By : Budi Santoso, ST
BATU KALI
BORED PILE
PLAT 2
ANALISA PERHITUNGAN :
TULANGAN UTAMA
13
mm
Diameter
Panjang tul
135.750 m
Volume tul
141.373 kg
SENGKANG (TUMPUAN)
Diameter
8
Jarak
150
Pjg total
68.952
Volume tul
27.194
DATA SLOOF
MENU
Tump
D
2
8
D
150
D
D
200
13
13
Lap
mm
mm
m
kg
TUMPUAN
mm
mm
m
kg
HASIL :
Vol tulangan
Vol beton
Kg/m3
2
3
8
LAPANGAN
INSERT PANJANG :
SENGKANG (LAPANGAN)
Diameter
8
Jarak
200
Pjg total
77.064
Volume tul
30.393
Atas
Bawah
Sengkang
30.000
198.959 kg
1.350 m3
147.38 kg/m3
M
SLOOF S1
KET :
B
H
Luas
0.15 m
0.30 m
0.05 m2
ANALISA HARGA :
13
13
Harga :
Rp
7,751,846.41
DATA BALOK
ANALISA PERHITUNGAN :
TULANGAN UTAMA
Diameter
13
Panjang tul
Volume tul
mm
4.000 m
4.166 kg
SENGKANG (TUMPUAN)
Diameter
8
mm
Jarak
Pjg total
Volume tul
150
TUMPUAN
LAPANGAN
5.856 m
1.000
INSERT PANJANG :
HASIL :
SENGKANG (LAPANGAN)
Vol tulangan
Diameter
Vol beton
Jarak
mm
Pjg total
200 mm
4.88 m
Volume tul
1.925 kg
Atas
13
Bawah
Sengkang
13
150
BALOK BP1
KET :
mm
2.310 kg
ANALISA HARGA :
Kg/m3
0.40 m
0.20 m
0.08 m2
Luas
8.400 kg
0.080 m3
104.997 kg/m3
Harga
Lap
Tump
13
13
200
Rp
471,208.06
DATA KOLOM
ANALISA PERHITUNGAN :
TULANGAN UTAMA
Diameter
16
Panjang tul
Volume tul
SENGKANG
Diameter
9.465
mm
mm
Panjang tul
Volume tul
13.781
kg
16
150
m
INSERT PANJANG :
1.000
HASIL :
KET :
Vol tulangan
Tul utama
6 D16
Sengkang
8-125
MENU
16
D
Sengkang
kg
16
KOLOM K1
150
8.736
Jarak
ANALISA HARGA :
Tul Utama
mm
Vol beton
Kg/m3
23.247 kg
0.100 m3
232.466 kg/m3
Luas
0.25 m
0.40 m
0.10 m2
Harga
Rp
731,262.65
WF 150 x 75
HITUNG :
HASIL :
Berat wf
10 mm
2.00
ANALISA HARGA :
Tot pjg
6.00 m'
3.70 kg
Harga Wf
Rp
394,926.00
Beton
Rp
10,513.83
Jumlah
Rp
405,439.83
Ukuran
Wf 75 x 150
Tul atas
2 P 10
Tul bwh
2 P 10
Panjang Tul
Tul samping
2 P 10
Volume tul
Sengkang
8-300
0.217
0.135
Section area
m'
mm
m
3 m
1.18 kg
WF
A balok
1.000
4.881
Bawah
SENGKANG (T2)
Diameter
8.00
Jarak
300
Input panjang
0.002
Vol tulangan
2.00 m'
2.00 m'
Volume tul
Ket :
14.0000
Vol beton
A balok/cm2
A Wf
0.0293 m2
17.8500
cm2
292.9500 cm2
0.0275 m2
Unit weight
14.0000 kg
Volume tul
4.8805 kg
Volume Wf
0.0275 m3
Berat Wf
14.0000 kg
kg
m3
kg
PLAT TYPE S6
LX
LY
Tebal plat
0.15
HITUNG :
Arah Y >
10-300
10
300
6.282
31.41
19.356 kg
Arah Y <
12-150
12
150
1.01
8.08
7.170 kg
Arah Y <
12-150
12
150
1.01
8.08
7.170 kg
Arah X >
12-150
12
150
2.154
17.232
15.291 kg
Arah X >
12-150
12
150
1.077
8.616
7.646 kg
Arah X >
12-150
12
150
1.077
8.616
7.646 kg
64.278 kg
HASIL :
Vol tulangan
