3.2 Assignment of Load Densities to Rentable Space
Rentable Space Area (m
2
) Lighting &/m2) SmalllPower (Jl./m2)
. Levell
500 20 5
Levels 2 to 10 2000ILevei 20 5
Services Areas Area(r02) Lighting Cii./m2) SmalllPower C:!:lJm
2
)
Corridor/staircase 2000 10 I
Restrooms 150 8 1
Sub-stations 150 10 1
Lobby 2000 15 1
Carpark 5000 8 1
Lifts/escalators 170 15 1
Plant rooms 1000 10 1
Others 200 10 1
3.3 Summation of Plant Loads
Total Diversitr Maximum
Plant Rating Nos Rating Allowance Demand
Lift IOkW 12 120kW 50% 60kW
Escalator 7.5kW 4 30kW 50% 15kW
Air-conditioning plant 1200kW 1 2400kW 50% 1200kW
Ventilation + Total 150kW 150kW 100% 150kW
pressurisation fans +
water and fire pumps +
other related motor loads
Grand Total Plant Loads = 60+15+1200+150 = 1425 kW
3;4 . Load Listing of Loads at Rentable Space and Services Areas
Rentable Space
Levell
Levels 2 to 10
Area (m
2
)
500
18000
Lighting (kW)
10
360
.1:= 370
Total Rentable Space Load = 370 + 92.5 = 462.5 kW
Distribution System Design
Sma1l1Power [W/m
2
)
2.5
90
.1:=92.5