Jam Kerja Pemasangan & Pembongkaran Scaffolding No Capacity Diameter Tinggi (m^3) (m) (m) 20000 48.51 10.

97 Tinggi (feet) 36 Keliling (m) 152.4 Keliling Jumlah Section Total Jumlah Jam Kerja Jumlah Hari (feet) per 1 keliling tangki Section Ex Scaffolding 500 71 497 696 87

16

Catatan 1m= 3.28084 feet Jam Kerja Scafolding per section 7 x 5 x 5 feet Perancah >6 bag panjang Pasang Bongkar 0.9 0.5 Total 1.4

Jumlah Hari Total Hari In Scaffolding 66 153