) xvi) xvii) xvi) xvii) xvi) 20mm 25mm 32mm 40mm 50mm 63mm 75mm 90mm 110mm 125mm 140mm 160mm 180mm 200mm 225mm 250mm 280mm 315mm 355mm 400mm 450mm 500mm 560mm 630mm Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt 10 15 20 25 30 37 40 55 58 66 89 95 95 106 136 141 174 191 209 211 238 308 345 388

(SECTION - I : (X) H.D.P.E. PIPES)

Page No. 91

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

4 Lowering ,Laying and jointing HDPE Double Wall Corrugated Pipes for non pressure Underground drainage and Sewerage applications and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour material except O ring coupler giving satisfactory hydraulic testing as per relevant ISO etc complete Rate for SN 4 and SN8 160MM (OD) 175MM (OD) 200MM (OD) 250MM (OD) 315MM (OD)

i) ii) iii) iv) v)

Rmt Rmt Rmt Rmt Rmt

32 36 39 49 60

(SECTION - I : (X) H.D.P.E. PIPES)

Page No. 92

Section - I (XI)

Medium Density Polyethylene Pipes (MDPE)

(SECTION - I : (XI) MEDIUM DENSITY POLYETHYLENE PIPES (MDPE)


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Providing and supplying Blue MDPE pipes conforming to ISO 4427/1996 manufactured from virgin resin PE-80 food grade compounded Raw Material having blue colour only with quality assurance certificate from quality agencies like WRC / CIPET (India) / DVGM / KIWA / SPGN, etc. for usage in Drinking Water System. The cost shall include testing of all materials, all taxes (Central, State, Municipal), inspection charges, transportation upto site, transit insurance, loading as specified and directed, unloading, stacking, etc. complete as specified and directed. A i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) B i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) PN 16 (SDR 9) 20 mm 25 mm 32 mm 40 mm 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm PN 12.5 (SDR 11) 25 mm 32 mm 40 mm 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm
With E.D. Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

28 40 66 97 148 218 295 426 633 817 1027 1361 1722 2129 2697 3316 4169 5362
With E.D.

26 36 59 87 132 194 262 379 563 727 914 1211 1533 1895 2400 2952 3711 4772
Without E.D.

37 62 90 130 175 245 359 526 684 854 1118 1439 1778 2248 2770 3471

33 55 84 116 158 219 316 468 609 760 995 1291 1581 2001 2479 3089

(SECTION - I : (XI) M.D.P.E. PIPES)

Page No. 93

Sr. No. xvii) C i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) D i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) E i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii)

Description 315 mm PN 10 (SDR 13.6) 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm PN 8 (SDR 17) 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm PN 6 (SDR 21) 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 4400


With E.D.

Rate (Rs.) 2013-14 3916 134 189 272 401 516 647 846 1072 1320 1673 2060 2581 3259

Without E.D.

150 212 305 450 579 727 951 1205 1483 1881 2315 2900 3662
With E.D.

Without E.D.

122 171 247 367 470 589 771 977 1203 1528 1875 2399 3040
With E.D.

108 152 220 327 418 524 686 870 1071 1360 1705 2135 2705
Without E.D.

94 136 190 284 374 460 602 756 939 1189 1452 1836 2309

84 121 169 258 326 410 536 672 836 1058 1293 1634 2055

(SECTION - I : (XI) M.D.P.E. PIPES)

Page No. 94

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

2 Providing and supply of Electro Fusion Fittings in accordance with BS EN- 12201/Part-3 suitable for drinking water within black/ blue colour manufactured from compounded PE-80 / PE-100 virgin polymer and compatible with PE-80 / PE-100 pipes, in pressure rating SDR11 with min PN 12.5 rated for water application and shall be inclusive of all cost such as testing, all taxes related to central, state and municipal, inspection charges, transportation upto site, transit insurance, loading, unloading, stacking, etc. complete. A i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) B i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) C i) ii) iii) Couplers 20 25 32 40 50 63 75 90 110 125 140 160 180 200 225 250 280 315 Equal Tee 20 25 32 40 50 63 75 90 110 125 160 180 200 225 250 Elbow 90 Deg. 20 25 32
With E.D.

No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

100 100 100 173 217 257 435 476 664 675 1446 1569 2254 2530 3189 4973 5600 6116
With E.D.

210 210 210 463 473 775 1135 1620 2250 3104 5380 6758 10832 12215 17895
With E.D.

112 112 113

(SECTION - I : (XI) M.D.P.E. PIPES)

Page No. 95

Sr. No. iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) D i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) E i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) F i) ii) iii) iv) v) vi) vii) viii) ix) x)

Description 40 50 63 75 90 110 125 160 180 200 225 250 Elbow 45 Deg. 32 40 50 63 75 90 110 125 160 180 200 225 250 Reducer 25 x 20 32 x 20 32 x 25 40 x 32 50 x 32 50 x 40 63 x 32 63 x 40 63 x 50 90 x 63 110 x 75 110 x 90 125 x 90 160 x 110 180 x 125 200 x 160 225 x 160 250 x 160 250 x 200 End Cap 20 25 32 40 50 63 75 90 110 125

Unit No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

Rate (Rs.) 2012-13 153 181 252 394 465 641 816 1786 2070 2679 5840 10943
With E.D.

Rate (Rs.) 2013-14

120 145 172 240 374 442 641 816 1503 1970 2070 2679 5840
With E.D.

150 158 165 179 179 179 217 217 217 536 697 697 774 1369 1705 2020 2955 4082 4465
With E.D.

40 40 55 60 64 84 308 351 493 624

(SECTION - I : (XI) M.D.P.E. PIPES)

Page No. 96

Sr. No. xi) xii) xiii) xiv) xv) xvi) xvii) G 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Description 140 160 180 200 225 250 315 Ferrule Tapping Tee 63 x " 63 x " 63 x 1" 75 x " 75 x " 75 x 1" 90 x " 90 x " 90 x 1" 90 x 1" 90 x 1" 90 x 2" 110 x " 110 x " 110 x 1" 110 x 1" 100 x 1" 110 x 2" 160 x " 160 x " 160 x 1" 160 x 1" 160 x 1" 160 x 2" 200 x " 200 x " 200 x 1" 200 x 1" 200 x 1" 200 x 2" 250 x " 250 x " 250 x 1" 250 x 1" 250 x 1" 250 x 2" 315 x " 315 x " 315 x 1" 315 x 1" 315 x 1" 315 x 2"

Unit No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

Rate (Rs.) 2012-13 1021 1106 1286 2055 3530 4550 7527
With E.D.

Rate (Rs.) 2013-14

757 757 757 757 757 757 757 757 757 982 982 982 757 757 757 982 982 982 757 757 757 1070 1070 1070 1068 1068 1068 1540 1540 1540 1068 1068 1068 1540 1540 1540 1271 1271 1271 1726 1726 1726

(SECTION - I : (XI) M.D.P.E. PIPES)

Page No. 97

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

3 Providing and supply of Compression fittings, PN-16 rated in conformation to ISO14236/2000 and shall be tested as per ISO-3459, ISO-3501 and ISO3503, suitable for drinking water and approved by WRAS, UK/ KIWA etc. in food grade polypropylene and shall be inclusive of all cost such as testing, all taxes related to central, state and municipal, inspection charges, transportation upto site, transit insurance, loading, unloading, stacking, etc. complete. A i) ii) iii) iv) v) vi) B i) ii) iii) iv) v) vi) C i) ii) iii) iv) v) vi) D i) ii) iii) iv) v) vi) vii) viii) E i) ii) iii) iv) v) vi) F Male Adaptor 20 x " 25 x " 32 x 1" 40 x 1" 50 x 1" 63 x 2" Female Adaptor 20 x " 25 x " 32 x 1" 40 x 1" 50 x 1" 63 x 2" Coupling 20 x 20 25 x 25 32 x 32 40 x 40 50 x 50 63 x 63 Reducing Coupling 25 x 20 32 x 20 32 x 25 40 x 25 40 x 32 50 x 32 50 x 40 63 x 50 Elbow 90 Deg. 20 25 32 40 50 63 Elbow 90 Deg. threaded male off take i) 20 x " ii) 25 x "
With E.D.

No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

68 78 100 184 241 344


With E.D.

73 86 108 202 259 365


With E.D.

70 77 98 187 240 347


With E.D.

128 169 169 289 289 374 374 530


With E.D.

130 155 190 312 443 600


With E.D.

No No

78 95

(SECTION - I : (XI) M.D.P.E. PIPES)

Page No. 98

Sr. No. iii) iv) v) vi) G i) ii) iii) iv) v) vi) H i) ii) iii) iv) v) vi) I i) ii) iii) iv) v) vi)

Description 32 x 1" 40 x 1" 50 x 1" 63 x 2" Elbow 90 Deg. threaded female off take 20 x " 25 x " 32 x 1" 40 x 1" 50 x 1" 63 x 2" Equal Tee 20 x 20 x 20 25 x 25 x 25 32 x 32 x 32 40 x 40 x 40 50 x 50 x 50 63 x 63 x 63 End Cap 20 25 32 40 50 63

Unit No No No No

Rate (Rs.) 2012-13 123 197 269 374


With E.D.

Rate (Rs.) 2013-14

No No No No No No No No No No No No No No No No No No

89 110 132 257 337 443


With E.D.

155 204 264 436 590 839


With E.D.

40 40 55 60 64 84

(SECTION - I : (XI) M.D.P.E. PIPES)

Page No. 99

Section - I (XII)

Prestressed Concrete Cylinder Pipes (PCCP)

SECTION - I : (XII) PRESTRESSED CONCRETE CYLINDER PIPES (PCCP)


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Providing and supplying Prestressed Concrete Cylinder Pipes suitable for sliding overlap weld joint or confined rubber ring joint with necessary rubber ring of following class and diameter including cost of all taxes (Central and local), inspection charges, transportation to site of work / stores, transit insurance, unloading and stacking, etc. complete. As per IS-784:2001 i) Factory Test Pressurea) Site test pressure + 0.1 N/mm2, for working 2 pressure upto 1N/mm . 2 b) Site test pressure + 0.2 N/mm , for working 2 pressure above 1N/mm . ii) Site Test Pressure- 1.5 times working pressure pertaining to the section or 1.1 times static pressure, whichever is more (such pressure is to be controlled within 25 % of pump head in case of pumping main) iii) Working Pressure- The maximum sustained internal pressure including surge to which each portion of pipeline may be subjected when installed. A i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) B i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) Factory Test Pressure 4 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 5.5 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm
With E.D. Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

4464.00 4909.00 5390.00 5965.00 7213.00 8334.00 9382.00 11499.00 13280.00 14870.00 16349.00 18890.00 20511.00 21993.00 23476.00 24958.00 26440.00
With E.D.

4054.00 4457.00 4896.00 5417.00 6551.00 7569.00 8522.00 10445.00 12062.00 13505.00 14849.00 17156.00 18628.00 19975.00 21321.00 22668.00 24014.00
Without E.D.

4464.00 4930.00 5417.00 6000.00 7262.00 8400.00 9493.00 11606.00 13412.00 15040.00 17157.00 19169.00 20866.00 22350.00 23832.00 25315.00

4054.00 4479.00 4923.00 5449.00 6596.00 7629.00 8621.00 10542.00 12181.00 13661.00 15584.00 17409.00 18952.00 20298.00 21646.00 22992.00

(SECTION - I : (XII) P.C.C.P. PIPES)

Page No. 100

Sr. No. xvii) C i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) D i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) E i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) F i) ii) iii) iv) v)

Description 1800 mm Factory Test Pressure 7 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 8.5 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 10 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 11.5 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 26797.00 24339.00


With E.D. Without E.D.

Rate (Rs.) 2013-14

4475.00 4951.00 5445.00 6032.00 7312.00 8479.00 9629.00 11756.00 13613.00 15289.00 17455.00 19518.00 21450.00 22384.00 23867.00 25349.00 26831.00
With E.D.

4063.00 4496.00 4945.00 5478.00 6641.00 7701.00 8745.00 10677.00 12366.00 13886.00 15853.00 17728.00 19483.00 20329.00 21676.00 23023.00 24369.00
Without E.D.

4492.00 4976.00 5473.00 6067.00 7376.00 8578.00 9765.00 11923.00 13819.00 15537.00 17903.00 20032.00 21859.00 22789.00 24273.00 25755.00 27237.00
With E.D.

4080.00 4520.00 4970.00 5510.00 6700.00 7790.00 8869.00 10828.00 12550.00 14112.00 16261.00 18194.00 19853.00 20699.00 22045.00 23392.00 24738.00
Without E.D.

4508.00 4995.00 5506.00 6117.00 7449.00 8677.00 9913.00 12087.00 14024.00 15926.00 18207.00 20390.00 22276.00 23209.00 24692.00 26175.00 27657.00
With E.D.

4095.00 4539.00 5002.00 5555.00 6764.00 7880.00 9003.00 10978.00 12736.00 14465.00 16536.00 18520.00 20233.00 21079.00 22427.00 23773.00 25120.00
Without E.D.

4527.00 5027.00 5550.00 6169.00 7523.00

4111.00 4567.00 5039.00 5602.00 6833.00

(SECTION - I : (XII) P.C.C.P. PIPES)

Page No. 101

Sr. No. vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) G i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) H i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) I i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii)

Description 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 13 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 14.5 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 17 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 8774.00 7968.00 10188.00 9254.00 12254.00 11131.00 14228.00 12922.00 16181.00 14696.00 18513.00 16814.00 20751.00 18848.00 22699.00 20617.00 23631.00 21462.00 25113.00 22809.00 26596.00 24155.00 28078.00 25502.00
With E.D. Without E.D.

Rate (Rs.) 2013-14

4562.00 5069.00 5594.00 6220.00 7595.00 8874.00 10356.00 12421.00 14526.00 16438.00 18823.00 21120.00 23116.00 24047.00 25530.00 27012.00 28494.00
With E.D.

4143.00 4604.00 5081.00 5649.00 6898.00 8058.00 9407.00 11281.00 13193.00 14930.00 17095.00 19181.00 20995.00 21841.00 23188.00 24534.00 25871.00
Without E.D.

4601.00 5116.00 5649.00 6279.00 7672.00 9456.00 10525.00 12706.00 14739.00 16696.00 19130.00 21479.00 24161.00 25092.00 26575.00 28057.00 29539.00
With E.D.

4179.00 4646.00 5131.00 5703.00 6968.00 8588.00 9559.00 11541.00 13386.00 15163.00 17374.00 19507.00 21944.00 22789.00 24137.00 25483.00 26830.00
Without E.D.

4636.00 5162.00 5707.00 6347.00 7771.00 9076.00 10728.00 12889.00 14955.00 16964.00 19440.00 21844.00

4212.00 4689.00 5183.00 5765.00 7057.00 8244.00 9745.00 11705.00 13581.00 15408.00 17656.00 19840.00

(SECTION - I : (XII) P.C.C.P. PIPES)

Page No. 102

Sr. No. xiii) xiv) xv) xvi) xvii) J i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) K i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) L i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) M i)

Description 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 18.5 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 20 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 21.5 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 23 Kg/cm 350 mm

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 24628.00 22367.00 25558.00 23214.00 27041.00 24560.00 28524.00 25907.00 30006.00 27253.00
With E.D. Without E.D.

Rate (Rs.) 2013-14

4674.00 5209.00 5765.00 6417.00 7870.00 9189.00 11082.00 13113.00 15211.00 17231.00 19752.00 22892.00 25266.00 25671.00 27153.00 28635.00 30119.00
With E.D.

4245.00 4731.00 5236.00 5828.00 7148.00 8347.00 10064.00 11910.00 13814.00 15649.00 17940.00 20793.00 22948.00 23314.00 24662.00 26009.00 27355.00
Without E.D.

4711.00 5257.00 5822.00 6489.00 7968.00 9416.00 11349.00 13415.00 15564.00 17638.00 20785.00 23387.00 25824.00 26227.00 27710.00 29192.00 30674.00
With E.D.

4278.00 4775.00 5288.00 5894.00 7237.00 8552.00 10306.00 12182.00 14135.00 16019.00 18878.00 21241.00 23453.00 23821.00 25168.00 26514.00 27861.00
Without E.D.

4750.00 5302.00 5880.00 6559.00 8084.00 9879.00 11528.00 13711.00 15918.00 18527.00 21302.00 23929.00 27241.00 27647.00 29129.00 30611.00 32094.00
With E.D.

4316.00 4817.00 5340.00 5957.00 7342.00 8973.00 10469.00 12453.00 14457.00 16827.00 19347.00 21733.00 24741.00 25109.00 26457.00 27803.00 29150.00
Without E.D.

4787.00

4349.00

(SECTION - I : (XII) P.C.C.P. PIPES)

Page No. 103

Sr. No. ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) N i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii)

Description

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Factory Test Pressure 24.5 Kg/cm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm Notes 1) For P.C.C. pipes lowering, laying and pouring of cement mortar in the field on joints (after laying and welding), rates as per P.S.C. pipes lowering, laying and jointing shall be adopted. 2) For field welding rates applicable for similar welding in M.S. pipes given in that section shall be adopted. 3) Whenever manufacturer is separate and contractor for lowering, laying, jointing and testing is separate, the principal contractor shall enter into an agreement with P.C.C. pipe manufacturer for satisfactory manufacturing, transporting, lowering, laying, jointing and testing of pipes. This foot note shall appear into the tender conditions.

Rate (Rs.) 2012-13 5350.00 4859.00 5939.00 5394.00 6628.00 6020.00 8254.00 7497.00 10190.00 9256.00 11880.00 10790.00 14008.00 12723.00 16270.00 14778.00 19017.00 17272.00 21825.00 19823.00 24612.00 22353.00 27747.00 25200.00 28150.00 25567.00 29632.00 26915.00 31116.00 28261.00 32598.00 29607.00
With E.D. Without E.D.

Rate (Rs.) 2013-14

4825.00 5398.00 5997.00 6699.00 8586.00 10331.00 12097.00 14244.00 17036.00 19508.00 22354.00 26559.00 28276.00 28677.00 30159.00 31642.00 33124.00

4382.00 4902.00 5447.00 6084.00 7798.00 9383.00 10986.00 12938.00 15472.00 17718.00 20305.00 24122.00 25682.00 26045.00 27392.00 28738.00 30085.00

(SECTION - I : (XII) P.C.C.P. PIPES)

Page No. 104

Section - I (XIII)

Pipe Appurtenances

SECTION - I : (XIII) PIPE APPURTENANCES


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Providing and supplying ISI mark CI D/F reflux valves (non-return valves) of following dia including all taxes (Central and local), railway freight, inspection charges, unloading from railway wagon, loading into truck, transportation upto departmental stores / site, unloading, stacking, etc. complete. Reflux valves as per IS-5312 Part I (1984) A Without bypass arrangement - PN-1 i) 50 mm ii) 65 mm iii) 80 mm iv) 100 mm v) 125 mm vi) 150 mm vii) 200 mm viii) 250 mm ix) 300 mm x) 350 mm xi) 400 mm xii) 450 mm xiii) 500 mm xiv) 600 mm xv) 700 mm B With bypass arrangement - PN-1 i) 80 mm ii) 100 mm iii) 125 mm iv) 150 mm v) 200 mm vi) 250 mm vii) 300 mm viii) 350 mm ix) 400 mm x) 450 mm x) 500 mm xii) 600 mm xiii) 700 mm xiv) 750 mm xv) 800 mm xvi) 900 mm xvii) 1000 mm C Without bypass arrangement - PN-1.6 i) 50 mm ii) 65 mm iii) 80 mm iv) 100 mm v) 125 mm vi) 150 mm vii) 200 mm viii) 250 mm ix) 300 mm x) 350 mm xi) 400 mm xii) 450 mm

No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

3308.00 3873.00 4078.00 5694.00 8130.00 9844.00 17694.00 30194.00 41374.00 68478.00 94273.00 111059.00 181880.00 266900.00 468495.00 4709.00 6708.00 9134.00 10848.00 20224.00 33057.00 44373.00 72752.00 97627.00 114222.00 185408.00 270477.00 709220.00 776307.00 843396.00 920068.00 1073413.00 3227.00 3486.00 5718.00 7323.00 10203.00 11419.00 24284.00 38986.00 54474.00 93820.00 108424.00 127927.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 105

Sr. No. xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) D i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) 2

Description 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm With bypass arrangement - PN-1.6 50 mm 65 mm 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm Providing double flanged Sluice Valves conforming to IS-2906 / 14846 including worm gear arrangements as per test pressure, stainless steel spindle, caps, including all taxes, transportation, etc. complete. Sluice Valve PN-1.0 (without bypass arrangement) 50 mm 65 mm 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm

Unit No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

Rate (Rs.) 2012-13 207834.00 305384.00 369010.00 423608.00 481972.00 609995.00 753081.00 911227.00 1084436.00 3312.00 3727.00 5484.00 7092.00 9911.00 12030.00 24298.00 36715.00 51028.00 85713.00 112272.00 131355.00 213216.00 311049.00 375853.00 431463.00 490910.00 621308.00 767046.00 928125.00 1104545.00

Rate (Rs.) 2013-14

A i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix)

No No No No No No No No No No No No No No No No No No No

4391.00 4985.00 5116.00 6812.00 8521.00 10217.00 19333.00 29913.00 37695.00 53477.00 72101.00 88187.00 113477.00 167606.00 300430.00 342603.00 427239.00 550860.00 814189.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 106

Sr. No.

