Siemens Medium Size Gas Turbine Continued Product and Operation Improvement Program Olov Andersson Dr.

Vladimir Navrotsky Scott Santamaria

Siemens Industrial Turbomachinery AB

PowerGen Europe June 08-10, 2010

Copyright Siemens AG 2010. All rights reserved.

Content Summary .................................................................................................................................... 3 Nomenclature ............................................................................................................................. 3 Introduction ................................................................................................................................ 4 Medium-sized gas turbines, operating experience ..................................................................... 5 SGT-500 ................................................................................................................................. 5 SGT-600 ................................................................................................................................. 6 SGT-700 ................................................................................................................................. 6 SGT-800 ................................................................................................................................. 6 Continued MGT performance and operation improvements ..................................................... 6 MGT Performance improvement ............................................................................................... 7 Repair and refurbishment solutions............................................................................................ 8 SGT-800 ................................................................................................................................... 11 SGT-600 ................................................................................................................................... 12 Life extension program ............................................................................................................ 13 Life-cycle extension ............................................................................................................. 13 Extension of the maintenance intervals................................................................................ 15 SGT-800 ........................................................................................................................... 15 SGT-600 ........................................................................................................................... 18 Maintainability improvement program .................................................................................... 19 Remote monitoring and condition monitoring systems (RMS/CMS).................................. 20 Maintenance tool development to improve maintainability................................................. 21 Dummy compressor casing .................................................................................................. 22 Conclusion................................................................................................................................ 23 Acknowledgment ..................................................................................................................... 23 References ................................................................................................................................ 23

Copyright Siemens AG 2010. All rights reserved.

Summary Gas turbine life cycle cost is one of the most important parameters for power plant owners, as it has significant influence on power plant profitability. The importance of power plant profitability is increasing, especially when bearing in mind dynamic market changes or unstable economic environments. This is why continued reduction of gas turbine life cycle cost should be considered as an essential contribution of the Original Equipment Manufacturer (OEM) to improvements in customer power-plant profitability and competitiveness. There are several ways in which the OEM can reduce the life-cycle cost of a gas turbine. Two areas with great impact are product performance enhancement and maintenance cost reduction. Gas turbine performance enhancement includes gas turbine efficiency improvement, power output increase and lifetime extension via installation of modified components or systems. Maintenance cost reduction is primarily achieved via repair and refurbishment of expensive gas turbine components and via reduction of maintenance scope or staff, and finally a reduction of the number of periodic overhauls included in the maintenance program. This article describes Siemens strategy for development programs and solutions in the area of life-cycle cost reduction for medium-sized gas turbines. The development programs within Siemens are strongly supported by significant service-related R&D investments and include upgrade solutions, repair solutions, life extension programs, new inspection technology and tools, as well as remote monitoring and diagnostics. Nomenclature OEM R&D MGT SGT ISO EOH TBC DLE - Original Equipment Manufacture(r), - Research and Development, - Medium-sized Gas Turbine, - Siemens Gas Turbine (SGT-500, SGT-600; ), - International Standards, - Equivalent Operating Hours, - Thermal Barrier Coating, - Dry Low Emission,

Copyright Siemens AG 2010. All rights reserved.

LTA LTE MP PTP RMS CMS cRSP KPI Introduction

- Life Time Assessment, - Life Time Extension, - Maintenance Plan, - Long Term Program, - Remote Monitoring System, - Condition Monitoring System, - Common Remote Service Platform, - Key Performance Indicators.

Siemens manufactures, on a global basis, several gas turbines ranging from 5-375 MW, see Figure 1. The Medium-sized Gas Turbines (MGT) referred to in this paper and as seen in the chart below encompass the four gas turbines manufactured in Finspong, Sweden.
SGT5-8000H SGT5-4000F SGT6-5000F SGT6-4000F SGT5-2000E SGT6-2000E SGT-800 SGT-700 SGT-600 SGT-500 SGT-400 SGT-300 SGT-200 SGT-100 168 113 47 31 25 17 13 8 7 5 Siemens range of Medium Gas Turbines 187 208 292 375

Figure 1: Siemens Utility and Industrial gas turbines. Siemens medium-sized gas turbines: SGT-500, -600, -700, -800. These four medium-sized gas turbines have a long history dating back to the 1940s. The SGT500 is the oldest industrial gas turbine currently under production at the facilities in Sweden, in commercial operation since 1955. The turbine started with 9MW of power output and throughout the years has been upgraded in several phases. The unit has just recently been upgraded and now achieves a power output of 18.5MW.

Industrial Turbines

Copyright Siemens AG 2010. All rights reserved.

