You are on page 1of 2

VERIFICATION AS-BUILT vs.

SITE PHYSICAL
ITEM

LAYOUT VERIFICATION

DESCRIPTION

Correct Location (Y/N)


Supply Air Diff

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

VAV-4F9/1.1
VAV-4F9/1.2
VAV-4F9/1.3
VAV-4F9/1.4
VAV-4F9/1.5
VAV-4F9/1.6
VAV-4F9/1.7
VAV-4F9/1.8
VAV-4F9/1.9
VAV-4F9/1.10
VAV-4F9/1.11
VAV-4F9/1.12
VAV-4F9/1.13
VAV-4F9/1.14
VAV-4F9/1.15
VAV-4F9/1.16
VAV-4F9/1.17
VAV-4F9/1.18
VAV-4F9/1.19
VAV-4F9/1.20

Return Air Diff

Temp sensor

All Supply diff in


the same room
with temp sensor
(Y/N)

PHYSICAL TAGGING
Correct Tagging
(Y/N)
VAV

Temp Sensor

STATUS
Layout update
As built

BMS