Description

Unit No No

xx) 1100 mm xxi) 1200 mm B Sluice Valve PN-1.0 (with bypass arrangement) i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) C i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) D i) ii) iii) iv) v) vi) vii) 50 mm 65 mm 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm Sluice Valve PN-1.6 (without bypass arrangement) 50 mm 65 mm 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm Sluice Valve PN-1.6 (with bypass arrangement) 50 mm 65 mm 80 mm 100 mm 125 mm 150 mm 200 mm

Rate (Rs.) 2012-13 1078533.00 1280269.00

Rate (Rs.) 2013-14

No No No No No No No No No No No No No No No No No No No No No

4391.00 4985.00 5116.00 6812.00 8521.00 12374.00 21854.00 33263.00 40982.00 58087.00 77248.00 93275.00 120104.00 174198.00 310617.00 351996.00 437316.00 561585.00 826615.00 1093680.00 1293675.00

No No No No No No No No No No No No No No No No No No No No No

5803.00 6371.00 7265.00 9636.00 12024.00 11893.00 24101.00 37382.00 49699.00 72811.00 99720.00 123737.00 160146.00 243982.00 524772.00 579078.00 672599.00 813137.00 1183325.00 1285723.00 1721030.00

No No No No No No No

5803.00 6371.00 7265.00 9636.00 12024.00 14014.00 26755.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 107

Sr. No. viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) 3

Description 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm Providing double flanged short body pattern type manually operated butterfly valves having body, disc and end cover in graded cast iron to IS-210 Gr. CF 200 generally conforming in IS-13095 / 1991, synthetic rubber faced ring secured on disc by retaining ring with stainless steel screw stub shaft of stainless steel riding in teflon bearing excluding C.C. foundation/ structural steel support. Butterfly Valve PN-1.0 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1400 mm 1500 mm Butterfly Valve PN-1.6 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm

Unit No No No No No No No No No No No No No No

Rate (Rs.) 2012-13 40969.00 53299.00 77866.00 105441.00 129463.00 167602.00 251533.00 538550.00 589319.00 682470.00 823468.00 1195568.00 1297614.00 1734270.00

Rate (Rs.) 2013-14

A i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) B i) ii) iii) iv) v) vi) vii) viii) ix) x) xi)

No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

5808.00 7424.00 8467.00 10944.00 14586.00 18230.00 28844.00 58665.00 63023.00 72811.00 79947.00 98727.00 159784.00 198334.00 218214.00 301378.00 358723.00 581758.00 550499.00 839367.00 1042954.00 6444.00 8537.00 9317.00 12585.00 16776.00 20965.00 33171.00 67464.00 72476.00 83733.00 91939.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 108

Sr. No. xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) 4

Description 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 1400 mm 1500 mm Lowering, laying and jointing in position following C.I. D/F Reflux valves, Butterfly valves and Sluice valves including cost of all labour, jointing material, including nut bolts and giving satisfactory hydraulic testing, etc. complete. (Rate for all class of valves) 50 mm 65 mm 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm to 1500 mm Providing and supplying Air Valves as per IS14845 / 2000 and MJP's standard specifications of approved make and quality of following diameters including all taxes (Central and Local), railway freight, inspection charges, unloading from railway wagons, loading into truck, transportation upto departmental stores / site, unloading and stacking etc. complete. Air Valve Single Ball Flanged / Screwed Type PN-1 12 / 15 mm 20 mm 25 mm 32 mm 40 mm 50 mm Type PN-1.6 12 / 15 mm 20 mm

Unit No No No No No No No No No No

Rate (Rs.) 2012-13 113537.00 183751.00 228084.00 249867.00 346586.00 448404.00 727199.00 688125.00 1049209.00 1294878.00

Rate (Rs.) 2013-14

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) xxi) 5

No No No No No No No No No No No No No No No No No No No No No

689.00 1036.00 1440.00 1881.00 2342.00 2957.00 3076.00 4008.00 4158.00 5124.00 6182.00 7354.00 7616.00 8083.00 8714.00 9598.00 11438.00 12136.00 14307.00 16521.00 18153.00

A i) ii) iii) iv) v) vi) B i) ii)

No No No No No No No No

615.00 741.00 1022.00 1116.00 1228.00 1349.00 719.00 1022.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 109

Sr. No. iii) iv) v) vi) 6

Description 25 mm 32 mm 40 mm 50 mm Providing and supplying Air Valves as per IS10845 and MJP's standard specifications double orifice type combined with screw down isolating valve, small orifice elastic ball resting on a gun metal orifice nipple, large orifice vulcanite ball seating on moulded seat ring, inlet face and drilled, including all taxes (Central and Local), insurance, third party inspection charges, loading, unloading, transportation upto departmental stores / site, etc. complete. Air Valve Double Ball Flanged Type PN-1 with small Orifice 50 mm 65 mm 80 mm Type PN-1.6 with small Orifice 50 mm 65 mm 80 mm Providing and supplying Air Valves as per IS14845 / 2000 and MJP's standard specifications double orifice type combined with isolating sluice valve, mounted in horizontal position and operated by wheel gearing, small orifice elastic ball resting on a gun metal orifice nipple, large orifice vulcanite ball seating on moulded seat ring, inlet face and drilled, including all taxes (Central and Local), insurance, third party inspection charges, loading, unloading, transportation upto departmental stores / site, etc. complete. Air Valve Double Ball Flanged Type PN-1 100 mm 150 mm 200 mm Type PN-1.6 100 mm 150 mm 200 mm Providing and supplying Kinetic Double Orifice type Air Valves as per MJP's standard specifications combined with screw down isolating valve, small orifice elastic ball resting on a gun metal orifice nipple, large orifice vulcanite ball seating on moulded seat ring, inlet face and drilled, including all taxes (Central and Local), insurance, third party inspection charges, loading, unloading, transportation upto departmental stores / site, etc. complete. Kinetic Air Valve Flanged

Unit No No No No

Rate (Rs.) 2012-13 1228.00 1324.00 1418.00 1851.00

Rate (Rs.) 2013-14

A i) ii) iii) B i) ii) iii) 7

No No No No No No

5673.00 6619.00 7561.00 7515.00 8509.00 10530.00

A i) ii) iii) B i) ii) iii) 8

No No No No No No

9561.00 17425.00 29304.00 14617.00 20593.00 34633.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 110

Sr. No. A i) ii) iii) B i) ii) iii) 9

Description Type PN-1 40 mm 50 mm 80 mm Type PN-1.6 40 mm 50 mm 80 mm Providing and supplying Kinetic Double Orifice type Air Valves as per MJP's standard specifications having small orifice elastic ball resting on a gun metal orifice nipple, large orifice vulcanite ball seating on moulded seat ring, with built-in kinetic features, isolating sluice valve mounted in horizontal position and operated by wheel gearing, inlet face and drilled, including all taxes (Central and Local), insurance, third party inspection charges, loading, unloading, transportation upto departmental stores / site, etc. complete. Kinetic Air Valve Flanged Type PN-1 100 mm 150 mm 200 mm Type PN-1.6 100 mm 150 mm 200 mm Lowering, laying and fixing in proper alignment and position all types of C.I. air valves as directed by Engineer-in-charge including cost of conveyance from stores to site of work, cost of all material and giving satisfactory hydraulic testing, etc. complete (for all class of valves). Air Valve Single Ball (PN-1 and PN-1.6) 15 mm 20 mm 25 mm 32 mm 40 mm 50 mm 65 mm 80 mm 100 mm 125 mm 150 mm 200 mm Air Valve Double Ball (PN-1 and PN-1.6) 15 mm 20 mm 25 mm 32 mm 40 mm 50 mm 65 mm 80 mm

Unit

Rate (Rs.) 2012-13 9516.00 11729.00 15304.00 11280.00 13903.00 18176.00

Rate (Rs.) 2013-14

No No No No No No

A i) ii) iii) B i) ii) iii) 10

No No No No No No

20610.00 38804.00 56659.00 24427.00 45993.00 67161.00

A i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) B i) ii) iii) iv) v) vi) vii) viii)

No No No No No No No No No No No No No No No No No No No No

110.00 140.00 180.00 199.00 213.00 231.00 243.00 255.00 285.00 345.00 383.00 421.00 120.00 149.00 180.00 205.00 238.00 275.00 317.00 379.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 111

Sr. No. ix) x) xi) xii) C i) ii) iii) iv) v) vi) vii) viii) 11

Description 100 mm 125 mm 150 mm 200 mm Kinetic Air Valve (PN-1 and PN-1.6) 40 mm 50 mm 65 mm 80 mm 100 mm 125 mm 150 mm 200 mm Providing, erecting Cast Steel / Spheroidal Graphite (S.G.) Iron D/F Sluice Valves / Butterfly Valves with jointing to pipe work (including all hardware and packing), water works quality having non-rising spindle with hand wheel and without bypass arrangement, spindle of stainless steel as per requirement, excluding C.C. foundation / structural steel support. For Rating Class 150 (Working Pressure 20 kg/cm & Test Pressure 30 kg/cm) Sluice Valves 80 mm 100 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm Butterfly Valves 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm Providing, erecting Cast Steel D/F Sluice Valves / Butterfly Valves with jointing to pipe work (including all hardware and packing), water works quality having non-rising spindle with hand wheel and without bypass arrangement, spindle of stainless steel as per requirement, excluding C.C. foundation / structural steel support. For Rating Class 300 (Working Pressure 52 kg/cm & Test Pressure 78 kg/cm) Sluice Valves 80 mm 100 mm 150 mm

Unit No No No No No No No No No No No No

Rate (Rs.) 2012-13 400.00 441.00 603.00 664.00 273.00 315.00 345.00 379.00 417.00 455.00 652.00 711.00

Rate (Rs.) 2013-14

A i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) B i) ii) iii) iv) v) vi) 12

No No No No No No No No No No No No No No No No No

14656.00 19540.00 29311.00 45713.00 65786.00 84173.00 112230.00 187281.00 255524.00 300616.00 343203.00 105843.00 112835.00 126737.00 135014.00 156289.00 175884.00

A i) ii) iii)

No No No

15776.00 24908.00 37976.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 112

Sr. No. iv) v) vi) vii) viii) ix) x) xi) B i) ii) iii) iv) v) vi) 13

Description 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm Butterfly Valves 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm Providing, erecting Cast Steel / Spheroidal Graphite (S.G.) Iron D/F Reflux Valves Single Door with jointing to pipe work (including all hardware and packing), water works quality with jointing to pipe without bypass arrangement, with gunmetal seats excluding C.C. foundation / structural steel support. For Rating Class 150 (Working Pressure 20 kg/cm & Test Pressure 30 kg/cm) 80 mm 100 mm 150 mm 200 mm 250 mm 300 mm Providing, erecting Cast Steel D/F Reflux Valves Single Door with jointing to pipe work (including all hardware and packing), water works quality with jointing to pipe without bypass arrangement, with gunmetal seats excluding C.C. foundation / structural steel support. For Rating Class 300 (Working Pressure 52 kg/cm & Test Pressure 78 kg/cm) 80 mm 100 mm 150 mm 200 mm 250 mm 300 mm Providing, erecting Kinetic Double Orifice Cast Steel Air Valves with an isolating Sluice Valve mounted in horizontal position operated by wheel gear suitable for working pressure of Class-150 rating 20 kg/cm. 80 mm 100 mm 150 mm 200 mm

Unit No No No No No No No No No No No No No No

Rate (Rs.) 2012-13 59558.00 64292.00 108382.00 182788.00 266657.00 321057.00 500178.00 756005.00 129129.00 137659.00 154619.00 164717.00 190673.00 214579.00

Rate (Rs.) 2013-14

i) ii) iii) iv) v) vi) 14

No No No No No No

10227.00 15661.00 26530.00 50442.00 87831.00 115713.00

i) ii) iii) iv) v) vi) 15

No No No No No No

15237.00 21477.00 35717.00 63275.00 114555.00 139478.00

i) ii) iii) iv)

No No No No

29546.00 41185.00 78920.00 102014.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 113

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

16 Providing, erecting Kinetic Double Orifice Cast Steel Air Valves with an isolating Sluice Valve mounted in horizontal position operated by wheel gear suitable for working pressure of Class-300 rating 52 kg/cm. i) 80 mm ii) 100 mm iii) 150 mm iv) 200 mm 17 Providing and fixing in position air valve shaft including providing and fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long over branch flange of air valve tee, providing PCC block of M-150 concrete 150 mm thick around the air valve tee including encasing of vertical shaft in PCC M-150 as shown in type design together with providing and making flanged joints wherever required and fixing of air valve tee etc. complete, as per type design and as directed by Engineer-in-charge for following diameters of pipe lines (type design attached). A i) ii) iii) iv) B i) ii) iii) iv) 18 Foundation on Murum and Hard Strata Upto 150 mm dia pipeline 200 to 400 mm dia pipeline 450 to 900 mm dia pipeline 1000 to 1200 mm dia pipeline Foundation in B.C. Soil or Any Other Soil Upto 150 mm dia pipeline 200 to 400 mm dia pipeline 450 to 900 mm dia pipeline 1000 to 1200 mm dia pipeline Providing and supplying C.I. D/F angle type spring loaded pressure relief valves of approved make and quality including all taxes (Central and Local), octroi, inspection charges, transportation to departmental stores, etc. complete. Pressure Relief Valves Type PN-1 25 mm 40 mm 50 mm 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm Type PN-1.6 25 mm 40 mm 50 mm 80 mm 100 mm 125 mm

No No No No

35996.00 41148.00 96157.00 116071.00

No No No No No No No No

4636.00 5431.00 11045.00 13870.00 5492.00 6625.00 12616.00 15821.00

A i) ii) iii) iv) v) vi) vii) viii) ix) x) B i) ii) iii) iv) v) vi)

No No No No No No No No No No No No No No No No

4234.00 5517.00 7145.00 10837.00 15170.00 20684.00 23635.00 52194.00 73367.00 96757.00 5294.00 6893.00 8914.00 13543.00 18958.00 25849.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 114

Sr. No. vii) viii) ix) x) 19

Description 150 mm 200 mm 250 mm 300 mm Lowering, laying and fixing in proper alignment and position all types of C.I. D/F angle type spring loaded pressure relief valves including cost of all material, labour, cost of conveyance from stores to site of work and giving satisfactory hydraulic testing, etc. complete. For all class of valves 25 mm 40 mm 50 mm 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm Note : Only 85% rate is payable till satisfactory hydraulic testing is given. Cutting and champhering of pipes of following diameters including cost of all materials and labour involved, etc. complete as directed by Engineer-in-charge (for all class of pipes). 80 mm 100 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm Providing and supplying I.S.I. mark rubber gasket suitable for C.I. or D.I. pipes of all class for tyton joints including all taxes (Central and Local), inspection charges, transportation to departmental stores / site, etc. complete. S.B.R. Gaskets for CI / DI Pipes 80 mm 100 mm 150 mm 200 mm 250 mm

Unit No No No No

Rate (Rs.) 2012-13 29544.00 65238.00 91707.00 121226.00

Rate (Rs.) 2013-14

i) ii) iii) iv) v) vi) vii) viii) ix) x)

No No No No No No No No No No

206.00 273.00 316.00 378.00 415.00 462.00 652.00 712.00 831.00 949.00

20

C.I. Pipes

A.C. Pipes

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) 21

1 Cut 1 Cut 1 Cut 1 Cut 1 Cut 1 Cut 1 Cut 1 Cut 1 Cut 1 Cut 1 Cut 1 Cut 1 Cut 1 Cut 1 Cut 1 Cut

33.00 39.00 59.00 76.00 109.00 129.00 131.00 167.00 194.00 232.00 283.00 333.00 398.00 435.00 479.00 521.00

11.00 13.00 21.00 22.00 32.00 44.00 54.00 61.00 66.00 75.00 86.00

A i) ii) III) iv) v) vi)

No No No No No

39.00 43.00 60.00 102.00 133.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 115

Sr. No. vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) B i) ii) iii) iv) C i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii)

Description 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm Sealing 'O' Rings of SBR (for CID Joints) 80 mm 100 mm 125 mm 150 mm Flat Flanged Gaskets moulded out of SBR (for Flanged Joints) 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm

Unit No No No No No No No No No No No Set Set Set Set

Rate (Rs.) 2012-13 187.00 214.00 298.00 325.00 444.00 615.00 1095.00 1138.00 1179.00 1705.00 2190.00 45.00 53.00 64.00 75.00

Rate (Rs.) 2013-14

No No No No No No No No No No No No

82.00 109.00 129.00 177.00 219.00 307.00 326.00 393.00 487.00 532.00 623.00 838.00

d) Providing Rubber Gasket EPDM Gaskets for C. I. / D.I. Pipes 80 mm. 100 mm. 150 mm. 200 mm. 250 mm. 300 mm. 350 mm. 400 mm. 450 mm. 500 mm. 600 mm. 700 mm. 750 mm. 800 mm. 900 mm. 1000 mm

46.00 48.00 70.00 117.00 160.00 212.00 247.00 338.00 378.00 500.00 703.00 1320.00 1383.00 1688.00 2178.00 2530.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 116

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

22 Providing, fixing in position and jointing high performance CI Air Valves for water combination type (kinetic air valve along with automatic air valves), double ball, double orifice with stainless steel ball, tamperproof air vents rolling seal mechanism for air release and anti-vacuum application designed for 16 kg/cm working pressure and tested for 20 kg/cm pressure. (Rate to include cost of gaskets, bolt, nut and any other material required for jointing and its transportation, etc. including all taxes and duties except octroi.) CI ARV FLFF PN-16 i) 50 mm ii) 80 mm iii) 100 mm iv) 150 mm v) 200 mm

No No No No No

9513.00 13201.00 21226.00 35528.00 43035.00

(SECTION - I : (XIII) PIPE Appurtenances)

Page No. 117

Section - I (XIV)

Mechanical Joints / Fittings

SECTION - I : (XIV) MECHANICAL JOINTS / FITTINGS


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Supply of C.I. Mechanical Compression Flanged / Socket Tail Piece (popularly known as ITM Flanged / Socket Tail Piece) suitable for making flanged connection with the plain barrel of C.I. Spun Pipes (as per IS-1536/2001) and D.I. Pipes (as per IS-8329/2000). The tail piece to be supplied complete with sealing rubber gasket of S.B.R., C.I. follower glands and M.S. nut bolts. The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS1538/1993. i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) 2 80 mm dia. 100 mm dia. 125 mm dia. 150 mm dia. 200 mm dia. 250 mm dia. 300 mm dia. 350 mm dia. 400 mm dia. 450 mm dia. 500 mm dia. 600 mm dia. 700 mm dia. 750 mm dia. Supply of C.I. Mechanical Compression Collar Coupling (popularly known as JiffyTM Collar Coupling) suitable for C.I. Spun Pipes (as per IS-1536/2001) and D.I. Pipes (as per IS-8329/2000), complete with sealing rubber gasket of S.B.R., C.I. follower glands and M.S. nut bolts. The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS-1538/1993. 80 mm dia. 100 mm dia. 125 mm dia. 150 mm dia. 200 mm dia. 250 mm dia. 300 mm dia. 350 mm dia. 400 mm dia. 450 mm dia. 500 mm dia. 600 mm dia. 700 mm dia. 750 mm dia. No No No No No No No No No No No No No No 1302 1419 1786 2555 3310 4993 5589 7372 9623 11295 14193 18200 24823 30164

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv)

No No No No No No No No No No No No No No

784 841 1121 1512 1726 2767 3541 4364 6792 7626 10422 13000 16984 19928

(SECTION - I : (XIV) Mechanical Joints / Fittings)

Page No. 118

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

3 Supply of C.I. Mechanical Joint Double Socket 90 () Bends as dimensionally described in Table-14 of IS-13382/1992 complete with sealing rubber gaskets of SBR (dimensionally described in IS12820/1989) with cast iron follower gland and mild steel nut bolts coated or otherwise protected from rusting and suitable for C.I. pipes. i) 80 mm dia. ii) 100 mm dia. iii) 125 mm dia. iv) 150 mm dia. v) 200 mm dia. vi) 250 mm dia. vii) 300 mm dia. viii) 350 mm dia. ix) 400 mm dia. x) 450 mm dia. xi) 500 mm dia. xii) 600 mm dia. xiii) 700 mm dia. xiv) 750 mm dia. 4 Supply of C.I. Mechanical Joint Double Socket 45 (/8) Bends as dimensionally described in Table-15 of IS-13382/1992 complete with sealing rubber gaskets of SBR (dimensionally described in IS12820/1989) with cast iron follower gland and mild steel nut bolts coated or otherwise protected from rusting and suitable for C.I. pipes. i) 80 mm dia. ii) 100 mm dia. iii) 125 mm dia. iv) 150 mm dia. v) 200 mm dia. vi) 250 mm dia. vii) 300 mm dia. viii) 350 mm dia. ix) 400 mm dia. x) 450 mm dia. xi) 500 mm dia. xii) 600 mm dia. xiii) 700 mm dia. xiv) 750 mm dia. 5 Supply of C.I. Mechanical Joint Double Socket 22.5 (/16) Bends as dimensionally described in Table-16 of IS-13382/1992 complete with sealing rubber gaskets of SBR (dimensionally described in IS12820/1989) with cast iron follower gland and mild steel nut bolts coated or otherwise protected from rusting and suitable for C.I. pipes. i) 80 mm dia. ii) 100 mm dia.

No No No No No No No No No No No No No No

2231 2587 3022 4751 6305 9385 11422 18911 25775 32899 40940 57862 91333 103733

No No No No No No No No No No No No No No

2071 2306 2914 4002 5271 7733 9330 15564 19205 26788 29845 41324 58888 77879

No No

1988 2213

(SECTION - I : (XIV) Mechanical Joints / Fittings)

Page No. 119

Sr. No. iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) 6

Description 125 mm dia. 150 mm dia. 200 mm dia. 250 mm dia. 300 mm dia. 350 mm dia. 400 mm dia. 450 mm dia. 500 mm dia. 600 mm dia. 700 mm dia. 750 mm dia. Supply of C.I. Mechanical Joint Double Socket 11.25 (/32) Bends as dimensionally described in Table-17 of IS13382/1992 complete with sealing rubber gaskets of SBR (dimensionally described in IS-12820/1989) with cast iron follower gland and mild steel nut bolts coated or otherwise protected from rusting and suitable for C.I. pipes. 80 mm dia. 100 mm dia. 125 mm dia. 150 mm dia. 200 mm dia. 250 mm dia. 300 mm dia. 350 mm dia. 400 mm dia. 450 mm dia. 500 mm dia. 600 mm dia. 700 mm dia. 750 mm dia. Supply of C.I. Mechanical Joint All Socket Tees as dimensionally described in Table18 of IS-13382/1992 complete with sealing rubber gaskets of SBR (dimensionally described in IS-12820/1989) with cast iron follower gland and mild steel nut bolts coated or otherwise protected from rusting and suitable for C.I. pipes. 80 x 80 x 80 mm. dia. 100 x 100 x 80 mm. dia. 100 x 100 x 100 mm. dia. 150 x 150 x 80 mm. dia. 150 x 150 x 100 mm. dia. 150 x 150 x 150 mm. dia. 200 x 200 x 80 mm. dia. 200 x 200 x 100 mm. dia. 200 x 200 x 150 mm. dia. 200 x 200 x 200 mm. dia. 250 x 250 x 80 mm. dia. 250 x 250 x 100 mm. dia. 250 x 250 x 150 mm. dia.