64.278 kg
Vol beton
0.15 m3
Kg/m3
428.5169492 kg/m3
ANALISA HARGA :
Harga
Rp
364,614.00
PLAT S7
Mesh
M8-150
Berat mesh
61.790
kg
Luas Mesh
8.50
m2
1.00
1.00
Tebal plat
0.150
Luas plat
Luas bekisting
m
1.000 m2
1.6 m2
Kebutuhan Mesh
Mesh/lbr
Mesh/kg
1.000 lbr
61.79 kg
Vol mesh
123.58 kg
Volume beton
0.150 m3
PLAT S8
Mesh
M6-150
Berat mesh
34.760
kg
Luas Mesh
8.50
m2
1.00
1.00
Tebal plat
0.150
Luas plat
Luas bekisting
m
1.000 m2
1.6 m2
Kebutuhan Mesh
Mesh/lbr
Mesh/kg
1.000 lbr
34.76 kg
Vol mesh
69.52 kg
Volume beton
0.150 m3
INSERT PANJANG :
1.000
HITUNG :
Urugan Pasir
B1
0.700
B1'
0.797
T1
0.145
Luas
0.109 m2
Volume
0.109 m3
Batu Pecah
B2
0.797
B2'
0.897
T2
0.150
Luas
0.127 m2
Volume
0.127 m3
Batu Kali
B3
0.600
B3'
0.250
T3
0.525
Luas
0.223 m2
Volume
0.223 m3
MENU
HASIL :
Tanah Urug
Volume
B3
0.148
Galian tanah
0.798 m3
B3'
0.498
Urugan pasir
0.109 m3
T3
0.525
Pasangan pondasi
0.223 m3
0.339 m3
Luas
0.339 m2
Volume
0.339 m3
ANALISA HARGA :
Galian tanah
Rp
Urugan pasir
Rp
19,654.91
Pasangan pondasi
Rp
138,437.79
Rp
5,345.65
Rp
207,938.14
Jumlah Total
44,499.78
Tul Bgkk
Diameter
n tul
HITUNG :
HASIL :
13
4
Volume
mm
Panjang tul
9.492 m
Volume tul
9.885 kg
Volume
0.560 m3
Tul Lrs
Diameter
n tul
Volume
13
4
mm
Pjg total
3.353
1.020
2.040 m3
6.706 m3
171.745 kg
MENU
7.544 m
Volume tul
ANALISA HARGA :
7.856 kg
6.706 m3
Volume Beton
Volume
2.040 m3
Vol tulangan
Sengkang Klm
Luas
0.560 m3
Tanah Urug
Luas
9.307 m3
Urugan pasir
Volume beton
Urugan Pasir
Luas
Galian tanah
Galian tanah
Rp
Urugan pasir
Rp
101,489.66
Rp
6,497,016.48
519,080.85
Diameter
13
mm
# 1 Volume beton
Jarak
100
mm
Rp
105,706.05
25.574 m
# 0
Rp
7,223,293.03
26.633 kg
Pjg total
Volume tul
# 4
Sengkang Tlpk
Diameter
13
mm
# 1
Jarak
150
mm
# 0
Pjg total
Volume tul
61.152 m
127.370 kg
Jumlah Total
BORED PILE
HITUNG :
ANALISA HARGA :
Ket :
Pengeboran
Rp
104,201,826.30
Beton
Rp
120,794,473.80
Tulangan
Rp
107,291,602.31
Jumlah Total Rp
332,287,902.41
Tul utama
D16
Sengkang
8-150
Panjang tul
Diameter
0.6
Input pjg
30.000
m'
Jumlah PB
13.000
bh
Volume tul
Panjang tul
Tul Utama
19
10
6203.66 kg
SENGKANG SPIRAL
Diameter
8
Jarak
DATA PB
Volume tul
mm
3932.5 m
mm
150
mm
7347.600 m
2,897.776 kg
HASIL :
Sengkang spiral
Vol beton
150
Vol tulangan
PILE CAP
HITUNG :
Ket :
SENGKANG
Panjang tot
Diameter
13
mm
Jarak
B
150
1.5
mm
m
1.5
0.6
110.214
9101.436
HASIL :
Vol beton
260 m
Vol tulangan
17.55
270.769
m3
kg
m3
kg
MENU
Boq No
Pekerjaan
Jenis Pekerjaan
Volume
Total Biaya
No.
