Horizontal Drilling PETE 411 - Well Drilling 34. Horizontal Drilling Slide 2 Horizontal Drilling Why Drill Horizontal Wells? Relative Production Rates Relative Costs Types of Horizontal Wells Drilling Problems & Solutions How Popular is Horizontal Drilling? Examples PETE 411 - Well Drilling 34. Horizontal Drilling Slide 3 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 4 Why Drill Horizontal Wells? Increase Reserves
Increase Production Rates
Control Water Production
Control Gas Production PETE 411 - Well Drilling 34. Horizontal Drilling Slide 5 Why Drill Horizontal Wells? Produce From Thin Reservoirs
Connect Vertical Fractures
Produce Methane from Coal Seams
Increase Injectivity - (steam, water, polymers, etc.) Control Sand Production PETE 411 - Well Drilling 34. Horizontal Drilling Slide 6 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 7 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 8 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 9 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 10 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 11 Production Rates Oryx - Austin Chalk Vertical Horizontal Horizontal/Vertical Well Well Production Ratio B/D B/D
12 507 42
15 215 14
5 107 21
PETE 411 - Well Drilling 34. Horizontal Drilling Slide 12 Production Rates Drilled 7 wells from 1986 to 1989. Drilled ~ 85 wells in 1990
Vertical Well Drilling Cost: 235 $/ft Horizontal Well Drilling Cost: 520-282 $/ft Cost Ratio: 2.2-1.2 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 13 Drilling Costs Austin Chalk (1993) Vertical well ~ $500,000 Recompletion as Horizontal Well ~ $375,000 New Horizontal Well ~ $1,000,000-2,000,000 ~ $100+/ft to $150/ft {these numbers are rough estimates only} PETE 411 - Well Drilling 34. Horizontal Drilling Slide 14 Rospo Mare - Italy PETE 411 - Well Drilling 34. Horizontal Drilling Slide 15 Prudhoe Bay Vertical Well: 3000 - 4000 B/D Horizontal Well: 10,000 - 12,000 B/D Production Ratio: 3 - 4 Vertical Well: 235 $/ft Horizontal Well: 520 - 282 $/ft Cost Ratio: 2.2-1.2 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 16 Long Radius (~1,000-3,000 ft) {~2-6 deg/100 ft} Medium Radius (140~700 ft) {~8-40 deg/100 ft} Short Radius (~20-40 ft) {~1.5-3 deg/ft} <1,000 ft ~5,000 ft ~8,000 ft PETE 411 - Well Drilling 34. Horizontal Drilling Slide 17 New Drilling Technology Measurement While Drilling (MWD) Directional Surverying and Control Indentification of Markers (identify zones)
Top Drive Drill with 90-ft stands instead of 30-ft joints Circulate while pulling drillpipe out of hole Rotate drillpipe while pulling out of hole PETE 411 - Well Drilling 34. Horizontal Drilling Slide 18 New Drilling Technology Mud Motors Drill without rotating pipe Change hole direction while drilling Steerable systems PETE 411 - Well Drilling 34. Horizontal Drilling Slide 19 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 20 Potential Problems in Horizontal Drilling Running equipment in and out of hole drillstring, casing, cables
Preventing/Remedying differential sticking
Excessive torque PETE 411 - Well Drilling 34. Horizontal Drilling Slide 21 Potential Problems in Horizontal Drilling Cleaning the hole and preventing cuttings from settling along the hole bottom
Controlling weight on bit to achieve and maintain directional control
Cementing casing or liner PETE 411 - Well Drilling 34. Horizontal Drilling Slide 22 Summary Horizontal wells may produce at 3-5 times the rate of vertical wells in the same area ( as much as 20 times higher in special cases).
Horizontal wells typically cost 1.5-3 times as much as vertical wells in the same area.
Horizontal wells are often very attractive in formations with extensive vertical fractures. PETE 411 - Well Drilling 34. Horizontal Drilling Slide 23 Summary The use of horizontal wells has been growing - worldwide.
Horizontal wells has increased our recoverable reserves. In the U.S. one rig in ten is drilling horizontal wells. (1994) (1998)
Today ~ one rig in fifteen is drilling horizontal wells. (2001) PETE 411 - Well Drilling 34. Horizontal Drilling Slide 24 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 25 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 26 Long - Radius Wells Used for achieving large horizontal displacements from platforms or drilling pads Used for achieving very long horizontal sections (to 6,000 ft +)
Build Rate: ~ 2-6 degrees/100 ft Build Radius: ~ 1,000-3,000 ft Length of Horiz. Section: 1,000 - 8,000 ft (1995) PETE 411 - Well Drilling 34. Horizontal Drilling Slide 27 Method: Use conventional directional drilling technology
Use rigid bottom hole assemblies, motors & bent subs, stabilizers
or Use Navigation drilling systems with steerable drilling motors PETE 411 - Well Drilling 34. Horizontal Drilling Slide 28 Medium - Radius Wells Build Rate: ~ 8 - 20 degrees/100 ft (up to 40 deg/100 ft in some cases)
Build Radius: ~ 300 - 700 ft
Length of Horiz. Section: 1,000-6,000 ft PETE 411 - Well Drilling 34. Horizontal Drilling Slide 29 Method: Use modified long-radius drilling technology Use different motors for Angle Build and Angle Hold sections. Use a Tangent Section between the two build sections Use compressive service drillpipe through the curve if Build Rate > 15 deg./100 ft. (CS drillpipe has integral wear knots every ~ 10 ft) PETE 411 - Well Drilling 34. Horizontal Drilling Slide 30 Short-Radius Wells Build Rate: ~ 1 - 3 degrees/ft
Build Radius: ~ 20 - 40 ft
Length of Horiz. Section: 200 - 1,000 ft PETE 411 - Well Drilling 34. Horizontal Drilling Slide 31 Method: Two downhole motor designs are available Drill vertical rathole to identify horizon Build angle with special curve-drilling assembly with a non-rotating shell that gives curvature to the tool After building angle to horizontal, use a special angle-hold assembly: this consists of two undergauge stabilizers behind the bit, and flexible drillpipe. PETE 411 - Well Drilling 34. Horizontal Drilling Slide 32 PETE 411 - Well Drilling 34. Horizontal Drilling Slide 33 Horizontal Well Pair PETE 411 - Well Drilling 34. Horizontal Drilling Slide 34 Horizontal Well Pair PETE 411 - Well Drilling 34. Horizontal Drilling Slide 35 Vertical Injection Wells and Horizontal Production Well PETE 411 - Well Drilling 34. Horizontal Drilling Slide 36