Unit No No No No No No No No No No No No

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 2657 3757 4711 7124 8599 13576 17404 22017 25658 33998 51142 56318

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) 7

No No No No No No No No No No No No No No

1969 2162 2348 3672 4522 6685 7407 11689 15834 19985 21784 29863 40258 44912

i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii)

No No No No No No No No No No No No No

3016 3243 3596 5037 5108 6335 6075 6142 7316 8050 8555 8744 10435

(SECTION - I : (XIV) Mechanical Joints / Fittings)

Page No. 120

Sr. No.

Description

Unit No No No No No No No No

xiv) 250 x 250 x 200 mm. dia. xv) 250 x 250 x 250 mm. dia. xvi) 300 x 300 x 80 mm. dia. xvii) 300 x 300 x 100 mm. dia. xviii) 300 x 300 x 150 mm. dia. xix) 300 x 300 x 200 mm. dia. xx) 300 x 300 x 250 mm. dia. xxi) 300 x 300 x 300 mm. dia. 8 Supply of C.I. Mechanical Joint Double Socket with Flanged Tees as dimensionally described in Table-19 of IS13382/1992 complete with sealing rubber gaskets of SBR (dimensionally described in IS-12820/1989) with cast iron follower gland and mild steel nut bolts coated or otherwise protected from rusting and suitable for C.I. pipes. 1 80 x 80 x 80 mm. dia. 2 100 x 100 x 80 mm. dia. 3 100 x 100 x 100 mm. dia. 4 150 x 150 x 80 mm. dia. 5 150 x 150 x 100 mm. dia. 6 150 x 150 x 150 mm. dia. 7 200 x 200 x 80 mm. dia. 8 200 x 200 x 100 mm. dia. 9 200 x 200 x 150 mm. dia. 10 200 x 200 x 200 mm. dia. 11 250 x 250 x 80 mm. dia. 12 250 x 250 x 100 mm. dia. 13 250 x 250 x 150 mm. dia. 14 250 x 250 x 200 mm. dia. 15 250 x 250 x 250 mm. dia. 16 300 x 300 x 80 mm. dia. 17 300 x 300 x 100 mm. dia. 18 300 x 300 x 150 mm. dia. 19 300 x 300 x 200 mm. dia. 20 300 x 300 x 250 mm. dia. 21 300 x 300 x 300 mm. dia. 22 350 x 350 x 80 mm. dia. 23 350 x 350 x 100 mm. dia. 24 350 x 350 x 150 mm. dia. 25 350 x 350 x 200 mm. dia. 26 350 x 350 x 300 mm. dia. 27 350 x 350 x 350 mm. dia. 28 400 x 400 x 80 mm. dia. 29 400 x 400 x 100 mm. dia. 30 400 x 400 x 150 mm. dia. 31 400 x 400 x 200 mm. dia. 32 400 x 400 x 300 mm. dia. 33 400 x 400 x 400 mm. dia. 34 450 x 450 x 80 mm. dia. 35 450 x 450 x 100 mm. dia. 36 450 x 450 x 200 mm. dia. 37 450 x 450 x 300 mm. dia. 38 450 x 450 x 350 mm. dia. 39 450 x 450 x 450 mm. dia. 40 500 x 500 x 100 mm. dia.

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 11025 12366 9381 9591 12301 12708 13455 14849

No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

2954 3241 3429 4892 5013 5970 5741 6124 7053 8087 8108 8532 10125 10595 10970 9519 9705 11205 11300 12470 15283 13314 14159 15234 17752 18187 20812 17404 18449 20541 20955 25253 28915 20758 21805 25573 32269 34049 36984 23355

(SECTION - I : (XIV) Mechanical Joints / Fittings)

Page No. 121

Sr. No. 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 9

Description 500 x 500 x 250 mm. dia. 500 x 500 x 300 mm. dia. 500 x 500 x 400 mm. dia. 500 x 500 x 500 mm. dia. 600 x 600 x 100 mm. dia. 600 x 600 x 300 mm. dia. 600 x 600 x 400 mm. dia. 600 x 600 x 500 mm. dia. 600 x 600 x 600 mm. dia. 700 x 700 x 100 mm. dia. 700 x 700 x 200 mm. dia. 700 x 700 x 350 mm. dia. 700 x 700 x 400 mm. dia. 750 x 750 x 150 mm. dia. 750 x 750 x 250 mm. dia. 750 x 750 x 750 mm. dia. Supply of C.I. Mechanical Joint Double Socket Reducers as described in Table-21 of IS-13382/1992 complete with sealing rubber gaskets of SBR (dimensionally described in IS-12820/1989) with cast iron follower gland and mild steel nut bolts coated or otherwise protected from rusting and suitable for C.I. pipes. 100 x 80 mm. dia. 150 x 80 mm. dia. 150 x 100 mm. dia. 200 x 100 mm. dia. 200 x 150 mm. dia. 250 x 150 mm. dia. 250 x 200 mm. dia. 300 x 150 mm. dia. 300 x 200 mm. dia. 300 x 250 mm. dia. 350 x 200 mm. dia. 350 x 250 mm. dia. 350 x 300 mm. dia. 400 x 250 mm. dia. 400 x 300 mm. dia. 400 x 350 mm. dia. 450 x 400 mm. dia. 450 x 350 mm. dia. 450 x 400 mm. dia. 500 x 350 mm. dia. 500 x 400 mm. dia. 500 x 450 mm. dia. 600 x 400 mm. dia. 600 x 450 mm. dia. 600 x 500 mm. dia. 700 x 500 mm. dia. 700 x 600 mm. dia. 750 x 600 mm. dia. 750 x 700 mm. dia. 800 x 450 mm. dia. 800 x 700 mm. dia.

Unit No No No No No No No No No No No No No No No No

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 31936 33086 39892 48162 33376 45831 52215 56505 69377 44235 51246 61922 66526 52759 60506 116081

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

2092 3292 3485 4011 4387 5994 5848 7372 7384 7510 10612 10646 10520 16029 14200 14295 17751 17740 17519 21339 21014 20483 30985 30156 28313 42533 38601 45846 42377 63072 54144

(SECTION - I : (XIV) Mechanical Joints / Fittings)

Page No. 122

Section - I (XV)

M.S. Pipes

SECTION - I : (XV) MILD STEEL PIPE


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Manufacturing, providing and supplying spirally welded/ ERW / SAW / fabricated M.S. pipes (Commercial Quality) including procurement of plates, gas cutting to required size, rolling, tack welding, assembling in suitable lengths to form pipes, welding on automatic welding machine and forming 'V' edge on both ends of pipes including all taxes (Central and local), railway freight, insurance, unloading from railway wagon, loading into truck, transport to stores / site, unloading, stacking, etc. complete as per IS-3589 and IS-5504 as applicable as per specifications (No negative tolerance in thickness is permissible). A Dia of pipe : 219.10 mm (O.D.) Thickness of pipe i) 4.8 mm ii) 5.6 mm iii) 6.4 mm iv) 7.0 mm v) 7.9 mm vi) 8.2 mm vii) 8.7 mm viii) 9.5 mm B Dia of pipe : 273.10 mm (O.D.) Thickness of pipe i) 4.8 mm ii) 5.6 mm iii) 6.4 mm iv) 7.2 mm v) 7.8 mm vi) 8.7 mm vii) 9.5 mm C Dia of pipe : 323.90 mm (O.D.) Thickness of pipe i) 5.6 mm ii) 6.4 mm iii) 7.1 mm iv) 7.9 mm v) 8.4 mm vi) 8.7 mm vii) 9.5 mm D Dia of pipe : 355.70 mm (O.D.) Thickness of pipe i) 5.6 mm ii) 6.4 mm iii) 7.1 mm iv) 7.9 mm v) 8.7 mm vi) 9.5 mm E Dia of pipe : 406.00 mm (O.D.) Thickness of pipe
Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT

1527.00 1775.00 2021.00 2204.00 2477.00 2567.00 2717.00 2955.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

1912.00 2224.00 2533.00 2842.00 3071.00 3414.00 3641.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

2646.00 3016.00 3339.00 3706.00 3934.00 4071.00 4433.00


Without E.D.

RMT RMT RMT RMT RMT RMT

2909.00 3317.00 3672.00 4077.00 4480.00 4880.00


Without E.D.

(SECTION - I : (XV) M.S. PIPE )

Page No. 123

Sr. No. i) ii) iii) iv) v) vi) vii) F i) ii) iii) iv) v) vi) vii) G i) ii) iii) iv) v) vi) vii) H i) ii) iii) iv) v) vi) vii) I i) ii) iii) iv) v) vi) vii) viii) J i) ii) iii) iv) v) vi) vii) K i) ii)

Description 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 457.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 508.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 559.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 610.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 660.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 711.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm

Unit RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 3327.00 3796.00 4203.00 4668.00 5130.00 5590.00 5878.00
Without E.D.

RMT RMT RMT RMT RMT RMT RMT

3751.00 4280.00 4741.00 5267.00 5788.00 6310.00 6635.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

4177.00 4765.00 5278.00 5864.00 6447.00 7030.00 7392.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

4600.00 5248.00 5816.00 6462.00 7105.00 7748.00 8148.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT

5024.00 5734.00 6353.00 7059.00 7764.00 8468.00 8906.00 10651.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

5439.00 6209.00 6881.00 7646.00 8411.00 9172.00 9648.00


Without E.D.

RMT RMT

5863.00 6693.00

(SECTION - I : (XV) M.S. PIPE )

Page No. 124

Sr. No. iii) iv) v) vi) vii) viii) L i) ii) iii) iv) v) vi) vii) M i) ii) iii) iv) v) vi) vii) viii) N i) ii) iii) iv) v) vi) vii) O i) ii) iii) iv) v) vi) vii) P i) ii) iii) iv) v) vi) vii) Q i) ii) iii)

Description 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 762.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 813.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 864.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 914.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 965.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 1016.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm

Unit RMT RMT RMT RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 7417.00 8244.00 9069.00 9892.00 10405.00 12449.00
Without E.D.

RMT RMT RMT RMT RMT RMT RMT

6288.00 7178.00 7955.00 8842.00 9727.00 10610.00 11161.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT RMT

6711.00 7662.00 8492.00 9440.00 10387.00 11330.00 11919.00 14266.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

7135.00 8146.00 9030.00 10038.00 11045.00 12048.00 12675.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

7550.00 8622.00 9558.00 10624.00 11690.00 12754.00 13418.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

7975.00 9107.00 10095.00 11223.00 12348.00 13473.00 14175.00


Without E.D.

RMT RMT RMT

8398.00 9590.00 10632.00

(SECTION - I : (XV) M.S. PIPE )

Page No. 125

Sr. No. iv) v) vi) vii) viii) R i) ii) iii) iv) v) vi) vii) S i) ii) iii) iv) v) vi) vii) T i) ii) iii) iv) v) vi) vii) U i) ii) iii) iv) v) vi) vii) V i) ii) iii) W i) ii) iii) iv) v) vi) X i)

Description 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 1067.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 1118.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 1168.00 mm (O.D.) Thickness of pipe 5.6 mm 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 1219.00 mm (O.D.) Thickness of pipe 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 1296.00 mm (O.D.) Thickness of pipe 9.5 mm 9.98 mm 10.0 mm Dia of pipe : 1321.00 mm (O.D.) Thickness of pipe 6.4 mm 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm Dia of pipe : 1422.00 mm (O.D.) Thickness of pipe 7.1 mm

Unit RMT RMT RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 11821.00 13008.00 14193.00 14932.00 17883.00
Without E.D.

RMT RMT RMT RMT RMT RMT RMT

8822.00 10075.00 11170.00 12419.00 13666.00 14911.00 15689.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

9247.00 10559.00 11706.00 13016.00 14325.00 15631.00 16446.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

9661.00 11034.00 12234.00 13603.00 14970.00 16335.00 17188.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

11519.00 12772.00 14201.00 15629.00 17055.00 17945.00 21498.00


Without E.D.

RMT RMT RMT

18141.00 19049.00 19087.00


Without E.D.

RMT RMT RMT RMT RMT RMT

12487.00 13846.00 15397.00 16946.00 18492.00 19459.00


Without E.D.

RMT

14910.00

(SECTION - I : (XV) M.S. PIPE )

Page No. 126

Sr. No. ii) iii) iv) v) vi) Y i) ii) Z i) ii) iii) iv) v) vi) vii) AA i) ii) AB i) ii) AC i) ii) iii) iv) v) vi) AD i) ii) iii) iv) v) AE i) ii) iii) iv) v) AF i) ii) iii) iv) v) AG

Description 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 1473.00 mm (O.D.) Thickness of pipe 9.5 mm 9.98 mm Dia of pipe : 1524.00 mm (O.D.) Thickness of pipe 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm 11.9 mm 12.0 mm Dia of pipe : 1550.00 mm (O.D.) Thickness of pipe 10.0 mm 11.0 mm Dia of pipe : 1576.00 mm (O.D.) Thickness of pipe 9.5 mm 10.0 mm Dia of pipe : 1626.00 mm (O.D.) Thickness of pipe 7.1 mm 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 1650.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 1700.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 1750.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 1800.00 mm (O.D.) Thickness of pipe

Unit RMT RMT RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 16581.00 18250.00 19917.00 20957.00 25114.00
Without E.D.

RMT RMT

20637.00 21672.00
Without E.D.

RMT RMT RMT RMT RMT RMT RMT

15986.00 17777.00 19567.00 21355.00 22472.00 26708.00 26930.00


Without E.D.

RMT RMT

22858.00 25127.00
Without E.D.

RMT RMT

22089.00 23243.00
Without E.D.

RMT RMT RMT RMT RMT RMT

17060.00 18973.00 20885.00 22793.00 23985.00 28748.00


Without E.D.

RMT RMT RMT RMT RMT

19254.00 21194.00 23132.00 24342.00 29175.00


Without E.D.

RMT RMT RMT RMT RMT

19841.00 21840.00 23837.00 25084.00 30065.00


Without E.D.

RMT RMT RMT RMT RMT

20427.00 22485.00 24542.00 25826.00 30956.00


Without E.D.

(SECTION - I : (XV) M.S. PIPE )

Page No. 127

Sr. No. i) ii) iii) iv) v) AH i) ii) iii) iv) v) AI i) ii) iii) iv) v) AJ i) ii) iii) iv) v) AK i) ii) iii) iv) v) AL i) ii) iii) iv) v) AM i) ii) iii) iv) v) AN i) ii) iii) iv) v) AO i)

Description 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 1850.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 1900.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 1950.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 2000.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 2050.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 2100.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 2150.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 2200.00 mm (O.D.) Thickness of pipe 7.9 mm

Unit RMT RMT RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 21013.00 23131.00 25247.00 26569.00 31846.00
Without E.D.

RMT RMT RMT RMT RMT

21599.00 23777.00 25951.00 27310.00 32737.00


Without E.D.

RMT RMT RMT RMT RMT

22186.00 24422.00 26658.00 28053.00 33627.00


Without E.D.

RMT RMT RMT RMT RMT

22773.00 25068.00 27362.00 28795.00 34517.00


Without E.D.

RMT RMT RMT RMT RMT

23359.00 25713.00 28067.00 29537.00 35408.00


Without E.D.

RMT RMT RMT RMT RMT

23946.00 26359.00 28771.00 30279.00 36299.00


Without E.D.

RMT RMT RMT RMT RMT

24530.00 27005.00 29477.00 31021.00 37190.00


Without E.D.

RMT RMT RMT RMT RMT

25117.00 27651.00 30181.00 31763.00 38080.00


Without E.D.

RMT

25703.00

(SECTION - I : (XV) M.S. PIPE )

Page No. 128

Sr. No. ii) iii) iv) v) AP i) ii) iii) iv) v) AQ i) ii) iii) iv) v) AR i) ii) iii) iv) v) AS i) ii) iii) iv) v) AT i) ii) iii) iv) v) AU i) ii) iii) iv) v) vi)

Description 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 2250.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 2300.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 2350.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 2400.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 2450.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm Dia of pipe : 2500.00 mm (O.D.) Thickness of pipe 7.9 mm 8.7 mm 9.5 mm 10.0 mm 12.0 mm 16.0 mm

Unit RMT RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 28297.00 30887.00 32505.00 38970.00
Without E.D.

RMT RMT RMT RMT RMT

26290.00 28942.00 31592.00 33247.00 39861.00


Without E.D.

RMT RMT RMT RMT RMT

26877.00 29587.00 32297.00 33990.00 40751.00


Without E.D.

RMT RMT RMT RMT RMT

27462.00 30233.00 33002.00 34731.00 41643.00


Without E.D.

RMT RMT RMT RMT RMT

28049.00 30879.00 33707.00 35474.00 42533.00


Without E.D.

RMT RMT RMT RMT RMT

28635.00 31525.00 34413.00 36215.00 43424.00


Without E.D.

RMT RMT RMT RMT RMT RMT

29222.00 32170.00 35117.00 36959.00 44314.00 58990.00

(SECTION - I : (XV) M.S. PIPE )

Page No. 129

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

2 Manufacturing, providing and supplying spirally welded/ ERW / SAW / fabricated M.S. pipes (Commercial Quality) including procurements of plates, gas cutting to required size, rolling, tack welding, assembling in suitable lengths to form pipes, welding on automatic welding machine and forming 'V' edge on both ends of pipes including all taxes (Central and local), railway freight, insurance, unloading from railway wagon, loading into truck, transport to stores / site, unloading, stacking, etc. complete as per IS-3589 and IS-5504 as applicable as per specifications (No negative tolerance in thickness is permissible). A Dia of pipe : 200.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm B Dia of pipe : 250.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm C Dia of pipe : 300.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm D Dia of pipe : 350.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm E Dia of pipe : 400.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm
Without E.D.

RMT RMT RMT RMT RMT RMT

1522.00 1829.00 2151.00 2470.00 2792.00 3117.00


Without E.D.

RMT RMT RMT RMT RMT RMT

1892.00 2280.00 2670.00 3063.00 3460.00 3859.00


Without E.D.

RMT RMT RMT RMT RMT RMT

2264.00 2725.00 3190.00 3657.00 4129.00 4601.00


Without E.D.

RMT RMT RMT RMT RMT RMT

2634.00 3170.00 3709.00 4250.00 4795.00 5344.00


Without E.D.

RMT RMT RMT RMT RMT RMT

3006.00 3616.00 4229.00 4845.00 5464.00 6085.00

(SECTION - I : (XV) M.S. PIPE )

Page No. 130

Sr. No.

Description

Unit

Rate (Rs.) 2012-13


Without E.D.

Rate (Rs.) 2013-14

F Dia of pipe : 450.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm G Dia of pipe : 500.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm H Dia of pipe : 550.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm I Dia of pipe : 600.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm vii) 12.0 mm J Dia of pipe : 650.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm vii) 12.0 mm K Dia of pipe : 700.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm vii) 12.0 mm L Dia of pipe : 750.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm

RMT RMT RMT RMT RMT RMT

3376.00 4060.00 4748.00 5439.00 6131.00 6828.00


Without E.D.

RMT RMT RMT RMT RMT RMT

3748.00 4506.00 5268.00 6032.00 6800.00 7570.00


Without E.D.

RMT RMT RMT RMT RMT RMT

4119.00 4951.00 5787.00 6626.00 7468.00 8313.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

4490.00 5397.00 6307.00 7220.00 8135.00 9054.00 10901.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

4862.00 5841.00 6826.00 7813.00 8804.00 9797.00 11792.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

5232.00 6288.00 7346.00 8408.00 9471.00 10538.00 12682.00


Without E.D.

RMT RMT RMT RMT

5604.00 6734.00 7866.00 9001.00

(SECTION - I : (XV) M.S. PIPE )

Page No. 131

Sr. No. v) vi) vii) M i) ii) iii) iv) v) vi) vii) N i) ii) iii) iv) v) vi) vii) O i) ii) iii) iv) v) vi) vii) P i) ii) iii) iv) v) vi) vii) Q i) ii) iii) iv) v) vi) vii) R i) ii) iii) iv) v) vi) vii)

Description 9.0 mm 10.0 mm 12.0 mm Dia of pipe : 800.00 mm (I.D.) Thickness of pipe 5.0 mm 6.0 mm 7.0 mm 8.0 mm 9.0 mm 10.0 mm 12.0 mm Dia of pipe : 850.00 mm (I.D.) Thickness of pipe 5.0 mm 6.0 mm 7.0 mm 8.0 mm 9.0 mm 10.0 mm 12.0 mm Dia of pipe : 900.00 mm (I.D.) Thickness of pipe 5.0 mm 6.0 mm 7.0 mm 8.0 mm 9.0 mm 10.0 mm 12.0 mm Dia of pipe : 950.00 mm (I.D.) Thickness of pipe 5.0 mm 6.0 mm 7.0 mm 8.0 mm 9.0 mm 10.0 mm 12.0 mm Dia of pipe : 1000.00 mm (I.D.) Thickness of pipe 5.0 mm 6.0 mm 7.0 mm 8.0 mm 9.0 mm 10.0 mm 12.0 mm Dia of pipe : 1050.00 mm (I.D.) Thickness of pipe 5.0 mm 6.0 mm 7.0 mm 8.0 mm 9.0 mm 10.0 mm 12.0 mm

Unit RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 10140.00 11281.00 13572.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

5974.00 7179.00 8384.00 9595.00 10807.00 12024.00 14463.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

6346.00 7624.00 8905.00 10189.00 11475.00 12765.00 15353.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

6717.00 8069.00 9424.00 10782.00 12143.00 13508.00 16244.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

7088.00 8515.00 9943.00 11376.00 12811.00 14249.00 17134.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

7458.00 8959.00 10463.00 11970.00 13479.00 14992.00 18026.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

7830.00 9405.00 10983.00 12563.00 14147.00 15733.00 18916.00

(SECTION - I : (XV) M.S. PIPE )

Page No. 132

Sr. No.

