KEN TTDI

WEEKLY PROGRESS REPORT



PERIOD ENDING 04/07/2014
STRUCTURAL REPORT
Current progress on site
Elevation view
Current progress on site
Installing rebar at Roof Garden floor Zone A.
Current progress on site
Installing rebar at Roof Garden floor Zone B.
Current progress on site
Beam casting at roof tank floor Zone C.
Current progress on site
Beam casting at roof tank floor Zone D.
Planning work on site
this week:

1. Beam casting at roof
tank floor Zone C.

2. Beam casting at roof
tank floor Zone D.










2
1
CURRENT PROGRESS ON SITE.
1
2
Planning work on site
this week:

1. Install rebar at roof
garden floor Zone A.

2. Install rebar at roof
garden floor Zone B.










2
1
CURRENT PROGRESS ON SITE.
WEEKLY PLANNING ON SITE.
Planning work on site
this week:

1. Installing rebar at roof
garden floor Zone A.

2. Installing rebar at roof
garden floor Zone B.










2 1
Legend

-Completed






Pilecap sequence.
Legend

-Completed


B3 Concrete Slab Sequence.
Planning


B2 Concrete Slab Sequence.
Planning
Legend

-Completed


Legend

-Completed



B1 Concrete Slab Sequence.
Planning
Legend

-Completed


LG Concrete Slab Sequence.
Planning
Legend

-Completed



GF Concrete Slab Sequence.
Planning
Legend

-Completed

-On-Going

GFM Concrete Slab Sequence.
-Next Cast

Planning
Legend

-Completed



1
st
Floor Concrete Slab Sequence.
Planning
Legend

-Completed

-On-Going

2
nd
Floor Concrete Slab Sequence.
-Next Cast

Planning
Legend

-Completed

-On-Going

2
nd
Floor Mezzanine Concrete Slab Sequence.
-Next Cast

Planning
Legend

-Completed

-On-Going

3
rd
Floor Concrete Slab Sequence.
-Next Cast

Planning
Legend

-Completed

-On-Going

4
th
Floor Concrete Slab Sequence.
-Next Cast

Planning
Legend

-Completed

-On-Going

5
th
Floor Concrete Slab Sequence.
-Next Cast

Planning
















Legend

-Completed

-On-Going

6
th
Floor Concrete Slab Sequence.
-Next Cast

Planning



Zone C - 20/01/2014

Zone D - 18/01/2014














Legend

-Completed

-On-Going

7
th
Floor Concrete Slab Sequence.
-Next Cast

Planning

















Legend

-Completed

-On-Going

8
th
Floor Concrete Slab Sequence.
-Next Cast































Planning

Legend

-Completed

-On-Going

9
th
Floor Concrete Slab Sequence.
-Next Cast


































Planning

Legend

-Completed

-On-Going

10
th
Floor Concrete Slab Sequence.
-Next Cast


































Planning

Legend

-Completed

-On-Going

11
th
Floor Concrete Slab Sequence.
-Next Cast


















Zone C - 05/04/2014


















Planning

Legend

-Completed

-On-Going

12
th
Floor Concrete Slab Sequence.
-Next Cast






































Planning

ARCHITECTURAL REPORT
Brickworks for toilet at 8
th
floor south east.
Brickworks for toilet at 8
th
floor north east.
Brickworks for riser room at 8
th
floor east.
Brickworks for lift 6-7 at 8
th
floor .

Brickworks for lift 3-5 at 8
th
floor.
Install door frames at 10
th
floor.
Setting out for curtain wall at 6
th
floor.
PROGRESS : Architectural



B3 B2 B1 LG GF GFM 1 2 2M 3 4 5 6 7 8 9 10 11 12 RGF RF
- - - - - - - - - 100 100 100 100 100 40 40 40 - - - -
- - - - - - - - - 100 100 100 100 40 40 40 40 - - - -
- - - - - - - - - 100 100 100 90 40 40 40 - - - - -
- - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - -
TASK LEVEL
Setting out
Door frame installation
Brickworks
Plastering & S. Coating
Tiling & Stone Works
MECHANICAL & ELECTRICAL
REPORT
Install pipe sleeve for sump at roof tank floor.
Install PVC pipe for electrical service at 4
th
floor.
Install PVC pipe for swimming pool services area at roof tank.
PROGRESS : Fire Protection Services

Overall progress = 17.60%

B3 B2 B1 LG GF GFM 1 2 2M 3 4 5 6 7 8 9 10 11 12 RGF RF
100 100 100 100 - - - - - 80 - - - - - - - - - - -
- - - 100 100 100 100 100 100 100 100 100 100 - - - - - - - -
100 100 100 100 - - - - - - - - - - - - - - - - -
TASK LEVEL
Sprinkler main/range piping works.
Wet riser piping works.
Pressure test on sprinkler piping.
PROGRESS : Cold/Hot Water System