The other gas turbines being produced at the aforementioned facilities have also been upgraded several times, the most recently being the SGT-800 from 45 to 47MW in 2007 and the SGT-700 from 29 to 31.2MW in 2008. Continued product upgrades and the further developments of the gas turbines have played an integral part in improving the performance, reliability and availability of the gas turbines. Future developments and upgrades of gas turbines have not only been focused on improving the performance of the gas turbines core engine, but also on reducing maintenance costs for power plant owners. Together, performance and maintenance-related developments have played an important role in reducing the life-cycle costs of gas turbines. Medium-sized gas turbines, operating experience The world-renowned Siemens products are associated with the very high levels of quality. Siemens Industrial Turbomachinery is absolutely committed to sustaining and enhancing its products. Siemens vision is to be the most responsive source of solutions to improve the customers operating-plant competitiveness and profitability. Product enhancement programs can be considered successful only if developed improvements can be demonstrated and sustained. Monitoring of gas turbine operating statistics, especially before and after improved solutions implementation, can show whether the developed improvements are successful and sustained. This is why Siemens has a solid process and tools to follow up and analyse gas turbine operating experience and statistics. The operating experience and operating statistics (defined in accordance with ISO 3977-9 [1]) presented below represents the current status of the MGT fleet at the end of December 2009. SGT-500 The current SGT-500 fleet accounts for more than 170 units, more than 70% of them in commercial operation. The total accumulated operating experience is more then 8.7 million Equivalent Operating Hours and >200 000 starts. The fleet leader has accumulated more than 180 000 EOH. The operating statistics: - Reliability Factor 98.4%; -Availability Factor 95.9%. The data from the operating statistics are based on the input from 15% of the SGT-500 fleet in commercial operation and include all types of applications and designs.

Copyright Siemens AG 2010. All rights reserved.

SGT-600 The current SGT-600 fleet accounts for more than 260 units, more than 60% of them in commercial operation. The total accumulated operating experience is more then 5.5 million Equivalent Operating Hours and >71 000 starts. The fleet leader has accumulated more than 145 000 EOH. The operating statistic: -Reliability Factor 98.9%; -Availability Factor 95.9%. The data from the operating statistics are based on the input from 40% of the SGT-600 fleet in commercial operation and include all types of applications and designs. SGT-700 The current SGT-700 fleet accounts for 34 units, 50% of them in commercial operation. The total accumulated operating experience is more than 200 000 Equivalent Operating Hours and >2 000 starts. The fleet leader has accumulated more than 40 000 EOH. The operating statistics: -Reliability Factor 99.6%; -Availability Factor 96.4%. The data from the operating statistics are based on the input from 75% of the SGT-700 fleet in commercial operation and include all types of applications and designs. SGT-800 The current fleet accounts for more than 100 units, more than 40% of them in commercial operation. The total accumulated operating experience is more than 1,000,000 Equivalent Operating Hours and >12 000 starts. The fleet leader has accumulated more than 67 000 EOH. The operating statistics show good and mature records: -Reliability Factor 99.6%; Availability Factor 97.8%. The data from the operating statistics are based on the input from 32% of the SGT-800 fleet in commercial operation and include all types of applications and designs. Continued MGT performance and operation improvements Continued enhancement of existing OEM products and services is an important part of the OEMs development efforts. In order to offer, to both future and existing users, gas turbines with high grading for efficiency, reliability, availability and maintainability at low life-cycle cost, Siemens Energy invests significantly and with continuity in the development of its products and services.

Copyright Siemens AG 2010. All rights reserved.

MGT Performance improvement The industrial gas turbine market is highly competitive. In order to maintain competitiveness, gas turbine manufacturers continually develop new as well as present fleet of gas turbines. Performance enhancements have been amongst the key areas of development for Siemens MGT turbines as they tend to reduce further the life cycle costs of gas turbines. Some examples of gas turbine performance enhancements that influence life cycle costs are power output uprates, efficiency improvements, increased fuel flexibility and lifetime extension. As part of the long-term development program for Siemens MGTs, power uprates are achieved with design changes aimed at reducing the overall $/kW, lowering the turbines overall life-cycle costs. In nearly all cases, power uprates are accompanied by efficiency increases. Increased efficiency not only lowers fuel costs, but also results in the reduction of CO2 emissions. In addition, power uprates are often accompanied by increased mass flow and exhaust temperature, which increases the total cogeneration and combined-cycle efficiency of the gas turbine (reducing CO2 emissions even further). Moreover, power upgrades can also be accompanied by the extension of the time between maintenance overhauls, which not only increases turbine availability, but also decreases service costs - Both contributing to decrease life-cycle costs. Examples of two such recent MGT power uprates follow here. Enhanced and validated in 2007, the SGT-800 is one of the latest gas turbines receiving product enhancements. Prior to the upgrade, the SGT-800 was rated at 45MW power and 37% electrical efficiency. Underlying the enhancement is a well-established operating record since commercial introduction and a detailed mapping of the hot section of the turbine. Over 1900 thermo-crystals were attached to the hot gas path components, and in addition, thermal paint and thermocouples and pressure taps were used to verify the temperature and pressure distribution in the turbine area [2]. The results showed that the amount of the cooling air required for blades and vanes could be redistributed and even saved. These savings, combined with an increase in compressor airflow of 1.5%, has been the basis for a power output increase to 47MW and an efficiency increase to 37.5% [3]. Together, the increase in mass flow, combined with an increase in exhaust heat temperature, has increased combined cycle efficiency from 53% to over 54%. Another recent enhancement to the SGT-800 is a modification of the DLE combustion system. Successful testing has shown the introduction of a passive damping of pulsations not
Copyright Siemens AG 2010. All rights reserved.

