Assignment (In a Group of Maximum 6 Students) 1.

The three reservoirs are connected by 28-cm unfinished concrete pipe which with a roughness coefficient of 1 as in Figure 1. Based on the data given, compute the steady flow rate of water at 20 oC in all pipes.

Figure 1 L1 = 95 m; Z1 = 25 m; L2 = 125 m; L3 = 160 m Z2 = 115 m; Z3 = 85 m

2. Water is flowing in the piping system shown in the Figure 2. By using Hardy Cross Method, determine the flow distribution.

Figure 2 Submission Date: 20th December 2013 (Friday) by 5 pm. Copy Works will be penalty with 0%.