Checked by : DA
A. INPUT
kip 1000 lb
knot 0.5144
m
sec
1. Barge Particulars :
2
Length
L := 381.4 m
S := 31384 m
Beam
B := 64 m
Ac := 5000 m
Depth
D := 38 m
Ca := 0.0004
Draft (mean)
d := 11 m
Barge displacement
:= 259361 tonne
Appendage allowance(%)
Tow speed
Vt := 5 knot
Ap := 5
Dk := 0
2. Environment :
Vc := 0.5
Current speed
Vw := 10
Wind velocity
:= 1.279 10
Water density
:= 1.025 tonne m
sec
m
Kinematic viscosity
sec
ft sec
B. OUTPUT
1. Barge Resistance :
Resistance of the barge is estimated from the parent barge data published in "Resistance of Offshore
Barges and Required Tug Horsepower" by Graham J. Blight & R.Y.T.Dai, OTC Paper 3320, 1978.
The resistance coefficient curve of the parent barge is as shown below:
Lm := 623 ft
vrl :=
i
Bm := 140 ft
Ct :=
i
dm := 25.32 ft
x := vrl
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
Net speed,
0.009033
0.006896
0.005714
0.005545
0.005724
0.006000
0.006441
0.006896
m := 60962 tonne
i := 1 .. 8
knot
ft
9.5 10
9 10
8.5 10
8 10
Cti
7.5 10
7 10
3
6.5 10
3
V := Vt + V
6c10
3
5.5 10
0.05
0.094
Page 1 of 5
0.4
Total resistance coefficient for the barge corresponding to the required V/Sq(L) is estimated by
linear interpolation and given by
Ctm := linterp x , Ct ,
Lm
V
Ctm = 5.686 10
2.2
2.3
3.0
lbvl := 4.0
5.0
6.0
7.0
0.0
1.70
1.70
1.50
crz := 1.35
1.40
1.55
1.85
0.3
0.4
0.5
0.6
0.7
0.8
L/B and v/ L
data
crz
V
vlm :=
ft
0.5
Lm knot
vlm = 0.239
v m :=
LB m :=
Bm
LB m = 4.45
LBm
vlm
Crlbm :=
Lm
0.5
V ft
vlb :=
L knot
LB b :=
vlb = 0.169
LB b = 5.959
v b :=
LBb
vlb
Crlbb :=
dCrlbb = 2.325 10
Page 2 of 5
1000
L
B
1.9
2.0
3.0
bdvl := 4.0
5.0
6.0
15.0
0.0
0.3
0.4
0.5 crz :=
0.6
0.7
0.8
2.70
2.70
2.10
1.75
1.40
1.20
1.10
B/d and v/ L
data
crz
Bdm :=
v m :=
Bm
dm
Bdm = 5.529
Bdb :=
Bdm
vlm
Crbdm :=
v b :=
B
d
Bdb = 5.818
Bdb
vlb
Crbdb :=
dCrbdb = 2.003 10
3.0
4.0
6.0
cvvl := 8.0
10.0
12.0
14.0
0.0
0.3
0.4
0.5 crz :=
0.6
0.7
0.8
0.40
0.48
0.78
1.45
2.30
3.55
5.25
Page 3 of 5
crz
3
Cvm :=
1000 35 ft tonne
Cvb :=
Lm
v m :=
Cvm
vlm
Crvm :=
1000 35 ft tonne
v b :=
Cvb
vlb
Crvb :=
1000
dCrvb = 1.264 10
Cfm :=
log V Lm 2
0.075
Cfb :=
log V L 2
Cfm = 1.675 10
Cfb = 1.533 10
1.0
100
3
2
Rb := Ctb 0.5 S V
Rb = 748.702 kN
Page 4 of 5
2. Wind Resistance :
Barge Hull transv. projected area
Ab := B ( D d )
3
Ab = 1.728 10 m
Windage Area above Deck
Ac = 5 10 m
Cwind := 0.00338
Wind coefficient,
lb
2
knot ft
Wind resistance,
Rwind = 650.378 kN
3. Wave Resistance :
Based on DnV 96 : Rules for Planning and Execution of Marine Operations,
Refer section 3.3 :
f1 := 1.0m f2 := 1000
newton
_coefficients
2 B
Rwavdnv := Hs ( 0.52 L 13 f1) f2
L
Rwave = 124.394 kN
4. Total Resistance :
Rb = 748.702 kN
_barge resistance
Rwind = 650.378 kN
_wind resistance
Rwave = 124.394 kN
_wave resistance
Rsum := ( Rb + Rwave) 1 +
Rtotal :=
Ap
+R
wind
100
Rsum
_total resistance
Rtotal
BP = 200 tonne