PROYECTO
: INSTALACION DEL PUENTE LAGARTO EN LA VIA VECINAL RUTA 652 DEL DISTRITO DE PALCAZU-OXAPAMPA - PASCO
PROP.
FECHA
: SETIEMBRE 2013
ITEM
EQUIPO A TRANSPORTAR
Und.
Cantidad
Peso Unit.
Peso Total
2,000.00
hm
2.00
1,000.00
EQUIPO DE OXICORTE
hm
3.00
25.00
75.00
MOTOBOMBA 34 HP 8"
hm
4.00
45.00
180.00
VOLQUETE DE 10 M3
hm
2.00
4,000.00
8,000.00
VOLQUETE DE 4 M3
hm
1.00
1,500.00
1,500.00
hm
1.00
10,000.00
10,000.00
hm
1.00
6,500.00
6,500.00
hm
2.00
10,000.00
20,000.00
255.00
TIRFOR DE 5 TON.
hm
3.00
85.00
10
GATAS DE 50 TN.
hm
2.00
35.00
70.00
11
RODILLOS
hm
2.00
250.00
500.00
12
TECLE DE 5 TON.
hm
2.00
250.00
500.00
13
TEODOLITO
hm
2.00
25.00
50.00
14
NIVEL DE INGENIERIA
hm
2.00
20.00
40.00
15
GPS
hm
1.00
5.00
5.00
16
hm
2.00
850.00
1,700.00
17
hm
2.00
950.00
1,900.00
18
hm
2.00
150.00
300.00
19
hm
1.00
10,000.00
10,000.00
20
hm
1.00
1,800.00
1,800.00
21
hm
1.00
1,500.00
1,500.00
22
hm
1.00
6,500.00
6,500.00
23
hm
2.00
7,500.00
15,000.00
24
hm
1.00
8,500.00
8,500.00
25
hm
1.00
6,500.00
6,500.00
26
MINICARGADOR 70 HP
hm
1.00
250.00
250.00
27
hm
3.00
60.00
180.00
28
hm
1.00
75.00
75.00
29
MONTACARGA 80 HP 5 TON
hm
1.00
650.00
650.00
30
MOTONIVELADORA DE 125 HP
hm
1.00
4,000.00
4,000.00
31
hm
1.00
5,500.00
5,500.00
32
hm
1.00
15,000.00
15,000.00
TOTAL (KG.)
Costo por Viaje Huancayo - Sallanga (Camin Plataforma)
129,030.00
2500.00
Capacida en Kg
20000.00
Costo por Kg
0.850
Peso total
Costo Total
129030.00
109675.50
109675.50
EQUIPO A TRANSPORTAR
CAMION VOLQUETE 4x2 210 -280 HP 8 M
UNIDAD
CANTIDAD
HM
2 x 1.5
COSTO
UNITARIO
COSTO TOTAL
350.00
COSTO TOTAL
1050.00
1050.00
1050.00
109675.50
1050.00
COSTO TOTAL
S/.
110725.50