You are on page 1of 27

Group-7

Slide-1

Group-7

Slide-2

Group-7

Slide-3

Group-7

Slide-4

Group-7

Slide-5

Group-7

Slide-6

Group-7

Slide-7

Group-7

Slide-8

Group-7

Slide-9

Group-7

Slide-10

Group-7

Slide-11

Group-7

Slide-12

Group-7

Slide-13

Group-7

Slide-14

Group-7

Slide-15

Group-7

Slide-16

Group-7

Slide-17

Group-7

Slide-18

Group-7

Slide-19

Group-7

Slide-20

Group-7

Slide-21

Group-7

Slide-22

Group-7

Slide-23

S.No. 1 2 3 4

Particulars

AFBC 1.5 2m/s Required 700 950OC Small quantity Low grade fuel can be used 97%

PF Boiler 6m/s Not required 1100 1300OC Small quantity Only high grade fuel should be used 99.5%

CFBC 5-6m/s Required 700 950OC Very high Low grade as well as multi grade fuel 99%

Flue gas velocity in furnace


Bed material Bed temperature Refractory

Fuel flexibility

Combustion Efficiency

Group-7

Slide-24

S.No.
7

Particulars
Boiler Size

AFBC
Small & medium

PF Boiler
Big

CFBC
Big or small

Fuel with alpha quartz


Operation with variation of load Make-up of bed material Response time Start-up process

Can be used
Frequent load variation can lead to clinker formation Regular make-up to maintain bed height Lower

Can be used

Cannot be used

10 11 12

Fuel will be Frequent & Large load controlled from mill variations can be according to the load sustained variations Only at the time of No bed starting Better than AFBC but Faster less than PF Boiler Manual start-up Auto start-up with burner management

Manual start-up (Because of risk of clinker formation)