Description

Unit

Rate (Rs.) 2012-13


Without E.D.

Rate (Rs.) 2013-14

S Dia of pipe : 1100.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm vii) 12.0 mm T Dia of pipe : 1150.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm vii) 12.0 mm U Dia of pipe : 1200.00 mm (I.D.) Thickness of pipe i) 5.0 mm ii) 6.0 mm iii) 7.0 mm iv) 8.0 mm v) 9.0 mm vi) 10.0 mm vii) 12.0 mm V Dia of pipe : 1250.00 mm (I.D.) Thickness of pipe i) 6.0 mm ii) 7.0 mm iii) 8.0 mm iv) 9.0 mm v) 10.0 mm vi) 12.0 mm W Dia of pipe : 1300.00 mm (I.D.) Thickness of pipe i) 6.0 mm ii) 7.0 mm iii) 8.0 mm iv) 9.0 mm v) 10.0 mm vi) 12.0 mm X Dia of pipe : 1350.00 mm (I.D.) Thickness of pipe i) 7.0 mm ii) 8.0 mm iii) 9.0 mm iv) 10.0 mm v) 12.0 mm Y Dia of pipe : 1400.00 mm (I.D.) Thickness of pipe i) 7.0 mm ii) 8.0 mm iii) 9.0 mm iv) 10.0 mm v) 12.0 mm

RMT RMT RMT RMT RMT RMT RMT

8201.00 9850.00 11501.00 13157.00 14815.00 16476.00 19808.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

8572.00 10296.00 12021.00 13751.00 15483.00 17218.00 20698.00


Without E.D.

RMT RMT RMT RMT RMT RMT RMT

8942.00 10740.00 12541.00 14344.00 16151.00 17960.00 21588.00


Without E.D.

RMT RMT RMT RMT RMT RMT

11186.00 13061.00 14938.00 16819.00 18702.00 22479.00


Without E.D.

RMT RMT RMT RMT RMT RMT

11632.00 13579.00 15531.00 17487.00 19444.00 23369.00


Without E.D.

RMT RMT RMT RMT RMT

14100.00 16126.00 18155.00 20186.00 24260.00


Without E.D.

RMT RMT RMT RMT RMT

14619.00 16720.00 18822.00 20928.00 25150.00

(SECTION - I : (XV) M.S. PIPE )

Page No. 133

Sr. No.

Description

Unit

Rate (Rs.) 2012-13


Without E.D.

Rate (Rs.) 2013-14

Z Dia of pipe : 1450.00 mm (I.D.) Thickness of pipe i) 7.0 mm ii) 8.0 mm iii) 9.0 mm iv) 10.0 mm v) 12.0 mm AA Dia of pipe : 1500.00 mm (I.D.) Thickness of pipe i) 7.0 mm ii) 8.0 mm iii) 9.0 mm iv) 10.0 mm v) 12.0 mm AB Dia of pipe : 1550.00 mm (I.D.) Thickness of pipe i) 7.0 mm ii) 8.0 mm iii) 9.0 mm iv) 10.0 mm v) 12.0 mm AC Dia of pipe : 1600.00 mm (I.D.) Thickness of pipe i) 7.0 mm ii) 8.0 mm iii) 9.0 mm iv) 10.0 mm v) 12.0 mm AD Dia of pipe : 1650.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm AE Dia of pipe : 1700.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm AF Dia of pipe : 1750.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm AG Dia of pipe : 1800.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm AH Dia of pipe : 1850.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm

RMT RMT RMT RMT RMT

15138.00 17313.00 19490.00 21672.00 26041.00


Without E.D.

RMT RMT RMT RMT RMT

15659.00 17907.00 20159.00 22414.00 26931.00


Without E.D.

RMT RMT RMT RMT RMT

16178.00 18501.00 20826.00 23156.00 27822.00


Without E.D.

RMT RMT RMT RMT RMT

16697.00 19094.00 21495.00 23898.00 28712.00


Without E.D.

RMT RMT RMT RMT

19688.00 22161.00 24640.00 29602.00


Without E.D.

RMT RMT RMT RMT

20281.00 22830.00 25382.00 30493.00


Without E.D.

RMT RMT RMT RMT

20875.00 23499.00 26124.00 31384.00


Without E.D.

RMT RMT RMT RMT

21469.00 24166.00 26866.00 32276.00


Without E.D.

RMT RMT RMT

22062.00 24835.00 27609.00

(SECTION - I : (XV) M.S. PIPE )

Page No. 134

Sr. No.

Description

Unit RMT

iv) 12.0 mm AI Dia of pipe : 1900.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm AJ Dia of pipe : 1950.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm AK Dia of pipe : 2000.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm v) 16.0 mm AL Dia of pipe : 2050.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm v) 16.0 mm AM Dia of pipe : 2100.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm v) 16.0 mm AN Dia of pipe : 2150.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm v) 16.0 mm AO Dia of pipe : 2200.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm v) 16.0 mm AP Dia of pipe : 2250.00 mm (I.D.) Thickness of pipe i) 8.0 mm ii) 9.0 mm iii) 10.0 mm iv) 12.0 mm v) 16.0 mm AQ Dia of pipe : 2300.00 mm (I.D.) Thickness of pipe

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 33166.00


Without E.D.

RMT RMT RMT RMT

22656.00 25502.00 28350.00 34057.00


Without E.D.

RMT RMT RMT RMT

23251.00 26170.00 29093.00 34947.00


Without E.D.

RMT RMT RMT RMT RMT

23844.00 26837.00 29834.00 35838.00 47878.00


Without E.D.

RMT RMT RMT RMT RMT

24438.00 27506.00 30577.00 36728.00 49066.00


Without E.D.

RMT RMT RMT RMT RMT

25032.00 28174.00 31319.00 37618.00 50253.00


Without E.D.

RMT RMT RMT RMT RMT

25625.00 28842.00 32061.00 38509.00 51440.00


Without E.D.

RMT RMT RMT RMT RMT

26219.00 29509.00 32804.00 39399.00 52627.00


Without E.D.

RMT RMT RMT RMT RMT

26813.00 30177.00 33545.00 40290.00 53815.00


Without E.D.

(SECTION - I : (XV) M.S. PIPE )

Page No. 135

Sr. No. i) ii) iii) iv) v) AR i) ii) iii) iv) v) AS i) ii) iii) iv) v) AT i) ii) iii) iv) v) AU i) ii) iii) iv) v)

Description 8.0 mm 9.0 mm 10.0 mm 12.0 mm 16.0 mm Dia of pipe : 2350.00 mm (I.D.) Thickness of pipe 8.0 mm 9.0 mm 10.0 mm 12.0 mm 16.0 mm Dia of pipe : 2400.00 mm (I.D.) Thickness of pipe 8.0 mm 9.0 mm 10.0 mm 12.0 mm 16.0 mm Dia of pipe : 2450.00 mm (I.D.) Thickness of pipe 8.0 mm 9.0 mm 10.0 mm 12.0 mm 16.0 mm Dia of pipe : 2500.00 mm (I.D.) Thickness of pipe 8.0 mm 9.0 mm 10.0 mm 12.0 mm 16.0 mm

Unit RMT RMT RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 27407.00 30846.00 34288.00 41180.00 55002.00
Without E.D.

RMT RMT RMT RMT RMT

28001.00 31514.00 35029.00 42072.00 56190.00


Without E.D.

RMT RMT RMT RMT RMT

28594.00 32182.00 35772.00 42962.00 57379.00


Without E.D.

RMT RMT RMT RMT RMT

29188.00 32849.00 36514.00 43853.00 58566.00


Without E.D.

RMT RMT RMT RMT RMT

29782.00 33517.00 37257.00 44743.00 59753.00

(SECTION - I : (XV) M.S. PIPE )

Page No. 136

Section - I (XVI)

Fabrication of M.S. Pipes and Specials

SECTION - I : (XVI) FABRICATION OF M.S. PIPES AND SPECIALS


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Major Works 1 Fabricating pipes from steel plates supplied free of cost and stacking the same in the fabricators yard. The rate to include cutting the plates, rolling, tack welding, assembling in suitable lengths to form pipes, welding on automatic welding machines and forming 'V' edge for both ends of pipe. 5 to 8 mm 8 to 12 mm 12 to 16 mm 16 to 20 mm 20 to 25 mm 2 Fabricating one piece cants, short pipes (shorter than one strake length) from the steel plates supplied free of cost of and stacking the same in fabricators' yard. The rate to include cutting the plates, rolling, tack welding either on automatic welding machine or manually and forming 'V' edge to both ends of pipes. 5 to 8 mm 8 to 12 mm 12 to 25 mm 3 Fabricating composite bends from steel plates supplied free of cost and stacking the same in the fabricators' yard. The rate to include cutting the plates, rolling, tacking drums, assembling the same to form bend of suitable length, welding, either on automatic welding machine or manually and forming 'V' edge to both ends of bend but the rate excluding the circumferential butt welding required for assembling cants to form necessary composite bend. Circumferential butt welding will be paid for separately under Item No. 7 (a). However, the rate under this item will include the cost of longitudinal butt welding of pipes strakes. 5 to 8 mm 8 to 12 mm 12 to 16 mm 16 to 25 mm 4 Fabricating tapers from the steel plates, supplied free of cost and stacking the same in the fabricators' yard. The rate to include cutting the plates, rolling, tack welding, welding either on automatic welding machine or manually and forming 'V' edge to both ends of tapers, but the rate excludes circumferential butt welding required for assembling drums to form necessary tapers. Circumferential butt welding will be paid for under Item No. 7 (a). However, the rate under this includes the longitudinal butt welding to form drums. The rate shall also include the cost of fabrication of stiffener rings and gussets and mounting the same on tapers, tack and chain welding, etc. as directed by Engineer-in-charge.

MT MT MT MT MT

9005.00 7062.00 5297.00 4767.00 4590.00

MT MT MT

12359.00 8121.00 5827.00

MT MT MT MT MT

14830.00 9887.00 7768.00 7239.00 11476.00

(SECTION - I : (XVI) Farication of M.S.Pipes and Specials)

Page No. 137

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

5 Fabricating specials and fixtures from steel materials supplied free of cost. (welding will be paid separately except for category vi (a) and (b) below. The weight for payment under this item shall be calculated on the basis of finished material neglecting the bolt holes wherever provided.) i) Saddle pieces, loose stiffener rings, pressure type blank flanges, ladders, platforms, and any other minor fixtures. The rate to include cutting, bending, tack welding, etc. complete. ii) 'Y' branches, 'T' branches. The rate to include cutting, bending, tack welding etc. complete. iii) Dished closures such as domes. The rate to include cutting, cold pressing and tack welding etc. complete. iv) Dished closures such as manhole cover. The rate to include cutting cold pressing and tack welding only. The rate also to include drilling holes including grinding wherever necessary, with supply of bolts, nuts, washers, etc. complete as per drawing. v) Flat manhole covers. The rate to include cutting, tack welding. The rate also to include drilling holes including grinding wherever necessary with supply of bolts, nuts, washers, etc. complete as per drawing. vi) a) Flange rings below 40 mm. thick. The rate to include gas cutting, tack welding to form ring, drilling holes including grinding wherever necessary etc. complete. b) Flange rings 40 mm and above thick. The rate to include gas cutting, tack welding to form ring, drilling holes including grinding wherever necessary, etc. complete. vii) a) Machining of flange rings for cut upto 2 mm. including handling, assembling, alignment the ring on machine, etc. complete as directed by Engineer-in-charge. i) for thickness of flange ring below 40 mm. ii) for thickness of flange ring 40 mm. and above. b) Extra over and above (vii) (a) for machining beyond 2 mm. for every additional cut of 2 mm. or part thereof. viii) Stress relieving of flange rings as specified and directed.

MT

4590.00

MT MT MT

9711.00 15007.00 16067.00

MT

10417.00

MT

16949.00

MT

22069.00

Sqm Sqm Sqm Sqm

971.00 1483.00 741.00 3531.00 67.00

ix) Plug plates 150 mm. dia. and the thickness of plate from Each 14 mm to 25 mm as per drawing. The rate to include gas cutting, drilling holes, cost of G.I. plugs, rolling to required curvature and threading, etc. complete. 6 Providing, fabricating and fixing expansion joints for pipelines as per the drawing. The rate to include machining the strakes and steel ring as shown in the drawing and welding on either automatic welding machine or manually. Rate includes plates and flats required for expansion joint and all other materials such as synthetic rubber, rubber ring, etc. complete including packing as per specifications, grease, bolts and nuts, etc. including local handling, all types of taxes and duties etc. complete. Expansion joints suitable for pipe diameters. i) 300 mm dia ii) 400 mm dia

Each Each

21887.00 31585.00

(SECTION - I : (XVI) Farication of M.S.Pipes and Specials)

Page No. 138

Sr. No. iii) iv) v) vi) vii) viii) ix) x) xi) 7

Description

Unit Each Each Each Each Each Each Each Each Each MT

450 mm dia 500 mm dia 600 mm dia 700 mm dia 750 mm dia 800 mm dia 900 mm dia 1000 mm dia 1200 mm dia Fabricating ring girder as per drawing and specifications from M.S. channels, flats, plates, etc. supplied free of cost and assembling the same on the ring girder strake and tack welding as per directions. 8 Fabricating ring girder supports (stools) as per drawing and specifications complete with top plates, base plates, side flats for fixing rollers wherever necessary, grease box covers, rag bolts, grid rods etc. from steel material supplied free of cost and stacking the same in fabricators yard. 9 Fabricating and assembling M.S. roller as per drawing. The rate to include machining, assembling and fixing the same to the side flats provided below the top plates of R.C. supports (stools) greasing including providing antitheft measures M.S. rounds will be supplied free of cost. All other materials such as bright stainless steel pins etc. shall be supplied by the fabricator at his cost. 10 Blast cleaning the surface of the old or new pipeline internally to remove all rust etc. complete, including providing sand, machinery, labour, cutting of pipes at required places and rewelding the same etc. complete as directed by Engineer-in-charge. (Pipe pieces if required for rewelding of old pipeline shall be paid separately.)

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 41085.00 55084.00 64711.00 80556.00 88773.00 103312.00 119952.00 143629.00 190757.00 5827.00

MT

7945.00

MT

17293.00

Sqm

77.00

11 Blast cleaning of old or new pipeline surface internally with Sqm mechanical cleaning machine having steel scraper blades with required passes including removing all rust, scaling, etc. including cutting of pipes at required places, rewelding the same including cost of all materials and labour, etc. complete. (Pipe pieces if required for rewelding of old pipeline shall be paid separately.) 12 Blast cleaning of old pipeline surface internally by using Sqm swabbing method by passing polyurethane foam "Pig" with required hydraulic pressure, cutting of pipes at required places, rewelding the same including cost of all materials and labour, etc. complete. (Pipe pieces if required for rewelding of old pipeline shall be paid separately.) 13 Blast cleaning the surface of the old or new pipeline Sqm externally to remove all rust including providing sand machinery, etc. complete as directed by Engineer-incharge. 14 Providing and applying primer and one coat of red oxide of Sqm iron paint, internally, to blast cleaned surface of the pipes.

77.00

91.00

91.00

25.00

(SECTION - I : (XVI) Farication of M.S.Pipes and Specials)

Page No. 139

Sr. No.

Description

Unit Sqm

15 Providing and applying primer and one coat of red oxide of iron paint, internally, including cleaning the surface of the pipes with steel scrappers, wire brushes, and metal cleaning solution, etc. 16 Fabricating and fixing insulated flange rings assembly as per drawing from steel materials, supplied free of cost. The rate to include fabrication of tail pipes (about 0.6 M long) fabrications of flange rings, machining, drilling holes, including grinding wherever necessary and welding. The rate above to include nuts, bolts, washers, etc. but shall not include supply and fixing of backbite/PVC rings, cylinders and rubber packing. For pipe dia. i) From 300 mm upto 450 mm ii) Above 450 mm upto 750 mm iii) Above 750 mm upto 1000 mm iv) Above 1000 mm upto 1250 mm v) Above 1250 mm upto 1750 mm vi) Above 1750 mm upto 2000 mm 17 Providing and applying primer and one coat of red oxide of iron paint, externally, to blast cleaned surface of the pipes.

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 43.00

Each Each Each Each Each Each Sqm

2138.00 4155.00 6184.00 10817.00 14722.00 17999.00 27.50

18 Providing and applying primer and one coat of red oxide of Sqm iron paint, externally, including cleaning the surface of the pipes with steel scrappers, wire brushes and metal cleaning solution, etc. complete. 19 Providing and applying covering coat of grey graphite of Sqm approved quality including dusting the surface, etc. complete. 20 Providing and applying one coat of zinc rich epoxy primer Sqm to the internal surface of pipeline at site, etc. complete. 21 Providing and applying primer first coat of intertol 49 W Sqm emaline 05/58 pipe coat or any other equivalent approved paint to the internal surface of pipeline at site, etc. complete. b) Second coat Sqm c) Third coat Sqm

60.00

31.00

66.00

50.00

41.00 40.00

(SECTION - I : (XVI) Farication of M.S.Pipes and Specials)

Page No. 140

Section - I (XVII)

M.S. Pipes Laying

SECTION - I : (XVII) M.S. PIPES LAYING


Sr. No. Description Unit Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 1 Lowering, laying in position to correct line and level, M.S. pipes with / without any outcoating on pedestals or chairs upon prepared formation. The rate to include loading, unloading, hoisting, marginal cutting wherever required, assembling, tack welding and transportation upto 500 M, etc. complete as specified. A i) ii) iii) iv) v) B i) ii) iii) iv) v) vi) vii) C i) ii) iii) iv) v) vi) D i) ii) iii) iv) v) vi) E i) ii) 2 5 mm to 8 mm thick Upto 250 mm dia Above 250 mm upto 500 mm dia Above 500 mm upto 750 mm dia Above 750 mm upto 1000 mm dia Above 1000 mm upto 1250 mm dia Above 8 mm upto 12 mm thick From 750 mm upto 1000 mm dia Above 1000 mm upto 1250 mm dia Above 1250 mm upto 1500 mm dia Above 1500 mm upto 1750 mm dia Above 1750 mm upto 2000 mm dia Above 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 12 mm upto 16 mm thick From 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 16 mm upto 20 mm thick From 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Above 20 mm upto 25 mm thick From 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Lowering, laying in position to correct line and level M.S. specials with / without any outcoating such as distance pieces, straps, bends, tapers, etc. on pedestals or chairs upon formation. The rate to include loading, unloading, hoisting, marginal cutting wherever required, assembling, tack welding and transportation upto 500 M, etc. complete. 5 mm to 8 mm thick Upto 250 mm dia Above 250 mm upto 500 mm dia Above 500 mm upto 750 mm dia Above 750 mm upto 1000 mm dia

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

282.00 332.00 381.00 431.00 482.00 574.00 640.00 706.00 774.00 840.00 906.00 974.00 864.00 932.00 996.00 1060.00 1124.00 1189.00 1306.00 1378.00 1450.00 1522.00 1595.00 1668.00 1778.00 1880.00

A i) ii) iii) iv)

RMT RMT RMT RMT

394.00 462.00 534.00 603.00

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 141

Sr. No. v) B i) ii) iii) iv) v) vi) vii) C i) ii) iii) iv) v) vi) D i) ii) iii) iv) v) vi) E i) ii) 3

Description Above 1000 mm upto 1250 mm dia Above 8 mm upto 12 mm thick From 750 mm upto 1000 mm dia Above 1000 mm upto 1250 mm dia Above 1250 mm upto 1500 mm dia Above 1500 mm upto 1750 mm dia Above 1750 mm upto 2000 mm dia Above 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 12 mm upto 16 mm thick From 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 16 mm upto 20 mm thick From 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Above 20 mm upto 25 mm thick From 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Lowering, laying in position to correct line and level M.S. pipes with / without any outcoating, on pedestals or chairs upon piers, trestles, etc. The rate to include loading, unloading, hoisting, marginal cutting wherever required, assembling, tack welding and transportation upto 500 M, etc. complete. 5 mm to 8 mm thick Upto 250 mm dia Above 250 mm upto 500 mm dia Above 500 mm upto 750 mm dia Above 750 mm upto 1000 mm dia Above 1000 mm upto 1250 mm dia Above 8 mm upto 12 mm thick From 750 mm upto 1000 mm dia Above 1000 mm upto 1250 mm dia Above 1250 mm upto 1500 mm dia Above 1500 mm upto 1750 mm dia Above 1750 mm upto 2000 mm dia Above 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 12 mm upto 16 mm thick From 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 16 mm upto 20 mm thick

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 673.00 804.00 897.00 989.00 1082.00 1177.00 1269.00 1362.00 1252.00 1304.00 1394.00 1483.00 1574.00 1664.00 1796.00 1877.00 2031.00 2132.00 2232.00 2333.00 2488.00 2631.00

A i) ii) iii) iv) v) B i) ii) iii) iv) v) vi) vii) C i) ii) iii) iv) v) vi) D

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

337.00 396.00 457.00 517.00 578.00 689.00 768.00 848.00 928.00 1009.00 1089.00 1167.00 994.00 1042.00 1194.00 1273.00 1350.00 1416.00

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 142

Sr. No. i) ii) iii) iv) v) vi) E i) ii) 4

Description From 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Above 20 mm upto 25 mm thick From 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Lowering, laying in position to correct line and level M.S. specials such as distance pieces, straps, bends, tapers, etc. on pedestals or chairs up on piers or trestles. The rate to include loading, unloading, hoisting, marginal cutting wherever required, assembling, tack welding and transportation upto 500 M, etc. complete as specified. 5 mm to 8 mm thick Upto 250 mm dia Above 250 mm upto 500 mm dia Above 500 mm upto 750 mm dia Above 750 mm upto 1000 mm dia Above 1000 mm upto 1250 mm dia Above 8 mm upto 12 mm thick From 750 mm upto 1000 mm dia Above 1000 mm upto 1250 mm dia Above 1250 mm upto 1500 mm dia Above 1500 mm upto 1750 mm dia Above 1750 mm upto 2000 mm dia Above 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 12 mm upto 16 mm thick From 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 16 mm upto 20 mm thick From 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Above 20 mm upto 25 mm thick From 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Transporting within 500 metres, laying in position to correct line and level M.S. pipes with / without any outcoating, on prepared bedding in trenches including marginal cutting wherever required, assembling, tack welding the same. The rate to include loading, unloading, hoisting, etc. complete as specified.