only increases emission tuning potential, but also increases the reliability and life of the combustor. The combustor modification, combined with the reduction of thermal stress in key components (blades & vanes) has led to further increase in reliability and intervals between maintenance, which in turn lowers the life-cycle cost of the gas turbine. Following the upgrade of the SGT-800, the SGT-700 was upgraded and validated in 2008. The SGT-700 was originally released at 29MW of power output and 36% electrical efficiency. An extensive program encompassing analysis of fleet data, maintenance activities and component improvements has led to an increase in power to 31.2MW and efficiency to 36.4%. In addition, both the mass flow and exhaust heat temperature have been increased, leading to an overall increase in combined-cycle efficiency from 51.5% to 52.3% [4]. As part of the upgrade validation, a comprehensive crystal test was also performed for the SGT-700. Over 700 measuring points on turbine blading showed that secondary air could be redistributed, allowing for optimal temperatures in the turbine section [4]. Other changes were also implemented during the power enhancement, such as compressor-turbine design changes and the introduction of TBC-coating at the vanes. All in all, the enhancements have once again allowed for an extension of the time between maintenance, lowering the overall lifecycle costs of the engine. These are just a few examples of Siemens long-term product enhancement program addressing gas turbine performance improvement, helping to lower the overall life-cycle gas turbine costs. As mentioned earlier, Siemens is, in addition, in the process of further upgrading its SGT-500 and SGT-600. Also, other areas in which Siemens has been carrying out extensive testing with positive results are the increased fuel flexibility of the DLE combustion systems and cyclic-based maintenance programs. Repair and refurbishment solutions Maintenance-cost reduction is primarily achieved via repair and refurbishment of expensive gas-turbine components. Replacement of the components is one of the dominating costs for maintenance of a gas-turbine-based power plant. It is concentrated around the hot gas path of the gas turbine, where the components normally require replacement on a regular basis according to a maintenance plan, but occasionally also other areas will be subject to repair, depending on operating conditions and environment.

Copyright Siemens AG 2010. All rights reserved.

The continuous development towards higher efficiency and thus higher firing temperatures has resulted in higher thermal loads on the hot gas path components. In parallel to continuous progress in materials and cooling technology, increased efforts have been made for the maintenance of these components to ensure their proper function, reliability and reasonable cost over the whole lifetime of the engine. Especially the requirements to keep environmentally friendly low-emission combustion with machines operating at lean fuel air mixture, set demands for keeping structural integrity and tight tolerances during the whole operational life. As a Siemens response to that, the development of reconditioning methods for super-alloyed materials and thermal barrier coatings has been accelerated. The main driver of these developments is maintenance-cost reduction, i.e. extension of hot gas path component lifetime without sacrificing the original mechanical and aerodynamic properties. In some cases, in addition to maintenance cost reduction, the repairs give the opportunity to shorten the delivery time of strategic components. In order to make the reconditioning procedure efficient, Siemens have established reconditioning processes for a number of hot gas path components for MGTs. This enables a consistent assessment of the components going for repair and the possibility to ensure a high quality-control level on the repaired components. It also enables process changes as a response to findings and field experience gained from further operation. The picture below (Figure: 2) shows the maintenance plan and components replacement schedule for the SGT-800 medium-size gas turbine. This maintenance plan and component replacement schedule is typical for all MGTs. In order to keep the downtime for service as short as possible, new parts are fitted at first time of replacement, and the components coming out from the engine are taken for repair. At the next overhaul, the repaired parts will be installed in the engine and the replaced components will be sent for repair.

Copyright Siemens AG 2010. All rights reserved.

