G.P.

C DAILY DRILLING REPORT


EASTERN DESERT REPORT NO:24 FIELD: AL HAMD WELL: AL HAMD 3 RIG: ADMARINE-3, ORKB S.L:24.58 MT, RKB S.L:32.3 MT

SPUD IN DATE: 2/04/2013 DATE OF REPORT: 18/04/2013 MORNING DEPTH:


BIT NO. SIZE TYPE S. / NO. NOZZLES PUMP ( G.P.M ) PRESS., PSI W.O.B ( KLB ) ROP ( M/Hr ) R.P.M HOURS DEPTH IN (Mt) DEPTH Out (Mt) DRLD. ( MT ) TORQUE, KLB.FT T. BIT REV., K WT BELOW JAR , KLBs BHA LENGTH , MT BHA WEIGHT , KLBs

MID NIGHT DEPTH: DATE OF OPERs.: 17/04/2013

PROGRESS

OPERATION @ 6:00 AM: CIR.

MUD TYPE : MUD WT. (ppg) VISCOSITY PV YP LSYP GELS FLUID LOSS API F. CAKE MBT, PPB ALKALINITY MUD Pf/Mf CHLORIDES, PPM PH HARDNESS, mg/L WATER CONT %

GPC REPRESENTATIVE :- ENG: SAMY SALAH ENG :- MOHAMMED ELSABAA, HASSAN ELGANINY PETROLEUM ENG:- WAEL ALI, HOSAM AWAD

RECEIVED
DIESEL , LIT CEMENT, SKs BARITE , SKS

USED
3498

ON HAND
101293 1303 603

DAILY MUD COSTS CUM. MUD COSTS

41.43 69442.216

BHA: 8 1/2" JUNK MILL + BIT SUB + 6 x 6 1/2" D/C + 9 x 5" HWDP + 5" D/P TO SURFACE

TIME FROM

HRs. HRs TO OPERATIONS

00:00 01:00 04:00 10:00

01:00 04:00 10:00 11:00

1.0 3.0 6.0 1.0

CONT'D POOH W/ 5" D/P TO SURFACE & L/D HALL STINGER. P/U & M/U 8 1/2" NAPESCO JUNK MILL & RIH W/ SAME TO 660 MT CONT . W.O.C ( TOTAL 24 HRS ). DISPLACED HOLE W/SEA WATER & CONT'D RIH W/8 1/2" NAPESCO JUNK MILL + 6 X 6 1/2" D/C + 9 X 5" HWDP + 5" D/PS , TAGGED TOC @ 810 MT. CIRC. & TESTED CSG W/1000 PSI "HOLD OK" AFTER 24 HRS WOC , D.O.C FROM 810 MT TO 944 MT ** D.O.CMT PARAMETERS ( 50 RPM , 15 KLB W.O.B , 250 GPM ) ** SWEPT HOLE W/15 BBL H.V.P EVERY STAND .

11:00

11:30

0.5

11:30

24:00

12.5

TOTAL HRs.

THIS AM
00:00 03:30 3.5 CONT'D D.O.C TO 957 MT ( 949 MT ORKB , 2 MT BELOW PERF. ) CIRC. &MANY TIMES TRIED TO TEST CSG W/ 500 PSI , FOUND PRESS. DECREASED TO 50 PSI IN 5 MIN ** R/UP HALL. PUMP , TESTED LINES T/2500 PSI OK , TRIED TO PUMP WATER W/ .25 BBL/MIN , PRESSURE INCREASED AFTER 3 MIN T/ 500 PSI ( PUMPED VOL.: 0.5 BBL) , STOPPED PUMP , PRESSURE DECREASED TO 50 PSI AFTER 5 MIN , REPEATED THIS TEST THREE TIMES , SAME RESULTS. CONT'D D.O.C 3 MT TO 960 MT ( 952 MT ORKB , 5 MT BELOW PERF. )

03:30

04:30

1.0

04:30

06:00

1.5 6.0

TOTAL HRs.

SAMY SALAH
GPC REPRESENTATIVE ENG./ SAMY SALAH