You are on page 1of 12

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
PQ

Electrical Transient Analyzer Program


ETAP PowerStation

Load Flow Analysis


Loading Category:

Design

Load Diversity Factor:

None

Swing

Generator

Load

Total

XFMR2

XFMR3

Reactor

Line/Cable

Impedance

Tie PD

Total

Number of Buses:

Number of Branches:

Method of Solution:

Newton-Raphson Method

Maximum No. of Iteration:

99

Precision of Solution:

0.000100

System Frequency:

60.00

Unit System:

English

Project Filename:

PQ

Output Filename:

E:\hendro\TUGAS ITS\Tugas PQ\Tugas PQ ku yang baru\sebelum perbaikan\Untitled.lf1

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
PQ

BUS Input Data

Bus
ID

Initial Voltage
Type

kV

% Mag.

Ang.

Generator
MW

Motor Load

Mvar

MW

Mvar

Bus1

Swing

2.400

100.0

0.0

Bus2

Load

0.400

100.0

0.0

0.011

0.007

Bus3

Load

0.400

100.0

0.0

0.038

0.020

Bus5

Load

0.400

100.0

0.0

0.075

0.037

Bus6

Load

0.400

100.0

0.0

0.470

0.227

Bus10

Gen.

2.400

100.0

0.0

Bus12

Load

0.400

100.0

0.0

0.011

0.007

Bus13

Load

0.400

100.0

0.0

0.120
0.724

Total Nunmber of Buses: 8

0.000

0.000

Static Load
MW

Mvar

0.000

0.060

0.208

0.030

0.052

0.505

0.030

0.112

Mvar Limits
Max.

Min.

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Study Case: LF

Filename:

PQ

2-WINDING TRANSFORMER Input Data

Transformer
ID

Rating
MVA

Prim. kV

Sec. kV

Z Variation
%Z

X/R

+ 5%

- 5%

% Tap Setting
% Tol.

Prim.

Adjusted

Sec.

%Z

Phase Shift
Type

Angle

T1

0.150

2.400

0.400

4.000

3.5

4.0000

Std Pos. Seq.

0.0

T2

0.050

2.400

0.400

2.300

0.9

2.3000

Std Pos. Seq.

0.0

T3

0.500

2.400

0.400

4.800

4.7

4.8000

Std Pos. Seq.

0.0

T5

0.050

2.400

0.400

2.600

1.7

2.6000

Std Pos. Seq.

0.0

T7

0.300

2.400

0.400

2.300

0.9

2.3000

Std Pos. Seq.

0.0

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
PQ

BRANCH CONNECTIONS
CKT/Branch
ID

Connected Bus ID
Type

From Bus

% Impedance, Pos. Seq., 100 MVAb


To Bus

T1

2W XFMR

Bus1

Bus5

742.39

2561.24

2666.67

T2

2W XFMR

Bus1

Bus2

3453.28

3038.89

4600.00

T3

2W XFMR

Bus1

Bus6

199.78

938.98

960.00

T5

2W XFMR

Bus1

Bus3

2648.07

4475.24

5200.00

T7

2W XFMR

Bus10

Bus12

575.55

506.48

766.67

CB138

Tie Breakr

Bus12

Bus13

SW4

Tie Switch

Bus1

Bus10

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
PQ

EQUIPMENT CABLE Input Data


O/L
Equipment Cable
ID

Equipment
ID

ohms / 1000 ft per Conductor


Type

Library

Size

L(ft)

#/ph

T (C)

Heater
R

R (ohm)

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Study Case: LF

Filename:

PQ

LOAD FLOW REPORT

Bus
ID
* Bus1

Voltage
kV

%Mag.

