You are on page 1of 8

S10

PRESUPUESTO REFERENCIAL
"REMODELACION Y AMPLIACION DE LA GRAN UNIDAD ESCOLAR
MARIANO MELGAR"
MINISTERIO DE EDUCACION
LIMA - LIMA - BREA
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
03.11
03.12
03.13
03.14
03.15
03.16
03.17
03.18
03.19
03.20
03.21
03.22
03.23
03.24
03.25
03.26
03.27
03.28
03.29
03.30
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
04.08
04.09
04.10
04.11

Costo al:
Descripcin

Unidad Metrado

OBRAS PROVISIONALES
ALMACN, OFICINAS Y CASETA DE GUARDIA
glb
1.00
CARTEL DE OBRA DE 2.40 X 3.60 m - PINTADO
u
1.00
CERCO PROVISIONAL CON TRIPLAY PARA DIVISION DE OBRA EN ETAPAS
m
150.00
SERVICIOS HIGINICOS OBRA (URINARIO + DUCHA)
glb
1.00
CONSUMO DE ENERGIA ELECTRICA Y AGUA
mes
8.00
SEALIZACION Y SEGURIDAD
glb
1.00
TRANSPORTE DE EQUIPO Y MAQUINARIA
vje
4.00
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
1,892.03
TRAZO Y REPLANTEO PRELIMINAR
m2
1,892.03
APUNTALAMIENTO DE LOSA ALIGERADA 1 Y 2 PISO H=3.60
m2
1,479.12
DESMONTAJE DE PUERTAS (INC. MARCOS)
m2
375.75
DESMONTAJE DE VENTANAS S/PROTECTOR (INC. PICADO DE BORDE PARA DESCUBRIR ANCLAJE)
m2
1,375.34
DESMONTAJE DE APARATOS SANITARIOS
u
115.00
DEMOLICIN Y ELIMINACIN
DEMOLICIN DE MURO DE ALBAILERIA - SOGA
m2
1,143.72
DEMOLICIN DE MURO DE ALBAILERIA - CABEZA
m2
633.33
DEMOLICIN DE CIMIENTOS
m3
107.68
DEMOLICIN DE SOBRECIMIENTOS
m3
94.11
DEMOLICION DE FALSO PISO EN PORTICOS
m2
1,164.79
DEMOLICION DE CONTRAPISO E=2"
m2
8,442.95
DEMOLICIN DE LOSA ALIGERADA
m3
133.86
DEMOLICION DE GRADAS, BANCAS, ESCALERAS DE CONCRETO
m3
1.20
DEMOLICION DE PATIO Y VEREDA DE CONCRETO
m2
2,222.99
DEMOLICION DE PISO DE CONCRETO
m2
179.10
DEMOLICIN DE PISO CERAMICO INC. FALSO PISO
m2
370.86
PICADO DE CIMIENTOS
m3
112.80
PICADO DE SOBRECIMIENTO
m3
13.66
PICADO DE MURO DE ALBAILERIA (INC. CORTE Y ENDENTADO)
m3
68.93
PICADO DE VIGA DE CONCRETO ARMADO
m3
71.29
PICADO DE LADRILLO PASTELERO EN TECHO
m2
4,126.71
PICADO TARRAJEO EN PIZARRA
m2
275.00
PICADO DE LOSA ALIGERADA
m2
26.08
PICADO EN BORDE DE LOSA PARA ANCLAJE DE BARANDA (INC. TAPADO C/MEZCLA)
u
216.00
REMOCION DE PINTURA DE LADRILLO EXPUESTO (INC. PICADO P/TARRAJEO)
m2
3,143.44
REMOCION DE PISO CERAMICO Y LOSETA (INC. RETIRO DE REBABA)
m2
8,130.06
REMOCION DE ZCALO CERAMICO (INC. RETIRO DE REBABA)
m2
571.58
REMOCION DE CONTRAZCALO CERAMICO Y LOSETA
m
3,420.98
REMOCION DE TICERO DE CONCRETO
m
250.00
REMOCION Y RESANE PARA UBICACION DE CENTRO DE LUZ
pto
629.00
REMOCIN DE PINTURA LATEX EN MUROS
m2 10,745.88
REMOCIN DE PINTURA EN TECHOS
m2
7,871.61
ACARREO INTERNO MAT. PROCEDENTE DE DEMOLICION
m3
1,780.46
ELIMINACION DE MATERIAL PROCEDENTE DE LA DEMOLICION
m3
2,310.30
PERFORACION C/BROCA Y ANCLAJE C/ADITIVO EPXICO
u
660.00
MOVIMIENTO DE TIERRAS
EXCAVACION DE CISTERNA
m3
295.76
NIVELACION Y COMPACTACION DE FONDO DE CISTERNA
m2
91.85
EXCAVACION DE ZANJAS Y ZAPATAS
m3
1,817.10
RELLENO MANUAL CON MATERIAL DE PROPIO
m3
660.32
RELLENO MASIVO C/MATERIAL PRESTAMO COMP. C/EQ. H=0.10m
m2
3,501.28
RELLENO MASIVO C/MATERIAL PRESTAMO COMP. C/EQ. H=0.20m
m2
6,400.00
CORTE MASIVO DE TERRENO A MAQUINA.
m3
1,641.67
NIVELACIN INTERIOR Y APISONADO PARA F. PISO
m2
1,389.46
EXCAVACION DE ZANJA P/SARDINEL
m2
23.03
CONFORMACION DE SUBRASANTE
m2
6,400.00
ACARREO INTERNO MATERIAL PROCEDENTE DE LA EXCAVACION (DISTANCIA GENERICA) m3
1,802.51

Pgina 1

Precio (S/.)

Parcial (S/.)

