You are on page 1of 35

ANALISA PERHITUNGAN

SLOOF
BALOK

A. HARGA

PONDASI

P. BATU KALI
P. BORED PILE

P. PLAT 2

KOLOM
WF
PLAT LANTAI

S6
S7

S8
By : Budi Santoso, ST

BATU KALI
BORED PILE
PLAT 2

ANALISA PERHITUNGAN :
TULANGAN UTAMA
13
mm
Diameter
Panjang tul
135.750 m
Volume tul
141.373 kg
SENGKANG (TUMPUAN)
Diameter
8
Jarak
150
Pjg total
68.952
Volume tul
27.194

DATA SLOOF

MENU

Tump
D

2
8

D
150

D
D
200

13
13

Lap
mm
mm
m
kg

TUMPUAN

mm
mm
m
kg

HASIL :
Vol tulangan
Vol beton
Kg/m3

2
3
8

LAPANGAN

INSERT PANJANG :
SENGKANG (LAPANGAN)
Diameter
8
Jarak
200
Pjg total
77.064
Volume tul
30.393

Atas
Bawah
Sengkang

30.000

198.959 kg
1.350 m3
147.38 kg/m3

M
SLOOF S1
KET :
B
H
Luas

0.15 m
0.30 m
0.05 m2

ANALISA HARGA :
13
13

Harga :

Rp

7,751,846.41

DATA BALOK

ANALISA PERHITUNGAN :
TULANGAN UTAMA
Diameter
13
Panjang tul
Volume tul

mm

4.000 m
4.166 kg

SENGKANG (TUMPUAN)
Diameter
8
mm
Jarak
Pjg total
Volume tul

150

TUMPUAN

LAPANGAN

5.856 m

1.000

INSERT PANJANG :
HASIL :

SENGKANG (LAPANGAN)

Vol tulangan

Diameter

Vol beton

Jarak

mm

Pjg total

200 mm
4.88 m

Volume tul

1.925 kg

Atas

13

Bawah
Sengkang

13

150

BALOK BP1
KET :

mm

2.310 kg

ANALISA HARGA :

Kg/m3

0.40 m

0.20 m
0.08 m2

Luas
8.400 kg
0.080 m3
104.997 kg/m3

Harga

Lap

Tump

13

13

200

Rp

471,208.06

DATA KOLOM

ANALISA PERHITUNGAN :
TULANGAN UTAMA
Diameter
16
Panjang tul
Volume tul
SENGKANG
Diameter

9.465

mm
mm

Panjang tul
Volume tul

13.781

kg

16

150

m
INSERT PANJANG :

1.000

HASIL :

KET :

Vol tulangan

Tul utama

6 D16

Sengkang

8-125

MENU

16

D
Sengkang

kg

16

KOLOM K1

150
8.736

Jarak

ANALISA HARGA :

Tul Utama

mm

Vol beton
Kg/m3

23.247 kg

0.100 m3

232.466 kg/m3

Luas

0.25 m
0.40 m
0.10 m2

Harga

Rp

731,262.65

WF 150 x 75

HITUNG :

HASIL :
Berat wf

TULANGAN UTAMA (T1)


Diameter

10 mm

Pjg tul utama


Atas
Samping

2.00

ANALISA HARGA :

Tot pjg

6.00 m'
3.70 kg

Harga Wf

Rp

394,926.00

Beton

Rp

10,513.83

Jumlah

Rp

405,439.83

Ukuran

Wf 75 x 150

Tul atas

2 P 10

Tul bwh

2 P 10

Panjang Tul

Tul samping

2 P 10

Volume tul

Sengkang

8-300

0.217

0.135

Section area
m'

mm
m
3 m
1.18 kg

WF
A balok

1.000

4.881

Bawah

SENGKANG (T2)
Diameter
8.00
Jarak
300

Input panjang

0.002

Vol tulangan
2.00 m'
2.00 m'

Volume tul
Ket :