Uraian
Upah Pekerja
Tk. Gali tanah
Mandor
Bahan
Alat Bantu
Pacul
Benang rami
:
:
:
:
:
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
oh
oh
0.7350
0.0730
65,800.00
85,700.00
48,363.00
6,256.10
bh
glg
0.0250
0.0150
45,000.00
2,000.00
1,125.00
30.00
Sub Total
55,774.10
Total
55,774.10
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Upah Pekerja
Tk. Gali tanah
Mandor
Bahan
Alat Bantu
Pacul
Pengki
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
oh
oh
0.1920
0.0190
65,800.00
85,700.00
12,633.60
1,628.30
bh
bh
0.0250
0.0150
45,000.00
25,000.00
1,125.00
375.00
Sub Total
15,761.90
Total
15,761.90
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah Pekerja
Pekerja
Mandor
oh
oh
0.3000
0.0100
55,800.00
85,700.00
16,740.00
857.00
Bahan
Pasir urug
m3
1.2000
135,000.00
162,000.00
Alat Bantu
Pacul
Pengki
bh
bh
0.0250
0.0150
45,000.00
25,000.00
1,125.00
375.00
Sub Total
181,097.00
Total
181,097.00
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah Pekerja
Pekerja
Mandor
oh
oh
0.3000
0.0100
55,800.00
85,700.00
16,740.00
857.00
Bahan
Pasir urug
m3
1.2000
135,000.00
162,000.00
Alat Bantu
Pacul
Pengki
bh
bh
0.0250
0.0150
45,000.00
25,000.00
1,125.00
375.00
Sub Total
181,097.00
Total
181,097.00
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Upah Pekerja
Pekerja
Mandor
Bahan
Alat Bantu
Pacul
Pengki
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
oh
oh
0.6880
0.0500
55,800.00
85,700.00
38,390.40
4,285.00
bh
bh
0.2000
0.1500
45,000.00
25,000.00
9,000.00
3,750.00
Sub Total
55,425.40
Total
55,425.40
No.