Figure 2: SGT-800 Maintenance plan and component replacement schedule

The maintenance of the hot gas path components is predicted to be performed within specific intervals, depending on operating hours, cycles, environment, etc. At Siemens this is the basis for components replaced according to plan. To respond to the needs for different repair scope due to the gas turbines different operating profiles and conditions, the repair scope of hot gas path components can be broken down to different levels and activities (scope). As an example, in Figure 3 below the number of different inspection areas are shown for an annular combustor. The inspection areas shown in the figure are defined, based on all previous operating experience. Depending on the findings, the scope of repair for each combustor could be different and not all areas that are shown in the figure will be subjected to repair or replacement (cost reduction opportunities).

Figure 3: Inspection of annular combustor to identify repair scope

Copyright Siemens AG 2010. All rights reserved.

10

Apart from the hot gas path components there are also a number of other components and areas like abradable seals, honeycombs, compressor parts, etc., that will show very different wear depending on operating conditions. The decision regarding the replacement of these components will be done during the overhaul of the unit and the components are then repaired on condition. These repairs are not included in the planned activity because it is difficult to predict and forecast them. As they normally are discovered during an overhaul, a repair will require a short turn around time. In response to this, Siemens have increased their efforts in regionalization. To find, qualify and approve different repair shops globally has become an important and continuing activity at Siemens. In order to restore gas turbine performance, to reduce the maintenance cost and to extend the lifetime of compressor components, the reconditioning and repair processes are under continuous development. Siemens consider the development of repair technologies and processes as strategically important and invest significant R&D funds and efforts in this area. As an example of currently available repair capabilities for MGTs, the repair scope of SGT800 and SGT-600 gas turbine components are presented below. SGT-800 Compressor components: compressor casing and stator rings recoating of abradable coating to restore the compressor performance (restoration of radial clearance), repair of the rotor seals and stator Honeycombs. Compressor components are repaired on condition (when it is necessary). Combustor: local weld repair, exchange of outer and inner liners and front panel, TBC recoating, repairs of the burners. Developed reconditioning and repair processes of the combustion chamber are included into the standard maintenance plan. Turbine components:

Copyright Siemens AG 2010. All rights reserved.

11

Currently the following cost-reducing repair capabilities are included in the standard maintenance plan: weld repair and recoating of blade 1. The latest repair solution is based on laser welding (laser cladding) technology, weld repair of vanes 1 and 2, recoating of vanes 1 and 2, Repair of heat shields above blades 1, 2 and 3 are currently under development. SGT-600 Compressor components: blades and vanes - recoating, stator rings above blades recoating with abradable coating to restore the compressor performance, repair of the rotor seals, repair of the compressor rotors, including exchange of the compressor disks. Compressor components are repaired on components condition and are not included in the standard Maintenance Plan. Combustor: local weld repair, exchange of outer and inner liners, weld repairs of the burners, TBC recoating. Developed reconditioning and repair processes of the combustion chamber are included in the standard maintenance plan. At present the further developments of the SGT-600 combustor repair are concentrated on repair-cost reduction with the target to reduce the current repair cost by 30%. Turbine components: weld repair of blade 1 (latest solution is based on laser welding technology), recoating of blade 1, weld repair of vane 1 & 2 (latest solution), recoating of vane 1 & 2 (new environmentally friendly recoating technology is in use), repair of heat shields above blade 1 & 2 (brazing of new honeycomb).

Copyright Siemens AG 2010. All rights reserved.

12

Reconditioning and repair processes for the compressor-turbine components are included in the standard maintenance plan. Life extension program As was mentioned above, continuous improvement of the MGT fleet performance and reliability has been provided by significant R&D investments. During the last few years the MGT R&D portfolio has been extended by a number of additional projects dedicated to maintainability improvement, downtime reduction and life-cycle extension. The extension of the life-cycle of mature MGT fleet has been driven by operator demands and an aging of the fleet. A significant number of the engines in the SGT-500 and SGT-600 fleet are approaching their design life of 120,000 EOH. The latest design modifications of MGT fleets and positive operating experience give Siemens the opportunity to consider the extension of the life cycle of the engine beyond 120,000 EOH (up to 180,000 EOH, dependent on the previous operation profile and history) and to extend the maintenance intervals. Life-cycle extension The scope of the life-cycle extension is strongly dependent on the engine component condition at 120,000 EOH. The engine components condition is determined by the engine operation profile, operation history and performed maintenance. In order to keep the life-cycle extension predictable, controllable and profitable it is necessary to know the engine history and its components condition before reaching the 120,000 EOH, especially for the components that have a long lead time. Therefore, it is recommended to have two major activities within the life-cycle extension process: a major inspection that determines the general state of the engine - Lifetime Assessment (LTA) and actual Lifetime Extension (LTE) event. These two activities should be carried out separately in time. In order to minimize the downtime, the LTA should be combined with one of the standard inspections. The most suitable standard inspection for the MGT is the C-level inspection at 80,000 EOH. As an example of life-cycle extension the SGT-600 fleet-extension program is presented below [5].