2.400

100.000

Generation

Ang.
0.0

MW

Mvar

0.77

Motor Load

Static Load

MW

MW

Mvar
0

0.65

Load Flow

Mvar
0

MW

XFMR
Mvar

Amp

%PF

Bus5

0.08

0.10

29

61.9

Bus2

0.01

0.01

83.6

Bus6

0.48

0.25

129

88.2

Bus3

0.04

0.02

10

87.6

Bus10

0.16

0.27

75

52.2

Bus1

-0.01

-0.01

18

83.7

Bus2

0.400

99.422

0.0

0.01

0.01

Bus3

0.400

98.031

-0.7

0.04

0.02

Bus1

-0.04

-0.02

63

88.2

Bus5

0.400

96.960

-0.7

0.07

0.04

0.00

0.06

Bus1

-0.08

-0.09

178

62.9

Bus6

0.400

96.744

-2.3

0.47

0.23

Bus1

-0.47

-0.23

778

90.1

* Bus10

2.400

100.000

0.0

Bus12

0.16

0.27

75

52.2

Bus1

-0.16

-0.27

75

52.2

Bus10

-0.16

-0.26

455

51.6

Bus13

0.15

0.26

439

50.0

Bus12

-0.15

-0.26

439

50.0

Bus12

Bus13

0.400

0.400

97.689

97.689

0.4

0.4

0.01

0.12

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA

0.01

0.21

ID

0.03

0.05

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
PQ

BUS LOADING Summary Report

Bus
ID

Bus Total Load


kV

Rated Amp

MW

Mvar

MVA

% PF

Amp

Bus1

2.400

0.767

0.649

1.004

76.3

241.58

Bus2

0.400

0.011

0.007

0.013

83.7

18.33

Bus3

0.400

0.038

0.020

0.043

88.2

63.72

Bus5

0.400

0.075

0.093

0.120

62.9

178.05

Bus6

0.400

0.470

0.227

0.522

90.1

778.90

Bus10

2.400

0.165

0.269

0.316

52.2

75.99

Bus12

0.400

0.159

0.264

0.309

51.6

455.94

Bus13

0.400

0.149

0.257

0.297

50.0

439.21

% Loading

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
PQ

BRANCH LOADING Summary Report

Transformer
Cable & Reactor

CKT / Branch
ID

Type

Ampacity
(Amp)

Loading
Amp

Capability
(MVA)

Loading (input)
MVA

T1

Transformer

0.150

0.123

Loading (output)
MVA

82.2

0.120

%
79.7

T2

Transformer

0.050

0.013

25.4

0.013

25.3

* T3

Transformer

0.450

0.540

119.9

0.522

116.0

* T5

Transformer

0.030

0.044

147.2

0.043

144.3

* T7

Transformer

0.050

0.316

631.8

0.309

617.2

* Indicates a branch with operating load exceeding the branch capability

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
PQ

BRANCH LOSSES Summary Report

CKT / Branch
ID

From-To Bus Flow


MW

Mvar

To-From Bus Flow


MW

Mvar

Losses
kW

% Bus Voltage
Kvar

Vd
% Drop
in Vmag

From

To

T1

0.076

0.097

-0.075

-0.093

1.1

3.9

100.0

97.0

3.04

T2

0.011

0.007

-0.011

-0.007

0.1

0.0

100.0

99.4

0.58

T3

0.476

0.254

-0.470

-0.227

5.8

27.3

100.0

96.7

3.26

T5

0.039

0.021

-0.038

-0.020

0.5

0.9

100.0

98.0

1.97

T7

0.165

0.269

-0.159

-0.264

5.7

5.1

100.0

97.7

2.31

13.3

37.2

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

10

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
PQ

EQUIPMENT CABLE LOSSES Summary Report

Equipment Cable

Connected

ID

Load Type

Losses
kW

% Voltage
kvar

Bus

Load

Vd
% Drop
in Vmag

Vst
% for
Motor

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

11

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
PQ

Alert Summary Report


% Alert Settings
Critical

Marginal

Loading
Bus
Cable
Reactor
Generator
Transformer
Protective Device

Bus Voltage
OverVoltage

105.0

102.0

UnderVoltage

95.0

98.0

Generator Excitation
OverExcited (Q Max.)
UnderExcited (Q Min.)

Marginal Report
ID

Device Type

Rating

Unit

Calculated

%Mag.

Condition

Bus12

Bus

0.400

kV

0.391

97.7

UnderVoltage

Bus13

Bus

0.400

kV

0.391

97.7

UnderVoltage

Bus5

Bus

0.400

kV

0.388

97.0

UnderVoltage

Bus6

Bus

0.400

kV

0.387

96.7

UnderVoltage

ETAP PowerStation

Project:

4.0.0C

Location:

Page:

12

Date:

04-26-2007

Contract:

SN:

KLGCONSULT

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
PQ

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW

Mvar

MVA

% PF

Swing Bus(es):

0.767

0.649

1.004

76.35 Lagging

Generators:

0.000

0.000

0.000

100.00 Lagging

Total Demand:

0.767

0.649

1.004

76.35 Lagging

Total Motor Load:

0.724

0.505

0.883

82.02 Lagging

Total Static Load:

0.029

0.106

Apparent Losses:

0.013

0.037

System Mismatch:

0.000

0.000

Number of Iterations: 1