FOOTING

CF-2

CF-2

CF-2

CF-3

CF-1

DESIGN OF COMBINED FOOTING 2 (CF-2)


Take d = 375 mm
H = 375+75 = 450 mm
Allowable Soil Bearing Pressure
Qa = 70 kpa
fy = 276 Mpa
fc = 20.7 Mpa
2
= 15 kN / m
Depth of excavation = 1.5 mts.
P = 603.99 + 827.35 + 424.41
P = 1,855.75 kN
Effective soil bearing capacity
Qe = Qa - h
Qe = 70 23.5(0.45) 15(1.5 0.45)
2
Qe = 43.675 KN / m
Actual width of combined footing
1,855.75
10.5 W =
43.675
W = 4.05 mts.
Say W = 4.10 mts

Soil Bearing Pressure

Pu = 1.7(603.99)+1.7(827.35)+1.7(424.41)
Pu = 3,154.775 kN
Qu =

3,154.775
( 4.10)(10.5)

Qu = 73.282 kN/ m

Vu6

1m

0.775 m

Vu5
Check d for Punching Shear
Vu = 827.35 73.282(0.775)(0.775)
Vu = 783.335 kN

Vu4
0.775 m

8.5 m

Capacity of Section
1
) 20.7 [775(4)](375)
3
Vc = 1,498.57 kN > Vu therefore OK
Vc = 0.85(

Check d for One-Way Shear


Vu1 = -73.282(0.625)(4.1) = -187.785 kN
Vu2 = 603.99 73.282(1.775)(4.1) = 70.68 kN
Vu3 = 603.99 73.282(4.675)(4.1) = -800.6 kN
Vu4 = 424.41 73.282(4.675)(4.1) = -980.2 kN
Vu5 = 424.41 73.282(1.775)(4.1) = -108.9 kN
Vu6 = -73.282(0.625)(4.1) = -187.785 kN

Vu3
Vu2
0.775 m
Vu1
1m
0.775
4.10 mts

Max Vu = 980.2 kN
1
) 20.7 (4,100)(375)
6
Vc = 990.99 kN > Vu therefore OK
Vc = 0.85(

ADOPT 4.10 mts x 10.5 mts combined footing