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah Pekerja
Pekerja
Tukang batu
Kepala tukang
Mandor
oh
oh
oh
oh
1.5000
0.6000
0.0600
0.0750
55,800.00
65,800.00
75,700.00
85,700.00
83,700.00
39,480.00
4,542.00
6,427.50
Bahan
Batu belah 15/20 cm
Semen Portland (PC)
Pasir Pasang
m3
Kg
m3
1.1000
163.0000
0.5200
165,000.00
1,200.00
185,000.00
181,500.00
195,600.00
96,200.00
Alat Bantu
Ember aduk
Pacul
Sekop
bh
bh
bh
1.0000
0.1000
0.1000
6,000.00
45,000.00
25,000.00
6,000.00
4,500.00
2,500.00
Sub Total
620,449.50
Total
620,449.50
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah Pekerja
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
oh
oh
oh
oh
oh
oh
4.3000
0.3500
1.0400
1.0500
0.2450
0.1650
55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00
239,940.00
23,030.00
68,432.00
69,090.00
18,546.50
14,140.50
Bahan
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Koral beton
Benang rami
m3
Kg
kg
Kg
Kg
Kg
m3
m3
glg
0.2000
1.5000
0.4000
150.0000
2.2500
323.0000
0.5200
0.7800
0.0150
2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
2,000.00
528,045.00
17,415.00
8,610.00
1,518,900.00
27,000.00
387,600.00
92,040.00
164,268.00
30.00
Alat Bantu
Ember aduk
Pacul
Sekop
bh
bh
bh
1.0000
0.1000
0.1000
6,000.00
45,000.00
25,000.00
6,000.00
4,500.00
2,500.00
Sub Total
3,190,087.00
Total
3,190,087.00
No.
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
Uraian
Upah Pekerja
Pekerja
Satuan
oh
Koef
Harga Satuan
( Rp )
4.3000
55,800.00
Jumlah
( Rp )
239,940.00
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
oh
oh
oh
oh
oh
0.3500
1.0400
1.0500
0.2450
0.1650
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00
23,030.00
68,432.00
69,090.00
18,546.50
14,140.50
Bahan
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Koral beton
Benang rami
m3
kg
Lt
kg
kg
kg
m3
m3
glg
0.2000
1.5000
0.4000
150.0000
2.2500
323.0000
0.5200
0.7800
0.0150
2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
2,000.00
528,045.00
17,415.00
8,610.00
1,518,900.00
27,000.00
387,600.00
92,040.00
164,268.00
30.00
Alat Bantu
Ember aduk
Pacul
Sekop
bh
bh
bh
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
Sub Total
3,184,812.00
Total
3,184,812.00
No.
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah Pekerja
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
oh
oh
oh
oh
oh
oh
4.3000
0.3500
1.0400
1.0500
0.2450
0.1650
55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00
239,940.00
23,030.00
68,432.00
69,090.00
18,546.50
14,140.50
Bahan
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Koral beton
Benang rami
m3
kg
Lt
kg
kg
kg
m3
m3
glg
0.2000
1.5000
0.4000
150.0000
2.2500
323.0000
0.5200
0.7800
0.0150
2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
2,000.00
528,045.00
17,415.00
8,610.00
1,518,900.00
27,000.00
387,600.00
92,040.00
164,268.00
30.00
Alat Bantu
Ember aduk
bh
1.0000
6,000.00
6,000.00
Pacul
Sekop
bh
bh
0.0250
0.0150
45,000.00
40,000.00
1,125.00
600.00
Sub Total
3,184,812.00
Total
3,184,812.00
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Tukang gali
Mandor
oh
oh
0.1600
0.0080
65,800.00
85,700.00
10,528.00
685.60
Alat Bantu
Crawler Crane
Mesin Bor
jam
jam
0.1300
0.1300
322,000.00
215,000.00
41,860.00
27,950.00
Lain-lain
Oli+Solar
Alat Bantu
ls
ls
1.0000
0.2200
13,500.00
14,000.00
13,500.00
3,080.00
Sub Total
97,603.60
Total
97,603.60
No.
