You are on page 1of 1

1

DOCUMENTATION RUBRIC

NAME: ______________________________ DATE: _________ PD: _____

PROJECT TITLE: ___________________________________________________ GRADE: ________/72____
ELEMENT SCORED SCORE SCORE SCORE SCORE
8 6 4 2
1. IDENTIFY
THE
PROBLEM
DETAIL OF ALL OF THE
CONSTRAINTS AND AT
LEAST 3 TOOLS AND
SKILLS THAT YOUR
HAVENT USED BEFORE.
DETAIL OF MOST OF
THE CONSTRAINTS AND
AT LEAST 3 TOOLS OR
SKILLS THAT YOUR
HAVENT USED BEFORE.
DETAIL OF SOME OF
THE CONSTRAINTS AND
AT LEAST 2 TOOLS OR
SKILLS THAT YOUR
HAVENT USED BEFORE.
DETAIL OF FEW OF THE
CONSTRAINTS AND AT
LEAST 2 TOOLS OR SKILLS
THAT YOUR HAVENT
USED BEFORE.
2. RESEARCH
AT LEAST 8 FACTS ABOUT
THE HISTORY OF THE
TOPIC, 5 FACTS ABOUT
CONCEPTS AND
PRINCIPLES, AND 5
PICTURES.
AT LEAST 6 FACTS ABOUT
THE HISTORY OF THE
TOPIC, 3 FACTS ABOUT
CONCEPTS AND
PRINCIPLES, AND 3
PICTURES.
AT LEAST 4 FACTS ABOUT
THE HISTORY OF THE
TOPIC, 2 FACTS ABOUT
CONCEPTS AND
PRINCIPLES, AND 2
PICTURES.
AT LEAST 2 FACTS ABOUT
THE HISTORY OF THE
TOPIC, 1 FACTS ABOUT
CONCEPTS AND
PRINCIPLES, AND 1
PICTURES.
3. DEVELOP
ALTERNATIVE
SOLUTIONS
MORPH CHART WITH 5
ATTRIBUTES AND 3 HIGH
QUALITY SCANS FROM
EACH PARTNER AND
EACH DESIGN HAS 4
BULLETS EXPLAINING ITS
FUNCTION.
MORPH CHART WITH 3
ATTRIBUTES AND 3
SCANS FROM EACH
PARTNER AND EACH
DESIGN HAS 3 BULLETS
EXPLAINING ITS
FUNCTION.
MORPH CHART WITH 2
ATTRIBUTES AND 2
SCANS FROM EACH
PARTNER AND EACH
DESIGN HAS 2 BULLETS
EXPLAINING ITS
FUNCTION.
MORPH CHART WITH 1
ATTRIBUTES AND 1 SCAN
FROM EACH PARTNER
AND EACH DESIGN HAS 1
BULLET EXPLAINING ITS
FUNCTION.
4. PROTOTYPE
1 VIDEO AND 5 PICTURES
FROM THE BUILD AND
TEST PROCESS WITH 4
BULLETS PER PICTURE
EXPLAINING SOMETHING
GOOD OR BAD.
1 VIDEO AND 4 PICTURES
FROM THE BUILD AND
TEST PROCESS WITH 3
BULLETS PER PICTURE
EXPLAINING SOMETHING
GOOD OR BAD.
4 PICTURES FROM THE
BUILD AND TEST PROCESS
WITH 2 BULLETS PER
PICTURE EXPLAINING
SOMETHING GOOD OR
BAD.
2 PICTURES FROM THE
BUILD AND TEST PROCESS
WITH 1 BULLET PER
PICTURE EXPLAINING
SOMETHING GOOD OR
BAD.
5. SELECT THE
BEST
SOLUTION
4 SCANNED SKETCHES
OF THE NEW DESIGN AND
8 BULLETS JUSTIFYING
ITS FEATURES.
3 SCANNED SKETCHES
OF THE NEW DESIGN AND
6 BULLETS JUSTIFYING
ITS FEATURES.
2 SCANNED SKETCHES
OF THE NEW DESIGN AND
4 BULLETS JUSTIFYING
ITS FEATURES.
2 SCANNED SKETCHES
OF THE NEW DESIGN AND
2 BULLETS JUSTIFYING
ITS FEATURES.
6. BUILD
10 PICTURES FROM THE
BUILD PROCESS WITH 2
BULLETS PER PICTURE
EXPLAINING ITS
FUNCTION.
8 PICTURES FROM THE
BUILD PROCESS WITH 2
BULLETS PER PICTURE
EXPLAINING ITS
FUNCTION.
6 PICTURES FROM THE
BUILD PROCESS WITH 2
BULLETS PER PICTURE
EXPLAINING ITS
FUNCTION.
4 PICTURES FROM THE
BUILD PROCESS WITH 2
BULLETS PER PICTURE
EXPLAINING ITS
FUNCTION.
7. TEST
VIDEO OF EACH RUN (3)
WITH 5 BULLETS PER RUN
EXPLAINING WHAT
HAPPENED
VIDEO OF EACH RUN (3)
WITH 3 BULLETS PER RUN
EXPLAINING WHAT
HAPPENED
VIDEO OF EACH RUN (2)
WITH 3 BULLETS PER RUN
EXPLAINING WHAT
HAPPENED
VIDEO OF EACH RUN (1)
WITH 2 BULLETS PER RUN
EXPLAINING WHAT
HAPPENED
8. EVALUATION
COMPARISON BETWEEN
YOUR TEST AND ALL OF
YOU CLASSMATES IN AN
EXCEL DOCUMENT
INCLUDING A GRAPH
COMPARISON BETWEEN
YOUR TEST AND MOST ,
BUT NOT ALL, OF YOU
CLASSMATES IN AN EXCEL
DOCUMENT INCLUDING A
GRAPH
COMPARISON BETWEEN
YOUR TEST AND MOST,
BUT NOT ALL, OF YOU
CLASSMATES IN AN EXCEL
DOCUMENT MISSING
GRAPH
COMPARISON BETWEEN
YOUR TEST AND ONLY A
FEW OF YOU CLASSMATES
IN AN EXCEL MISSING
GRAPH
9. REDESIGN
SKETCHES, A CAD
DRAWING, AND 10
BULLETS JUSTIFYING
YOUR CHANGES
SKETCHES AND 10
BULLETS JUSTIFYING
YOUR CHANGES
SKETCHES AND 8
BULLETS JUSTIFYING
YOUR CHANGES
SKETCHES AND 6
BULLETS JUSTIFYING
YOUR CHANGES

You might also like