You are on page 1of 1

F/DEV/01

PROTOTYPE
PRELAUNCH
MASS PRODUCTION
OUTSOURCING INHOUSE
10 YES COLDFORGE
20 YES COLDFORGE
40 YES COLDFORGE
50 YES COLDFORGE
60 YES COLDFORGE
70 YES COLDFORGE
80 YES COLDFORGE
90 YES COLDFORGE
100 YES COLDFORGE
110 YES COLDFORGE
120 YES COLDFORGE
No DATE REVISED BY
YES COLDFORGE
COLDFORGE
ANODIZING PROCESS FLOW OF BLACK OUTER TUBE
COLD FORGE PART NO. CF/043 CUSTOMER NAME TENNECO MARZOCCHI SRL NAME SIGNATURE
REVISION NO. 00 CUSTOMER DRAWING NO. 5182304 CHECKED BY MUKESH VERMA
DOCUMENT NO. CF/PFC/043 CUSTOMER PART NAME OUTER TUBE BMWK5X PREPARED BY AMIT KUMAR
PROCESS FLOW CHART CONDITION OF COMPLETE PARTS
SR.
NO.
PROCESS DEVICE
ORDER STATUS
MAKER NAME
REVISION DATE: 2/4/2014 REVISION NO. & DATE AA/ 24/10/13 APPROVED BY R.B.NAGAR
Anodizing tank with Chemical
Eatching tank with chemical
Tank with DMwater
Tank with DMwater
30 Desmutting tank with chemical
EATCHING
WATER RINSE
DESMUTTING
WATER RINSE
COLORING
Cold sealing tank with chemical
Tank with DMwater
WATER RINSE
ANODIZING
WATER RINSE
TRANSPORT DELAY
WATER RINSE WATER RINSE
INSPECTION DISPATCH
OPERATION PACKAGING OPERATION & INSPECTION
STORE
WATER RINSE
COLD SEALING
Tank with DMwater
Tank with DMwater
Coloring tank with color
Tank with DMwater
Tank with DMwater
20
30
40
50
60
80
90
100
110
120
10 70

You might also like