5/31/2009
Total (S/.)
54,082.64

3,000.00
3,015.14
68.25
6,300.00
2,000.00
9,530.00
1,500.00

3,000.00
3,015.14
10,237.50
6,300.00
16,000.00
9,530.00
6,000.00

0.18
1.29
33.64
8.29
5.45
17.60

340.57
2,440.72
49,757.60
3,114.97
7,495.60
2,024.00

12.42
15.30
69.07
39.48
6.17
4.11
33.66
69.07
9.45
5.38
6.17
48.71
34.80
99.07
194.12
4.37
6.60
33.02
8.04
3.46
6.17
7.17
2.43
1.78
35.31
2.83
3.11
14.15
23.72
18.19

14,205.00
9,689.95
7,437.46
3,715.46
7,186.75
34,700.52
4,505.73
82.88
21,007.26
963.56
2,288.21
5,494.49
475.37
6,828.90
13,838.81
18,033.72
1,815.00
861.16
1,736.64
10,876.30
50,162.47
4,098.23
8,312.98
445.00
22,209.99
30,410.84
24,480.71
25,193.51
54,800.32
12,005.40

5.67
5.68
28.30
14.80
7.54
14.60
8.89
5.68
28.30
4.49
14.15

1,676.96
521.71
51,423.93
9,772.74
26,399.65
93,440.00
14,594.45
7,892.13
651.75
28,736.00
25,505.52

65,381.58

397,862.62

324,683.51

S10

PRESUPUESTO REFERENCIAL
"REMODELACION Y AMPLIACION DE LA GRAN UNIDAD ESCOLAR
MARIANO MELGAR"
MINISTERIO DE EDUCACION
LIMA - LIMA - BREA
Item

Costo al:
Descripcin

Unidad Metrado

04.12
ELIMNACIN DE MATERIAL EXCEDENTE CON MQUINA
05
CONCRETO SIMPLE
05.01
CIMIENTOS CORRIDOS 1:10 + 30% P.G.
05.02
SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M.
05.03
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
05.04
PATIOS DE CONCRETO 175 kg/cm E=5" FROT.Y BRUADO
05.05
VEREDA DE CONCRETO f'c= 175 kg/cm2 E=4"
05.06
SOLADO PARA ZAPATA e=2", 1:12 CEM/HORM
05.07
SUBZAPATA MEZCLA 1:10 + 30% P.G.
05.08
FALSO PISO MEZCLA 1:8 e=4"
05.09
SARDINEL, CONCRETO 1:8 + 25% P.M.
05.10
SARDINEL, ENCOFRADO Y DESENCOFRADO
06
CONCRETO ARMADO
06.01
ZAPATAS
06.01.01
ZAPATAS.- CONCRETO f'c=210 kg/cm2
06.01.02
ZAPATAS.- ACERO Fy=4200 Kg/cm2
06.02
VIGAS DE CIMENTACIN
06.02.01
VIGAS DE CIMENTACION.- CONCRETO fc=210kg/cm2
06.02.02
VIGAS DE CIMENTACION.- ENCOFRADO Y DESENCOFRADO
06.02.03
VIGAS DE CIMENTACION.- ACERO Fy=4200 Kg/cm2
06.03
PLACAS
06.03.01
PLACAS.- CONCRETO f`c=210Kg/cm2 - 1PISO
06.03.02
PLACAS.- CONCRETO f`c=210Kg/cm2 - 2PISO
06.03.03
PLACAS.- CONCRETO f`c=280 Kg/Cm2 - 1 PISO
06.03.04
PLACAS.- CONCRETO f`c=280 Kg/Cm2 - 2 PISO
06.03.05
PLACAS.- ENCOFRADO Y DESENCOFRADO
06.03.06
PLACAS.- ACERO fy=4200 Kg/cm2
06.04
VIGAS
06.04.01
VIGAS.- CONCRETO 175Kg/cm2
06.04.02
VIGAS - CONCRETO 210Kg/cm2 1 Y 2 PISO
06.04.03
VIGAS.- CONCRETO 280Kg/cm2 - 1 Y 2 PISO
06.04.04
VIGAS.- ENCOFRADO Y DESENCOFRADO
06.04.05
VIGAS.- ACERO fy=4200 Kg/cm2
06.05
COLUMNAS
06.05.01
COLUMNAS.- CONCRETO fc=175Kg/cm2
06.05.02
COLUMNAS.- CONCRETO fc= 210Kg/cm2
06.05.03
COLUMNAS.- ENCOFRADO Y DESENCOFRADO
06.05.04
COLUMNAS.- ACERO fy=4200 Kg/cm2
06.06
COLUMNETAS Y SOLERAS
06.06.01
COLUMNETAS Y SOLERAS.- CONCRETO fc=175Kg/cm2
06.06.02
COLUMNETAS Y SOLERAS.- ENCOFRADO Y DESENCOFRADO
06.06.03
COLUMNETAS Y SOLERAS.- ACERO fy=4200 Kg/cm2
06.07
GRADERIAS
06.07.01
GRADERIA.- CONCRETO fc=210 kg/cm2
06.07.02
GRADERIA.- ENCOFRADO Y DESENCOFRADO
06.07.03
GRADERIA.- ACERO fy=4200 kg/cm2
06.08
RAMPAS
06.08.01
RAMPAS.- CONCRETO f'c=210 kg/cm2
06.08.02
RAMPAS.- ACERO fy=4200 kg/cm2
06.09
CISTERNA Y CUARTO DE BOMBAS
06.09.01
CISTERNA Y CTO. DE BOMBAS.- CONCRETO fc=245 Kg/cm2
06.09.02
CISTERNA Y CTO. DE BOMBAS.- ENCOFRADO Y DESENCOFRADO CARAVISTA
06.09.03
CISTERNA Y CTO. DE BOMBAS.- ACERO fy=4200 Kg/cm2
06.10
LOSAS ALIGERADAS
06.10.01
LOSA ALIGERADA.- CONCRETO 210 kg/cm2 - 1 Y 2 PISO
06.10.02
LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADO
06.10.03
LOSA ALIGERADA.- LADR. HUECO 15X30X30
06.10.04
LOSA ALIGERADA.- ACERO fy=4200 Kg/cm2
06.11
LOSAS MACIZA

Pgina 2

Precio (S/.)

