You are on page 1of 1

CALCULO DEL DIAMETRO MAS ECONOMICO.

LINEAS DE CONDUCCION POR BOMBEO


DIAMETRO NOM.
(MM)

GASTO EN

AREA (M2)

PULG.

95.2
152.2
190.2

4
6
8

OBRA_____________________________

0.07118112
0.18193665
0.28412662

M3/SEG

VELOCIDAD EN
M/SEG

0.027216
0.027216
0.027216

0.3823486
0.14959053
0.09578828

LOG. TOTAL EN
(M)

Q2

COEF.MANNIN (n)

1900 0.000740711
1900 0.000740711
1900 0.000740711

CALCULO:______________________________________________________________________
REVISO:___________________________
FECHAS:_______________
CONSTANTE.MAN
NIN (K)

0.009 233.6640244
0.009 19.13275149
0.009 5.828178481

PERDIDA POR
FRICCION

5% hf OTRAS
PERDIDAS

hf=K*Q2*L

h=Dt+D.N

328.847122 16.44235611
26.9264825 1.346324126
8.20228842 0.410114421

H=h+hft

Q*H Q=(L.P.S)

100.8 446.0894784
100.8 129.0728066
100.8 109.4124028

75n

n=%

12.1407712
3.51284551
2.97776796

67.5
67.5
67.5

HP=QH/75n

179.863278
52.0421556
44.1150808

GOLPE DE ARIETE
PRESION DE TRABAJO DE LA
TUBERIA KG/CM

DIAM.NOMINAL
(D)

100
100
100

ESPESOR DE LA
PARED DE TUB.
(cm)

105.5
155.3
202.3

0.24
0.39
0.49

(V)

145 V

m/seg

3.82348598
1.49590528
0.9578828

554.405468
216.906265
138.893006

Ea(d)

Et (e)

196835.52
314688.72
393257.52

1+Ead/Ete

I+(Ead/Et)

7536 26.11936306
12246 25.69726605
15386 25.55943845

Ea=MODULO DE ELASTICIDAD DEL AGUA (20670 KG/CM 2)

V=VELOCIDAD INICIAL DEL AGUA (M/SEG)

Ead/Et

27.1193631 5.207625472
26.697266 5.166939718
26.5594385 5.15358501

sobrepresion
ha=145V/
1+Ead/Ete

sobrepresiones
absorvidas por la
valvula (80%ha)

sobrepresiones
absorvidas por la
tuberias (20%ha)

106.460319 85.16825501
41.9796392 33.58371139
26.9507548 21.56060381

21.2920638
8.39592785
5.39015095

AC . CEM=328000

H=CARGA TOTAL DE BOMBEO EN METROS.

ha=SOBRE PRESION POR GOLPE DE ARIETE EN (m.c.a)

ACERO=2100000

N.D=NIVEL DINAMICO

PEAD 5200

DIAMETRO=______MM (
CANTIDAD

")____CLASE_____

UNIDAD

P.U

DIAMETRO=______MM (
IMPORTE $

CANTIDAD

UNIDAD

=
=0

")____CLASE_____
P.U

DIAMETRO=______MM (
IMPORTE $

CANTIDAD

UNIDAD

M3

M3

M3

EXCAVACION MATERIAL CLASE II

EXCAVACION MATERIAL CLASE III

M3

M3

M3

PLANTILLA APIZONADA

M3

M3

M3

RELLLENO COMPACTADO

M3

M3

M3

PIEZAS ESPECIALES

PZA

PZA

PZA

COSTO DE TUBERIAS

INST.PRUEBA DE TUBERIA

ATRAQUES DE CONCRETO SIMPLE

(5)

KG/CM2

MM

H.P

K.W-H
(2)

(1)

PULG.

HP=0.7457 K.W.H

2=1 x.7457

coeficiente de rugosidad de manning=

CARGA ANUAL DE BOMBEO $


(4)

CARGA ANUAL DE AMORTIZACION


COSTO TOTAL DE CONDUCCION (M.L)
COSTO TOTAL ANUAL DE OPERACIN
CONDUCCION (AOS AL % ANUAL.)
(5)
DE BOMBEO 365 DIAS.
(7)
(6)

4=3*8760

6=5xCOEF.ANUALIDAD

7=4+6

3=2x$

a=(r)+r/(1+r)

n-1

a=
r=
n=

0.084819524
0.1
10

0.009

27.216

A=Q/v=
0.02268333
diametro teorico (d)=

0.17009651 m

= 170.096511 mm

deacuero al catalogo de tubo


diametro nominal(pulg.)
4
6
8

100.8

carga normal de operaciuon=


logitud total en m=

83.3
1900

diametro exterior(mm)
100
160
200

el desnivel desde el nivel dinamico N.D del pozo hasta


la superficie libre del agua en el tanque es igual al
desnivel topografico Dt mas la profundidad del nivel dinamico N.D=
h= Dt+prof. N.D

IMPORTE $

COSTO POR HORA EN BOMBEO $


(3)

EL DIAMETRO ECONOMICO ESTA DADO POR EL MENOR COSTO DETERMINADO EN LA COLUMNA 7

Qmax diario=

P.U

$XL=

DIAMETRO NOMINAL

PRESION DEL TRABAJO DE TUBERIA

")____CLASE_____

M3

RELLENO A VOLTEO

COSTO TOTAL DE CONDUCCION:

449.881542
119.968734
97.3025538

CONC.336000

CONCEPTO

(m)

428.589478
111.572807
91.9124028

Et=MODULO DE ELASTICIDAD DE LAS PAREDES PARA P.V.C 31400 KG/CM2

DT=DESNIVEL TOPOGRAFICO O DESNIVEL ENTRE N.D Y LA S.L.A EN EL TANQUE EN METROS

EXCAVACION MATERIAL CLASE I

presion

carga normal de
t.=20%ha+carga
operacin en (m) normal de operacin

6.69671304 pulg.

espesor minimo ( e )(mm)


2.4
3.9
4.9

diametro interior (mm)


95.2
152.2
190.2

You might also like