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
Uraian
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
Satuan
oh
oh
oh
oh
Koef
Harga Satuan
( Rp )
2.1000
0.3500
0.0350
0.1050
55,800.00
65,800.00
75,700.00
85,700.00
Jumlah
( Rp )
117,180.00
23,030.00
2,649.50
8,998.50
Bahan
Semen Portland (PC)
Pasir Beton
Koral Beton
kg
m3
m3
448.0000
0.4000
0.8200
1,200.00
177,000.00
210,600.00
537,600.00
70,800.00
172,692.00
1.0000
12,500.00
12,500.00
Lain-lain
Alat Bantu : Pipa Tremi+CasinglsPelindung
Sub Total
945,450.00
Total
945,450.00
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Tukang besi
Mandor
oh
oh
0.0050
0.0005
65,800.00
85,700.00
329.00
42.85
Bahan
Besi Beton Ulir
Kawat Beton
Kawat Las
Kawat Gantung
kg
ls
ls
ls
1.0000
1.0000
1.0000
1.0000
10,126.00
250.00
100.00
600.00
10,126.00
250.00
100.00
600.00
Sub Total
11,447.85
Total
11,447.85
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Mandor
Satuan
Bahan
oh
1.0000
85,700.00
85,700.00
Precast HCS
m2
1.0000
265,000.00
265,000.00
Sub Total
350,700.00
Total
350,700.00
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Pekerja
Tukang batu
Tukang besi
Kepala tukang
Mandor
oh
oh
oh
oh
oh
3.9000
0.3500
1.0500
0.2450
0.1650
55,800.00
65,800.00
65,800.00
75,700.00
85,700.00
217,620.00
23,030.00
69,090.00
18,546.50
14,140.50
Bahan
Semen Portland (PC)
Pasir beton
Koral Beton
Besi beton
kawat beton
kg
m3
m3
kg
kg
232.0000
0.5200
0.7800
150.0000
2.2500
1,200.00
177,000.00
210,600.00
10,126.00
12,000.00
278,400.00
92,040.00
164,268.00
1,518,900.00
27,000.00
Alat Bantu
Ember aduk
Pacul
Sekop
bh
bh
bh
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
Sub Total
2,430,760.00
Total
2,430,760.00
No.
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Pekerja
Tukang batu
Tukang besi
Kepala tukang
Mandor
oh
oh
oh
oh
oh
3.9000
0.3500
1.0500
0.2450
0.1650
55,800.00
65,800.00
65,800.00
75,700.00
85,700.00
217,620.00
23,030.00
69,090.00
18,546.50
14,140.50
Bahan
Semen Portland (PC)
Pasir beton
Koral Beton
Besi beton
kawat beton
kg
m3
m3
kg
kg
232.0000
0.5200
0.7800
150.0000
2.2500
1,200.00
177,000.00
210,600.00
10,126.00
12,000.00
278,400.00
92,040.00
164,268.00
1,518,900.00
27,000.00
Alat Bantu
Ember aduk
Pacul
Sekop
bh
bh
bh
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
Sub Total
2,430,760.00
Total
2,430,760.00
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Pekerja
Tukang batu
Kepala Tukang
Mandor
oh
oh
oh
oh
1.6500
0.2500
0.0250
0.0800
55,800.00
65,800.00
75,700.00
85,700.00
92,070.00
16,450.00
1,892.50
6,856.00
Bahan
Semen Portland (PC)
Pasir beton
Koral Beton
kg
m3
m3
218.0000
0.5200
0.8700
1,200.00
177,000.00
210,600.00
261,600.00
92,040.00
183,222.00
Alat Bantu
Ember aduk
Pacul
Sekop
bh
bh
bh
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
Sub Total
661,855.50
Total
661,855.50
PEKERJAAN KONSTRUKSI
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Pekerja
Tukang batu
Kepala Tukang
Mandor
oh
oh
oh
oh
2.0000
0.3500
0.0350
1.0000
55,800.00
65,800.00
75,700.00
85,700.00
111,600.00
23,030.00
2,649.50
85,700.00
Bahan
Semen Portland (PC)
Pasir beton
Koral Beton
Pelapis Kedap air (MU 600)
kg
m3
m3
kg
400.0000
0.4800
0.8000
1.2000
1,200.00
177,000.00
210,600.00
23,200.00
480,000.00
84,960.00
168,480.00
27,840.00
Alat Bantu
Ember aduk
Pacul
Sekop
bh
bh
bh
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
Sub Total
991,984.50
Total
991,984.50
No.