Parcial (S/.)

m3

2,701.04

23.72

64,068.67

m3
m3
m2
m2
m2
m2
m3
m2
m3
m2

237.77
32.53
293.70
3,427.00
74.28
988.65
215.01
1,380.64
31.45
378.92

154.27
203.00
29.47
53.04
45.19
24.10
154.20
25.32
202.81
28.44

36,680.78
6,603.59
8,655.34
181,768.08
3,356.71
23,826.47
33,154.54
34,957.80
6,378.37
10,776.48

5/31/2009
Total (S/.)
346,158.16

2,024,562.49
m3
kg

561.76
41,095.19

268.21
3.46

m3
m2
kg

132.49
631.89
25,588.34

279.02
41.39
3.46

m3
m3
m3
m3
m2
kg

263.54
31.64
216.42
251.56
5,740.47
66,478.60

292.25
298.65
311.41
317.71
51.81
3.46

m3
m3
m3
m2
kg

30.97
25.10
309.26
2,068.67
47,996.50

268.20
283.62
302.68
51.06
3.46

m3
m3
m2
kg

43.31
50.77
902.75
17,228.92

268.20
283.62
52.39
3.46

m3
m2
kg

72.55
672.48
3,819.19

263.56
52.39
3.46

m3
m2
kg

87.83
1,030.32
9,099.28

278.33
29.79
3.46

m3
kg

15.77
646.24

258.70
3.46

m3
m2
kg

52.76
187.26
3,769.54

250.40
51.85
3.46

m3
m2
u
kg

9.73
108.15
901.21
715.77

272.91
31.73
2.30
3.46

292,859.01
150,669.65
142,189.36
151,656.95
36,967.36
26,153.93
88,535.66
761,217.05
77,019.57
9,449.29
67,395.35
79,923.13
297,413.75
230,015.96
380,726.01
8,306.15
7,118.86
93,606.82
105,626.29
166,067.89
132,922.26
11,615.74
14,399.39
47,295.07
59,612.06
67,566.91
19,121.28
35,231.23
13,214.40
86,622.46
24,445.72
30,693.23
31,483.51
6,315.69
4,079.70
2,235.99
35,963.14
13,211.10
9,709.43
13,042.61
10,636.35
2,655.41
3,431.60
2,072.78
2,476.56
36,931.23

S10

PRESUPUESTO REFERENCIAL
"REMODELACION Y AMPLIACION DE LA GRAN UNIDAD ESCOLAR
MARIANO MELGAR"
MINISTERIO DE EDUCACION
LIMA - LIMA - BREA
Item

Costo al:
Descripcin

Unidad Metrado

06.11.01
LOSA MACIZA.- CONCRETO 210 kg/cm2
06.11.02
LOSA MACIZA.- ENCOFRADO Y DESENCOFRADO
06.11.03
LOSA MACIZA.- ACERO Fy=4200 Kg/cm2
06.12
ESCALERAS
06.12.01
ESCALERAS.- CONCRETO fc=210 kg/cm2
06.12.02
ESCALERAS.- ENCOFRADO Y DESENCOFRADO
06.12.03
ESCALERAS.- ACERO fy=4200 kg/cm2
06.13
PISCINA
06.13.01
PISCINA.-CONCRETO F`c=175Kg/cm2
06.13.02
PISCINA.-ENCOFRADO Y DESENCOFRADO
06.13.03
PISCINA.-ACERO F`y=4200Kg/cm2
07
VARIOS
07.01
PUENTE DE ADHERENCIA UNION DE CONCRETO FRESCO Y ENDURECIDO
07.02
ESTRUCTURA METLICA EN TECHO DE AUDITORIO
07.03
LIMPIEZA PERMANENTE DE LA OBRA
07.04
CHARLAS DE SEGURIDAD EN OBRA
07.05
EQUIPO DE PROTECCION PERSONAL (EPP)
07.06
PREVENCIONISMO DE SEGURIDAD EN OBRA
08
MUROS Y TABIQUES DE ALBAILERA
08.01
MURO DE LADRILLO KK TIPO IV CABEZA M : 1:1:4 e=1.5cm
08.02
MURO DE LADRILLO KK TIPO IV SOGA M : 1:1:4 e=1.5cm
08.03
MURO DE LADRILLO KK TIPO IV CANTO M : 1:1:4 e=1.5cm
09
REVOQUES ENLUCIDOS Y MOLDURAS
09.01
TARRAJEO PRIMARIO, MORTERO C:A 1:5
09.02
TARRAJEO EN MURO INTERIOR Y EXTERIOR
09.03
PAETEO PREVIO EN LADRILLO EXPUESTO
09.04
TARRAJEO EXTERIOR EN LADRILLO EXPUESTO
09.05
TARRAJEO DE COLUMNAS (INC. VESTIDURA DE ARISTA)
09.06
TARRAJEO DE VIGAS (INC. VESTIDURA DE ARISTA)
09.07
TARRAJEO EN PLACAS INTERIOR (INC. PICADO)
09.08
TARRAJEO EN PLACAS EXTERIOR (INC. PICADO)
09.09
TARRAJEO EN PIZARRA
09.10
BRUAS SEGN DETALLE
09.11
ENMARCADO DE PIZARRA
09.12
VESTIDURA DE DERRAMES (1:5) - OBRA NUEVA
09.13
CIELO RASO CON MEZCLA C:A 1:5
10
PISOS Y PAVIMENTOS
10.01
CONTRAPISO DE 50 mm
10.02
CONTRAPISO DE 50 mm EN PISOS SUPERIORES
10.03
PISO DE CEMENTO PULIDO 2"
10.04
PISO DE CEMENTO FROTACHADO Y BRUADO
10.05
PISO PORCELANATO 50 x 50 COLOR - ALTO TRANSITO
10.06
PISO PORCELANATO 40 x 40 COLOR - ALTO TRANSITO
10.07
PISO CERAMICO 40 x 40 COLOR - ALTO TRANSITO
10.08
PISO CERAMICO 20 x 20 COLOR
10.09
PISO VINLICO EN AUDITORIO ( EN ROLLO )
10.10
PISO ENTABLADO DE MADERA
11
ZOCALO
11.01
ZOCALO CERAMICO 30X30
11.02
ZOCALO CERAMICO 30X20
11.03
ZOCALO CERAMICO 20X20
11.04
SARDINEL EN DUCHA H=0.20m
12
CONTRAZOCALOS
12.01
CONTRAZOCALO DE CERAMICO H=20cm
12.02
CONTRAZOCALO CEMENTO SIN COLOREAR H = 30 cm
13
CARPINTERIA DE MADERA
13.01
PUERTA CN MACHIHEMBRADA
13.02
TICERO DE MADERA DE CEDRO (L=5m) BARNIZADO
14
CARPINTERIA METALICA Y HERRERA

Pgina 3

Precio (S/.)

