3.) I travel most often to South Grand by… (Select one) Responses
1.2%
0%
Car. 45 51.72%
Bus. 0 0% 42.5%
Bike. 4 4.60%
51.7%
Foot. 37 42.53%
Scooter or motorcycle. 1 1.15%
Other. 0 0% 4.6%0%
Totals 87 100% Car.
Bus.
Bike.
Foot.
Scooter or motorcycle.
Other.
4.) I utilize the South Grand District to… (Select all that
apply) Responses
11.2%
2.4% 18%
I shop here. 66 17.98% 13.1%
I dine here. 89 24.25% 10.1% 24.2%
I work here. 22 5.99% 11.7% 3.3%6%
I own a business here. 12 3.27% I shop here.
I live here. 43 11.72% I dine here.
I work here.
I own property here. 37 10.08% I own a business here.
I run errands here. 48 13.08% I live here.
I worship here. 9 2.45% I own property here.
I run errands here.
I visit the library. 41 11.17% I worship here.
Totals 367 100% I visit the library.
Responses 3.8%
4.1%9% 25.1%
10.1%
South Grand. 67 25.09%
Downtown St. Louis. 50 18.73% 13.9% 18.7%
0.4% 15%
Central West End. 40 14.98%
South Grand.
Clayton. 1 0.37% Downtown St. Louis.
The Loop. 37 13.86% Central West End.
Soulard. 27 10.11% Clayton.
The Loop.
Morgan Ford. 11 4.12% Soulard.
Lafayette Square. 24 8.99% Morgan Ford.
Other. 10 3.75% Lafayette Square.
Other.
Totals 267 100%
Page 2 of 11
Responses
7.) Which traffic issues concern you most along South
Grand? (Rank your top three) Responses
Page 3 of 11
8.) When you are walking on South Grand, what
concerns you most? (Rank three) Responses
16.8% 28.6%
Crossing South Grand. 75 28.63%
Crossing side streets. 12 4.58% 19.1%
4.6%
Crossing South Grand.
Too many driveways. 26 9.92% 21% 9.9%
Long wait for crossing lights. 55 20.99% Crossing side streets.
Narrow sidewalks. 50 19.08%
Personal security. 44 16.79% Too many driveways.
Totals 262 100%
Long wait for crossing
lights.
Narrow sidewalks
Responses
23.5% 0.9% 11.4%
Italian. 37 11.42% 13%
American. 42 12.96%
Ethiopian. 18 5.56% 4.6% 5.6%
4.9% 5.6%
Afghan. 18 5.56% 8.6% 21.9%
Thai. 71 21.91%
Italian. American.
Japanese. 28 8.64%
Mexican. 16 4.94% Ethiopian. Afghan.
Persian. 15 4.63% Thai. Japanese.
Vietnamese. 76 23.46% Mexican. Persian.
Gas Station. 3 0.93% Vietnamese. Gas Station.
Totals 324 100%
Page 4 of 11
11.) How do you rate the appearance of South Grand
0%
1.1%
today? (Select one) Responses 26.9%
37.6%
Very poor. 1 1.08%
Poor. 35 37.63%
Neutral. 32 34.41%
Good. 25 26.88%
Very Good. 0 0%
34.4%
Totals 93 100%
Very poor. Poor. Neutral. Good. Very Good.
Page 5 of 11
18.8%
14.) For the South Grand Business Improvement 31.2%
District, I feel the quantity of parking…(Select one) Responses
15.) Should parallel parking remain on South Grand?
(Select one) Responses 17.7%
Yes. 61 63.54%
No. 18 18.75%
I do not know, I would like to learn more. 17 17.71%
Totals 96 100% 18.8%
63.5%
16.) To increase the amount of parking, should parallel 27.1%
parking be converted to free angled parking on Arkansas
Street? (Select one) Responses 49%
Yes. 47 48.96%
No. 23 23.96%
I do not know, I would like to learn more. 26 27.08% 24%
Totals 96 100%
Yes. No. I do not know, I would like to learn more.
Page 6 of 11
Responses
16.4% 19.1%
8.2%
Keep the existing parallel parking on side st... 35 19.13%
Hartford St. 27 14.75% 11.5% 14.8%
Juniata St. 29 15.85% 14.2% 15.8%
Wyoming St. 26 14.21% Keep the existing parallel parking on side
Humphrey St. 21 11.48% st...
Hartford St.
Utah St. (east of South Grand) 15 8.20%
I do not know, I would like to learn more. 30 16.39% Juniata St.
