You are on page 1of 3

3

kg COD /m /d
kg COD/d
2

9.8 m /s
0.002 m
3
1020 kg/m

g
dp
p

settling

m
2

980 kg/m
0.001002 kg/m/s
2
1.02245E-06 m /s
0.09
m/s
5.22
m/min
312.97
m/h
velocity up
68.53%
%
0.00059581
m/s
F
COD

20
40
800

Limit
2500
Required Conversion

40000

mg/L

40000

H
D:H
Base Area
velocity

6
2.38
160.00
0.13
0.0021
0.0000

m
Desired
2
=D /4
2
=F/(D /4)

recycle ratio
recycle ratio

(based on % of settling velocity)


(based on minimum fluidization velocity)
F

D2
F/(D2/4)

17.16
1.459144
20
3.142
203.6919
0.125

g/m

TRIAL CALCULATION
g
dp

9.8

m2/s

0.025

m/s
Ns/m2

1500

m
kg/m3

994

kg/m3

m2/s

0.000693

kg/m/s

m/s

14.27

mg/L
93.75%
kg/m3

u
Dp

960.00

m /h
3
kg COD/m
kg COD/hr

uD/

Re
f

mm

v
velocity

20
19200

3
(fumf2/
(spD
-pf)g
mf )*(150(1-mf)f/(fDpumff)+1.75)

(p-f)g

4958.8

mf

0.425
3
smf
1/14
s
0.930475997
1.75(fumf2/sDpmf3)
2

150(1-mf)fumf/(s Dp2mf3)
B=

B=

960400

umf2

umf
0.059580968
m/s
0.000524
Goal Seek B=0 By Changing C45

26006.37
OK

960400

umf2

26006.37

umf

umf

4958.8

(4V / H)
2
2
m
m/h
m/min
m/sec

1/2

100
90
80
70
% conversion
60
50
40
30
20
10
0
0

10

20

30

40

50

60

70

80

kg COD/m3/d