Parcial (S/.)

m3
m2
kg

48.04
282.74
4,551.56

272.91
28.55
3.46

m3
m2
kg

10.30
9.89
283.78

300.73
65.90
3.46

m3
m2
kg

91.11
127.67
7,601.82

258.56
51.34
3.46

13,110.60
8,072.23
15,748.40
4,731.15
3,097.52
651.75
981.88
56,414.28
23,557.40
6,554.58
26,302.30

m2
m2
glb
glb
mes
mes

436.41
868.35
1.00
1.00
8.00
8.00

47.64
200.00
4,000.00
50,797.24
4,172.00
339.25

20,790.57
173,670.00
4,000.00
50,797.24
33,376.00
2,714.00

m2
m2
m2

646.48
1,572.81
220.51

99.94
59.86
50.20

64,609.21
94,148.41
11,069.60

m2
m2
m2
m2
m2
m2
m2
m2
m2
m
m
m
m2

1,769.31
9,536.85
3,143.44
3,143.44
333.27
551.56
1,090.80
814.54
275.00
3,790.01
323.00
516.04
583.79

15.42
17.01
9.31
14.62
24.17
34.25
19.24
24.98
17.01
5.85
7.46
9.58
28.48

27,282.76
162,221.82
29,265.43
45,957.09
8,055.14
18,890.93
20,986.99
20,347.21
4,677.75
22,171.56
2,409.58
4,943.66
16,626.34

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

5,050.87
4,488.59
1,281.82
3,165.80
4,440.10
2,480.70
2,284.49
326.37
398.95
76.32

23.87
29.12
21.66
22.73
74.24
68.80
60.28
46.94
53.74
92.45

120,564.27
130,707.74
27,764.22
71,958.63
329,633.02
170,672.16
137,709.06
15,319.81
21,439.57
7,055.78

m2
m2
m2
m

300.29
1,640.75
126.06
55.65

52.61
49.27
49.99
41.14

15,798.26
80,839.75
6,301.74
2,289.44

m
m

3,248.56
553.27

18.10
10.49

58,798.94
5,803.80

m2
u

459.05
50.00

503.50
136.79

231,131.68
6,839.50

5/31/2009
Total (S/.)

285,347.81

169,827.22

383,836.26

1,032,824.26

105,229.19

64,602.74

237,971.18

318,386.41

S10

PRESUPUESTO REFERENCIAL
"REMODELACION Y AMPLIACION DE LA GRAN UNIDAD ESCOLAR
MARIANO MELGAR"
MINISTERIO DE EDUCACION
LIMA - LIMA - BREA
Item
14.01
14.02
14.03
14.04
14.05
14.06
15
15.01
15.02
15.03
15.04
16
16.01
16.02
17
17.01
17.02
17.03
18
18.01
18.02
18.03
18.04
18.05
18.06
18.07
18.08
19
19.01
19.02
19.03
19.04
19.05
20
20.01
20.02
20.03
20.04
20.05
20.06
20.07
20.08
20.09
20.10
20.11
20.12
20.13
21
21.01
21.02
21.03
21.04
21.05
22
22.01
22.02
23
23.01
23.02

Costo al:
Descripcin

Unidad Metrado

PASAMANO DE FIERRO P/ SSHH DISCAPACITADOS


BARANDA METALICA
PUERTA DE FIERRO
VENTANA DE FIERRO
SUMINISTRO Y COLOCACION DE ESCALERA DE GATO
CERCO TIPO MALLA CON COLUMNAS FG 3
CERRAJERIA
BISAGRA DE ACERO ALUMINIZADA DE 3 1/2"
BISAGRA DE ACERO ALUMINIZADA DE 4"
CERRADURA TRES GOLPES EN PUERTAS
PICAPORTE EN PUERTAS DE SS.HH.
CARPINTERIA DE ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO EN VENTANAS
SUMINISTRO Y COLOCACION DE ALUMINIO EN PUERTA PRINCIPAL
VIDRIOS, CRISTALES Y SIMILARES
SUMINISTRO Y COLOCACION DE VIDRIO CRUDO DE 6mm EN VENTANAS
SUMINISTRO Y COLOCACION DE VIDRIO CRISTAL TEMPLADO DE 6mm EN VENTANAS
SUMINISTRO Y COLOCACION DE VIDRIO CRISTAL TEMPLADO DE 10mm
PINTURA
PINTURA EXTERIOR
PINTURA LATEX EN MUROS Y COLUMNAS
PINTURA LATEX EN CIELORASO Y VIGAS
PINTURA EN PIZARRA
PINTURA ESMALTE EN CONTRAZOCALO
PINTURA DEMARCACION DE LOSA DEPORTIVA
PINTURA ESMALTE EN SARDINEL
IMPRIMACION DE MUROS Y CIELO RASO
COBERTURA
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
CUBIERTA DE LADRILLO PASTELERO ASENTADO CON BARRO
CUBIERTA DE CALAMINON
CUBIERTA TIPO TERMOTECHO TCA
CUBIERTA DE ALUMINIO EN INGRESO PRINCIPAL
VARIOS
MESA DE CONCRETO REVEST. C/PORCELANATO P/LAVADERO TIPO OVALIN
MESA DE CONCRETO REVEST. C/PORCELANATO LABORATORIO (3.60X0.80)
MESA DE CONCRETO REVEST. C/PORCELANATO LABORATORIO (1.80X0.80)
MESA DE CONCRETO EN COCINA
BANCAS, CONCRETO CICLOPEO C/ENCHAPE CERAMICO
ASTA DE BANDERA
CASETA METALICA DE CONTROL (KIOSKO)
BANCAS, CONCRETO 1:8 + 25% P.M.
SUMINISTRO Y COLOCACION DE GRASS SINTETICO
ARCOS DE FUTBOL
SUMINISTRO Y COLOCACION DE CELOSIA DE Fe
TABIQUE DE MELAMINE CON ESTRUCTURA DE ALUMINIO EN SSHH
CERCO TIPO UNI
TRABAJOS PRELIMINARES
EXCAVACION DE ZANJAS EN REDES ELECTRICAS
SOLADO P/COLOCACION DE DUCTOS Y TUB. E=2"
RELLENO MANUAL C/MATERIAL PROPIO EN REDES ELECTRICAS
DESMONTAJE DE ARTEFACTOS ELECTRICOS
PICADO Y RESANE EN MURO P/TUBO ( SECCION 10x7.5cm)
SALIDA PARA CENTRO DE LUZ
SALIDA PARA LUMINARIA EN TECHO
SALIDA PARA LUMINARIA EN PARED
SALIDA PARA INTERRUPTOR DE LUZ
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR DOBLE

Pgina 4

Precio (S/.)

