You are on page 1of 1

QUALITY CONTROL FORM

QCF 114

PROJECT

CLIENT

DUNG QUAT REFINERY ( DQR )


VIETNAM
OIL
AND
GAS
CORPORATION ( PETROVIETNAM )
8474L

BORED PILE INSTALLATION RECORD


____________

ITEM:

___________________________________________________________

DRAWING No.

_______________________________

UNIT / AREA

_______________________________

REV. ______

SH__ OF __

Status

Temporary Casing, if any

10

Volume of concrete used in


forming the pile shaft

11

Name and type of equipment


used

Theoretical

SUBCONTRACTOR
NAME
SIGNATURE
DATE

/var/www/apps/conversion/tmp/scratch_2/218943944.doc

CONTRACTOR

CLIENT

You might also like