Well Test 1Every part is 10-15 Slides as Maximum 2For part of Pressure Build Up Test in Gas wells, there are 2 referenes, choose one of them 3Presentation starts with Ahmed Borg and ends with mostafa Ibrahim.
Well Test 1Every part is 10-15 Slides as Maximum 2For part of Pressure Build Up Test in Gas wells, there are 2 referenes, choose one of them 3Presentation starts with Ahmed Borg and ends with mostafa Ibrahim.
Well Test 1Every part is 10-15 Slides as Maximum 2For part of Pressure Build Up Test in Gas wells, there are 2 referenes, choose one of them 3Presentation starts with Ahmed Borg and ends with mostafa Ibrahim.
2- For Part of Pressure Build Up Test in Gas wells, there are 2 referenes , choose one of them 3- Presentation starts with Ahmed Borg and ends with Mostafa Ibrahim. Notes 1- Dead time is Thursday 21-3-2013 , very important to finish parts and send it to (eng.ahmed_ebrahim_2011@yahoo.com) 6 Mostafa Ibrahim Matthews - Pressure Buildup and Flow Tests in Wells(Chapter 3),section 3-4 Pressure Build Up Test in Gas wells 4 Hamada Abdellah Chapter 5 (((5-8,5-9))) Chaudhri,Oil_Well_Testing_Handbook 5 Mohamed Ahmed Amin Chaudhri,Gas_Well_Testing_Handbook(Chapter 6) Chaudhri,Oil_Well_Testing_Handbook 2 Ahmed Ibrahim Sayed Chapter 5(((5-3,5-4))) Chaudhri,Oil_Well_Testing_Handbook 3 Mai Ezzat Chapter 5 (((5-5))) Chaudhri,Oil_Well_Testing_Handbook S Name Part Reference Ahmed Borg 1 Chapter 5(((Introduction, 5-1,5-2)))