Parcial (S/.)

m
m
m2
m2
m
m2

12.10
416.30
210.20
189.69
3.00
1,121.76

82.53
206.71
210.00
95.00
52.10
150.67

998.61
86,053.37
44,142.00
18,020.55
156.30
169,015.58

pza
pza
pza
pza

956.00
52.00
240.00
99.00

4.55
6.02
63.12
4.23

4,349.80
313.04
15,148.80
418.77

m2
m2

1,882.90
133.38

235.01
33.39

442,500.33
4,453.56

m2
m2
m2

90.00
1,882.90
133.38

52.42
144.88
247.18

4,717.80
272,794.55
32,968.87

m2
m2
m2
m2
m
m
m
m2

5,112.38
22,130.00
11,971.01
275.00
552.89
880.00
842.05
29,110.31

9.40
5.81
5.81
15.45
6.62
4.99
5.10
3.17

48,056.37
128,575.30
69,551.57
4,248.75
3,660.13
4,391.20
4,294.46
92,279.68

m2
m2
m2
m2
m2

4,268.67
4,268.67
1,113.53
561.86
39.49

4.67
29.59
46.36
127.18
183.90

19,934.69
126,309.95
51,623.25
71,457.35
7,262.21

u
u
u
u
m
u
u
m
m2
u
m2
m
m

21.25
13.00
4.00
1.00
3.98
1.00
3.00
23.40
6,400.00
2.00
153.24
126.40
94.99

518.57
960.21
551.04
1,918.18
149.03
1,061.04
1,500.00
96.03
117.15
3,050.00
72.95
465.69
165.51

11,019.61
12,482.73
2,204.16
1,918.18
593.14
1,061.04
4,500.00
2,247.10
749,760.00
6,100.00
11,178.86
58,863.22
15,721.79

m3
m
m3
u
m

326.12
470.70
326.12
1,114.00
1,577.55

33.66
9.57
17.63
10.91
19.95

10,977.20
4,504.60
5,749.50
12,153.74
31,472.12

pto
pto

1,143.00
74.00

78.01
105.01

89,165.43
7,770.74

pto
pto

288.00
5.00

8.15
12.23

2,347.20
61.15

5/31/2009
Total (S/.)

20,230.41

446,953.89

310,481.22

355,057.46

276,587.45

877,649.83

64,857.16

96,936.17

2,522.59

S10

PRESUPUESTO REFERENCIAL
"REMODELACION Y AMPLIACION DE LA GRAN UNIDAD ESCOLAR
MARIANO MELGAR"
MINISTERIO DE EDUCACION
LIMA - LIMA - BREA
Item
23.03
23.04
24
24.01
24.02
24.03
24.04
25
25.01
25.02
25.03
25.04
25.05
25.06
25.07
25.08
26
26.01
26.02
26.03
26.04
26.05
26.06
26.07
26.08
26.09
27
27.01
27.02
27.03
27.04
27.05
27.06
27.07
27.08
27.09
27.10
27.11
27.12
27.13
27.14
27.15
27.16
27.17
27.18
27.19
27.20
27.21
27.22
27.23
27.24
27.25
27.26
28
28.01
28.02
28.03
28.04
28.05