Unit RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 1566.00 1653.00 1740.00 1826.00 1913.00 2001.00 2133.00 2256.00

A i) ii) iii) iv) v) B i) ii) iii) iv) v) vi) vii) C i) ii) iii) iv) v) vi) D i) ii) iii) iv) v) vi) E i) ii) 5

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

472.00 556.00 639.00 724.00 807.00 965.00 1076.00 1188.00 1299.00 1412.00 1525.00 1635.00 1503.00 1563.00 1672.00 1781.00 1889.00 1998.00 2195.00 2314.00 2437.00 2555.00 2679.00 2802.00 2988.00 3157.00

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 143

Sr. No. A i) ii) iii) iv) v) B i) ii) iii) iv) v) vi) vii) C i) ii) iii) iv) v) vi) D i) ii) iii) iv) v) vi) E i) ii) 6

Description 5 mm to 8 mm thick Upto 250 mm dia Above 250 mm upto 500 mm dia Above 500 mm upto 750 mm dia Above 750 mm upto 1000 mm dia Above 1000 mm upto 1250 mm dia Above 8 mm upto 12 mm thick From 750 mm upto 1000 mm dia Above 1000 mm upto 1250 mm dia Above 1250 mm upto 1500 mm dia Above 1500 mm upto 1750 mm dia Above 1750 mm upto 2000 mm dia Above 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 12 mm upto 16 mm thick From 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 16 mm upto 20 mm thick From 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Above 20 mm upto 25 mm thick From 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Transporting within 500 metres and laying in position to correct line and level M.S. specials with / without any outcoating, such as distance pieces, straps, bends, tapers, etc. on prepared bedding in trenches including marginal cutting wherever required, assembling, tack welding the same. The rate to include loading, unloading, hoisting, etc. complete as specified. 5 mm to 8 mm thick Upto 250 mm dia Above 250 mm upto 500 mm dia Above 500 mm upto 750 mm dia Above 750 mm upto 1000 mm dia Above 1000 mm upto 1250 mm dia Above 8 mm upto 12 mm thick From 750 mm upto 1000 mm dia Above 1000 mm upto 1250 mm dia Above 1250 mm upto 1500 mm dia Above 1500 mm upto 1750 mm dia Above 1750 mm upto 2000 mm dia Above 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 12 mm upto 16 mm thick From 2000 mm upto 2250 mm dia

Unit

Rate (Rs.) 2012-13 289.00 340.00 391.00 442.00 493.00 589.00 656.00 724.00 793.00 860.00 928.00 996.00 915.00 955.00 1021.00 1087.00 1153.00 1219.00 1334.00 1408.00 1483.00 1558.00 1632.00 1708.00 1817.00 1922.00

Rate (Rs.) 2013-14

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

A i) ii) iii) iv) v) B i) ii) iii) iv) v) vi) vii) C i)

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

406.00 475.00 548.00 618.00 691.00 824.00 919.00 1013.00 1109.00 1288.00 1345.00 1394.00 1282.00

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 144

Sr. No. ii) iii) iv) v) vi) D i) ii) iii) iv) v) vi) E i) ii) 7

Description Above 2250 mm upto 2500 mm dia Above 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 16 mm upto 20 mm thick From 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Above 20 mm upto 25 mm thick From 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Welding in all positions with required number of runs, for M.S. pipes internally and / or externally including gauging wherever necessary, fixing appurtenances and other accessories in connection with pipe laying work as per specification.

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 1387.00 1428.00 1521.00 1616.00 1708.00 1855.00 1972.00 2078.00 2181.00 2286.00 2391.00 2543.00 2692.00

A Butt Joints Plate thickness i) 4 mm ii) 5 mm iii) 6 mm iv) 7 mm v) 8 mm vi) 10 mm vii) 12 mm viii) 14 mm ix) 16 mm x) 18 mm xi) 20 mm xii) 22 mm xiii) 25 mm B Lap joints with convex fillet welds Leg Lengths i) 5 mm ii) 6 mm iii) 8 mm iv) 10 mm v) 12 mm vi) 14 mm vii) 16 mm viii) 18 mm ix) 20 mm x) 22 mm xi) 25 mm 8 Shifting and aligning ring girders including removing tack welds and re-tacking in the correct position etc. complete as per specification for the pipes of following diameter. i) From 1000 mm upto 1250 mm dia ii) Above 1250 mm upto 1500 mm dia

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

131.00 198.00 465.00 519.00 651.00 798.00 854.00 1018.00 1232.00 1334.00 1599.00 2008.00 2725.00

RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

183.00 234.00 310.00 347.00 519.00 705.00 776.00 941.00 1062.00 1419.00 1723.00

RMT RMT

355.00 435.00

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 145

Sr. No. iii) vv) v) vi) vii) viii) ix) x) xi) xii) 9

Description Above 1500 mm upto 1750 mm dia Above 1750 mm upto 2000 mm dia Above 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Transporting within 500 metres and fixing in position stools, base plates, roller sets, grease box covers, etc. including welding wherever necessary. The rate also to include fixing stools, base plates, etc. in true line and level, connecting the base plate to anchor bolts by flush welding including cutting the bolts, if required, assembling and aligning C.I. or M.S. roller sets of any size including oiling, greasing, etc. The rate also to include grouting anchor bolts, welding of two halves of grease box covers as directed by Engineer-in-charge, for pipes of following dia From 1000 mm upto 1250 mm dia Above 1250 mm upto 1500 mm dia Above 1500 mm upto 1750 mm dia Above 1750 mm upto 2000 mm dia Above 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia Transporting within 500 metres and aligning, fixing in position and tack welding expansion joints suitable for pipeline of diameters. From 1000 mm upto 1250 mm dia Above 1250 mm upto 1500 mm dia Above 1500 mm upto 1750 mm dia Above 1750 mm upto 2000 mm dia Above 2000 mm upto 2250 mm dia Above 2250 mm upto 2500 mm dia Above 2500 mm upto 2750 mm dia Above 2750 mm upto 3000 mm dia Above 3000 mm upto 3250 mm dia Above 3250 mm upto 3500 mm dia Above 3500 mm upto 3750 mm dia Above 3750 mm upto 4000 mm dia

Unit RMT RMT RMT RMT RMT RMT RMT RMT RMT RMT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 513.00 592.00 670.00 749.00 827.00 908.00 987.00 1065.00 1144.00 1229.00

i) ii) iii) vv) v) vi) vii) viii) ix) x) xi) xii) 10

Each Each Each Each Each Each Each Each Each Each Each Each

1299.00 1405.00 1511.00 1617.00 1723.00 1829.00 1935.00 2041.00 2147.00 2253.00 2378.00 2463.00

i) ii) iii) vv) v) vi) vii) viii) ix) x) xi) xii)

Each Each Each Each Each Each Each Each Each Each Each Each

4395.00 4558.00 4723.00 4887.00 9238.00 9445.00 9650.00 9793.00 10063.00 10270.00 10474.00 10682.00

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 146

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

11 Transporting within 500 metres, aligning and fixing in position and tack welding only, including marginal cutting, supplying and providing rubber packing, etc. where necessary. A Minor fixtures such as manhole covers, pressure and non-pressure type blank flanges, loose rings, small pipes to form saddle bypass arrangement, plug plates, ladders, platform, stiffener rings, etc. B Minor fixtures such as tees, domes, 'Y' branches, insulating flange ring assembly, etc. 12 Gas cutting (either square cut or V cut) pipes, plates, etc. of thickness i) Upto 5 mm ii) Above 5 mm upto 10 mm iii) Above 10 mm upto 14 mm iv) Above 14 mm upto 18 mm v) Above 18 mm upto 22 mm vi) Above 22 mm 13 Gas cutting holes upto 50 mm dia (for plugs) Thickness of Shell i) 5 mm to 12 mm ii) Above 12 mm 14 Providing M.S. bar mesh prepared out of 16 mm dia M.S. bar at 15 cm. c/c both ways, welded to flanged ring including tack welding of bars and fixing the same with nuts and bolts on open faces of outlet/inlet pipes in the sump or reservoir, etc. complete as directed by Engineer-incharge. 15 Providing permanent test points on the pipe line as per drawing and as directed by Engineer-in-charge including providing and fixing sluice valves, road boxes for sluice valves of size 80 mm to 250 mm in one brick masonry chamber 300 mm x 300 mm clear C.M. 1:5 with 12 mm thick 1:3 cement plaster both inside and outside on M-100 c/c, 150 mm thick, etc. complete as specified and directed.

MT

7868.00

MT

3997.00

RMT RMT RMT RMT RMT RMT

59.00 84.00 109.00 124.00 172.00 230.00

No No Sqm

65.00 90.00 1192.00

No

2675.00

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 147

Sr. No.

Description

Unit No

16 Supplying, transporting, the S.P. fire hydrants including duck foot bend, S.V. and S.V. road box, painting the hydrant, fixing the saddle piece, supplying, and laying required length of C.I. pipeline and jointing the same spun yarn, molten lead including caulking, fixing the S.V. road box in one brick masonry chamber in 1:5 C.M. with 12 mm thick 1:3 cement plaster both inside and outside on 1:2:4 C.C. 150 mm thick etc. complete as specified and directed. [As per I.S. 900/1965 Revised]

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 13090.00

17 Hydraulic testing of M.S. pipeline to specified pressure including cost of all materials and labour and water for testing for the length upto 1 km., using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary. i) ii) iii) iv) v) Upto 600 mm dia (I.D.) Above 600 mm upto 750 mm dia (I.D.) Above 750 mm upto 900 mm dia (I.D.) Above 900 mm upto 1050 mm dia (I.D.) Above 1050 mm upto 1200 mm dia (I.D.) Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km 37248.00 37303.00 37389.00 37518.00 37646.00 37899.00 38272.00 38898.00 39354.00 39809.00 189.00 270.00 402.00 531.00 684.00 1010.00 1528.00 2344.00 2919.00 3530.00

vi) Above 1200 mm upto 1500 mm dia (I.D.) vii) Above 1500 mm upto 1800 mm dia (I.D.) viii) Above 1800 mm upto 2250 mm dia (I.D.) ix) Above 2250 mm upto 2500 mm dia (I.D.) x) Above 2500 mm (I.D.) Extra over Initial Km. i) Upto 600 mm dia (I.D.) ii) Above 600 mm upto 750 mm dia (I.D.) iii) Above 750 mm upto 900 mm dia (I.D.) iv) Above 900 mm upto 1050 mm dia (I.D.) v) Above 1050 mm upto 1200 mm dia (I.D.) vi) Above 1200 mm upto 1500 mm dia (I.D.) vii) Above 1500 mm upto 1800 mm dia (I.D.) viii) Above 1800 mm upto 2250 mm dia (I.D.) ix) Above 2250 mm upto 2500 mm dia (I.D.) x) Above 2500 mm upto 2750 mm dia (I.D.)

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 148

Sr. No.

Description

Unit

xi) Above 2750 mm dia upto 3000 mm dia Km (I.D.) 18 Providing and applying with mechanical Sqm arrangement 1:3 proportion cement sand gunite, 40 to 50 mm thick to M.S. pipe surface under 2.1 kg. per sqcm. to 2.80 kg. per sqcm. pressure including removing the loose materials as directed by Engineer-in-charge and including scrapping the surface with wire brushes, degreasing, cleaning by compressed air and providing fixing BRC fabric no. 14 as reinforcement, curing for 21 days, disposing off the rebound materials within a lead of 50 M, etc. complete as directed by Engineer-in-charge. 19 Providing and applying pipe coating of Sqm fibres, coaltar and solvent based rubber modified bituminous primer of density 0.92 gms/cu cm and viscosity of 1000-2000 cps @ 150 gms/sqm followed by seven layers (4 mm thick) of polythene polymerised bitumen and polyester (of local 7 layers) pipe coat 4 mm should conform to requirement of IS-10221 and AWWA C203 for pre-fabricated tapes including covering coat on pipe coating. Rates shall include cost of material coating and wrapping over the pipes, handling charges, preparation of pipe surface, all labour, material, etc. complete. Note : Pipe coating is to be done at laying work site only. 20 Providing and applying with mechanical Sqm arrangement cement sand gunite of 50 mm thickness to floors, walls, floor slabs or any other structure under 2.1 kg. per sqcm. to 2.80 kg. per sqcm. pressure including removing the loose materials on surface, cleaning with compressed air, degreasing, etc. including scaffolding and curing for 21 days, providing and fixing BRC fabric no. 14 but excluding cost of reinforcement, if any and removing rebound materials within a lead of 50 M, etc. complete as directed by Engineer-incharge (for GSRs and buildings).

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 4167.00 416.00

448.00

363.00

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 149

Sr. No.

Description

Unit

21 Providing and applying with mechanical Sqm arrangement cement sand gunite of 50 mm thickness to floors, walls, roof slabs or any other structure under 2.1 kg. per sqcm. to 2.80 kg. per sqcm. pressure including removing the loose materials on surface, cleaning with compressed air, degreasing, etc. including scaffolding and curing for 21 days, providing and fixing BRC fabric no. 14 but excluding cost of reinforcement, if any and removing rebound materials within a lead of 50 M for staging and bottom of bottom slab, etc. complete as directed by Engineer-incharge (for RCC ESRs). 22 Providing and making inner cement mortar lining to M.S. pipes with mechanical devices in cement mortar 1:1 proportion, including cost of all materials, labour, special sand required, machinery, power generation, all equipments and taking necessary access openings and manholes, cuts at suitable intervals as directed by Engineer-in-charge and rewelding the same after done with doubler plates pipes including necessary excavation, refilling, concrete breaking and remaking if any, breaking guniting and remaking the same, repainting wherever required with epoxy paint in 3 coats, all dewatering including emptying the pipeline and refilling the same after done with (water to be supplied by department free of cost within 5 km. lead at fixed point and all other arrangements to be done by agency), including carrying out "C" value performance test of pipeline, complete job as per the directions of the Engineer-incharge.

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 476.00

i) 9 mm thick for pipes upto 700 mm dia Sqm ii) 12 mm thick for pipes upto 700 mm dia Sqm 23 Providing and applying of elastomeric Sqm (450% elongation), thermoplastic, fire retardant, coating skin tensile strength 18 to 21 kg/cm, antifungal antibacterial anticorrosive, graft co-polymer coating on smooth plastered surface, 100 micron dyu film thickness of self bonding with plastered surface and 100 micron of top coat for sewage treatment plant (RCC tank inside coating) and water treatment plant.

326.00 377.00 1057.00

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 150

Sr. No.

Description

Unit

24 Providing and applying external and Sqm internal coating for steel structures in sewage treatment plant/ water treatment plant with elastomeric (450% elongation), thermoplastic, fire retardant, coating skin tensile strength18 to 21 kg/cm, antifungal antibacterial anticorrosive, graft copolymer 50 micron DFT of self bonding grade with steel, 50 micron DFT of inner coat and 50 micron DFT of top coat. 25 Providing and applying of elastomeric (450% elongation), thermoplastic, fire retardant, coating skin tensile strength 18 to 21 kg/cm, antifungal antibacterial anticorrosive, graft co-polymer coating on external pipelines in unlaid/ laid condition after proper cleaning, 50 micron DFT of self bonding grade with metal surface, 50 micron DFT of inner coat and 50 micron DFT of top coat. i) Water and sewage pipelines (external) in Sqm unlaid condition ii) Water and sewage pipelines (external) in Sqm laid condition 26 Providing and applying of elastomeric (450% elongation), thermoplastic, fire retardant, coating skin tensile strength 18 to 21 kg/cm, antifungal antibacterial anticorrosive, graft co-polymer coating on internal surface of pipelines 100 micron DFT of self bonding grade with steel surface, 100 micron DFT of top coat. i) Pipeline in unlaid condition Sqm ii) Pipeline in laid condition Sqm 27 Providing and applying of elastomeric (450% elongation), thermoplastic, fire retardant, coating skin tensile strength 18 to 21 kg/cm2, antifungal antibacterial anticorrosive, graft co-polymer coating on cleaned steel reinforcement bars 80 to 100 micron DFT with self bonding of bar coating. i) 6 mm dia MT ii) 8 mm dia MT iii) 10 mm dia MT iv) 12 mm dia MT v) 16 mm dia MT vi) 20 mm dia MT vii) 25 mm dia MT viii) 32 mm dia MT ix) 40 mm dia MT

Rate (Rs.) Rate (Rs.) 2012-13 2013-14 618.00

647.00 663.00

814.00 869.00

29598.00 22648.00 17947.00 14933.00 11182.00 9100.00 7187.00 5759.00 4373.00

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 151

Sr. No.

Description

Unit

Rate (Rs.) 2012-13

Rate (Rs.) 2013-14

28 Providing and applying HDPE coating for MS pipe internally as well as externally including cost of HDPE powder moulding pipe grade, labour, scrapping the pipe surface with wire brushes, degreasing, cleaning by compressed air and surface grinding and finishing including cost of loading, unloading and handling of pipe at factory, etc. complete as directed by Engineer-in-charge. HDPE coating thickness in Micron External Internal Total coating thickness in micron 0 2000 micron 3000 micron 3000 micron 2000 1000 1000 2000 2000 3000 4000 5000

Unit

Without E.D.

Sqm Sqm Sqm Sqm

1508.00 1893.00 2176.00 2501.00

(SECTION - I : (XVII) M.S.Pipes Laying)

Page No. 152

Section - I (XVIII)

Treatment Plant (WTP & STP)

Section - I - XVIII, TREATMENT PLANT (WTP & STP)


Sr. No. Description Unit Rate (Rs.) 2012-13 Complete Labour Rate (Rs.) 2013-14 Complete Labour

Water Treatment Plant (WTP)


1 Designing (aesthetically), providing and constructing high rate Unconventional Water Treatment Plant i.e. Simplified Water Treatment Plant consisting of Civil, Mechanical and Electrical works including cost of providing and applying epoxy paint to inside surface of water retaining structures in contact with chlorine and providing anti-termite treatment to entire structure below ground level, mechanical and electrical components of various subworks as given below, including necessary hydraulic testing, structural testing and trial run for 3 months, etc. complete as directed by Engineer-in-charge (turn-key job) works. Aeration fountain Inlet arrangements Mixing channel with ventury flume and flow measuring arrangement Inlet channel Flocculator - Conforming to I.S. 7208-1974 (Type-C) with detention period of 30 minutes Tube settlers - Designing, fabricating and constructing Tube Settlers with square or any other shaped tube like Circular, Cheveron, Hexagonal etc. having proven performance. Rapid sand gravity filters Filter house Chemical house Alum tanks - 2 Nos. with mixing, carrying and dosing arrangements with piping. Gravity feed gas chlorinator with 100% standby. TCL solution tank with mixing, carrying and dosing arrangement with piping. Bypass arrangement External and internal electrification Laboratory equipments Wash water tanks of capacity equal to 2% of designed quantity of filtered water in a day (+)10%. Wash water pumps with 100% standby. Air blowers capable of delivering 600 LMP per square metre of free air of filter area at 0.4 Kg/ sqcm at the under drains (100% standby). Pure water sump of capacity equal to 1 hour pumping capacity. Pure water pump house over the sump / by the side of sump. Drainage arrangements Alum store

1) 2) 3) 4) 5)

6)

7) 8) 9) 10)

11) 12) 13) 14) 15) 16)

17) 18)

19) 20) 21) 22)

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 153

Sr. No. 23)

Description Sanitary block with necessary water supply and drainage arrangements and internal WBM roads. These rates are applicable for seismic zones 2, 3 and 4. Rates given below are inclusive of uplift pressure if any and dewatering during the entire work. All RCC structures shall be constructed in M-250. Structures in contact with water shall be in M-300. Unconventional Treatment Plants less than 1 MLD capacity shall not be constructed. Note : Conditions from Sr. No. 1 to 27 shall form a part and parcel of the tender and must be included in draft tender papers for the work of unconventional treatment plants.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

24) 25)

26)

27)

Unconventional Water Treatment Plant


1) 2) 3) 4) 5) 6) 7) 2 Fixed cost for 1 MLD Add for capacity above 1 MLD upto 2 MLD Cost of 2 MLD treatment plant Add for capacity above 2 MLD upto 5 MLD Job MLD Job MLD 54.00 23.76 77.76 17.64 130.68 14.25 201.96 22.00 10.00 31.00 8.00 52.00 5.00 81.00

Cost of 5 MLD treatment plant Job Add for capacity above 5 MLD MLD Cost of 10 MLD treatment plant Job Designing (aesthetically), providing, constructing and commissioning Conventional Water Treatment Plant consisting of all Civil, Mechanical and Electrical works including cost of providing and applying epoxy paint to inside surface of water retaining structures in contact with chlorine and providing anti-termite treatment to entire structure below ground level, mechanical and electrical components of various sub-works as given below, including necessary hydraulic testing, structural testing, equipment testing and trial run for a period of 3 months, etc. complete as directed by Engineer-in-charge (turn-key job). Aeration Fountain - Plan area not less than 0.625 square metre per MLD Ventury Flume - With necessary devices, consisting of simple mechanical indicator. (Pedestal type gauge) Flash Mixer - Rapid mixing device, detention time 60 seconds to give velocity gradient 300 to 400 sec-1, vane mixer type conforming to I.S. 7090 of 1985.