14.0000

Vol beton

A balok/cm2
A Wf

0.0293 m2
17.8500

cm2

292.9500 cm2
0.0275 m2

Unit weight

14.0000 kg

Volume tul

4.8805 kg

Volume Wf

0.0275 m3

Berat Wf

14.0000 kg

kg
m3
kg

PLAT TYPE S6
LX

LY

Tebal plat

0.15

HITUNG :
Arah Y >

10-300

10

300

6.282

31.41

19.356 kg

Arah Y <

12-150

12

150

1.01

8.08

7.170 kg

Arah Y <

12-150

12

150

1.01

8.08

7.170 kg

Arah X >

12-150

12

150

2.154

17.232

15.291 kg

Arah X >

12-150

12

150

1.077

8.616

7.646 kg

Arah X >

12-150

12

150

1.077

8.616

7.646 kg
64.278 kg

HASIL :
Vol tulangan

64.278 kg

Vol beton

0.15 m3

Kg/m3

428.5169492 kg/m3

ANALISA HARGA :
Harga

Rp

364,614.00

PLAT S7
Mesh

M8-150

Berat mesh

61.790

kg

Luas Mesh

8.50

m2

1.00

1.00

Tebal plat

0.150

Luas plat
Luas bekisting

m
1.000 m2
1.6 m2

Kebutuhan Mesh
Mesh/lbr
Mesh/kg

1.000 lbr
61.79 kg

Vol mesh

123.58 kg

Volume beton

0.150 m3

PLAT S8
Mesh

M6-150

Berat mesh

34.760

kg

Luas Mesh

8.50

m2

1.00

1.00

Tebal plat

0.150

Luas plat
Luas bekisting

m
1.000 m2
1.6 m2

Kebutuhan Mesh
Mesh/lbr
Mesh/kg

1.000 lbr
34.76 kg

Vol mesh

69.52 kg

Volume beton

0.150 m3

PONDASI BATU KALI

INSERT PANJANG :

1.000

HITUNG :

Urugan Pasir
B1

0.700

B1'

0.797

T1

0.145

Luas

0.109 m2

Volume

0.109 m3

Batu Pecah
B2

0.797

B2'

0.897

T2

0.150

Luas

0.127 m2

Volume

0.127 m3

Batu Kali
B3

0.600

B3'

0.250

T3

0.525

Luas

0.223 m2

Volume

0.223 m3

MENU
HASIL :

Tanah Urug

Volume

B3

0.148

Galian tanah

0.798 m3

B3'

0.498

Urugan pasir

0.109 m3

T3

0.525

Pasangan pondasi

0.223 m3

Urugan tanah kembali

0.339 m3

Luas

0.339 m2

Volume

0.339 m3
ANALISA HARGA :
Galian tanah

Rp

Urugan pasir

Rp

19,654.91

Pasangan pondasi

Rp

138,437.79

Urugan tanah kembali

Rp

5,345.65

Rp

207,938.14

Jumlah Total

44,499.78

PONDASI PLAT TYPE 2


Lebar telapak :

Tul Bgkk
Diameter

Jumlah Pond. Plat

n tul

HITUNG :

HASIL :
13
4

Volume

mm

Panjang tul

9.492 m

Volume tul

9.885 kg

Volume

0.560 m3

Tul Lrs
Diameter
n tul

Volume

13
4

mm

Pjg total
3.353

1.020
2.040 m3

6.706 m3
171.745 kg

MENU

7.544 m

Volume tul

ANALISA HARGA :

7.856 kg

6.706 m3

Volume Beton
Volume

2.040 m3

Vol tulangan

Sengkang Klm
Luas

0.560 m3

Urugan tanah kembali


0.280

Tanah Urug
Luas

9.307 m3

Urugan pasir
Volume beton

Urugan Pasir
Luas

Galian tanah

Galian tanah

Rp

Urugan pasir

Rp

101,489.66

Rp

6,497,016.48

519,080.85

Diameter

13

mm

# 1 Volume beton

Jarak

100

mm

# 1 Urugan tanah kembali

Rp

105,706.05

25.574 m

# 0

Rp

7,223,293.03

26.633 kg

Pjg total
Volume tul

# 4

Sengkang Tlpk
Diameter

13

mm

# 1

Jarak

150

mm

# 0

Pjg total
Volume tul

61.152 m
127.370 kg

Jumlah Total

BORED PILE

HITUNG :

ANALISA HARGA :

Ket :

TULANGAN UTAMA (T1)


Diameter
16

Pengeboran

Rp

104,201,826.30

Beton

Rp

120,794,473.80

Tulangan

Rp

107,291,602.31

Jumlah Total Rp

332,287,902.41

Tul utama

D16

Sengkang

8-150

Panjang tul

Diameter

0.6

Input pjg

30.000

m'

Jumlah PB

13.000

bh

Volume tul

Panjang tul

Tul Utama

19

10

6203.66 kg

SENGKANG SPIRAL
Diameter
8
Jarak

DATA PB

Volume tul

mm
3932.5 m

mm

150

mm
7347.600 m

2,897.776 kg
HASIL :

Sengkang spiral

Vol beton

150

Vol tulangan

PILE CAP

HITUNG :

Ket :

SENGKANG
Panjang tot

Diameter

13

mm

Jarak
B

150
1.5

mm
m

1.5

0.6

Panjang Skg 3.6

110.214
9101.436

HASIL :
Vol beton
260 m

Vol tulangan

17.55
270.769

m3
kg

m3
kg

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

MENU
Boq No
Pekerjaan
Jenis Pekerjaan
Volume
Total Biaya

No.