Costo al:
Descripcin

Unidad Metrado

SALIDA PARA INTERRUPTOR TRIPLE


pto
SALIDA PARA INTERRUPTOR DE CONMUTACION
pto
SALIDAS PARA TOMACORRIENTES
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA (EN PARED)
pto
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA (EN RACK)
pto
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA (EN TECHO)
pto
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA A PRUEBA DE AGUA (EN PARED) pto
SALIDA DE FUERZA
SALIDA DE FUERZA (TALLER DE CONSTRUCCION)
pto
SALIDA DE FUERZA (TALLER DE CONSTRUCCIONES METALICAS)
pto
SALIDA DE FUERZA (TALLER DE FUNDICIN)
pto
SALIDA DE FUERZA (TALLER DE MECANICA)
pto
SALIDA DE FUERZA (TALLER AUTOMOTRIZ)
pto
SALIDA DE FUERZA (TALLER DE CARPINTERIA)
pto
SALIDA DE FUERZA (CAFETERIA)
pto
SALIDA DE FUERZA (CTO. MAQUINAS)
pto
CAJAS DE PASE
CAJA DE PASE 100x100x50MM
u
CAJA DE PASE 150x150x100MM
u
CAJA DE PASE 200x200x100MM
u
CAJA DE PASE 250x250x100MM
u
CAJA DE PASE 300x300x100MM
u
CAJA DE PASE 400x400x100MM
u
CAJA DE PASE 500x500x100MM
u
CAJA DE PASE 600x600x100MM
u
CAJA DE PASE OCTOGONAL
u
TABLEROS
TABLERO ELECTRICO TG-1 (1-3X630A,3-3X400A,2-3X300A,1-3X250A,1-3X200A,4-3X100A)
u
TABLERO ELECTRICO TG-2 (1-3X630A,2-3X400A,2-3X300A,1-3X250A,3-3X200A)
u
TABLERO ELECTRICO STD-A,(1-3X250A,2-3X40A,3-3X30A,16-2X20A,5IDX25-30mA)
u
TABLERO ELECTRICO STE-1,(1-3X100A,2-3X40A,6-2X20A,2IDX25-30mA)
u
TABLERO ELECTRICO STD-B,(1-3X300A,3-3X40A,11-2X20A,3IDX25-30mA)
u
TABLERO ELECTRICO STE-2,(1-3X400A,7-3X40A,21-2X20A,7IDX25-30mA)
u
TABLERO ELECTRICO STE-3,(1-3X400A, 7-2X20A,7IDX25mA)
u
TABLERO ELECTRICO STD-C,(1-3X400A,2-3X40A,2-3X30A,11-2X20A,4IDX25-30mA,1IH2X20A) u
TABLERO ELECTRICO STD-D,(1-3X400A,4-3X40A,11-2X20A,4IDX25-30mA,1IH2X20A)
u
TABLERO ELECTRICO STD-E,(1-3X200A,4-3X40A,11-2X20A,4IDX25-30mA,1IH2X20A)
u
TABLERO ELECTRICO STD-F,(1-3X300A,4-3X40A,11-2X20A,4IDX25-30mA,1IH2X20A)
u
TABLERO ELECTRICO STD-G,(1-3X400A,4-3X40A,1-3X100A,11-2X20A,4IDX25-30mA,1IH2X20A)u
TABLERO ELECTRICO STD-H1,(1-3X300A,1-3X200A,1-3X100A,2-3X40A,6-2X20A,2IDX25-30mA)u
TABLERO ELECTRICO STD-H11,(1-3X100A,6-2X20A)
u
TABLERO ELECTRICO STD-H12,(1-3X200A,8-2X20A)
u
TABLERO ELECTRICO STD-H2,(1-3X200A,2-3X40A,5-3X30A,7-2X20A,2IDX25-30mA)
u
TABLERO ELECTRICO STD-H3,(1-3X400A,2-3X40A,8-3X30A,6-2X20A,2IDX25-30mA)
u
TABLERO ELECTRICO STD-H4,(1-3X100A,4-3X40A,14-2X20A,4ID2X25-30mA)
u
TABLERO ELECTRICO STD-H5,(1-3X250A,2-3X40A,4-3X30A,19-2X20A,6ID2X25-30mA)
u
TABLERO ELECTRICO STD-I,(1-3X250A,6-3X40A,7-2X20A,2IDX25-30mA)
u
TABLERO ELECTRICO STD-J1,(1-3X200A,1-3X40A,4-3X30A,2-2X30A,5-2X20A,2IDX25-30mA) u
TABLERO ELECTRICO STD-J2,(1-3X200A,1-3X40A,4-3X30A,1-2X30A,5-2X20A,2IDX25-30mA) u
TABLERO ELECTRICO STD-AU,(1-3X100A,2-3X40A,2-3X30A,12-2X20A,4IDX25-30mA)
u
TABLERO ELECTRICO STD-COM,(1-3X100A,2-3X40A,6-2X20A,2IDX25-30mA,1IH2X20A)
u
TABLERO ELECTRICO STD-VES1,(1-3X40A,4-2X20A,1IDX25-30mA)
u
TABLERO ELECTRICO STD-VES2,(1-3X100A,1-3X40A,6-2X20A,1IDX25-30mA,1IH2X20A)
u
CABLES Y CONDUCTORES
CABLE 3-1X95mm2 N2XH + 1X35mm2 (T) PVC-P 55mm (TG / STD-A)
m
CABLE 3-1X25mm2 N2XH + 1x10mm2 (T) PVC -P 25mm (TG / STE-1)
m
CABLE 3-1X150mm2 NHX90 + 1X35mm2 (T) PVC-P 90mm (TG / STD-B)
m
CABLE 3-1X185mm2 NHX90 + 1X35mm2 (T) PVC-P 90mm (TG / STE-2)
m
CABLE 3-1X185mm2 NHX90 + 1X35mm2 (T) PVC-P 90mm (TG / STD-C)
m

Pgina 5

Precio (S/.)

5/31/2009

Parcial (S/.)

3.00
4.00

14.32
17.82

42.96
71.28

618.00
104.00
7.00
7.00

95.98
96.97
103.54
95.50

59,315.64
10,084.88
724.78
668.50

9.00
10.00
6.00
27.00
13.00
21.00
2.00
4.00

221.49
176.69
176.69
176.69
176.69
176.69
201.98
115.08

1,993.41
1,766.90
1,060.14
4,770.63
2,296.97
3,710.49
403.96
460.32

19.00
47.00
36.00
6.00
8.00
26.00
1.00
5.00
4.00

37.41
43.41
52.08
56.66
66.76
106.75
116.86
119.81
22.98

710.79
2,040.27
1,874.88
339.96
534.08
2,775.50
116.86
599.05
91.92

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

10,065.76
9,347.76
3,477.94
1,799.44
3,054.32
3,029.36
2,692.22
3,355.56
3,372.64
3,252.64
3,252.64
3,704.64
3,827.30
1,479.00
1,928.52
3,088.06
3,360.50
2,893.82
3,706.90
3,011.30
2,960.72
2,934.96
2,825.22
1,837.54
723.98
1,837.54

10,065.76
9,347.76
3,477.94
1,799.44
3,054.32
3,029.36
2,692.22
3,355.56
3,372.64
3,252.64
3,252.64
3,704.64
3,827.30
1,479.00
1,928.52
3,088.06
3,360.50
2,893.82
3,706.90
3,011.30
2,960.72
2,934.96
2,825.22
1,837.54
723.98
1,837.54

46.20
70.20
76.20
104.35
102.40

99.75
31.19
125.25
163.98
163.98

4,608.45
2,189.54
9,544.05
17,111.31
16,791.55

Total (S/.)

70,793.80

16,462.82

9,083.31

86,820.28

157,264.72

S10

PRESUPUESTO REFERENCIAL
"REMODELACION Y AMPLIACION DE LA GRAN UNIDAD ESCOLAR
MARIANO MELGAR"
MINISTERIO DE EDUCACION
LIMA - LIMA - BREA
Item

