You are on page 1of 1

Al Hamd Oil Field

Well No. (Al Hamd-7)


(Deviated, max. 49 @ 1100 mt)

RKB= 22.22 mt

ABANDONMENT WELL PROFILE

WTR Depth= 36 mt

24" C.P. @ 88 mt

KOP @ 170 mt
3

RD

CEMENT PLUG @ 200 mt (+ 100 MT CMT)

13 3/8" CSG @ 495 mt


(K-55, 68 PPF, 37 jts)

Belayim P.I.:
(1060-1045 mt)
2

ND

15 mt

CEMENT PLUG @ 1100 mt (+ 100 MT CMT)

Squeezed Belayim P.I.:


(1080-1070 mt)
(1107-1091 mt)

CMT RETAINER @ 1150 mt (NEW)

L. Miocene P.I.:
(1218-1207 mt)

11 mt

(1238-1231 mt)

7 mt

(1289-1267 mt)

22 mt

1ST CEMENT PLUG @ 1310 mt (+ 150 MT CMT)

PBTD @ 1310 mt
CMT RETAINER @ 1314 mt

(OLD)

Squeezed P.I.:
(1329-1326 mt)
9 5/8" CSG @ 1500 mt
(N-80, 40 lb/ft, 128 JTs)

Prepared By: Eng. Mohsen Ahmed

T.D. @ 1500 mt

You might also like