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Pekerja
Tukang batu
Kepala Tukang
Mandor
oh
oh
oh
oh
2.0000
0.3500
0.0350
1.0000
55,800.00
65,800.00
75,700.00
85,700.00
111,600.00
23,030.00
2,649.50
85,700.00
Bahan
Semen Portland (PC)
Pasir beton
Koral Beton
kg
m3
m3
400.0000
0.4800
0.8000
1,200.00
177,000.00
210,600.00
480,000.00
84,960.00
168,480.00
kg
1.2000
23,200.00
27,840.00
Alat Bantu
Ember aduk
Pacul
Sekop
bh
bh
bh
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
Sub Total
991,984.50
Total
991,984.50
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
oh
oh
oh
oh
oh
oh
8.8500
0.3500
1.5600
1.4000
0.3310
0.1700
55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00
493,830.00
23,030.00
102,648.00
92,120.00
25,056.70
14,569.00
Bahan
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Koral beton
m3
kg
Lt
kg
kg
kg
m3
m3
0.2700
2.0000
0.6000
351.0000
3.0000
323.0000
0.5200
0.7800
2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
712,860.75
23,220.00
12,915.00
3,554,226.00
36,000.00
387,600.00
92,040.00
164,268.00
Alat Bantu
Ember aduk
Pacul
Sekop
bh
bh
bh
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
Sub Total
5,742,108.45
Total
5,742,108.45
Boq No
Pekerjaan
:
:
:
:
Volume
Total Biaya
No.
Uraian
Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Satuan
oh
oh
oh
oh
oh
oh
Bahan
Kayu terentang
m3
Paku biasa 2"-5"
kg
Minyak bekisting
Lt
Besi beton
kg
Kawat beton
kg
Semen portland
kg
Pasir beton
m3
Koral beton
m3
Kayu borneo balok
m3
Plywood 9 mm
lbr
Dolken kayu galam -8-10/4 Mbtg
Alat Bantu
Ember aduk
Pacul
Sekop
(260 Kg besi)
m3
Rp 7,312,626.50
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
11.3000
0.3500
3.3000
2.1000
0.5700
0.2500
55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00
630,540.00
23,030.00
217,140.00
138,180.00
43,149.00
21,425.00
0.4000
4.0000
2.0000
260.0000
4.5000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
5,055,750.00
230,522.00
9,500.00
1,056,090.00
46,440.00
43,050.00
2,632,760.00
54,000.00
387,600.00
92,040.00
164,268.00
758,362.50
806,827.00
190,000.00
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
bh
bh
bh
Sub Total
7,312,626.50
Total
7,312,626.50
No.
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
Uraian
Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Satuan
oh
oh
oh
oh
oh
oh
Koef
Harga Satuan
( Rp )
9.9600
0.3500
2.8000
1.4000
0.4550
0.2080
55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00
Jumlah
( Rp )
555,768.00
23,030.00
184,240.00
92,120.00
34,443.50
17,825.60
Bahan
Kayu terentang
m3
Paku biasa 2"-5"
kg
Minyak bekisting
Lt
Besi beton
kg
Kawat beton
kg
Semen portland
kg
Pasir beton
m3
Koral beton
m3
Kayu borneo balok
m3
Plywood 9 mm
lbr
Dolken kayu galam -8-10/4 Mbtg
Alat Bantu
Ember aduk
Pacul
Sekop
0.3200
3.2000
1.6000
185.0000
3.0000
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
5,055,750.00
230,522.00
9,500.00
844,872.00
37,152.00
34,440.00
1,873,310.00
36,000.00
387,600.00
92,040.00
164,268.00
707,805.00
645,461.60
152,000.00
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
bh
bh
bh
Sub Total
5,890,100.70
Total
5,890,100.70
No.