Costo al:
Descripcin

Unidad Metrado

28.06
CABLE 3-1X185MM2 NHX90 + 1X35MM2 (T) PVC-P 90mm (TG/STE-3)
28.07
CABLE 3-1X240mm2 NHX90 + 1X50mm2 (T) PVC-P 90mm (TG / STD-D)
28.08
CABLE 3-1X70mm2 NHX90 + 1X25mm2 (T) PVC-P 55mm (TG / STD-E)
28.09
CABLE 3-1X150mm2 NHX90 + 1X35mm2 (T) PVC-P 90mm (TG / STD-F)
28.10
CABLE 3-1X240mm2 NHX90 + 1X50mm2 (T) PVC-P 90mm (TG / STD-G)
28.11
CABLE 3-1X25mm2 NHX90 + 1X10mm2 (T) PVC-P 55mm (STD / STD-VES2)
28.12
CABLE 3-1X120mm2 NHX90 + 1X35mm2 (T) PVC-P 90mm (TG / STD-H1)
28.13
CABLE 3-1X25mm2 NHX90 + 1X10mm2 (T) PVC-P 55mm (STD-H1 / STD-H11)
28.14
CABLE 3-1X70mm2 NHX90 + 1X25mm2 (T) PVC-P 55mm (STD-H1 / STD-H12)
28.15
CABLE 3-1X50mm2 NHX90 + 1X16mm2 (T) PVC-P 55mm (TG / STD-H2)
28.16
CABLE 3-1X185mm2 NHX90 + 1X35mm2 (T) PVC-P 90mm (TG / STD-H3)
28.17
CABLE 3-1X50mm2 NHX90 + 1X16mm2 (T) PVC-P 55mm (TG / STD-H4)
28.18
CABLE 3-1X50mm2 NHX90 + 1X16mm2 (T) PVC-P 55mm (TG / STD-H5)
28.19
CABLE 3-1X95mm2 N2XH + 1X35mm2 (T) PVC-P 55mm (TG / STD-I)
28.20
CABLE 3-1X70mm NHX90 + 1X25mm2 (T) PVC-P 55mm (TG / STD-J1)
28.21
CABLE 3-1X70mm NHX90 + 1X25mm2 (T) PVC-P 55mm (TG / STD-J2)
28.22
CABLE 3-1X35mm NHX90 + 1X10mm2 (T) PVC-P 55mm (TG / STD-AU)
28.23
CABLE 3-1X35mm NHX90 + 1X10mm2 (T) PVC-P 55mm (TG / STD-COM)
28.24
CABLE 3-1x10mm2 NH70 + 1x10mm2 (T) PVC-P 25mm (MED-STD-VES1)
29
CONDUCTOS Y CANALIZACIONES
29.01
TUBERIA PVC ELECTRICAS 2" (55mm)
29.02
INSTALACIN DUCTOS DE CONCRETO
29.03
BUZONETA DE ALIMENTADORES Y COMUNICACION
30
ARTEFACTOS ELECTRICOS
30.01
LUMINARIA TIPO 1
30.02
LUMINARIA TIPO 11
30.03
LUMINARIA TIPO 2
30.04
LUMINARIA TIPO 3
30.05
LUMINARIA TIPO 4
30.06
LUMINARIA TIPO 5
30.07
LUMINARIA TIPO 6
30.08
LUMINARIA TIPO 7
30.09
LUMINARIA TIPO 8
30.10
LUMINARIA TIPO 9
30.11
LUZ DE EMERGENCIA
31
SISTEMA DE COMUNICACIONES
31.01
SALIDA PARA DATA EN PARED
31.02
SALIDA PARA DATA EN TECHO
31.03
SALIDA PARA PARLANTES
31.04
SALIDA PARA MICROFONO
31.05
SALIDA PARA CENTRAL DE MUSICA
31.06
SALIDA PARA INTERRUPTOR
31.07
SALIDA PARA PROYECTOR
32
SISTEMA DE PUESTA A TIERRA
32.01
SISTEMA DE PUESTA A TIERRA (INC. POZOS Y CABLES DESNUDOS 70mm2)
33
PRUEBAS ELECTRICAS
33.01
PRUEBAS DE AISLAMIENTO Y RESISTIVIDAD RED GENERAL
34
RED GENERAL DE DESAGUE
34.01
MOVIMIENTO DE TIERRAS
34.01.01
EXCAVACION DE ZANJA PARA TUBERIA DE DESAGUE
34.01.02
RELLENO DE ZANJA PARA TUBERIA DE DESAGUE
34.02
SUMINISTRO E INTALACION DE TUBERIAS
34.02.01
RED DE DISTRIBUCION TUBERIA DE PVC SAL 6"
34.02.02
RED DE DISTRIBUCION TUBERIA DE PVC SAL 4"
34.03
CAJAS Y TAPA
34.03.01
CAJA DE REGISTRO DE ALBAILERIA DE 12" X 24" CON TAPA DE CONCRETO
34.03.02
CAJA DE REGISTRO DE ALBAILERIA DE 18" X 24" CON TAPA DE CONCRETO
34.03.03
CAJA DE REGISTRO DE ALBAILERIA DE 24" X 24" CON TAPA DE CONCRETO
34.03.04
TAPA DE CONCRETO DE CAJAS DE REGISTRO

Pgina 6

Precio (S/.)

Parcial (S/.)

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

104.35
128.20
46.20
71.20
8.50
43.00
22.50
13.50
16.50
41.00
57.00
67.45
73.95
61.50
70.00
70.00
38.20
84.20
10.60

163.98
215.45
70.73
125.25
215.45
35.68
201.72
35.68
70.73
53.52
163.98
53.52
53.52
99.75
70.73
70.73
42.29
42.29
21.44

17,111.31
27,620.69
3,267.73
8,917.80
1,831.33
1,534.24
4,538.70
481.68
1,167.05
2,194.32
9,346.86
3,609.92
3,957.80
6,134.63
4,951.10
4,951.10
1,615.48
3,560.82
227.26

m
m
u

598.45
470.70
15.00

15.48
78.05
375.80

9,264.01
36,738.14
5,637.00

u
u
u
u
u
u
u
u
u
u
u

327.00
178.00
318.00
242.00
49.00
20.00
20.00
55.00
3.00
6.00
77.00

154.07
184.47
152.47
121.95
75.67
322.07
174.87
203.37
188.15
342.07
93.57

50,380.89
32,835.66
48,485.46
29,511.90
3,707.83
6,441.40
3,497.40
11,185.35
564.45
2,052.42
7,204.89

pto
pto
pto
pto
pto
pto
pto

165.00
11.00
15.00
1.00
1.00
12.00
1.00

104.75
111.66
114.65
90.26
83.76
89.52
97.39

17,283.75
1,228.26
1,719.75
90.26
83.76
1,074.24
97.39

8.00

1,001.50

8,012.00

glb

1.00

4,000.00

4,000.00

5/31/2009
Total (S/.)