Uraian

Upah Pekerja
Tk. Gali tanah
Mandor

Bahan

Alat Bantu
Pacul
Benang rami

:
:
:
:
:

Satuan

F-3 Pekerjaan Struktur


A. PEKERJAAN TANAH
Pekerjaan Galian Tanah
m3
Rp
55,774.10

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

oh
oh

0.7350
0.0730

65,800.00
85,700.00

48,363.00
6,256.10

bh
glg

0.0250
0.0150

45,000.00
2,000.00

1,125.00
30.00

Sub Total

55,774.10

Total

55,774.10

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Upah Pekerja
Tk. Gali tanah
Mandor

Bahan

Alat Bantu
Pacul
Pengki

Satuan

F-3 Pekerjaan Struktur


A. PEKERJAAN TANAH
Pekerjaan Urugan Tanah
m3
Rp
15,761.90

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

oh
oh

0.1920
0.0190

65,800.00
85,700.00

12,633.60
1,628.30

bh
bh

0.0250
0.0150

45,000.00
25,000.00

1,125.00
375.00

Sub Total

15,761.90

Total

15,761.90

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


A. PEKERJAAN TANAH
Pekerjaan Urugan Pasir Bawah Pondasi
m3
Rp
181,097.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah Pekerja
Pekerja
Mandor

oh
oh

0.3000
0.0100

55,800.00
85,700.00

16,740.00
857.00

Bahan
Pasir urug

m3

1.2000

135,000.00

162,000.00

Alat Bantu
Pacul
Pengki

bh
bh

0.0250
0.0150

45,000.00
25,000.00

1,125.00
375.00

Sub Total

181,097.00

Total

181,097.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


A. PEKERJAAN TANAH
Pekerjaan Urugan Pasir Bawah Lantai
m3
Rp
181,097.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah Pekerja
Pekerja
Mandor

oh
oh

0.3000
0.0100

55,800.00
85,700.00

16,740.00
857.00

Bahan
Pasir urug

m3

1.2000

135,000.00

162,000.00

Alat Bantu
Pacul
Pengki

bh
bh

0.0250
0.0150

45,000.00
25,000.00

1,125.00
375.00

Sub Total

181,097.00

Total

181,097.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Upah Pekerja
Pekerja
Mandor

Bahan

Alat Bantu
Pacul
Pengki

Satuan

F-3 Pekerjaan Struktur


A. PEKERJAAN TANAH
Pembuangan Tanah Sejauh 200 meter
m3
Rp
55,425.40

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

oh
oh

0.6880
0.0500

55,800.00
85,700.00

38,390.40
4,285.00

bh
bh

0.2000
0.1500

45,000.00
25,000.00

9,000.00
3,750.00

Sub Total

55,425.40

Total

55,425.40

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

No.

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

Uraian

Satuan

F-3 Pekerjaan Struktur


B. PEKERJAAN PONDASI
Pondasi Batu Kali
(150 kg besi + bekisting)
m3
Rp
620,449.50

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah Pekerja
Pekerja
Tukang batu
Kepala tukang
Mandor

oh
oh
oh
oh

1.5000
0.6000
0.0600
0.0750

55,800.00
65,800.00
75,700.00
85,700.00

83,700.00
39,480.00
4,542.00
6,427.50

Bahan
Batu belah 15/20 cm
Semen Portland (PC)
Pasir Pasang

m3
Kg
m3

1.1000
163.0000
0.5200

165,000.00
1,200.00
185,000.00

181,500.00
195,600.00
96,200.00

Alat Bantu
Ember aduk
Pacul
Sekop

bh
bh
bh

1.0000
0.1000
0.1000

6,000.00
45,000.00
25,000.00

6,000.00
4,500.00
2,500.00

Sub Total

620,449.50

Total

620,449.50

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


B. PEKERJAAN PONDASI
Pondasi Plat Gabungan (PC 1)
(150 kg besi + bekisting)
m3
Rp 3,190,087.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah Pekerja
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

oh
oh
oh
oh
oh
oh

4.3000
0.3500
1.0400
1.0500
0.2450
0.1650

55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00

239,940.00
23,030.00
68,432.00
69,090.00
18,546.50
14,140.50

Bahan
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Koral beton
Benang rami

m3
Kg
kg
Kg
Kg
Kg
m3
m3
glg

0.2000
1.5000
0.4000
150.0000
2.2500
323.0000
0.5200
0.7800
0.0150

2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
2,000.00

528,045.00
17,415.00
8,610.00
1,518,900.00
27,000.00
387,600.00
92,040.00
164,268.00
30.00

Alat Bantu
Ember aduk
Pacul
Sekop

bh
bh
bh

1.0000
0.1000
0.1000

6,000.00
45,000.00
25,000.00

6,000.00
4,500.00
2,500.00

Sub Total

3,190,087.00

Total

3,190,087.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

No.