Totals 183 100%
Wyoming St.
Humphrey St
19.6%
Responses 28.9%
A residential parking permit system in our ne... 19 19.59%
Keep the parking the same. 50 51.55%
I do not know. I would like to learn more. 28 28.87%
Totals 97 100% 51.6%
A residential parking permit system in our
ne...
Keep the parking the same.
I do not know. I would like to learn more.
19.) I prefer the city parking lots to… (Select one) Responses
26.5%
Remain as parking lots. 46 46.94%
Be small parks. 26 26.53% 46.9%
Be developed. 26 26.53%
Totals 98 100%
26.5%
Remain as parking lots.
Be small parks.
Be developed.
Page 7 of 11
20.) I think there should be a dining plaza on the west 11.3%
8.2%
side of South Grand between Connecticut and Juniata to
enhance the dining experience. (Select One) Responses
Yes. 78 80.41%
No. 8 8.25%
I do not know, I would like to learn more. 11 11.34% 80.4%
Totals 97 100%
Yes. No. I do not know, I would like to learn more.
21.) The alleys should… (Select one) Responses
10.2%
Remain as currently configured. 10 10.20% 13.3%
One or two of these alleys should be “L” sha... 13 13.27%
The three alleys shown in the diagram should... 75 76.53%
Totals 98 100%
76.5%
Remain as currently configured.
One or two of these alleys should be “L” sha...
The three alleys shown in the diagram
22.) Concerning the gas station driveways, I would… 12.4%
(Select all that apply) Responses 9.5%
47.4%
Reduce driveways on South Grand. 65 47.45%
Reduce driveways on side streets. 42 30.66% 30.7%
Keep them the same. 13 9.49%
I do not know, I would like to learn more. 17 12.41% Reduce driveways on South Grand.
Totals 137 100% Reduce driveways on side streets.
Keep them the same.
Page 8 of 11
23.) Do you support fewer bus stops along South
Responses 13.3%
Grand?(Select one)
Yes 59 60.20%
No 26 26.53%
I do not know, I would like to learn more. 13 13.27% 26.5%
Totals 98 100% 60.2%
Yes No I do not know, I would like to learn more.
24.) Which bus stops do you use? (Select all that apply) Responses
10.8%
17 10.76% 10.1%
40.5%
16 10.13% 5.7%
9 5.70%
14 8.86%
14 8.86%
8.9%
8 5.06%
2 1.27% 4.4% 4.4% 1.3% 5.1% 8.9%
7 4.43%
7 4.43% I do not use these bus stops.
I do not use these bus stops. 64 40.51%
Totals 158 100%
Responses 14.6%
Yes. 59 61.46%
No. 23 23.96%
I do not know, I would like to learn more. 14 14.58%
24%
Totals 96 100% 61.5%
Page 9 of 11
26.) The total number of travel lanes on South Grand 18.2%
should… (Select one) Responses 0%
27.) The width of the sidewalks on South Grand 0% 14.3%
should… (Select one) Responses
Remain the same (12’ width). 14 14.29%
Be increased. 84 85.71%
Be reduced. 0 0% 85.7%
Totals 98 100%
Remain the same (12’ width).
Be increased.
Be reduced.
28.) I prefer the following future street… (Rank your
top 3) Responses 14% 1.1%6.1%
1.5%
7.6%
8.3%
“No change” to South Grand. 3 1.14% 28% 12.9%
“Beautification only” option. 16 6.06% 20.4%
“More travel lanes” option. 4 1.52% “No change” to South Grand.
“No on‐street parking wider sidewalks” optio... 20 7.58%
“4‐lane basic enhancement” option. 22 8.33% “Beautification only” option.
“Trees in parking” option. 34 12.88% “More travel lanes” option.
“3‐lane basic enhancement” option. 54 20.45%
“3‐lane enhancement plus” option. 74 28.03% “No on‐street parking wider sidewalks”
“Center median” option. 37 14.02% optio...
Totals 264 100% “4 lane basic enhancement” option
Page 10 of 11
Responses 12.1% 9%
7.9%
30.) If funding is inadequate to build out the entire
corridor, I would prefer to spend the construction 22.7%
dollars… (Select one) Responses
Uniformly across all 7 blocks in order to co... 75 77.32%
Complete 2 blocks now to the desired level a... 22 22.68%
Totals 97 100%
77.3%
Uniformly across all 7 blocks in order to co...
Complete 2 blocks now to the desired level a...
Page 11 of 11