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
Uraian
Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Satuan
oh
oh
oh
oh
oh
oh
Bahan
Kayu terentang
m3
Paku biasa 2"-5"
kg
Minyak bekisting
Lt
Besi beton
kg
Kawat beton
kg
Semen portland
kg
Pasir beton
m3
Koral beton
m3
Kayu borneo balok
m3
Plywood 9 mm
lbr
Dolken kayu galam -8-10/4 Mbtg
Alat Bantu
Ember aduk
Pacul
Sekop
bh
bh
bh
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
9.9600
0.3500
2.3000
1.4000
0.4050
0.2020
55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00
555,768.00
23,030.00
151,340.00
92,120.00
30,658.50
17,311.40
0.2500
3.0000
1.2000
200.0000
3.0000
323.0000
0.5200
0.7800
0.1050
2.5000
14.0000
2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
5,055,750.00
230,522.00
9,500.00
660,056.25
34,830.00
25,830.00
2,025,200.00
36,000.00
387,600.00
92,040.00
164,268.00
530,853.75
576,305.00
133,000.00
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
Sub Total
5,543,935.90
Total
5,543,935.90
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Satuan
oh
oh
oh
oh
oh
oh
Bahan
Kayu terentang
m3
Paku biasa 2"-5"
kg
Minyak bekisting
Lt
Semen Portland (PC)
kg
Pasir beton
m3
Koral Beton
m3
Grouting StoCrete NSG-H
kg
Besi beton
kg
kawat beton
kg
Kayu borneo balok
m3
Plywood 9 mm
lbr
Dolken kayu galam -8-10/4 Mbtg
Alat Bantu
Ember aduk
Pacul
Sekop
bh
bh
bh
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
11.3000
0.3500
3.3000
2.1000
0.5700
0.2500
55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00
630,540.00
23,030.00
217,140.00
138,180.00
43,149.00
21,425.00
0.4000
4.0000
2.0000
400.0000
0.4000
0.8200
80.0000
180.0000
2.2500
0.1500
3.5000
20.0000
2,640,225.00
11,610.00
21,525.00
1,200.00
177,000.00
210,600.00
4,600.00
10,126.00
12,000.00
5,055,750.00
230,522.00
9,500.00
1,056,090.00
46,440.00
43,050.00
480,000.00
70,800.00
172,692.00
368,000.00
1,822,680.00
27,000.00
758,362.50
806,827.00
5,651,941.50
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
Sub Total
12,385,072.00
Total
12,385,072.00
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Satuan
oh
oh
oh
oh
oh
oh
Bahan
Kayu terentang
m3
Paku biasa 2"-5"
kg
Minyak bekisting
lt
Besi beton polos
kg
kawat beton
kg
Semen Portland (PC)
kg
Pasir beton
m3
Koral Beton
m3
Kayu borneo balok
m3
Plywood 9 mm
lbr
Dolken kayu galam -8-10/4 Mbtg
Storox - 100
kg
Alat Bantu
Ember aduk
Pacul
Sekop
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
5.6000
0.3500
2.6400
1.0500
0.4000
0.1930
55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00
312,480.00
23,030.00
173,712.00
69,090.00
30,280.00
16,540.10
0.2400
3.2000
1.6000
150.0000
2.2500
323.0000
0.5200
0.7800
0.1600
2.8000
2.4000
1.2000
2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
5,055,750.00
230,522.00
9,500.00
23,200.00
633,654.00
37,152.00
34,440.00
1,518,900.00
27,000.00
387,600.00
92,040.00
164,268.00
808,920.00
645,461.60
22,800.00
27,840.00
1.0000
0.0250
0.0150
6,000.00
45,000.00
40,000.00