Overall progress = 46.65%

B3 B2 B1 LG GF GFM 1 2 2M 3 4 5 6 7 8 9 10 11 12 RGF RF
100 100 100 100 85 85 85 85 85 85 85 85 85 35 5 5 10 - - - -
TASK LEVEL
Piping.
PROGRESS : Sanitary Services

Overall progress = 57.80%

B3 B2 B1 LG GF GFM 1 2 2M 3 4 5 6 7 8 9 10 11 12 RGF RF
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 - - -
100 100 100 100 90 90 90 90 90 90 90 90 90 90 35 - - - - - -
TASK LEVEL
Pipe sleeves installation.
Piping.
PROGRESS : Electrical Services

Overall progress = 8.55%

B3 B2 B1 LG GF GFM 1 2 2M 3 4 5 6 7 8 9 10 11 12 RGF RF
98 97 98 50 - - - - - - 10 5 - - - - - - - - -
98 90 90 - - - - - - - - - - - - - - - - - -
100 - - - - - - - - - - - - - - - - - - - -
TASK LEVEL
Conduits and trunking.
Wiring.
Lights Fitting.
Site Staff & Manpower 28/06 29/06 30/06 01/07 02/07 03/07 04/07
Project Manager 1 - 1 1 1 1 -
Asst. Project Manager - - - - - - -
Site Engineer - - - - - - -
Project Engineer - - - - - - -
Project Admin - - - 1 1 1 1
Safety Supervisor 1 - 1 1 1 - -
Site Supervisor 5 - 4 4 5 4 5
Land Surveyor 1 - 1 1 1 1 1
Sr. Site Coordinator 1 - 1 1 1 1 1
Backhoe Operator 1 - 1 1 1 1 1
Crane Operator
1 - 1 1 1
1 1
Skim Coat - - - - - - -
Carpenter - - 20 20 17 17 -
Bar bender - - 16 16 16 16 -
Concreter / KSK 6 - 7 7 6 8 -
General Worker 8 - 8 8 8 8 8
Plasterer 2 - 2 2 - - -
Bricklayer 17 - 6 6 - - -
Trainee - - - - - - -
Electrician 2 - - 2 2 2 -
Scaffolding - - - - - - -
Globe 3 - - - - - -
BBR 9 - - - - 4 4
Total 58 - 69 72 61 65 22
Site Staff & Manpower
Plant & Machineries
Plant & Machineries 28/06 29/06 30/06 01/06 02/06 03/06 04/06
Mobile Crane 1 - 1 1 1 - -
Tower Crane 1 - 1 1 1 1 1
Genset 2 - 2 2 2 2 2
Welding Set - - - - 1 1 1
Water Pump 1 - - - 1 1 1
Air Compressor 2 - 2 2 2 2 2
Excavator/Breaker - - - - - - -
Backhoe 1 - 1 1 1 1 1
Forklift 1 - 1 1 1 1 1
Poker Vibrator - - - - - - -
Bar Bending - - - - - - -
Material Hoist 1 - 1 1 1 1 1
Air Breaker - - 1 1 - - -
Concrete Mixer 2 - 2 2 2 2 2
Oxy Cutter 1 - 1 1 - 1 1
Pump Machine - - - - - - 1
Water jet - - - - 1 1 1
Water tank - - - - - - -
Mini Excavator - - - - - - -
Bobcat 1 - 1 1 - 1 1
Compactor 1 - 1 1 1 - 1
Total 15 - 15 15 15 15 17
12
12 1
Weather Chart
0
1 1 1 1 1 1
1 1
29
0 AM 12
12 1 PM
1

1 1
1
1 1 1
1
1
1
1
1
1
1 1
1
1
1
04
0 AM 12
12 1 PM
1 1 1
1
1 1 1 1 1 1
1
1
1
1
1
1 1

1

1
02
0 AM 12
12 1 PM
0 AM 12
12 1 PM
1 1 1 1 1 1
1
1
1
1
1
1

1
1
01
0 AM 12
12 1 PM
1 1 1 1 1 1
1
1
1
1
1
1

1
1
30
0 AM 12
12 1 PM
PM
1 1 1 1 1 1
1
1
1
1
1
1
1
1
1
03
0 AM
1 1 1 1 1
1
1
1
1
1
1 1
1
28
0 AM 12
12 1 PM
Outstanding issues
No Issue Remarks

1
2









END OF REPORT