1) 2)

3)

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 154

Sr. No. 4)

Description Flocculator - Conforming to I.S. 7208-1974 (Type-C) with detention period of 30 minutes. Clarifier - Horizontal flow circular tank, detention period 2-5 hours, overflow rate 30 cubic metre per square metre per day (to be specified), Weir loading not more than 300 cubic metre per metre per day, with mechanical sludge scraper conforming to I.S. No. 10313-1982. Rapid Sand Filters and Filter House Filter designed for filteration rate of 5,000 litres per square metre per hour, minimum 2 beds for plant upto 10 MLD, for larger plants as specified, filters to be located in filter house with roof slab, pipe gallery and platform minimum 5.5 metre in width. Filter Sand - Effective size 0.45 to 0.70 mm, uniformity coefficient not more than 1.7, nor less than 1.3, depth of water over sand 0.75 M, free board 50 cm, gravel 0.45 M in depth, sand and gravel conforming to I.S. 8491(i)-77, backwash by air wash, standard appurtenances (to be specified), rate of flow controller, filter gauge, sand expansion gauge, etc. Wash Water Tank - Capacity to be specified and suitable to supply water to wash 2 filter units at a time where the units are 4 or more. Wash Water Pumps - Capacity to fill water tank in 1 hour with 100% standby. Air Blowers - Capable of delivering 600 LMP per square metre of free air, of filter area at 0.4 kg/sqcm at the underdrains (100% standby). Chemical House in Two Storeys Ground floor to accommodate 7 days' alum requirement and sundry storage. First floor to accommodate alum and lime tanks. etc. Solution tanks - Minimum 3 tanks (one for preparation, second for dosing and third as standby), each tank capable of giving 8 hours maximum dose without interruption, minimum free board 0.30 M, trays for dissolving, level indicator, mechanical agitation devices, solution feed and drain lines, solution feed device (constant head device, strength of solution upto 10% only) conforming to I.S. 9222 Part-I 1979.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

5)

6)

a)

b)

c)

d)

7) a) b) c)

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 155

Sr. No. 8) a) b) 9)

Description Pure Water Sump and Sump House. Capacity of sump - One hour of designed flow. Pump House - Pump house of required size over the sump or by the side. Store House - Suitable for alum storage of three months' requirement in monsoon with 10% extra capacity for other sundry articles. Vacuum feed type Chlorinators - Make to be approved by MJP. Conforming to I.S. 10533 - A Part-II 1983. Rate for withdrawal Temperature Kg. of Chlorine discharge Degree 'C' per day (Cylinders) 45 67 Tonnes 10 6.35 9.50 110 15 10.75 16.10 130 20 14.50 21.24 254 27&Above 18.70 28.12 315 Chlorinator equipment and container room to conform to I.S. 10553 Part-I 1983. 100% standby shall be provided. By pass arrangements - C.I. or M.S. pipes. Drainage arrangements - RCC pipes upto plot boundary. Electrical installation - Both internal and external including entire plant area. Laboratory equipment As per requirement (to be specified during tendering). Sanitary blocks - Carpet area - 15 square metre minimum upto 25 Mld and 25 square metre above 25 Mld. Administrative block and internal road - To accommodate office room, chlorine room, laboratory room, panel board room, blower room etc. and WBM road to connect all units from main gate of plot. Rates given below are inclusive of uplift pressure if any and dewatering during entire work. These rates are applicable for seismic zones 2, 3 and 4. All RCC structures shall be constructed in M-250. Structures in contact with water shall be in M-300. Note : Conditions from Sr. No.1 to 19 shall form a part and parcel of the tender and must be incorporated in draft tender papers of conventional treatment plants (proposed).

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

10) a) b)

c)

d) 11) 12) 13) 14)

15)

16)

17)

18) 19)

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 156

Sr. No.

Description

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

Conventional Water Treatment Plant


1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 3 Upto 5 MLD Cost of 5 MLD treatment plant Add for capacity above 5 MLD upto 10 MLD Cost of 10 MLD treatment plant Add for capacity above 10 MLD upto 20 MLD Cost of 20 MLD treatment plant Add for capacity above 20 MLD upto 50 MLD Cost of 50 MLD treatment plant Add for capacity above 50 MLD upto 100 MLD Cost of 100 MLD treatment plant Add for capacity above 100 MLD Designing (aesthetically), providing, fabricating Package Water Treatment Plant at the shop, transporting to site, installing, testing and commissioning at the site, giving necessary one month's free test and trail run with guarantee for one year, etc. complete. Prefabricated Package Water Treatment Plant comprising following : Rapid mixing channel in M.S. sheets and M.S. baffle. Flocculator not less than 10 minutes detention, in M.S. prefabricated box, flocculation being achieved either by glass pebbles of graded size or PVC tetrapod or equivalent arrangement to ensure good floc formation. Plate or tube settlers of not less than 30 minutes detention in M.S. prefabricated box, the plates / tubes mounted in the settler basin with inclination of not less than 60 degree to horizontal. Rapid sand gravity filter in M.S. prefabricated box with filter sand not less than 500 mm thick, supported on false floor below with polypropylene nozzles spaced at not more than 500 mm centres in either direction. Backwashing, inlet & outlet facilities shall be provided. Air blowers capacity of delevering 600 LPM per sqm of free air of filter area 0.4 kg/sqcm at underdrain ( 100% standby for capacity above 1 MLD) Wash water tank capacity equal to 2 % of designed quantity of filer water in a day + 10 % wash water pump with 100 % standby (Minimum 3 HP with all accessories) Backwash with water not less than 0.6 cum/sqm of filter bed area in filter box. MLD Job MLD Job MLD Job MLD Job MLD Job MLD 33.48 166.32 23.76 285.12 15.44 439.56 14.25 867.24 11.88 1461.24 9.72 13.00 67.00 10.00 114.00 6.00 216.00 5.00 347.00 4.00 584.00 4.00

1) 2)

3)

4)

5) 5.1

5.2

5.3 5.4

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 157

Sr. No. 5.5 6 7 8 9 10 11 12

Description Piping of outlet upto sump Laboratory equipments External & Internal electrification TCL solution tank with mixing, carrying and dosing arrangement with piping. Gravity feed gas chlorinator with 100% standby. Four alum storage unit Drainage arrangement Providing room with RCC roof for office and Lab space with necessary water supply & drainage arrangement & internal roads RCC sump of one hour cap.and pump house on it. Internal Road Wire fencing with gate for WTP premises. All civil works for foundation, consisting of raised RCC platform above G.L. or walls in B.B. masonry or UCR masonry shall be provided as per needs at site. Bypass in the form of pipes or M.S. channels included in the design, effecting bypass of such new tank and filter individually or both. (Limit upto 5.0 M. from W.T.P. face) The entire M.S. fabricated tank provided with FRP lining (5 mm thick) to inside face in contact with water epoxy painting- two coats with one coat of primer on outside. The thickness of plates employed shall not be less than 6 mm Alum dosing and mixing arrangements to be provided in twin tanks, each of 8 hours capacity, capable of importing does of 20 ppm with 5% solution. The alum tanks provided with a dose in steps of 5 ppm and entire unit mounted on the top of flocculator / settler box, in the form of prefabricated structure, with access platform and ladder. Alum boxes with FRP lining (5 mm thick) inside and epoxy paint two coats with one coat of primer on outside. Both flocculator and settling basins provided with hopper bottom with slope not less than 45 degrees to the horizontal drain pipes and valves provided to both flocculator and settling basin. Flow ratings to conform following parameters : Velocities in channels not to exceed 0.6 M./Second. Velocities in filter outlet pipes and valves not to exceed 1 M./Second.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

13 14 15 16)

17)

18)

19)

20)

21) a) b)

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 158

Sr. No. c) 22) 23)

Description Velocities in interconnecting pipe and controls not to exceed 1M./Second. Free board for all units not less than 300 mm All RCC structures shall be constructed in M-250. Structures in contact with water shall be in M-300. Package Water Treatment Plant 21 Cum/Hr. (0.50 MLD) 34 Cum/Hr. (0.80 MLD) 42 Cum/Hr. (1.00 MLD) 63 Cum/Hr. (1.50 MLD) 83 Cum/Hr. (2.00 MLD) 125 Cum/Hr. (3.00 MLD) Note : Depending upon the capacity required for the scheme, one of the above capacities should be chosen.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

1) 2) 3) 4) 5) 6)

Each Each Each Each Each Each

27.00 33.48 37.80 47.52 56.16 72.36

4 A

Sewage Treatment Plant (STP)


Designing (aesthetically), providing, constructing and giving satisfactory trials of modernised Sewage Treatment Plant consisting of receiving chamber, screen chamber, grit chamber, measuring flume, distribution chamber with primary and secondary treatment, etc. as detailed below, administration block of suitable size including allied units for waste disposal with all civil and mechanical works involved, etc. complete (turn key job).

1) 2) 3) 4) 5) 6) 7) 8)

Primary treatment - with extended sludge drying beds (Oxidation Ponds) Rates Upto 10 MLD Cost of 10 MLD plant Add for capacity above 10 MLD upto 20 MLD Cost of 20 MLD plant Add for capacity above 20 MLD Cost of 50 MLD plant Add for capacity above 50 MLD Cost of 100 MLD plant

MLD Job MLD Job MLD Job MLD Job

47.52 475.20 42.12 891.00 35.64 1960.20 30.24 3445.20

19.00 190.00 16.00 356.00 14.00 784.00 12.00 1378.00

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 159

Sr. No. B

Description Designing (aesthetically), providing, constructing and giving satisfactory hydraulic testing, commissioning and giving satisfactory trials of modernised Sewage Treatment Plant consisting of inlet chamber, screen chamber, detritus tanks, parshall flume, primary settling tanks, aeration tanks, secondary settling tanks, sludge sump and pump house, sludge thickener, primary digester, secondary digester, SST sump and pump house, chlorine contact tank, chlorinators, chlorinator room, sump cum blending tank, PST sludge sump cum blending tank, pump house, sludge centrifuge, gas holder, necessary piping work with required valves, gates, drains, pathways, administrative building cum laboratory, laboratory equipments, tools and plants, spare parts, etc. complete as turnkey job with all involved civil, electrical and mechanical works inclusive of following items, units as per detailed specification for civil, electrical and mechanical components with all duties and taxes, etc. complete. Inlet Chamber Designing, providing and constructing RCC(M-250) inlet chamber designed for the peak flow 2 DWF including necessary excavation in all types of strata including walkway around the periphery. Each compartment will have phosphor bronze, steel gate with extension rod, head stock, operating wheel, G.I. pipe railing, etc. The work includes providing and making necessary arrangements to connect the flow to screen chamber by approach channel as directed and as per specifications. Screen Chambers Designing, providing, constructing, testing and commissioning screen chamber designed for average 1 DWF and maximum 2 DWF in RCC(M-250) including inlet pipe/ channel from inlet chamber, outlet pipe/ channel to detritus tank, free board of 0.50 M minimum, RCC walkway 1.2 M wide with G.I. pipe railing, RCC staircase of 1.2 M width from GL to screen chamber.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 160

Sr. No.

Description Detritus Tank Designing, providing and constructing continuously grit removal type of detritus tank, mechanically operated in RCC (M250) capable of removing 100%, 0.20 mm size particle and above, having specific gravity 2.30 designed for one peak 2 DWF with suitable arrangement of separation of grit from putrescible solids including providing and making necessary arrangement of JB-1 inlet and outlet channel of required sizes as may be required to connect the flow to parshall flume, etc. complete including hydraulic testing for water tightness of the structure having minimum free board of 0.30 M washout arrangement to grit chamber and platform 1.20 M wide RCC walkway with G.I. pipe hand railing shall be provided. A pit for collecting grit conveyed by conveyor shall be provided.. It should be suitable to handle the grit for carting. All arrangements shall be as per detailed specifications and as directed.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

Parshall Flume Designing, providing and constructing parshall flume channel in RCC (M-250) for measuring quantity of sewage received at the treatment works, max. flow of 2 DWF and minimum flow of DWF including providing and making necessary arrangement of approach channel as may be required to connect the flow having minimum velocity of 0.3 M per second to distribution box (DB-1). The unit shall be provided with walkway and RCC staircase having width of 1.20 M each etc. complete, including hydraulic testing for watertightness of the civil structure having free board of 0.6 M including electrically operated, flow indicating and flow integrating devices having a standby of float operated ROF meter. All arrangements as per specifications.

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 161

Sr. No.

Description Primary Settling Tanks with Equipments Designing, providing, constructing and hydraulic testing in RCC (M-250) watertight primary settling tanks of 1 DWF capacity with feed chamber, sludge and effluent chamber, base adequately supported, providing 1.20 M wide clear peripheral and approach walkway inter connecting C.I. double flanged pipes from feed chamber of the clarifier distribution well, grouting wherever necessary, including foundation, etc. as per specifications, water depth at outer side shall be minimum 3.0 M, weir loading shall not be greater than 125 cum, DWF for average flow, bottom slope shall be 1:12.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

The floor of clarifier shall have 40 mm thick (min.)screed course of cement grout of mix in CM 1:2 detention period shall be 2.25 hrs. dispersion box and stiffened weir plate made of mild steel plate not less than 8 mm thick, anti-corrosive epoxy paint on both faces shall be provided. Minimum free board of 0.50 M be provided. It includes inlet pipe from distribution chamber, central shaft, inlet baffle, outlet chamber, scum remover, skimming device, scum chamber, connecting channel from PST, outlet chamber to DB-2 as per detailed specifications. Aeration Tank (AT) Designing, providing and constructing in RCC mix (M-250) aeration tank in compartments to handle combined flow of 1 DWF incoming flow and recirculation flow including construction of inlet, outlet and distribution chamber DB-3 and providing 1.20 m wide clear peripheral approach walkways, expansion joints wherever necessary, including foundation, etc. as per specifications. Peak factor shall be 2, F/M ratio shall be 0.40, low speed aerator speed between 20 to 100 RPM, recirculation flow @50% and free board 0.60 m depth, (SWD) 3.50 M minimum, D.O. level at A.T. 2 mg/lit, MLVSS concentration shall be 2500 mg/lit and MLVSS concentration shall be 2000 mg/lit, HRT shall be 4 to 6 hours and STR 6-8 days.

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 162

Sr. No.

Description It should have compartments for washing, oxygen transfer capacity of mechanical aerator shall not be less than 1.5 kg/KWH, BOD of effluent 20 mg/lit with input to aerator 0.15 to 0.30 KWH/1000 cum of aeration tank. All related works shall be as per detailed specifications. Secondary Equipments Settling Tanks with

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

Designing, providing and constructing in RCC (M-250) water tight secondary settling tank having detention period 2 hours and SWD shall be 4.20 M. The effluent BOD & SS from the secondary clarifier shall not be more than 20 Mg/lit and 30 Mg/lit respectively. It should be hydraulically tested, bottom floor slope of 1:12 and free board of 0.60 M minimum. Dispersion box shall be made of mild steel plate not less than 8 mm thick with anticorrosive epoxy paint from both faces and well stiffened. The sewage admitted at the centre flowing upward and outward towards periphery be slowly and continuously collected towards a convenient discharge point near centre by a rotating wheel arm. The clarifier will be completed with end drive half rotating bridge, structural steel rake, overflow weir, walkway diffuser, over load alarms, having push buttons, starters for the clarifier, walkway and the suitable sludge withdrawing arrangement with flush valve capable of withdrawing moisture content not more than 97% to 98% slopping floor shall have 40 mm thickness

(minimum), screed course of cement grout of mix 1 cement : 2 sand, rotating sludge scrapper mechanism fitted with squeezes including providing and making necessary arrangement to connect the flow to outlet chamber (DB-4) then the gravity mains for final disposal and as per detailed specifications and obligatory provision. All other arrangements shall be as per detailed specifications. Sludge Thickener with Equipments

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 163

Sr. No.

Description Designing, providing and constructing watertight of sludge thickener (gravity type) including foundation in RCC (M-250) with inlet and outlet chamber influent well, inlet and outlet pipes, with sludge pit and sludge removal arrangement, grouting wherever necessary with walkway all around of 1.20 M width G.I. pipe railing interconnecting CI pipes all complete as per specifications, detention time 24 hours. SWD shall be 4.25 metre with necessary fixed bridge scraper arrangement as per detailed specifications and necessary inlet and outlet arrangement. All other arrangement as per detailed specifications.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

Primary Digester with Mixer Equipment (Fixed Cover) Designing, providing and constructing unit of watertight and gastight primary digester suitable for 1 DWF plant and complete with pipe gallery, building, staircase for access from dome of digester into inside staircase, walkways at springing levels, etc. walls and base slab being in RCC (M250), domes in structural concrete including providing burners and civil works for gas collection, grouting wherever necessary, etc. complete as per specifications. It should be designed for min 9C and max. 45C and minimum detention time of 30 days, water depth shall not be more than 8.5 M, free board shall be 0.6 M with inlet and outlet arrangement of C.I. flanged pipes including giving hydraulic testing and airtightness testing. The item includes providing works for collecting gas and gas burner as per specifications. Secondary Digester with Equipment (Fixed Cover) Designing, providing and constructing including foundation unit of watertight and gastight secondary digester to deal with 1 DWF complete with pipe gallery, building, staircase for access from dome of digester into inside, staircase to walkways at springing levels, etc. Walls and base slab and domes being in RCC M-250, providing arrangement for digested sludge from digesters to centrifuge, providing burners and civil works for gas collection grouting wherever necessary, etc. complete as per specifications and obligatory provision. All other arrangements as per detailed specifications.

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 164

Sr. No.

Description S.S.T. Sump and Pump House with Recirculation Pumps and Sludge Pumps to Digester Designing, providing and constructing sump and pump house of requisite capacity with ceiling height not less than 6 M, sludge stream for recirculation to aeration tank and excess sludge to SCBT, including C.I. piping to carry this flow to sump as per detailed specification and as directed by Engineer-in-charge. Chlorine Contact Tank Designing, providing and constructing chlorine contact chamber of adequate capacity to deal with 1 DWF average flow. The chlorine contact tank should be of 30 minutes capacity during average flow to achieve 99.99% coliform reduction. Chlorine dose shall be maintained as per standard provisions including designing, providing and constructing water supply arrangement for chlorination including providing dewatering and bypass arrangements, jointing to final effluent main and outlet weir, etc. complete. The effluent quality should match with the standards laid down by Maharashtra Water Pollution Control Board and as per the obligatory provisions and detailed specifications and as directed by Engineerin-charge. Chlorinator and Chlorinator Room / Tonner Room Designing, providing and constructing chlorinators, vacuum type 2 nos. each having capacity of 10 Kg/hr as per obligatory provisions and detailed specifications with necessary provision of chlorinator room having floor area not less than 30 sqm including automatic residual chlorine controller with actuator and residual chlorine analyser including cost of chlorine cylinder, piping, valves, measuring and controlling equipments, safety devices, lifting equipments, etc. complete as per I.S.-10553 (Part II) 1982. The tonner room should have 3 MT capacity crane for loading and unloading facility. Tonner storage should distinctly isolated and should be for minimum 10 tonners space and arrangements as per gas laws 1981 and factory act shall be provided and all other matching amenities be provided, 5 MT gantry shall be provided for full length of tonner room at 6 M height from floor level, with outlet chamber and treated effluent outlet channel, etc. complete as per detailed specifications.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 165

Sr. No.

Description Sump cum Blending Tank (SCBT) Designing, providing and constructing sump cum blending tank of appropriate size and detention time with free board of 0.60 M. The slope of floor 1:4 with suction pit at the centre as per detailed specifications and obligatory requirements. P.S.T. Sump cum Blending Tank, Pump House with Recirculation Pumps Designing, providing and constructing pump house of appropriate size with pumps, ceiling height minimum 6 M over the circular sump for discharging the sludge to thickener and recycling of flow for blending with C.I. piping, etc. complete as per detailed specifications. Sludge Centrifuge Room with Centrifuges Designing, providing, constructing and installing including foundation, etc. sludge centrifuge to handle the sludge flow of one day in one hour per unit with sludge dewatering unit, drain, etc. complete as per specifications, sludge centrifuge with all necessary arrangements as per detailed specifications mentioned in Volume-II and Volume-III of tender and obligatory provisions, be provided with satisfactory functioning. Gas Holder Designing, providing and constructing gas holder having gas collection system, gas flow meter and gas burner with floating dome arrangement and storage time 6 hrs. to be constructed in M-250 having appropriate diameter as per detailed specifications and obligatory provisions. The floating dome shall be of 8 mm thick M.S. plate minimum and shall be provided with two coats of anti-corrosive epoxy coating from both faces. Outfall Sewer Designing, providing and constructing appropriate outfall sewer of RCC NP-2 pipe to discharge treated effluent, untreated effluent from outlet chamber (after basin / chlorination tank) to the local nalla at a point shown on the drawing including necessary chambers for inspection / cleaning including necessary excavation , dewatering, refilling, concrete encasing/ bedding concrete steps to reach the nalla bed level, pitching and energy dissipation chamber in the nalla portion, etc. complete upto 50 M length RCC NP-2 pipeline and including all above items.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 166

Sr. No.