Copyright Siemens AG 2010. All rights reserved.

13

The following boundary conditions were set up for SGT-600 life cycle extension: utilization of the standard SGT-600 Maintenance Plan (MP) with some extensions for LTA & LTE, utilization of the standard replacement intervals for hot gas path components (blades, vanes & combustor), LTE of the whole installation by means of extension of the lifetime of the most expensive engine parts - rotors and casings. The developed SGT-600 life-cycle extension program is applicable for the gas turbines that are running in base load operation mode. In this operation mode the dominant damage mechanism for rotors and stators is the creep. The latest tests and investigations show that the lifetime of the compressor and turbine rotors and casings can be extended beyond 120,000 EOH. The level of lifetime extension for each individual installation depends on the previous operation profile and history of this installation. The extension of the life cycle of SGT-600 from 120,000 to 180,000 EOH enables the operator to reduce the life-cycle cost by approximately 10 % (extra cost for LTA&LTE is included in the total life- cycle cost). The standard SGT-600 Maintenance schedule with added LTA & LTE milestones is presented in Figure 4.
SGT-600/GT10 Maintenance Schedule with LTA and LTE

LTE Level E + LTA Level D Level C

Level B

Level A Operation Maintenance

10

20

30

40

50

60

70

80

90 100 110 120 130 140 150 160

EOH x 1000

Figure 4: SGT-600 Maintenance schedule with LTA & LTE

The scope of inspections and activities at the LTA are as follows: inspections according to Level-E (compressor blades and vanes, turbine blades and vanes, fuel rods, couplings and gears, auxiliary systems), inspections to determine status of major components include non-destructive and destructive tests:
Copyright Siemens AG 2010. All rights reserved.

14

o non-destructive (compressor rotor, flange/bolt connections, casing positions, roundness measurements and exhaust parts), o destructive (power turbine vanes 3 and 4, power turbine blade 4). The outcome of the LTA is a tailored scope of reconditioning/ replacement during the LTE. The scope of inspections and activities at the LTE are as follows: the Level-C activities performed with some add-ons, replacements based upon LTA and Level-C inspection. The purpose of the LTE is that the gas turbine shall be fit for another 40,000+ EOH, with a potential for further life extensions in the future. The first SGT-600 life-cycle extension was done in autumn 2007, since then 10+ life cycle extensions have been done in the SGT-600 fleet. Extension of the maintenance intervals A Maintenance Plan (MP) with minimized downtime is strongly requested by all users and in particular by the oil & gas industry for both mechanical drive and power generation applications for on- and offshore installations. Currently the Maintenance intervals are extended for SGT-600 and SGT-800; SGT-500 and SGT-700 maintenance interval extension development is ongoing. As an example of maintenance-intervals extension program, the SGT-800 [5] and SGT-600 [6] extension programs are presented below. SGT-800 The latest Siemens modifications of SGT-800 engine and its hot gas path components enable not only the enhancement of power output and efficiency, but also the extension of components life and, as a result, extension of the time between overhauls. The extension of the maintenance intervals from 20,000 to 30,000 EOH enables the operator to save two level B/C overhauls by performing three overhauls instead of five (see Figure 5 and 6). For the whole life cycle, the planned outage hours were reduced by more than 30%. This modification increases the availability of the SGT-800 by about 1%. Comparison of overall maintenance duration and corresponding availabilities for MP with maintenance intervals 20,000 EOH and 30,000 EOH is presented in Table 1.

Copyright Siemens AG 2010. All rights reserved.

15

Table 1: Maintenance duration and corresponding availabilities

Overhaul intervals POH maintenance/PH*100


(POH - Planned Outage Hours; PH - Planned Hours)

20 000 EOH

30 000 EOH

1-shift: 2-shift: 2-shift (with exchange turbine module and stator 1):

3.0 % 2.3 % 2.0 %

2.0 % 1.6 % 1.4 %

Extension of the maintenance intervals and reduction of the number of major inspections (level B/C overhauls) requires more information about the engine and its components condition to mitigate the risk associated with extended maintenance interval. This is why MP with extended maintenance intervals will be offered to the customers only in conjunction with a Long Term Program (LTP) and installation of an RMS/CMS system (see below). Also, additional technical and operational requirements apply to the SGT-800 with extended maintenance intervals: base-load operation profile, latest component designs and features corresponding to 47 MW rating (standard in SGT-800 47 MW version), natural gas fuel operation no H2S in fuel, static filters (standard in SGT-800 47 MW version), air dust trap after compressor (standard in SGT-800 47 MW version), drier in exhaust (standard in SGT-800 47 MW version). The Maintenance Plan with extended intervals will initially be implemented on the 47MW SGT-800 installations, with a base-load operation profile. The development of the extension programs for other operation profiles is planned as a next step. Current MP and MP with extended maintenance intervals are shown in Figures 5 and 6.