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

Uraian

Upah Pekerja
Pekerja

Satuan

oh

F-3 Pekerjaan Struktur


B. PEKERJAAN PONDASI
Pondasi Plat 1 (PP 1)
(150 kg besi + bekisting)
m3
Rp 3,184,812.00

Koef

Harga Satuan
( Rp )

4.3000

55,800.00

Jumlah
( Rp )

239,940.00

Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

oh
oh
oh
oh
oh

0.3500
1.0400
1.0500
0.2450
0.1650

65,800.00
65,800.00
65,800.00
75,700.00
85,700.00

23,030.00
68,432.00
69,090.00
18,546.50
14,140.50

Bahan
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Koral beton
Benang rami

m3
kg
Lt
kg
kg
kg
m3
m3
glg

0.2000
1.5000
0.4000
150.0000
2.2500
323.0000
0.5200
0.7800
0.0150

2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
2,000.00

528,045.00
17,415.00
8,610.00
1,518,900.00
27,000.00
387,600.00
92,040.00
164,268.00
30.00

Alat Bantu
Ember aduk
Pacul
Sekop

bh
bh
bh

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

Sub Total

3,184,812.00

Total

3,184,812.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

No.

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

Uraian

Satuan

F-3 Pekerjaan Struktur


B. PEKERJAAN PONDASI
Pondasi Plat 2 (PP 2)
(150 kg besi + bekisting)
m3
Rp 3,184,812.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah Pekerja
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

oh
oh
oh
oh
oh
oh

4.3000
0.3500
1.0400
1.0500
0.2450
0.1650

55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00

239,940.00
23,030.00
68,432.00
69,090.00
18,546.50
14,140.50

Bahan
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Koral beton
Benang rami

m3
kg
Lt
kg
kg
kg
m3
m3
glg

0.2000
1.5000
0.4000
150.0000
2.2500
323.0000
0.5200
0.7800
0.0150

2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
2,000.00

528,045.00
17,415.00
8,610.00
1,518,900.00
27,000.00
387,600.00
92,040.00
164,268.00
30.00

Alat Bantu
Ember aduk

bh

1.0000

6,000.00

6,000.00

Pacul
Sekop

bh
bh

0.0250
0.0150

45,000.00
40,000.00

1,125.00
600.00

Sub Total

3,184,812.00

Total

3,184,812.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


B. PEKERJAAN PONDASI
Pondasi Bor Piled ( D30cm)
Pengeboran D30 cm /m', Bored Pile
m'
Rp
97,603.60

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Tukang gali
Mandor

oh
oh

0.1600
0.0080

65,800.00
85,700.00

10,528.00
685.60

Alat Bantu
Crawler Crane
Mesin Bor

jam
jam

0.1300
0.1300

322,000.00
215,000.00

41,860.00
27,950.00

Lain-lain
Oli+Solar
Alat Bantu

ls
ls

1.0000
0.2200

13,500.00
14,000.00

13,500.00
3,080.00

Sub Total

97,603.60

Total

97,603.60

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

No.

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

Uraian

Upah
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

oh
oh
oh
oh

F-3 Pekerjaan Struktur


B. PEKERJAAN PONDASI
Pondasi Bor Piled ( D30cm)
Beton D30cm /m3, Bored Pile
m3
Rp
945,450.00

Koef

Harga Satuan
( Rp )

2.1000
0.3500
0.0350
0.1050

55,800.00
65,800.00
75,700.00
85,700.00

Jumlah
( Rp )

117,180.00
23,030.00
2,649.50
8,998.50

Bahan
Semen Portland (PC)
Pasir Beton
Koral Beton

kg
m3
m3

448.0000
0.4000
0.8200

1,200.00
177,000.00
210,600.00

537,600.00
70,800.00
172,692.00

1.0000

12,500.00

12,500.00

Lain-lain
Alat Bantu : Pipa Tremi+CasinglsPelindung
Sub Total

945,450.00

Total

945,450.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


B. PEKERJAAN PONDASI
Pondasi Bor Piled ( D30cm)
Pembesian Bored Pile /kg
kg
Rp
11,447.85

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Tukang besi
Mandor

oh
oh

0.0050
0.0005

65,800.00
85,700.00

329.00
42.85

Bahan
Besi Beton Ulir
Kawat Beton
Kawat Las
Kawat Gantung

kg
ls
ls
ls

1.0000
1.0000
1.0000
1.0000

10,126.00
250.00
100.00
600.00

10,126.00
250.00
100.00
600.00

Sub Total

11,447.85

Total

11,447.85

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Mandor

Satuan

F-3 Pekerjaan Struktur


C. PEKERJAAN LANTAI
Precast Plat Lantai HCS
m2
Rp
350,700.00

Bahan

oh

1.0000

85,700.00

85,700.00

Precast HCS

m2

1.0000

265,000.00

265,000.00

Sub Total

350,700.00

Total

350,700.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


C. PEKERJAAN LANTAI
Floor Lantai Dasar Adukan K 275
1 m3 Beton Ad. 1 : 2 : 3 (150 Kg besi)
m3
Rp 2,430,760.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Pekerja
Tukang batu
Tukang besi
Kepala tukang
Mandor