Description Piping Work in CI 'LA' class including Sluice Valve, Reflux Valve, M.S. Gate Providing, laying and jointing pipes other than those already included in the above items for interconnection bypass drains, etc. of all units including adequate numbers of manhole chambers. The item includes excavations, refilling and hydraulic testing of pipes, valves, gates, accessories and cost of jointing materials. The item includes required channels with gates for interconnection of units, bypass drains, etc. for all units and as directed, etc. complete as per detailed specifications. Administrative Building cum Laboratory (G+1) Designing, providing and constructing administrative building, office cum laboratory including stores. This shall be a building having appropriate carpet area at ground floor and at first floor complete as per specifications including necessary excavation, foundation in RCC M-200 framed structure, BB masonry (IInd class in CM 1:6) 20 mm cement plaster in CM 1:3 inside and outside painting, aluminium door and window with glass panels, mosaic tile flooring and skirting and all other allied items, fixtures, fastening electrification arrangements, water supply arrangement, etc. complete. The building will have laboratory on upper floor of administrative building and should be so centralised that it should not be attached with any unit but should have complete control of every unit as per laboratory equipment, beautification, telephone and intercom arrangement and wireless system.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

1) 2) 3) 4) 5) 6) 7) 8)

Structures in contact with water shall be in M-300 only Primary and secondary treatment-with digesters, sludge drying beds etc. complete. Rates Upto 10 MLD Cost of 10 MLD plant Add for capacity above 10 MLD upto 20 MLD Cost of 20 MLD plant Add for capacity above 20 MLD Cost of 50 MLD plant Add for capacity above 50 MLD Cost of 100 MLD plant

MLD Job MLD Job MLD Job MLD Job

57.24 572.40 49.68 1069.20 43.20 2352.24 35.64 4134.24

23.00 228.00 19.00 428.00 17.00 941.00 14.00 1653.00

(Section - I - XVIII, Treatment Plant - WTP / STP)

Page No. 167

Section - I (XIX)

R.C.C. G.S.R.s and Sumps

Section - I - XIX, RCC GSR AND SUMP


Sr. No. 1 Description Designing (aesthetically), and constructing RCC ground service reservoirs / RCC sumps in M-300 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab top RCC roof slab / or dome, 20 mm thick cement plaster with water proofing compound in CM 1:3 proportion to inside face of the container, including epoxy paint from inside including refilling and disposing of surplus stuff within lead of 50 M, all labour and material charges, for laying and jointing of pipe assembly for inlet, outlet washout, over flow and bypass arrangement consisting of C.I. M.S. D/F. pipes, specials and valves of given diameters, providing and fixing accessories such as M.S. ladder inside and outside, C.I. Manhole frame and cover, water top slab, B.B. masonry chamber for all valves, ventilating shafts, including giving satisfactory hydraulic test and water tightness test as per IS code and providing three coats of cement paints to all exposed surface of structure including roof surface etc. complete as per design data, criteria, obligatory requirements and detailed specifications. Anti-termite treatment shall be given for underground portion of the structure. Notes The design shall be in accordance with various relevant I.S. specification (I.S. 456/2000, I.S. 875 - 1987, I.S. 3370 - 1965 or revised.) Only M.S. bars grade I conforming to I.S. 432 part-I or high yield strength deformed bars conforming to I.S. 1786 or I.S. 1139 shall be used. Grade-II M.S. bars shall not be used. Entire structure shall be in M-300 only. The scope of pipe assembly work shall be upto 5 metre beyond outside face of the wall, cost of pipes valves and specials is not included in the rate but labour cost for laying and jointing is included. The G.S.R. / Sump above 15 lakh litres capacity shall be in two compartment. The Job includes designing the structure for uplift pressure and dewatering if required during entire execution and disposal of surplus excavated stuff within lead of 50 metres as directed by Engineerin-charge. If uplifts considered in design, then these rates shall be increased by 7.5%. Unit Rate (Rs.) 2012-13 Complete Labour Rate (Rs.) 2013-14 Complete Labour

1)

2)

3) 4)

5) 6)

(Section - I - XIX, RCC GSR / SUMP)

Page No. 168

Sr. No. 7)

Description G.S.R. outlets shall be with bell mouth of approved pattern in bottom slab and cost of designing bell mouth is included in the rate. Sump well includes cost of suction pit required at bottom. For pipe diameters upto 300 mm only CI pipes and CI specials shall be used. For pipe diameters above 300 mm, M.S. pipes and specials minimum 10 mm thick shall be used with proper anticorrosive epoxy treatment from inside and outside. Cost of pump house is not included in these rates. Above rates are applicable for Seismic Zones 2, 3 and 4. 75% part rate shall be payable for reinforcement, concrete and plastering items of all types of G.S.R.s and sumps till satisfactory hydraulic testing for water tightness test is given and till that work shall be treated as incomplete. 10% shall be added for sump if overhead pump house is proposed. Note : Conditions from Sr. No. 1 to 11 shall form a part and parcel of tender and must be included in the draft tender papers for work of R.C.C. GSRs and sumps. Rates for RCC GSRs and Sumps Upto 25,000 litres Cost of 25,000 litres capacity Add for capacity above 25,000 upto 50,000 litres Cost of 50,000 litres capacity Add for capacity above 50,000 upto 75,000 litres Cost of 75,000 litres capacity Add for capacity above 75,000 upto 1,00,000 litres Cost of 1,00,000 litres capacity Add for capacity above 1,00,000 upto 1,50,000 litres Cost of 1,50,000 litres capacity Add for capacity above 1,50,000 upto 2,00,000 litres Cost of 2,00,000 litres capacity Add for capacity above 2,00,000 upto 3,00,000 litres Cost of 3,00,000 litres capacity Add for capacity above 3,00,000 upto 5,00,000 litres Cost of 5,00,000 litres capacity Add for capacity above 5,00,000 upto 10,00,000 litres Cost of 10,00,000 litres capacity Add for capacity above 10,00,000 upto 15,00,000 litres

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

8)

9) 10) 11)

12)

1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19)

Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit

13.06 326700.00 7.12 504900.00 5.94 653400.00 5.35 787050.00 5.05 1039500.00 4.75 1277100.00 4.16 1692900.00 3.56 2405700.00 2.97 3890700.00 2.38

5.00 130680.00 3.00 201960.00 2.00 261360.00 2.00 314820.00 2.00 415800.00 2.00 510840.00 2.00 677160.00 1.00 962280.00 1.00 1556280.00 1.00

(Section - I - XIX, RCC GSR / SUMP)

Page No. 169

Sr. No.

Description

Unit Job Lit

20) Cost of 15,00,000 litres capacity 21) Add for capacity above 15,00,000 litres Note : 10% shall be added over the cost of GSR for sump where overhead pump house is proposed.

Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Complete Labour Complete Labour 5078700.00 2031480.00 2.16 1.00

(Section - I - XIX, RCC GSR / SUMP)

Page No. 170

Section - I (XX)

R.C.C. E.S.R.

Section - I - XX, RCC ESR


Sr. No. 1 Description Designing (aesthetically), and constructing RCC elevated service reservoirs of following capacity with RCC staging consisting of columns, internal and external bracings spaced vertically not more than 4.5 metres centre to centre for ESR having capacity upto 500 cum and not more than 6 m c/c for ESRs having capacity above 500 Cum including excavation in all types of strata, foundation concrete, cement plaster with water proofing compound to the inside face of the container including refilling disposing off the surplus stuff within a lead of 50 metres, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental design, providing and fixing accessories such as M.S. ladder, C.I. manhole frame and covers, water level indicators, lightening conductor, G.I. pipe railing around walk way and top slab, providing spiral stair case from ground level to roof level, M.S. grill gate of 2 M height with locking arrangement of approved design, B.B. masonry chambers for all valves, ventilating shafts, providing and applying three coats of cement paint to the structure including roof slab, epoxy painting to internal surface and anti-termite treatment for underground parts of the structure and giving satisfactory water tightness test as per I.S. code. The job to include painting the name of the scheme and other details on the reservoir as per the directions of Engineerin-Charge. Notes The design of the structure be in accordance with relevant I.S. specification (I.S. 3370 - 1965 or revised.) The design shall satisfy the stipulations as per I.S. 1893 - 1984 and I.S. 13920 / 1993 for seismic force and I.S. - 11682 / 1985 for R.C.C. staging of overhead tanks. For design having more than 6 columns, provision of internal bracing is obligatory. External bracings is also obligatory. Plain round mild steel bars grade-I conforming to I.S. 432 part-I or high yield strength deformed bars conforming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed. Unit Rate (Rs.) 2012-13 Complete Labour Rate (Rs.) 2013-14 Complete Labour

1)

2)

3)

4)

(Section - I - XX, RCC ESR)

Page No. 171

Sr. No. 5)

Description Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the ground level. These rates include providing M.S. ladder for E.S.R.s upto 2 lakh litres capacity and providing spiral staircase for E.S.R. above 2 lakh litres capacity. Staging shall have to be designed with stresses of M-200 concrete for ESR. However all RCC construction should be done in M-250 .Structures in contact with water shall be designed & casted in M-300 These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is struck at shallow depth, extra provision of dewatering shall be made as per site condition. All conditions given in the Member Secretary's Circular No. MJP / TS-I / 350 / 1668 dt. 2-8-97 and MJP / S-I / 350 / 2127 dt. 13-7-99 shall be strictly followed and additional cost, if any, due to these conditions is included in the rates mentioned below. 75% part rate shall be payable for reinforcement concrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given; and till that work shall be treated as incomplete. The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet, washout, overflow and bypass arrangement. The scope of work, however, includes cost of erecting, laying and jointing of pipes and valves including cost of jointing materials upto 5 M beyond outer face of outermost column. For ESR upto 500 cum capacity C.I. double flanged pipes upto 300 mm dia shall be provided and C.I. specials shall be used. For ESR above 500 cum capacity C.I./M.S. pipe assembly with minimum 8 mm thickness upto 500 mm dia and minimum 10 mm thickness above 500 mm dia can be used with proper anticorrosive epoxy treatment from inside and outside.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

6)

7)

8)

9)

10)

11)

12)

(Section - I - XX, RCC ESR)

Page No. 172

Sr. No. 13)

Description Below mentioned rates are for foundations with individual footing with bearing capacity of 20 tonnes per square metre. For raft foundations, these rates shall be increased by 7.5% where safe bearing capacity (SBC) is 5 MT per sqm and by 5% where SBC is more than 5 MT/sqm and upto 10 MT/sqm. This % of 5% or 7.5% is applicable for estimation of amount of lumpsum item of ESR. For extra item due to change from individual foundation to raft, actual increase in concrete and steel be paid as per relevant DSR item. The rate shall be increased by 30% for bearing piles upto depth of 10 M and for further increased in depth by 5 M each, it shall be increased by another 10%. These rates are applicable where raft is not feasible. For pile foundations sulphate resistant cement shall only be used. Single pile for the column is not permitted, group of piles shall be designed with pile cap for each column of ESR. The rates are applicable for staging height of 12 M. These rates shall be increased or decreased for per metre variation in this staging height as below : 12 to 16 M staging - 2% per metre 16 to 20 M staging - 3% per metre 20 M and above - 4% per metre For 17 M staging height, percentage calculation will be like below : 12 to 16 M --- 4 x 2 = 8% 16 & 17 M --- 1 x 3% = 3% Total = 11% For 21 M staging height, percentage calculation will be like below : 12 to 16 M --- 4 x 2 = 8% 16 to 20 M --- 4 x 3% = 12% 20& 21 M --- 1 x 4% = 4% Total = 24% Following rates are for seismic zone III. For zone IV, these rates shall be increased by 5% and for zone II, these rates shall be decreased by 5%. Concerned Executive Engineer shall confirm the seismic zone for the scheme from seismic zones plan before estimation and adopt appropriate rates as per actual seismic zones. (Seismic maps attached in this CSR). Notes Conditions from Sr. No. 1 to 10 shall form a part and parcel of the tender and must be included in the draft tender papers for works of R.C.C. E.S.R.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

14)

15)

16)

1)

(Section - I - XX, RCC ESR)

Page No. 173

Sr. No. 2)

Description Conditions from Sr. No. 11 to 16 are for estimation purpose only and shall not appear in the tender. Rates for RCC ESRs Upto 25,000 litres Cost of 25,000 litres capacity Add for capacity above 25,000 upto 50,000 litres Cost of 50,000 litres capacity Add for capacity above 50,000 upto 75,000 litres Cost of 75,000 litres capacity Add for capacity above 75,000 upto 1,00,000 litres Cost of 1,00,000 litres capacity Add for capacity above 1,00,000 upto 1,50,000 litres Cost of 1,50,000 litres capacity Add for capacity above 1,50,000 upto 2,00,000 litres Cost of 2,00,000 litres capacity Add for capacity above 2,00,000 upto 2,50,000 litres Cost of 2,50,000 litres capacity Add for capacity above 2,50,000 upto 3,00,000 litres Cost of 3,00,000 litres capacity Add for capacity above 3,00,000 upto 4,00,000 litres Cost of 4,00,000 litres capacity Add for capacity above 4,00,000 upto 5,00,000 litres Cost of 5,00,000 litres capacity Add for capacity above 5,00,000 upto 7,50,000 litres Cost of 7,50,000 litres capacity Add for capacity above 7,50,000 upto 10,00,000 litres Cost of 10,00,000 litres capacity Add for capacity above 10,00,000 upto 15,00,000 litres Cost of 15,00,000 litres capacity Add for capacity above 15,00,000 upto 20,00,000 litres Cost of 20,00,000 litres capacity

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19) 20) 21) 22) 23) 24) 25) 26) 27) 28)

Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job Lit Job

23.76 594000.00 14.26 950400.00 9.50 1188000.00 8.31 1395900.00 7.13 1752300.00 5.94 2049300.00 5.64 2331450.00 5.35 2598750.00 5.05 3103650.00 4.75 3578850.00 4.45 4692600.00 4.16 5732100.00 3.86 7662600.00 3.56 9444600.00

10.00 237600.00 5.00 380160.00 4.00 475200.00 3.00 558360.00 3.00 700920.00 2.00 819720.00 2.00 932580.00 2.00 1039500.00 2.00 1241460.00 2.00 1431540.00 2.00 1877040.00 2.00 2292840.00 1.00 3065040.00 1.00 3777840.00

(Section - I - XX, RCC ESR)

Page No. 174

Page No. 175

Section - I (XXI)

Chambers, Manholes and Drainage Drops

SECTION - I - XXI, CHAMBERS, MANHOLES AND DRAINAGE DROPS


Sr. No. 1 Description Unit Rate (Rs.) 2012-13 Complete Labour Rate (Rs.) 2013-14 Complete Labour

Valve Chamber RCC Covers

with

Precast

a) B

a) C

a) D

a) E

a) F

a) G

a)

Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:2:4 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-incharge. Note : Wall thickness : 0.23 M for depth of 1.2 M and 0.35 M for balance depth exceeding 1.2 M. As above of 60 x 45 cm internal size and depth upto 0.9 M with precast R.C.C slab cover. Add for every increase in depth of 30 cm or part thereof As above of 90 x 45 cm internal size and depth upto 1.2 M with precast R.C.C slab cover. Add for every increase in depth of 30 cm or part thereof As above of 90 x 60 cm internal size and depth upto 1.2 M with precast R.C.C slab cover. Add for every increase in depth of 30 cm or part thereof As above of 90 x 90 cm internal size and depth upto 1.2 M with precast R.C.C slab cover. Add for every increase in depth of 30 cm or part thereof As above of 90 cm internal dia. size and depth upto 1.2 M with precast R.C.C slab cover. Add for every increase in depth of 30 cm or part thereof As above of 1.2 x 1.2 M internal size and depth upto 1.2 M with precast R.C.C slab cover. Add for every increase in depth of 30 cm or part thereof As above of 1.5 x 1.5 M internal size and depth upto 1.5 M with precast R.C.C slab cover. Add for every increase in depth of 30 cm or part thereof

No

4791.00

1437.00

30 cm depth No

1085.00 7134.00

325.00 2141.00

30 cm depth No

1297.00 7753.00

390.00 2326.00

30 cm depth No

1403.00 9250.00

420.00 2776.00

30 cm depth No

1620.00 7029.00

486.00 2107.00

30 cm depth No

1261.00 12336.00

378.00 3701.00

30 cm depth No

2057.00 18096.00

617.00 5429.00

30 cm depth

2533.00

759.00

(Section - I - XXI, Chambers, manholes drainage drops)

Page No. 176

Sr. No. 2

Description

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

Valve chamber with cast iron manhole frame and covers


Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:2:4 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion, 12 mm thick cement plaster in CM 1:4 proportion on both sides with providing and fixing C.I. manhole frame and cover in RCC 1:1.5:3 coping or RCC 1:1.5:3 proportion x 15 cm thick slab, etc. complete as directed by Engineer-incharge. Note : Wall thickness : 0.23 M for depth of 1.2 M and 0.35 M for balance depth exceeding 1.2 M. As above of 60 x 45 cm internal size and depth upto 0.9 M with 60 x 45 cm size CI manhole frame and cover of 40 kg.

No

7709.00

1542.00

a) B

Add for every increase in depth of 30 cm 30 cm depth or part thereof As above of 90 x 45 cm internal size and No depth upto 1.2 M with 90 x 45 cm size CI manhole frame and cover of 40 kg. Add for every increase in depth of 30 cm 30 cm depth or part thereof As above of 90 x 60 cm internal size and No depth upto 1.2 M with 90 x 60 cm size CI manhole frame and cover of 50 kg. Add for every increase in depth of 30 cm or part thereof As above of 90 x 90 cm internal size and depth upto 1.2 M with 53 cm dia CI manhole frame and cover of 90 kg. fixed in RCC slab. Add for every increase in depth of 30 cm or part thereof As above of 1.2 x 1.2 M internal size and depth upto 1.2 M with 53 cm dia CI manhole frame and cover of 90 kg. fixed in RCC slab. Add for every increase in depth of 30 cm or part thereof As above of 1.5 x 1.5 M internal size and depth upto 1.5 M with 53 cm dia CI manhole frame and cover of 90 kg. fixed in RCC slab. Add for every increase in depth of 30 cm or part thereof
30 cm depth No

1085.00 9474.00

325.00 1895.00

a) C

1158.00 10845.00

347.00 2170.00

a) D

1254.00 15209.00

376.00 3041.00

a) E

30 cm depth No

1620.00 17670.00

486.00 3535.00

a) F

30 cm depth No

2056.00 22559.00

617.00 4512.00

a)

30 cm depth

2673.00

802.00

(Section - I - XXI, Chambers, manholes drainage drops)

Page No. 177

Sr. No. 3

Description

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

Valve chamber with precast steel fibre reinforced concrete frame and covers (S.F.R.C. frame and covers)
Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:2:4 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast S.F.R.C. frame and cover, etc. complete as directed by Engineer-in-charge. Note : Wall thickness : 0.23 M for depth of 1.2 M and 0.35 M for balance depth exceeding 1.2 M. As above of 60 x 45 cm internal size and depth upto 0.9 M with S.F.R.C. frame and cover. Add for every increase in depth of 30 cm or part thereof As above of 90 x 45 cm internal size and depth upto 1.2 M with S.F.R.C. frame and cover. Add for every increase in depth of 30 cm or part thereof As above of 90 x 60 cm internal size and depth upto 1.2 M with S.F.R.C. frame and cover. Add for every increase in depth of 30 cm or part thereof As above of 90 x 90 cm internal size and depth upto 1.2 M with S.F.R.C. frame and cover. Add for every increase in depth of 30 cm or part thereof As above of 1.2 x 1.2 M internal size and depth upto 1.2 M with S.F.R.C. frame and cover of size 540 mm dia. fixed in RCC slab. Add for every increase in depth of 30 cm or part thereof As above of 1.5 x 1.5 M internal size and depth upto 1.5 M with S.F.R.C. frame and cover of size 540 mm dia. fixed in RCC slab. Add for every increase in depth of 30 cm or part thereof Providing and fixing in position M.S. air valve boxes fabricated with 2 mm thick M.S. plate, 30 x 30 x 3 mm size M.S. angle frame, concreting in M-150 for fixing the box in position, applying two coats of oil paint, painting chainage, locking arrangement, etc. complete as directed by Engineer-in-charge. For single ball air valve For double ball air valve

No

7015.00

1403.00

a) B

30 cm depth No

1085.00 10021.00

328.00 2087.00

a) C

30 cm depth No

1158.00 10887.00

347.00 2293.00

a) D

30 cm depth No

1254.00 13471.00

376.00 2695.00

a) E

30 cm depth No

1447.00 16707.00

434.00 3342.00

a) F

30 cm depth No

2056.00 22537.00

617.00 4507.00

a) 4

30 cm depth

2674.00

802.00

a) b)

No No

2114.00 2919.00

529.00 729.00 Page No. 178

(Section - I - XXI, Chambers, manholes drainage drops)

Sr. No. 5

Description Providing and fixing C.I. road box including loading, unloading and carting to site of work including all necessary excavation in all types of strata and fixing in murum packing, etc. complete. 100 mm x 225 mm (20 kg) 225 mm x 300 mm (40 kg) Providing and constructing on sewer, B.B. masonry circular manhole with concentric cone 1.2 M dia. at bottom and 0.5 M dia. at top and upto a depth of 2.00 M with 23 cm brick work in CM 1:4 proportion excluding excavation including foundation concrete 250 mm thick and haunches and channels in C.C. 1:2:4 proportion, finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.5 kg., 1:2:4 coping and providing and fixing approved make and quality S.F.R.C. frame and cover of 56 cm dia. etc. complete as directed by Engineerin-charge.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

a) b) 6

No No No

1360.00 2720.00 20024.00

363.00 725.00 4005.00

a) 7

Rebate for every decrease in depth of 50 50 cm depth cm or part thereof Providing and constructing on sewer, B.B. No masonry circular manhole concentric cone 1.5 M dia. at bottom and 0.5 M dia. at top and upto a depth of 5.00 M with 23 cm brick work, upto depth of 2 M from top and 35 cm thick brick work for balance depth in CM 1:4 proportion with 20 mm thick smooth plaster on both sides in CM 1:2 proportion excluding excavation including foundation concrete 250 mm thick and haunches and channels in C.C. 1:2:4 proportion, finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.5 kg., 1:2:4 coping and providing and fixing approved make and quality S.F.R.C. frame and cover of 56 cm dia. etc. complete as directed by Engineer-in-charge.

2739.00 55992.00

822.00 11199.00

a)

Rebate for every decrease in depth of 50 50 cm depth cm or part thereof

5632.00

1689.00

(Section - I - XXI, Chambers, manholes drainage drops)

Page No. 179

Sr. No. 8

Description Providing and constructing on sewer, B.B. masonry circular manhole with concentric cone 1.5 M dia. at bottom and 0.5 M dia. at top and upto a depth of 9.00 M with 23 cm brick work, upto depth of 2 M from top and 35 cm thick brick work for depth of 2 M and 45 cm thick brick work for remaining depth upto 9 M in CM 1:4 proportion with 20 mm thick smooth plaster on both sides in CM 1:2 proportion excluding excavation including foundation concrete 250 mm thick and haunches and channels in C.C. 1:2:4 proportion, finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.5 kg., 1:2:4 coping and providing and fixing approved make and quality S.F.R.C. frame and cover of 56 cm dia. etc. complete as directed by Engineer-incharge.