Copyright Siemens AG 2010. All rights reserved.

16

SGT-800 basic Maintenance Plan


Level D Level C Level B Level A Operation Maintenance 10 20 30 40 50 60 70 80 90 100 110 120
Eqivalent Operating Hrs x 1000

SGT-800 Extended Intervals Maintenance Plan

Level C Level B Level A Operation Maintenance


10 20 30 40 50 60 70 80 90 100 110 120

Equivalent Operating Hours x 1000

Figure 5: SGT-800 Maintenance Plan (Maintenance interval - 20 000 EOH)

Figure 6: SGT-800 Maintenance Plan (Maintenance interval - 30 000 EOH)

The scope and duration of the different inspection levels for Maintenance Plan with extended maintenance intervals are presented in Table 2. The extended-intervals Maintenance Plan component-replacement schedule is presented in Figure 7.

Table 2: The scope and duration of the different inspection levels


Extended Intervals Maintenance Plan Activities
Equivalent Operating Hours x1000 Hours Level schedule 10 A 20 A 30 B 40 A 50 A 60 C 70 A 80 A 90 B 100 A 110 A 120 -

Level A
Expected down time incl. cooling down 1-shift 2-shift 3 days * N/A tbd Boroscope insp. of: - Compressor blading & stator - Combustion chamber - Burners - Turbine blading Inspection of: - Auxiliary systems - Electric generator

Level B
26 days** 20 days*** 16 days**** NDT of: - Turbine discs & rings Boroscope insp. of: - Compressor blading & stator Inspection of: - Turbine guide vanes and blades - Burners - Auxiliary systems - Couplings and gears - Electric generator (L4 at 90 EOH rotor extraction) See replacement schedule(Figure 11) Control system and instruments

Level C
31 days** 22 days*** 19 days**** NDT of: - Compressor blading & stator - Turbine discs & rings

2-shift, turbine module and turbine stator 1 Scope of inspection

Inspection of: - Turbine guide vanes and blades - Burners - Couplings and gears - Auxiliary systems - Electric generator (L3) See replacement schedule(Figure 11) Control system and instruments

Replacement or Recondition as required Verification

See replacement schedule (Figure 11) Control system and instruments

12 h/d

**10 h/d, 6 d/w ***10h/shift, 6 d/w ****10 h/shift, 6 d/w, exchange of turbine module and turbine stator 1

Copyright Siemens AG 2010. All rights reserved.

17

Extended Intervals Replacement Schedule


Equivalent Operating Hours x1000 Hours Level schedule 10 A
set #1 set #2 set set set set set set set set set set set set set set set set set set set set #1 #2 #3 #4 #1 #2 #3 #4 #1 #2 #3 #4 #1 #2 #3 #4 #1 #2 #3 #4

20 A

30 B
New

40 A

50 A

60 C
Recon.

70 A

80 A
Recon.

90 B

100 A
Recon

110 A

120 Recon.

Burners

Original

Combustion chamber

Original New New New Original New New New Original New New New Original New New New Original New New New Original New Original New

1st Vane

1st Blade

2nd Vane,

2nd Blade

3rd Vane 3rd Blade

set #1 set #2 set #1 set #2

Figure 7: SGT-800 extended-intervals component-replacement schedule

SGT-600 The target for SGT-600 downtime reduction was the establishment of a new MP with increased availability via planned outage hour reduction: extension of the maintenance intervals from 20,000 EOH to 30,000 EOH, reduction of the current inspections and site activities downtime: extension of shift work, reduction of the Level-A inspection from 3 days to 1 day, improvement of the maintenance processes and tools. The developed MP with maintenance intervals of 30,000 EOH will initially be implemented on the SGT-600 installations with base- load operation profile and with latest component design and features: DLE combustors (for both liquid and gas fuel) and latest component design: compressor guide vane 2, combustor design and combustor governing system, compressor turbine blade 1 & 2, compressor turbine guide vane 1 & 2,

Copyright Siemens AG 2010. All rights reserved.

