Date Recorded
04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013
JSA Nomor
22
Bagian/Unit Kerja
Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction Construction
Activity
Loading, Unloading, & Stringging Pipa 24" Inch Unloading Pipa 24" inch Lowering Pipa 24" Inch Pengelasan Pipa 24 Inch Blasting, Coating & Wrapping Pipa Loading, Unloading & Stringging Pipa 24" Inch Clearing Menggunakan Excavator dan Manual Penggalian dan Penimbunan Pengelasan Pipa 24 Inch Clearing untuk pembuatan Stock Pile & mini stock pile Auger Boring Radiography Clearing Menggunakan Excavator dan Manual Soil Investigation Test (Bore Hole) Push Pull menggunakan Excavator dan Roller Loading, Unloading & Stringging Pipa 24" Inch Pabrikasi Pabrikasi Loading, Unloading, dan Stringging Pipa 24" Inch Auger Boring
Location
P. Batu - Alaban P.Batu & Tjg. Beringin KM 209+250 ke 205+800 & KM 240+350 ke 238+800 KM 177+800 ke 170+000 & KM 170+000 ke 160+000 KM 179+800 ke 176+000 & KM 201+800 ke 200+600, P. Buaya KM 176+000 ke 170+000,KM 215+000 ke 208+800,KM 160+000 ke 170+000 KM 174+900 ke KM 172+000 Alaban KM 176+400 ke 172+000 & KM 214+000 ke 210+000 KM 170+000 ke KM 160+000 (Belawan-B.Selamat) Kuala Langsa & Alur Pemaban (KM 2,5 & KM 130) Belawan-Sungai Karang (KM 243+300) KM 176 ke 168 & KM 239 ke 204 KM 128+650(Tjg.Sementok) ke 100+010(Pgk. Kelapa) KM 196+465 & KM 196+482 (PURAKA II) KM 214+970 ke KM 213+400 (Buluh Telang) P. Batu - Alaban Stock Pile P. Batu Stock Pile Langsa KM 160+700 (Harumsari) ke KM 155+000 (Sejahtera) Belawan - Tjg. Beringin (KM 225+600)
Supervisi
Andy Aditya Ade Kusnady Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya Andy Aditya
Type of SIKA
Dingin Dingin Dingin Panas Dingin Dingin Dingin Dingin Panas Dingin Panas Dingin Dingin Dingin Dingin Dingin Panas Panas Dingin Panas
From
04 October 2013 25 October 2013 28 October 2013 28 October 2013 28 October 2013 28 October 2013 28 October 2013 28 October 2013 28 October 2013 28 October 2013 28 October 2013 28 October 2013 29 October 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013 04 November 2013
To
03 November 2013 24 November 2013 10 November 2013 10 November 2013 10 November 2013 10 November 2013 10 November 2013 10 November 2013 10 November 2013 10 November 2013 10 November 2013 10 November 2013 10 November 2013 09 November 2013 10 November 2013 17 November 2013 10 November 2013 10 November 2013 17 November 2013 10 November 2013 Close Open Open Open Open Open Open Open Open Open Close Open Open Open Open Open Open Open Open Open
Status
Extended to 06/HSE/NOP/2013 Continue Continue Continue Continue Continue Continue Continue Continue Continue Complete Continue Continue New Permit New Permit New Permit New Permit New Permit New Permit New Permit
Open 6 13
Close 1
#REF! Prepared by, #REF! #REF! Approved by, #REF! Acknowledge by
TOTAL SIKA
19
1
Dede Syahputra Permit Controll
Aulia Dinata
HSE Koordinator
Keterangan
Date Recorded
11 November 2013 11 November 2013
SIKA No.
JSA Nomor
51 52
Open 6 13
TOTAL SIKA
19
KCS KONSORSIUM GAS TRANSMISSION PIPELINE 24" x 268 KM ARUN - BELAWAN PROJECT
Periode : 11 November 2013
Bagian/Unit Kerja
Construction Construction
Activity
Loading dan Unloading Pipa mini stock pile Thrust Boring
Location
KM 130 (Alur Pemaban) KM 239 (Kuala Madu)
Close 1
#REF! Prepared by, #REF!
1
Dede Syahputra Permit Controll
Supervisi
Andy Aditya Andy Aditya
Type of SIKA
Dingin Panas
From
06 November 2013 06 November 2013
To
17 November 2013 17 November 2013 Open Open
Statu
epared by,
e Syahputra
Aulia Dinata
HSE Koordinator
mit Controll
Status
Keterangan