oh
oh
oh
oh
oh

3.9000
0.3500
1.0500
0.2450
0.1650

55,800.00
65,800.00
65,800.00
75,700.00
85,700.00

217,620.00
23,030.00
69,090.00
18,546.50
14,140.50

Bahan
Semen Portland (PC)
Pasir beton
Koral Beton
Besi beton
kawat beton

kg
m3
m3
kg
kg

232.0000
0.5200
0.7800
150.0000
2.2500

1,200.00
177,000.00
210,600.00
10,126.00
12,000.00

278,400.00
92,040.00
164,268.00
1,518,900.00
27,000.00

Alat Bantu
Ember aduk
Pacul
Sekop

bh
bh
bh

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

Sub Total

2,430,760.00

Total

2,430,760.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

No.

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

Uraian

Satuan

F-3 Pekerjaan Struktur


C. PEKERJAAN LANTAI
Floor Lantai Adukan K 275
1 m3 Beton Ad. 1 : 2 : 3 (150 Kg besi)
m3
Rp 2,430,760.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Pekerja
Tukang batu
Tukang besi
Kepala tukang
Mandor

oh
oh
oh
oh
oh

3.9000
0.3500
1.0500
0.2450
0.1650

55,800.00
65,800.00
65,800.00
75,700.00
85,700.00

217,620.00
23,030.00
69,090.00
18,546.50
14,140.50

Bahan
Semen Portland (PC)
Pasir beton
Koral Beton
Besi beton
kawat beton

kg
m3
m3
kg
kg

232.0000
0.5200
0.7800
150.0000
2.2500

1,200.00
177,000.00
210,600.00
10,126.00
12,000.00

278,400.00
92,040.00
164,268.00
1,518,900.00
27,000.00

Alat Bantu
Ember aduk
Pacul
Sekop

bh
bh
bh

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

Sub Total

2,430,760.00

Total

2,430,760.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


C. PEKERJAAN LANTAI
Beton Tumbuk, 1Pc : 3Ps : 5Kr
m3
Rp
661,855.50

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Pekerja
Tukang batu
Kepala Tukang
Mandor

oh
oh
oh
oh

1.6500
0.2500
0.0250
0.0800

55,800.00
65,800.00
75,700.00
85,700.00

92,070.00
16,450.00
1,892.50
6,856.00

Bahan
Semen Portland (PC)
Pasir beton
Koral Beton

kg
m3
m3

218.0000
0.5200
0.8700

1,200.00
177,000.00
210,600.00

261,600.00
92,040.00
183,222.00

Alat Bantu
Ember aduk
Pacul
Sekop

bh
bh
bh

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

Sub Total

661,855.50

Total

661,855.50

ANALISA PERHITUNGAN UPAH DAN BAHAN

PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


C. PEKERJAAN LANTAI
Pekerjaan Lapisan Beton Kedap Air (Eskalator)
m3
Rp
991,984.50

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Pekerja
Tukang batu
Kepala Tukang
Mandor

oh
oh
oh
oh

2.0000
0.3500
0.0350
1.0000

55,800.00
65,800.00
75,700.00
85,700.00

111,600.00
23,030.00
2,649.50
85,700.00

Bahan
Semen Portland (PC)
Pasir beton
Koral Beton
Pelapis Kedap air (MU 600)

kg
m3
m3
kg

400.0000
0.4800
0.8000
1.2000

1,200.00
177,000.00
210,600.00
23,200.00

480,000.00
84,960.00
168,480.00
27,840.00

Alat Bantu
Ember aduk
Pacul
Sekop

bh
bh
bh

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

Sub Total

991,984.50

Total

991,984.50

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

No.

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

Uraian

Satuan

F-3 Pekerjaan Struktur


C. PEKERJAAN LANTAI
Pekerjaan Lapisan Beton Kedap Air (Lift)
m3
Rp
991,984.50

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Pekerja
Tukang batu
Kepala Tukang
Mandor

oh
oh
oh
oh

2.0000
0.3500
0.0350
1.0000

55,800.00
65,800.00
75,700.00
85,700.00

111,600.00
23,030.00
2,649.50
85,700.00

Bahan
Semen Portland (PC)
Pasir beton
Koral Beton

kg
m3
m3

400.0000
0.4800
0.8000

1,200.00
177,000.00
210,600.00

480,000.00
84,960.00
168,480.00

Pelapis Kedap air (MU 600)