18

power turbine blade 3, diffuser. The extension of the maintenance intervals from 20,000 to 30,000 EOH enables the operator to save two overhauls, performing three overhauls instead of five. Furthermore, the duration of the remaining inspections has been reduced. In total, for the whole life cycle, the planned outage hours were reduced by about 50%. This modification increases the availability of the SGT-600 by about 1%. The current MP and the MP with extended maintenance intervals are presented in Figures 8 and 9.
SGT-600 Maintenance Plan Extended Intervals Base load operation
SGT-600 Maintenance Plan Base load operation TBO 20 EOH

SGT-600 basic maintenance plan


Level D Level C Level B Level A24h Operation Maintenance
10 20 30 40 50 60 70 80 90 100 110 120 Eq. Op. Hrs x 1000

SGT-600 basic maintenance plan


Level E Level D Level C Level B Level A Operation Maintenance
10 20 30 40 50 60 70 80 90 100 110 120 Eq. Op. Hrs x 1000

Sid 8

Sid 7

Figure 8 : SGT-600 Maintenance Plan (Maintenance interval of 20,000 EOH)

Figure 9 : SGT-600 Maintenance Plan (Maintenance interval of 30,000 EOH)

Maintainability improvement program Continued improvement of the MGT performance and reliability has been supported by significant R&D investments. To meet the challenges of the market and to improve our customers operating-plant competitiveness and to ensure their mutual profitability, new and innovative maintenance concepts and appropriate technologies and tools have to be developed and employed. Thus, during the last three years, the MGT R&D portfolio has been extended by a number of additional projects dedicated to serviceability and maintainability improvement. These R&D programs include the development of maintenance tools, advanced repair, nondestructive inspection technology, remote monitoring, condition monitoring, diagnostics and new maintenance concepts including maintenance with extended intervals, cycle-based maintenance and finally condition-based maintenance [7].

Copyright Siemens AG 2010. All rights reserved.

19

Some of the results of the developments that support MGT maintainability improvement are briefly presented below. Remote monitoring and condition monitoring systems (RMS/CMS) To get more individual information about operation of each gas turbine and by doing this to be better prepared for coming maintenance, a continued monitoring of the gas turbine is very important. Continued monitoring of gas turbine operation and condition of its components enables the operator to reduce the downtime, to support flexible plant operation, to minimize the risk of plant malfunction or breakdown and, finally, to reduce the plant/gas turbine life cycle cost. STA-RMS Siemens Remote Monitoring System is a common remote and conditionmonitoring system that has been developed for all Siemens Industrial Turbomachinery rotating equipment (gas turbines, steam turbines and compressors) and provides a wide range of functionalities: monitoring, trending and analysis of main engine parameters (e.g. speed rotation, pressures, temperatures), performance monitoring and analysis, vibration monitoring and analysis, emission monitoring and analysis (for gas turbine), automatic report generation. Siemens believes that operators will have many benefits from this system as it shares accumulated OEM knowledge and experience with the operator. The most recent development of the Siemens STA-RMS (see Figure 1) provides a powerful tool for the operator to follow up his rotating equipment, predict its future maintenance and provide a way for optimization of the rotating equipment and the plant operation. The STA-RMS concept includes the following levels: Level 1 - data collection on site. Data collectors have been designed for the various types of rotating equipment for industrial applications within Siemens Energy Level 2 - data transfer and remote access. A common Siemens cRSP solution (common Remote Service platform) has been developed and implemented. Level 3 - data storage in a common Siemens Energy Industrial Applications database, RMS database.

Copyright Siemens AG 2010. All rights reserved.

20

Level 4 - data presentation in the form of graphs, KPIs (statistics), trends, automatic reports, automatic diagnostics, common Siemens Energy Industrial Applications RMS web interface. Level 5 - different plug-ins or customer support services: help desk, evaluated reporting, remote services, advanced diagnostics (under development), risk assessment, decision support, condition-based maintenance (currently under development).
Customer purchased data PGI Units at customer site Data Transmission Common Central Database Data Evaluation/ Processing

GT ST CP Other
Data Filter/ Compression for Transmission Data Collection on site

Common Top + Siemens Solution (Remote Services)

ST
AI AI AI

CP GT Other

Secure Transmission -Internet -Modem -Phone Line

-Raw Data -Std. interfaces -Std. protocols

AI

Automatic Diagnostic Algorithm

PG I1-6 24/7 Expert Centres

Level 1

Level 2

Level 3

Level 4

Level 5

Figure 10: Remote Monitoring System concept and structure

Maintenance tool development to improve maintainability Accumulated experience and analysis of performed inspections, maintenance and overhauls of the current MGT fleets showed that maintainability and maintenance down-time could be further improved by developing new maintenance tools and/or modernizing the existing tools. In Figure 8 a few examples of the maintenance tools developed for SGT-800 are presented: universal table for work with SGT-800 stators, universal lifting tool (weight 13 kg) applicable for all turbine disks replaces two existing tools weighing 50 kg each, universal location pin applicable for all possible conjugations of parts. Replaces existing two sets (each consisting of 6 pins), dummy compressor casing.

Copyright Siemens AG 2010. All rights reserved.