Unit
No

Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Complete Labour Complete Labour 120336.00 24067.00

a) 9

Rebate for every decrease in depth of 50 50 cm depth cm or part thereof Providing and constructing B.B. masonry circular manhole without conical shape excluding excavation, RCC 1:1.5:3 proportion, 20 cm bedding brick masonry in CM 1:4 proportion, 23 cm thick for 2 M depth from top 35 cm thick for 2 M below it and 45 cm thick for balance depth, RCC slab at top and at 2 M depth from top for supporting brick masonry above it, plastering with smooth finish in CM 1:2 proportion, C.C. 1:2:4 finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.5 kg., providing and fixing S.F.R.C. frame and cover of 56 cm dia. at top including cost of all materials and labour, etc. complete. 1.00 M dia. x 2 M depth Rebate for every decrease cm or part thereof 1.00 M dia. x 3 M depth Rebate for every decrease cm or part thereof 1.00 M dia. x 4.5 M depth Rebate for every decrease cm or part thereof 1.50 M dia. x 2 M depth Rebate for every decrease cm or part thereof 1.50 M dia. x 3 M depth Rebate for every decrease cm or part thereof 1.50 M dia. x 4.5 M depth
No

7113.00

2134.00

A a) B a) C a) D a) E a) F

in depth of 50 50 cm
depth No

17050.00 2547.00 27072.00 4167.00 41904.00 5193.00 26814.00 3496.00 35607.00 5323.00 54419.00

5115.00 764.00 8122.00 1250.00 12571.00 1557.00 8044.00 1049.00 10682.00 1596.00 16325.00

in depth of 50 50 cm
depth No

in depth of 50 50 cm
depth No 50 cm depth No 50 cm depth No

in depth of 50

in depth of 50

(Section - I - XXI, Chambers, manholes drainage drops)

Page No. 180

Sr. No. a) 10

Description

Unit

Rebate for every decrease in depth of 50 50 cm depth cm or part thereof

Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Complete Labour Complete Labour 6637.00 1990.00 1822.00 364.00

Drainage Drops
Providing 150 mm dia. S.W. or R.C.C. pipes in vertical drop arrangement including providing 150 mm dia S.W. and R.C.C. pipe fixed in B.B. masonry of manhole at the required level including providing 150 mm dia double tee, 150 mm dia right angled bend, encasing in B.B. masonry 1:4 proportion all around the pipe, double tee, bend upto the foundation of manhole, jointing, cutting, filleting including neat cement rendering, plugging the opening with jungle wood knob complete as directed by Engineer-incharge (0.60 M depth) excluding cost of chamber.

No

a) 11 a) 12 a) 13 a) 14 a) 15 a) 16 a) 17

Extra for every 0.5 M depth beyond initial depth of 0.60 M. As above but for 200 mm dia pipes and depth 0.60 M Extra for every 0.5 M depth beyond initial depth of 0.60 M. As above but for 250 mm dia pipes and depth 0.60 M Extra for every 0.5 M depth beyond initial depth of 0.60 M. As above but for 300 mm dia pipes and depth 0.60 M Extra for every 0.5 M depth beyond initial depth of 0.60 M. As above but for 400 mm dia pipes and depth 0.60 M Extra for every 0.5 M depth beyond initial depth of 0.60 M. As above but for 500 mm dia pipes and depth 0.60 M Extra for every 0.5 M depth beyond initial depth of 0.60 M. As above but for 600 mm dia pipes and depth 0.60 M Extra for every 0.5 M depth beyond initial depth of 0.60 M. Providing and fixing in position steel fibre reinforced concrete (S.F.R.C.) frame and covers of approved make including loading, unloading, transportation, all taxes, etc. complete as directed by Engineer-in-charge (20 tonnes capacity). 540 mm dia 560 mm dia 90 x 45 cm size 90 x 60 cm size 60 x 60 cm size 60 x 45 cm size

50 cm depth No 50 cm depth No 50 cm depth No 50 cm depth No 50 cm depth No 50 cm depth No 50 cm depth

632.00 2412.00 757.00 2906.00 942.00 3539.00 1026.00 4798.00 1421.00 6470.00 1866.00 8429.00 2053.00

189.00 496.00 227.00 626.00 283.00 733.00 308.00 959.00 496.00 1294.00 559.00 1686.00 616.00

a) b) c) d) e) f)

No No No No No No

2633.00 3504.00 2633.00 2853.00 2606.00 2258.00

658.00 877.00 658.00 713.00 651.00 565.00

(Section - I - XXI, Chambers, manholes drainage drops)

Page No. 181

Sr. No. 18

Description Providing and fixing intercepting sewer trap including concrete bedding, etc. complete. 150 x 100 mm 100 x 100 mm Providing and fixing in position S.W. bends of various size, etc. complete. 100 mm 150 mm Providing and fixing 'Y' junction and labour, etc. complete. Saddle junction 100 x 100 M 'Y' junction 150 x 150 x 100 mm 'Y' junction 300 x 300 x 300 mm 'Y' junction 300 x 300 x 100 mm Providing and fixing in position A.C. soil ventilators / slotted as necessary and as directed by Engineer-in-charge, etc. complete. 80 mm 100 mm 150 mm Providing and fixing A.C. soil pipe or downtake pipe with all required fittings, taking hole, etc. complete (as per manufacturer's code of practice). 80 mm 100 mm 150 mm Providing and fixing Cast Iron soil pipe of 1.8 M length including taking out holes and all required fittings, etc. complete. S/S 80 mm 100 mm D/S 80 mm 100 mm

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

a) b) 19 a) b) 20 a) b) c) d) 21

No No

454.00 324.00

113.00 81.00

No No

144.00 167.00

36.00 42.00

No No No No

175.00 202.00 238.00 202.00

43.00 50.00 59.00 50.00

a) b) c) 22

No No No

171.00 208.00 294.00

43.00 51.00 72.00

a) b) c) 23

No No No

299.00 356.00 558.00

75.00 90.00 139.00

a) b) a) b)

No No No No

1036.00 1176.00 1118.00 1296.00

259.00 294.00 280.00 323.00

(Section - I - XXI, Chambers, manholes drainage drops)

Page No. 182

Section - J

Well Sinking and River Infiltration Works

SECTION - J, WELL SINKING AND RIVER INFILTRATION WORKS


Sr. No. 1 Description Unit Rate (Rs.) 2012-13 Complete Labour Rate (Rs.) 2013-14 Complete Labour Providing, constructing coffer dam in river basin / dam storages as per type design including excavation, filling the middle portion with B.C. soil (in gunny bags if required). Providing impervious / semipervious materials on both sides of B.C. soil (in gunny bags if required) Cum including ramming, compacting to the satisfaction of Engineer-in-charge till the completion of work including dismantling coffer dam after completion of works and disposing off the material as directed by the Engineer-in-charge. Note : Pay line maximum. Top width payable shall be 2 Mtr. and maximum payable side slopes shall be 1.5 horizontal to 1 vertical, if the constructed top width of the side slopes are less, then the measurements at actual are payable. Extra top width or flat slopes are not payable. Contractor is free to use ballies, plastic sheets, piles, pipes, CGI sheets for supporting hearting materials instead of impervious/ semi-pervious hearting materials for which no extra payments shall be payable. 30% payment shall be withheld for dismantling of coffer dam.

499.00

11.00

This foot note shall appear in tender condition. (Type section is shown on last page of type design section of CSR). Providing and fabricating at work shop, carting to site of work, including transport, loading, unloading, hoisting, lowering and setting out at actual site of well, sinking M.S. plate cutting edge for R.C.C. well curb consisting of 350 mm M.S. plate, 10 mm thick, champhering at bottom. Cutting edge should be provided in pieces not less than 2 M in length. Each joint should be plain from outside and jointed by gusset plate 400 x 200 x 12 mm thick M.S. plate with 12 nos. of 20 mm dia. crushank headed bolts (gusset plates from inside) with unequal angle of 90 x 60 x 10 mm should be welded from top of chamfered portion at 14 mm from bottom so that 15 mm side should be in contact with cutting edge with overlap of 300 mm joints. 16 mm dia bar should be welded

Kg

80.00

12.00

(Section - J, Well Sinking and River infiltration work)

Page No. 183

Sr. No.

Description to M.S. plate 200 mm below the top surface and length should be 1.8 M above plate with a bend 300 mm from plate surface including 3 coats of anti-corrosive paint as directed by Engineer-in-charge.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

Providing and filling puddle (selected good impervious clay) in Kolhapur type weirs in proper layers of 15 cm including watering, Cum ramming and compaction, etc. complete with all leads and lifts. Providing and filling around the well boulders filling of selected variety and size of boulders including cost of all materials, Cum labour, transportation, etc. complete with all leads and lifts. Providing and fixing 80 mm dia A.C./ P.V.C. pipe weep holes at 1.5 M c/c staggered including cost of all materials RMT and labour involved with all leads and lifts, etc. complete. Providing and fixing M.S. chequerred plate flooring of following thickness supported on M.S. angles (25 x 25 x 5 mm size) including welding, cutting and fabricating the plates to the required square or rounding shape, making holes in the plate, including providing and applying 3 coats of anticorrosive paint, etc. complete as directed by Engineer-in-charge. 6 mm thick 8 mm thick Providing at site of works ISI standard RCC slotted pipes of NP-3 class including cost of all central and local taxes, octroi, inspection, transportation, etc. complete including cost of RCC collar, etc. complete. 450 mm dia 600 mm dia Lowering, laying and jointing RCC slotted pipes of following diameters including all leads and lifts, cost of jointing material, labour, etc. complete as directed by Engineer-in-charge. 450 mm dia 600 mm dia Lowering, laying and jointing CI 'B' class connecting mains with rubber gaskets including transportation of pipes from stores to site of works, cost of jointing materials, cost of rubber gasket with all leads and lifts, etc. complete. 300 mm dia 350 mm dia 400 mm dia Sqm Sqm

226.00

91.00

680.00

181.00

178.00

3.00

a) b) 7

3623.00 4633.00

323.00 323.00

a) b) 8

RMT RMT

3623.00 5619.00

a) b) 9

RMT RMT

178.00 238.00

99.00 132.00

i) ii) iii)

RMT RMT RMT

200.00 231.00 308.00

99.00 122.00 150.00

(Section - J, Well Sinking and River infiltration work)

Page No. 184

Sr. No. iv) v) vi) vii) viii) 10

Description 450 mm dia 500 mm dia 600 mm dia 700 mm dia 750 mm dia Providing, lowering, laying and placing in position, shrouding material for porous pipe gallery / slotted pipe gallery / trench gallery with all leads and lifts involved including transportation of materials to site of works, screening and washing of materials and placing in position with given section, etc. complete as directed by Engineer-in-charge. 40 mm gauge pebbles 12 mm to 20 mm gauge pebbles 6 to 12 mm gauge pebbles Coarse sand (from river sand at site) Fine sand (from river sand at site) Providing and fixing in position C.I. dapuri steps or 22 mm dia. M.S. bar step with proper anchorage, etc. and providing and applying 3 coats of anti-corrosive paint, etc. complete as directed by Engineer-incharge. Providing and fixing M.S. sluice gates in position as per detailed drawings and specification including cost of all materials, labour, operating pedestal, connecting rod, painting with three coats of anti-corrosive paint, etc. complete as directed by Engineer-in-charge.

Unit RMT RMT RMT RMT RMT

Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Complete Labour Complete Labour 323.00 147.00 408.00 163.00 564.00 226.00 761.00 286.00 858.00 323.00

a) b) c) d) e) 11

Cum Cum Cum Cum Cum No

1129.00 1366.00 1557.00 772.00 356.00

273.00 330.00 378.00 189.00 56.00

12

Kg

91.00

35.00

13

14

Providing and fixing in position C.I. / M.S. Kg rose pieces in intake wells including cost of all materials and labour, painting with three coats of anti-corrosive oil paint, etc. complete as directed by Engineer-incharge. Providing and spreading around the well 1 Sqm mm thick polyethylene sheet complete as directed by Engineer-in-charge. Dewatering charges for estimation purpose for head works in river basin or dam : Approach Channel RMT Intake Well of 3 M dia. No Inspection Well of 2 M dia. No Connecting Main RMT Jack Well of 6 M dia. No Approach Bridge RMT

86.00

12.00

23.76

6.00

15

i) ii) iii) iv) v) vi)

5203.00 69391.00 44680.00 4170.00 208161.00 701.00

963.00 14660.00 8792.00 771.00 43105.00 229.00

(Section - J, Well Sinking and River infiltration work)

Page No. 185

Sr. No.

Description Notes The Contractor at his request may be allowed to start construction of masonry steining so as not to allow silting of well in oncoming monsoon and while paying masonry, 25% amount shall be withheld and released only when excavation to the full depth is completed.

Unit

Rate (Rs.) 2012-13 Complete Labour

Rate (Rs.) 2013-14 Complete Labour

1)

2)

3)

16

i) ii)

Dewatering : Total dewatering charges are to be proposed in the tender as lumpsum amount and 75% is payable for excavation and 25% is payable for construction of well/ gallery. Out of 75% excavation, breakup shall be as under: 25% for last 1 M depth. 20% for 2 M depth which just above last 1 M depth. 15% for 2 M depth which just above last 3 M depth. 15% for the rest of depth from water table level. The provisions made for dewatering in the tender being on lumpsum basis, the same shall have to be reduced / increased proportionately as the length of approach channel, connecting main or approach bridge reduces / increases during actual execution. Condition Nos. (1) & (2) shall appear in tender conditions. Carrying out recuperation/ yield test for asserting the discharge of constructed well/ excavated profile as directed by Engineer-in-charge. The test is carried out by drawing down water from the well/profile below normal/ subsoil water level upto full depth rise in water level is recorded. The normal water level/ subsoil water level in the well/ profile as well as stainer/ suction level at pump as per design of W.S. scheme shall be recorded prior to the test including cost of all materials, overhead, labourers, etc. completed as directed. The test shall be carried out as per Tech. Circular No. 2597 & 2011-97 and shall be carried out for 7 days. Lps more than 25,000 Day Lps less than 25,000 Day

3231.00 3214.00

1832.00 2273.00

(Section - J, Well Sinking and River infiltration work)

Page No. 186

Section - K

Ancillary Items for Reservoirs

SECTION - K, ANCILLARY ITEMS FOR RESERVOIRS


Sr. No. 1 Description Providing and fixing in position copper lightening conductor including copper rod of 20 mm dia as per upper terminal 1.5 M long with a knob at end and with conical spike at top, copper tape conductor 20 x 3 mm size, copper earth plate of 3 mm thick and 0.81 sqm. in area, clamps at 1 M centre to centre including, necessary excavation, laying and fixing the conductor, providing and fixing 40 mm G.I. pipe upto 3 M height from ground and 0.5 M below ground including making all connections, filling earthing pit with charcoal, salt, etc. & refilling & watering, etc. complete as per specifications laid down in relevant I.S. codes. Unit Rate (Rs.) 2012-13 Complete Labour Rate (Rs.) 2013-14 Complete Labour

i) ii)

For tape of 10 M length Rebate/ extra rate per metre length or part thereof over and above initial length of 10 M. Providing and fixing in position copper lightening conductor including copper rod of 20 mm dia upper terminal 1.5 M long with a knob at the end with a conical spike at top, aluminium tape conductor 20 x 3 mm size, copper earth plate of 3 mm thick and 0.81 sqm. in area, clamps at 1 M centre to centre including, necessary excavation, laying and fixing the conductor, providing and fixing 40 mm G.I. pipe upto 3 M height from ground and 0.5 M below ground including making all connections, filling earthing pit with charcoal, salt, etc. & refilling & watering, etc. complete as per specifications laid down in relevant I.S. codes.

No Mtr.

10731.00 292.00

710.00 12.00

i) ii)

i)

For tape of 10 M length Rebate/ extra rate per metre length or part thereof over and above initial length of 10 M. Providing, hoisting and fixing in position inverted 'J' type 100 mm dia C.I. cowl type ventilators with mosquitoproof aluminium mesh at top in including applying 2 coats of anti-corrosive paint, etc. complete as directed by Engineer-incharge, weighing not less than 35 kg. Providing, hoisting and fixing in position C.I. manhole, frame and cover of best quality and of required size and shape with locking arrangements including applying 2 coats of anti-corrosive paint, etc. complete. 90 x 60 cm size and weight 35 kg.

No Mtr.

9331.00 117.00

708.00 4.00

No

1750.00

770.00

No

2683.00

204.00

(Section - K, Ancilary items for Reservoirs)

Page No. 187

Sr. No. ii) 5

Description

Unit

Rate on weight basis for any size and type Kg of frame and cover. Providing and fixing in position M.S. RMT ladder 0.50 M wide consisting of 75 x 10 mm M.S. flats as stringers and 16 mm dia M.S. bars in double rows as steps placed at 25 cm c/c including cost of material and labour involved, welding, anchoring and applying 3 coats of anti-corrosive paint, etc. complete as directed by Engineer-incharge. Providing and applying epoxy paint of approved make (Shalimar, Ciba or Mahindra & Mahindra) to concrete surface for RCC ESR or GSR or any other structure including cleaning the surface by scrapping and air blowers to the satisfaction of Engineer-in-charge, necessary scaffolding, etc. complete with all leads and lifts and giving satisfactory hydraulic test for water tightness as per I.S. codes. For new surfaces - Two coats Sqm For old surfaces - Two coats Sqm Providing and constructing RCC spiral RMT staircase in M-250 mix concrete at site of work and consisting of central vertical column of 400 mm dia and steps in RCC M-250, tie members at each brace level, RCC parapet wall 80 cm high including cost of all labour and material involved, cost of scaffolding, centering, shuttering, curing, finishing in CM 1:3 proportion including RCC M-250 footing foundation, its excavation, refilling and cleaning the site, etc. complete as per type design, with 3 coats of cement paint. Providing and constructing RCC ventilating shaft of diameters and height mentioned below with required number of RCC 15 x 15 cm size columns and RCC circular slab or dome over the pillars in M150 including cost of all material and labour, providing and fixing steel or wooden frame and providing and fixing G.I. flyproof mesh of 26 gauge and providing and applying in 3 coats of oil paint to wooden or steel frame and cement paint to concrete structure, etc. complete as directed by Engineer-incharge. 0.9 M dia x 1.35 M height 1.2 M dia x 1.80 M height 1.5 M dia x 2.25 M height

Rate (Rs.) 2012-13 Rate (Rs.) 2013-14 Complete Labour Complete Labour 76.00 5.00 1400.00 207.00

i) ii) 7

571.00 642.00 6415.00

289.00 349.00 854.00

i) ii) iii)

No No No

6882.00 8748.00 13997.00

784.00 1004.00 1628.00

(Section - K, Ancilary items for Reservoirs)

Page No. 188

Sr. No. 9

Description Providing and installing mercury water level indicator for RCC ESR and wash water tank site as per instructions of Engineer-in-charge at ground level of the tank or nearing pump house or room for RCC ESR having 15 mtrs. stage height and 5 mtrs. water storage height with indication of water height in storage tank in metre and 1/10th of metre including providing and installing 15 mm dia class 'B' G.I. piping with necessary accessories from bottom of the tank upto the instrument as per instructions of Engineerin-charge. For extra stage height over 15 mtrs. or part thereof and water depth over 5 mtrs. or part thereof for Item No. 9. Providing, erecting, installing and commissioning Barometric leg chlorination system for water treatment plant upto 5 MLD capacity as per manufacturer's specification with all required materials viz. 15 kg. pressure yellow PVC pipe, specially prepared chamber, mixing chamber, scrubber unit, gas pressure flexible pipe, brass nozzle nipple, electronic alarm unit, PPM dose, indicator of 25 mm dia, 4 mm thick glass tube borosil, gas unit opening spanner 3 hole type, instruction board, aluminium pipe upto sump (max. length 15 M) including civil works wherever required for above materials, fittings, including satisfactory test and trial at work site, etc. complete. (Item do not include construction of chlorine gas room of 3.0 x 3.0 M or adequate size) as per drawing attached. For 5.0 Mld capacity Add / deduct per Mld or part of per Mld capacity Providing and fixing water level indicator upto 5 M height including M.S. enamelled gauge plate 300 mm wide and 3 mm thick, copper float, providing and fixing required accessories such as pointer, pulleys, nylon thread including cost of all material, labour, etc. complete. Providing and fixing water level indicator upto 5 M height including M.S. enamelled gauge plate 150 mm wide and 3 mm thick, copper float, providing and fixing required accessories such as pointer, pulleys, nylon thread including cost of all material, labour, etc. complete.

Unit No

Rate (Rs.) 2012-13 Complete Labour 17496.00

Rate (Rs.) 2013-14 Complete Labour

Mtr.

911.00

10

i) ii) 11

No Mld No 8748.00 1444.00

12

No

5249.00

1437.00

(Section - K, Ancilary items for Reservoirs)

Page No. 189

Section - L

Trial Run

SECTION - L, TRIAL RUN


Sr. No. 1 Description Commissioning, running and maintaining the scheme to quantities, rated capacity, including managing necessary personnel such as operator, valveman, etc. as per requirements of the scheme and who should also administer chemical dose for a period of 1 month for individual scheme and 3 months for regional scheme, together with training of personnel spared by MJP / Local Body and handing over the scheme to Local Body after completion of the above period as directed by Engineer-in-charge. Unit Rate (Rs.) 2012-13 Complete Labour Rate (Rs.) 2013-14 Complete Labour

Note : Required chemicals to be supplied by Department free of cost and electricity bill will also be paid by the Department. a) b) For single village (Three Months) For regional scheme upto 3 villages with raw water pumping, one treatment plant with pumps, raw water pumping main, leading main, ESR, BPT and distribution system, etc. (For six months) For regional scheme upto 3 villages with raw water pumping with pumps, raw water pumping main, leading main, ESR, BPT and distribution system, etc. (For six months) without WTP For regional scheme more than 3 villages trial period shall be one year with raw water pumping, one treatment plant with pumps, raw water pumping main, leading main, ESR, BPT and distribution system, etc. (For one year) For regional scheme more than 3 villages trial period shall be one year with raw water pumping with pumps, raw water pumping main, leading main, ESR, BPT and distribution system, etc. (For one year) without WTP Add for every additional villages or part thereof Add for every additional pumping station Job Job 48572.00 201115.00 28655.00 158120.00

c)

Job

130081.00

102271.00

d)

Job

407997.00

320773.00

e)

Job

264105.00

207643.00

f) g)

Mth. Mth.

5996.00 9867.00

3941.00 9076.00

(Section - L, Trial Run)

Page No. 190

Section - M

Type Designs

Page No. 191

Page No. 192

Page No. 193

Page No. 194

Page No. 195

Page No. 196

Page No. 197

Page No. 198

Page No. 199

Page No. 200

Page No. 201

Page No. 202

Page No. 203

Page No. 204

Page No. 205

Page No. 206

Page No. 207

Page No. 208

Page No. 209

Page No. 210

Page No. 211

Page No. 212

Page No. 213

Page No. 214

You might also like