kg

1.2000

23,200.00

27,840.00

Alat Bantu
Ember aduk
Pacul
Sekop

bh
bh
bh

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

Sub Total

991,984.50

Total

991,984.50

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


D. PEKERJAAN BETON BERTULANG
Beton Bertulang Sloof + Bekisting
(351 Kg besi)
m3
Rp 5,742,108.45

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

oh
oh
oh
oh
oh
oh

8.8500
0.3500
1.5600
1.4000
0.3310
0.1700

55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00

493,830.00
23,030.00
102,648.00
92,120.00
25,056.70
14,569.00

Bahan
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Besi beton
Kawat beton
Semen portland
Pasir beton
Koral beton

m3
kg
Lt
kg
kg
kg
m3
m3

0.2700
2.0000
0.6000
351.0000
3.0000
323.0000
0.5200
0.7800

2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00

712,860.75
23,220.00
12,915.00
3,554,226.00
36,000.00
387,600.00
92,040.00
164,268.00

Alat Bantu
Ember aduk
Pacul
Sekop

bh
bh
bh

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

Sub Total

5,742,108.45

Total

5,742,108.45

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

F-3 Pekerjaan Struktur


D. PEKERJAAN BETON BERTULANG
Beton Bertulang Kolom + Bekisting

:
:

Volume
Total Biaya

No.

Uraian

Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

oh
oh
oh
oh
oh
oh

Bahan
Kayu terentang
m3
Paku biasa 2"-5"
kg
Minyak bekisting
Lt
Besi beton
kg
Kawat beton
kg
Semen portland
kg
Pasir beton
m3
Koral beton
m3
Kayu borneo balok
m3
Plywood 9 mm
lbr
Dolken kayu galam -8-10/4 Mbtg
Alat Bantu
Ember aduk
Pacul
Sekop

(260 Kg besi)
m3
Rp 7,312,626.50

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

11.3000
0.3500
3.3000
2.1000
0.5700
0.2500

55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00

630,540.00
23,030.00
217,140.00
138,180.00
43,149.00
21,425.00

0.4000
4.0000
2.0000
260.0000
4.5000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000

2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
5,055,750.00
230,522.00
9,500.00

1,056,090.00
46,440.00
43,050.00
2,632,760.00
54,000.00
387,600.00
92,040.00
164,268.00
758,362.50
806,827.00
190,000.00

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

bh
bh
bh

Sub Total

7,312,626.50

Total

7,312,626.50

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

No.

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

Uraian

Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

oh
oh
oh
oh
oh
oh

F-3 Pekerjaan Struktur


D. PEKERJAAN BETON BERTULANG
Beton Bertulang Balok+ Bekisting
(185 Kg besi)
m3
Rp 5,890,100.70

Koef

Harga Satuan
( Rp )

9.9600
0.3500
2.8000
1.4000
0.4550
0.2080

55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00

Jumlah
( Rp )

555,768.00
23,030.00
184,240.00
92,120.00
34,443.50
17,825.60

Bahan
Kayu terentang
m3
Paku biasa 2"-5"
kg
Minyak bekisting
Lt
Besi beton
kg
Kawat beton
kg
Semen portland
kg
Pasir beton
m3
Koral beton
m3
Kayu borneo balok
m3
Plywood 9 mm
lbr
Dolken kayu galam -8-10/4 Mbtg
Alat Bantu
Ember aduk
Pacul
Sekop

0.3200
3.2000
1.6000
185.0000
3.0000
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000

2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
5,055,750.00
230,522.00
9,500.00

844,872.00
37,152.00
34,440.00
1,873,310.00
36,000.00
387,600.00
92,040.00
164,268.00
707,805.00
645,461.60
152,000.00

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

bh
bh
bh

Sub Total

5,890,100.70

Total

5,890,100.70

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

No.

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

Uraian

Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

oh
oh
oh
oh
oh
oh

Bahan
Kayu terentang
m3
Paku biasa 2"-5"
kg
Minyak bekisting
Lt
Besi beton
kg
Kawat beton
kg
Semen portland
kg
Pasir beton
m3
Koral beton
m3
Kayu borneo balok
m3
Plywood 9 mm
lbr
Dolken kayu galam -8-10/4 Mbtg
Alat Bantu
Ember aduk
Pacul
Sekop

bh
bh
bh

F-3 Pekerjaan Struktur


D. PEKERJAAN BETON BERTULANG
Beton Bertulang Tangga+ Bekisting
(200 Kg besi)
m3
Rp 5,543,935.90

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

9.9600
0.3500
2.3000
1.4000
0.4050
0.2020

55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00

555,768.00
23,030.00
151,340.00
92,120.00
30,658.50
17,311.40

0.2500
3.0000
1.2000
200.0000
3.0000
323.0000
0.5200
0.7800
0.1050
2.5000
14.0000

2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
5,055,750.00
230,522.00
9,500.00