21

Figure 11: SGT-800 Maintenance tools: a -universal table for works with stators; b- universal lifting tool for all turbine disks; c-universal location pin

Dummy compressor casing To provide good access to compressor components during inspection and maintenance, the compressor casing has been designed with a vertically split plane. Since the compressor casing is a part of the supporting structure, one of the two vertical halves of the compressor casing always has to be assembled during compressor maintenance. As a result, the attachment of the rear inner stator requires the compressor casing to be disassembled and assembled repeatedly during the maintenance and repair of the compressor. To avoid this, a dummy compressor casing has been designed (see Figure 12). During maintenance this replaces one of the halves of the compressor casing and enables work with the rear inner stator. This allows for a reduction of down-time during level C/D inspection by approx. 1 day. Moreover, the compressor casing dummy reduces the risk of damage to blade and guide vanes.

Figure 12: SGT-800 Compressor Maintenance tool - dummy compressor casing

Copyright Siemens AG 2010. All rights reserved.

22

Conclusion Siemens has been working hard with continued enhancement of MGT fleets and lowering their overall life-cycle costs. All these enhancement programs are part of Siemens long-term product development strategy and resulted in: High reliability and availability of the MGT gas turbine thanks to continued improvements and enhancement of the gas turbines and their component designs. The operating statistics show good and mature records. The positive operation experience and the results of the latest development and extended R&D programs have made it possible to develop the extension of maintenance intervals from 20,000 to 30,000 EOH for SGT-600 & SGT-800; SGT-700 is currently under development. Several performance enhancement and maintenance-related programs that have been invested in are developed with the sole purpose of reducing life-cycle costs for powerplant producers. Acknowledgment The authors of this paper would like to thank the following people for their assistance or material reference: Mats Bjrkman, Mats Blomstedt, Anders Hellberg, Georg Nordn, Lena Strmberg, Pontus Slottner, Patrik Helgesson, Christian Troger and Mikael Rosn. References [1] ISO 3977-9 INTERNATIONAL STANDARD, Gas turbine, Procurement, Part 9: Reliability, availability, maintainability and safety, First edition 1999-12-15. [2] Mats Annerfeldt, Sergey Shukin, Mats Bjrkman, Agne Karlsson, Anders Jnsson, Elena Svistounova, GTX100 Turbine section measurement using a temperature sensitive crystal technique. A comparison with 3D thermal and aerodynamic analysis, PowerGen Europe, Barcelona, 2004. [3] Sergey Shukin, Mats Annerfeldt, Mats Bjrkman, Siemens SGT-800 Industrial gas turbine enhanced to 47MW. Design modification and operation experience, ASME, GT2008-50087. [4] Anders Hellberg, Georg Norden Siemens Industrial Gas Turbines, SGT-700 31MWe, Power-Gen Europe, Cologne, 2009.

Copyright Siemens AG 2010. All rights reserved.

23

[5] Vladimir Navrotsky, Lena Strmberg, Claes Uebel, SGT-800 Gas Turbine Availability focused design and maintainability improvements, Power-Gen Europe, Cologne, 2009.. [6] Vladimir Navrotsky, Mats Blomstedt, Niklas Lundin, Claes Uebel, Continied Enhancement of SGT-600 Gas Turbine and Maintenance 17th Conference of the Electric Power Supply Industry, Macau, October 2008. [7] Vladimir Navrotsky, Per Johansson, Bengt Svensson, Development of the platform for Condition Based Maintenance, Power-Gen Asia, Singapore, 2005.

Copyright Siemens AG 2010. All rights reserved.

24

Permission for use The content of this paper is copyrighted by Siemens and is licensed to PennWell for publication and distribution only. Any inquiries regarding permission to use the content of this paper, in whole or in part, for any purpose must be addressed to Siemens directly. Disclaimer These documents contain forward-looking statements and information that is, statements related to future, not past, events. These statements may be identified either orally or in writing by words as expects, anticipates, intends, plans, believes, seeks, estimates, will or words of similar meaning. Such statements are based on our current expectations and certain assumptions, and are, therefore, subject to certain risks and uncertainties. A variety of factors, many of which are beyond Siemens control, affect its operations, performance, business strategy and results and could cause the actual results, performance or achievements of Siemens worldwide to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements. For us, particular uncertainties arise, among others, from changes in general economic and business conditions, changes in currency exchange rates and interest rates, introduction of competing products or technologies by other companies, lack of acceptance of new products or services by customers targeted by Siemens worldwide, changes in business strategy and various other factors. More detailed information about certain of these factors is contained in Siemens filings with the SEC, which are available on the Siemens website, www.siemens.com and on the SECs website, www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the relevant forwardlooking statement as anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or assume any obligation to update or revise these forward-looking statements in light of developments which differ from those anticipated. Trademarks mentioned in these documents are the property of Siemens AG, its affiliates or their respective owners.

Copyright Siemens AG 2010. All rights reserved.

25

You might also like