6,000.00
1,125.00
600.00
bh
bh
bh
Sub Total
5,032,932.70
Total
5,032,932.70
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Upah bor + pasang
ttk
1.0000
9,500.00
9,500.00
Bahan
FTR - 19
ttk
1.0000
30,960.00
30,960.00
Sub Total
40,460.00
Total
40,460.00
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Upah bor + pasang
ttk
1.0000
6,000.00
6,000.00
Bahan
FTR M12
RM 12
pc
pc
1.0000
1.0000
13,800.00
24,195.00
13,800.00
24,195.00
Sub Total
43,995.00
Total
43,995.00
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Upah bor + pasang
ttk
1.0000
8,000.00
8,000.00
Bahan
FTR M16
RM 16
Pc
Pc
1.0000
1.0000
24,150.00
35,640.00
24,150.00
35,640.00
Sub Total
67,790.00
Total
67,790.00
Boq No
Pekerjaan
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Upah bor + pasang
ttk
1.0000
10,000.00
10,000.00
Bahan
FTR M20
RM 20
Pc
Pc
1.0000
1.0000
44,850.00
49,200.00
44,850.00
49,200.00
Sub Total
104,050.00
Total
104,050.00
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Upah
Bahan
Stocrete NSG-H
Standard non shrink grout
25 Kg / zak
zak
Koef
Harga Satuan
( Rp )
1.0000
69,000.00
Jumlah
( Rp )
69,000.00
Sub Total
69,000.00
Total
69,000.00
Boq No
Pekerjaan
:
:
:
:
Volume
Total Biaya
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
Upah
Pekerja
Tukang Baja
Mandor Baja
oh
oh
oh
0.0200
0.0200
0.0700
55,800.00
90,000.00
115,000.00
1,116.00
1,800.00
8,050.00
Bahan
Besi Profil WF
Meni besi
Genzet 20KVa
Travo Las
Mata Gerinda
Mata Bor
Kawat Las
Baut dia 12mm-1"
Kg
Kg
unit
unit
bh
bh
kg
bh
1.1000
0.0800
0.0020
0.0010
0.0030
0.0030
0.0030
0.1500
11,700.00
12,000.00
100,000.00
100,000.00
20,000.00
25,000.00
20,000.00
1,500.00
12,870.00
960.00
200.00
100.00
60.00
75.00
60.00
225.00
Upah Erection+Transport
Transport
Pekerja
Tukang Baja
Mandor Baja
kg
oh
oh
oh
1.0000
0.0100
0.0050
0.0020
1,455.00
55,800.00
90,000.00
115,000.00
1,455.00
558.00
450.00
230.00
Sub Total
28,209.00
Total
28,209.00
No.
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
Uraian
Upah
Pekerja
Tukang kayu
Kepala tukang
mandor
Satuan
oh
oh
oh
oh
Bahan
kayu terentang
m3
paku biasa 2"-5"
kg
lt
Minyak bekisting
m3
Balok kayu borneo
lbr
Plywood tebal 9mm
Dolken kayu galam -8-10/4 Mbtg
Koef
Harga Satuan
( Rp )
Jumlah
( Rp )
0.5760
0.4800
0.0480
0.0100
55,800.00
65,800.00
75,700.00
85,700.00
32,140.80
31,584.00
3,633.60
857.00
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
2,640,225.00
11,610.00
21,525.00
5,055,750.00
230,522.00
9,500.00
105,609.00
4,644.00
4,305.00
75,836.25
80,682.70
57,000.00
Alat Bantu
Palu
Gergaji
bh
bh
0.0100
0.0100
9,000.00
25,000.00
90.00
250.00
Sub Total
0.58
396,632.35
Total
396,632.35
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
unit
Harga Satuan
( Rp )
1.0000
300,000.00
Jumlah
( Rp )
300,000.00
Sub Total
300,000.00
Total
300,000.00
Boq No
Pekerjaan
:
:
Volume
Total Biaya
:
:
No.
Uraian
Satuan
Koef
Harga Satuan
( Rp )
1.0000
1,100,000.00
Jumlah
( Rp )
1,100,000.00
Sub Total
1,100,000.00
Total
1,100,000.00