660,056.25
34,830.00
25,830.00
2,025,200.00
36,000.00
387,600.00
92,040.00
164,268.00
530,853.75
576,305.00
133,000.00

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

Sub Total

5,543,935.90

Total

5,543,935.90

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

oh
oh
oh
oh
oh
oh

Bahan
Kayu terentang
m3
Paku biasa 2"-5"
kg
Minyak bekisting
Lt
Semen Portland (PC)
kg
Pasir beton
m3
Koral Beton
m3
Grouting StoCrete NSG-H
kg
Besi beton
kg
kawat beton
kg
Kayu borneo balok
m3
Plywood 9 mm
lbr
Dolken kayu galam -8-10/4 Mbtg
Alat Bantu
Ember aduk
Pacul
Sekop

bh
bh
bh

F-3 Pekerjaan Struktur


D. PEKERJAAN BETON BERTULANG
Beton Mutu K 275 u/ Perkuatan Kolom
(180 Kg besi)
m3
Rp 12,385,072.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

11.3000
0.3500
3.3000
2.1000
0.5700
0.2500

55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00

630,540.00
23,030.00
217,140.00
138,180.00
43,149.00
21,425.00

0.4000
4.0000
2.0000
400.0000
0.4000
0.8200
80.0000
180.0000
2.2500
0.1500
3.5000
20.0000

2,640,225.00
11,610.00
21,525.00
1,200.00
177,000.00
210,600.00
4,600.00
10,126.00
12,000.00
5,055,750.00
230,522.00
9,500.00

1,056,090.00
46,440.00
43,050.00
480,000.00
70,800.00
172,692.00
368,000.00
1,822,680.00
27,000.00
758,362.50
806,827.00
5,651,941.50

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

Sub Total

12,385,072.00

Total

12,385,072.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

F-3 Pekerjaan Struktur


D. PEKERJAAN BETON BERTULANG
Dinding Beton Bertulang + Bekisting
(150 Kg besi)
m3
Rp 5,032,932.70

No.

Uraian

Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

oh
oh
oh
oh
oh
oh

Bahan
Kayu terentang
m3
Paku biasa 2"-5"
kg
Minyak bekisting
lt
Besi beton polos
kg
kawat beton
kg
Semen Portland (PC)
kg
Pasir beton
m3
Koral Beton
m3
Kayu borneo balok
m3
Plywood 9 mm
lbr
Dolken kayu galam -8-10/4 Mbtg
Storox - 100
kg
Alat Bantu
Ember aduk
Pacul
Sekop

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

5.6000
0.3500
2.6400
1.0500
0.4000
0.1930

55,800.00
65,800.00
65,800.00
65,800.00
75,700.00
85,700.00

312,480.00
23,030.00
173,712.00
69,090.00
30,280.00
16,540.10

0.2400
3.2000
1.6000
150.0000
2.2500
323.0000
0.5200
0.7800
0.1600
2.8000
2.4000
1.2000

2,640,225.00
11,610.00
21,525.00
10,126.00
12,000.00
1,200.00
177,000.00
210,600.00
5,055,750.00
230,522.00
9,500.00
23,200.00

633,654.00
37,152.00
34,440.00
1,518,900.00
27,000.00
387,600.00
92,040.00
164,268.00
808,920.00
645,461.60
22,800.00
27,840.00

1.0000
0.0250
0.0150

6,000.00
45,000.00
40,000.00

6,000.00
1,125.00
600.00

bh
bh
bh

Sub Total

5,032,932.70

Total

5,032,932.70

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


E. PEK. CHEMICAL ANCHOR (MERK FISCHER)
Fischer injection mortar FIS VT 380 C
ttk
Rp
40,460.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Upah bor + pasang

ttk

1.0000

9,500.00

9,500.00

Bahan
FTR - 19

ttk

1.0000

30,960.00

30,960.00

Sub Total

40,460.00

Total

40,460.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


E. PEK. CHEMICAL ANCHOR (MERK FISCHER)
Thereaded Rod + Fischer Chamical
Capsul RM ( FTR M12 )
ttk
Rp
43,995.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Upah bor + pasang

ttk

1.0000

6,000.00

6,000.00

Bahan
FTR M12
RM 12

pc
pc

1.0000
1.0000

13,800.00
24,195.00

13,800.00
24,195.00

Sub Total

43,995.00

Total

43,995.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

F-3 Pekerjaan Struktur


E. PEK. CHEMICAL ANCHOR (MERK FISCHER)
Thereaded Rod + Fischer Chamical
Capsul RM ( FTR M16 )
ttk
Rp
67,790.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Upah bor + pasang

ttk

1.0000

8,000.00

8,000.00

Bahan
FTR M16
RM 16

Pc
Pc

1.0000
1.0000

24,150.00
35,640.00

24,150.00
35,640.00

Sub Total

67,790.00

Total

67,790.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No

F-3 Pekerjaan Struktur

Pekerjaan

Volume
Total Biaya

:
:

No.

Uraian

Satuan

E. PEK. CHEMICAL ANCHOR (MERK FISCHER)


Thereaded Rod + Fischer Chamical
Capsul RM ( FTR M20 )
ttk
Rp
104,050.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Upah bor + pasang

ttk

1.0000

10,000.00

10,000.00

Bahan
FTR M20
RM 20

Pc
Pc

1.0000
1.0000

44,850.00
49,200.00

44,850.00
49,200.00

Sub Total

104,050.00

Total

104,050.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

Upah

Bahan
Stocrete NSG-H
Standard non shrink grout
25 Kg / zak

zak

F-3 Pekerjaan Struktur


E. PEK. CHEMICAL ANCHOR (MERK FISCHER)
Grouting
zak
Rp
69,000.00

Koef

Harga Satuan
( Rp )

1.0000

69,000.00

Jumlah
( Rp )

69,000.00

Sub Total

69,000.00

Total

69,000.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

F-3 Pekerjaan Struktur


F. PEKERJAAN BESI

:
:

Volume
Total Biaya

No.

Uraian

Satuan

Pemasangan Rangka Baja


kg
Rp
28,209.00

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

Upah
Pekerja
Tukang Baja
Mandor Baja

oh
oh
oh

0.0200
0.0200
0.0700

55,800.00
90,000.00
115,000.00

1,116.00
1,800.00
8,050.00

Bahan
Besi Profil WF
Meni besi
Genzet 20KVa
Travo Las
Mata Gerinda
Mata Bor
Kawat Las
Baut dia 12mm-1"

Kg
Kg
unit
unit
bh
bh
kg
bh

1.1000
0.0800
0.0020
0.0010
0.0030
0.0030
0.0030
0.1500

11,700.00
12,000.00
100,000.00
100,000.00
20,000.00
25,000.00
20,000.00
1,500.00

12,870.00
960.00
200.00
100.00
60.00
75.00
60.00
225.00

Upah Erection+Transport
Transport
Pekerja
Tukang Baja
Mandor Baja

kg
oh
oh
oh

1.0000
0.0100
0.0050
0.0020

1,455.00
55,800.00
90,000.00
115,000.00

1,455.00
558.00
450.00
230.00

Sub Total

28,209.00

Total

28,209.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

No.

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

Uraian

Upah
Pekerja
Tukang kayu
Kepala tukang
mandor

Satuan

oh
oh
oh
oh

Bahan
kayu terentang
m3
paku biasa 2"-5"
kg
lt
Minyak bekisting
m3
Balok kayu borneo
lbr
Plywood tebal 9mm
Dolken kayu galam -8-10/4 Mbtg

F-3 Pekerjaan Struktur


G. PEKERJAAN BEKISTING
Pasang dan Bongkar Bekisting
m3
Rp
396,632.35

Koef

Harga Satuan
( Rp )

Jumlah
( Rp )

0.5760
0.4800
0.0480
0.0100

55,800.00
65,800.00
75,700.00
85,700.00

32,140.80
31,584.00
3,633.60
857.00

0.0400
0.4000
0.2000
0.0150
0.3500
6.0000

2,640,225.00
11,610.00
21,525.00
5,055,750.00
230,522.00
9,500.00

105,609.00
4,644.00
4,305.00
75,836.25
80,682.70
57,000.00

Alat Bantu
Palu
Gergaji

bh
bh

0.0100
0.0100

9,000.00
25,000.00

90.00
250.00

Sub Total

0.58
396,632.35

Total

396,632.35

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

COLT DIESEL FE 74 / 125 PS


Capacity 7 ton
Dimensi Bak 14.538 m3

F-3 Pekerjaan Struktur


H. PEKERJAAN SEWA ALAT
COLT DIESEL FE 74 / 125 PS
unit
Rp
300,000.00

Koef

unit

Harga Satuan
( Rp )

1.0000

300,000.00

Jumlah
( Rp )

300,000.00

Sub Total

300,000.00

Total

300,000.00

ANALISA PERHITUNGAN UPAH DAN BAHAN


PEKERJAAN KONSTRUKSI

Boq No
Pekerjaan

:
:

Volume
Total Biaya

:
:

No.

Uraian

Satuan

HINO TRACTOR HEAD FM 320 P unit


Capacity 7 ton
Dimensi Bak 14.538 m3

F-3 Pekerjaan Struktur


H. PEKERJAAN SEWA ALAT
HINO TRACTOR HEAD FM 320 P
unit
Rp 1,100,000.00

Koef

Harga Satuan
( Rp )

1.0000

1,100,000.00

Jumlah
( Rp )

1,100,000.00

Sub Total

1,100,000.00

Total

1,100,000.00

You might also like