51,639.15

195,867.65

21,577.41

8,012.00
4,000.00
116,371.30
m3
m3

856.25
856.25

24.77
19.82

m
m

764.75
91.50

71.23
22.50

u
u
u
u

38.00
8.00
3.00
49.00

176.60
189.60
220.64
55.30

38,180.19
21,209.31
16,970.88
56,531.89
54,473.14
2,058.75
11,599.22
6,710.80
1,516.80
661.92
2,709.70

S10

PRESUPUESTO REFERENCIAL
"REMODELACION Y AMPLIACION DE LA GRAN UNIDAD ESCOLAR
MARIANO MELGAR"
MINISTERIO DE EDUCACION
LIMA - LIMA - BREA
Item

Costo al:
Descripcin

Unidad Metrado

34.04
CAMARA DE INSPECCION
34.04.01
BUZON STANDAR DE D=1.20m H=1.40m
35
RED GENERAL DE AGUA POTABLE
35.01
MOVIMIENTO DE TIERRAS
35.01.01
EXCAVACION DE ZANJA PARA TUBERIA DE AGUA
35.01.02
RELLENO DE ZANJA PARA TUBERIA DE AGUA
35.02
RED DE ALIMENTADOR EXTERIOR
35.02.01
RED DE ALIMENTADOR TUBERIA DE 1/2"
35.02.02
RED DE ALIMENTADOR TUBERIA DE 3/4"
35.02.03
RED DE ALIMENTADOR TUBERIA DE 1"
35.02.04
RED DE ALIMENTADOR TUBERIA DE 1 1/4"
35.02.05
RED DE ALIMENTADOR TUBERIA DE 1 1/2"
35.02.06
RED DE ALIMENTADOR TUBERIA DE 2"
35.02.07
RED DE ALIMENTADOR TUBERIA DE 4"
36
INSTALACIONES SANITARIAS DE DESAGUE
36.01
EXCAVACION DE ZANJAS PARA REDES
36.02
RELLENO MANUAL CON MATERIAL PROPIO
36.03
SALIDA DE DESAGUE EN PVC
36.04
SALIDA PARA VENTILACION
36.05
CAMA DE ARENA
36.06
PICADO DE MURO Y RESANE (SECCION 10x7.5 cm)
36.07
PICADO DE PISO Y RESANE (SECCION 10x7.5 cm)
36.08
TUBERIA PVC-SAL 2"
36.09
TUBERIA PVC-SAL 3"
36.10
TUBERIA PVC-SAL 4"
36.11
SUMIDERO DE BRONCE 2"
36.12
SUMIDERO DE BRONCE 3"
36.13
REGISTROS DE BRONCE DE 2"
36.14
REGISTROS DE BRONCE DE 3"
36.15
REGISTROS DE BRONCE DE 4"
36.16
REJILLA DE BRONCE 2"
36.17
REJILLA DE BRONCE 3"
37
INSTALACIONES SANITARIAS DE AGUA
37.01
SALIDA DE AGUA FRIA.- PVC
37.02
SALIDA DE AGUA FRIA PVC 1"
37.03
SALIDA DE AGUA FRIA PARA 1 1/4"
37.04
TUBERIA PVC CLASE 10 - 1/2" ROSCADA
37.05
TUBERIA PVC CLASE 10 - 3/4" ROSCADA
37.06
TUBERIA PVC CLASE 10 - 1" ROSCADA
37.07
TUBERIA PVC CLASE 10 - 1 1/4" ROSCADA
37.08
TUBERIA PVC CLASE 10 - 1 1/2" ROSCADA
37.09
TUBERIA PVC CLASE 10 - 2" ROSCADA
37.10
VALVULA GLOBO 1/2"
37.11
VALVULA TIPO BOLA 1/2"
37.12
VALVULA TIPO BOLA 3/4"
37.13
VALVULA TIPO BOLA 1"
37.14
VALVULA TIPO BOLA 1 1/4"
37.15
VALVULA TIPO BOLA 1 1/2"
37.16
CAJA DE MADERA PARA VALVULA
38
APARATOS SANITARIOS Y ACCESORIOS
38.01
INODORO BLANCO PARA FLUXOMETRO
38.02
INODORO TANQUE BAJO DE LOSA
38.03
URINARIOS DE LOZA DE PICO
38.04
URINARIO CORRIDO DE CEMENTO CON ENCHAPE CERAMICO
38.05
LAVATORIO DE LOZA BLANCA
38.06
LAVADERO TIPO OVALIN
38.07
LAVADERO DE ACERO INOXIDABLE
38.08
DUCHA SIMPLE CON GRIFERIA
38.09
JABONERA LOSA BLANCA

10.00

Precio (S/.)
1,006.00

Parcial (S/.)

5/31/2009
Total (S/.)

10,060.00
10,060.00
68,327.33

m3
m3

977.98
977.95

24.77
19.82

m
m
m
m
m
m
m

7.30
4.60
38.20
44.40
70.65
531.10
281.70

9.77
11.07
14.99
15.84
16.75
21.21
38.60

43,607.53
24,224.56
19,382.97
24,719.80
71.32
50.92
572.62
703.30
1,183.39
11,264.63
10,873.62

m3
m3
pto
pto
m
m
m
m
m
m
u
u
u
u
u
u
u

50.00
50.00
245.00
100.00
281.50
281.50
281.50
279.50
4.00
120.40
22.00
13.00
55.00
6.00
47.00
77.00
1.00

24.77
19.82
78.61
61.34
32.62
16.52
12.49
14.44
17.45
22.42
35.06
41.84
23.27
27.71
35.24
35.79
58.35

1,238.50
991.00
19,259.45
6,134.00
9,182.53
4,650.38
3,515.94
4,035.98
69.80
2,699.37
771.32
543.92
1,279.85
166.26
1,656.28
2,755.83
58.35

pto
pto
pto
m
m
m
m
m
m
u
u
u
u
u
u
pza

209.00
26.00
103.00
110.75
73.20
37.30
153.10
215.00
14.85
21.00
25.00
31.00
4.00
40.00
21.00
121.00

100.52
92.96
107.02
9.82
10.89
14.81
16.00
16.57
20.27
83.90
82.02
97.75
114.48
163.48
211.21
41.09

21,008.68
2,416.96
11,023.06
1,087.57
797.15
552.41
2,449.60
3,562.55
301.01
1,761.90
2,050.50
3,030.25
457.92
6,539.20
4,435.41
4,971.89

pza
pza
pza
m
pza
pza
pza
pza
u

102.00
7.00
26.00
28.96
36.00
85.00
2.00
60.00
60.00

538.77
256.57
373.25
159.29
167.77
336.97
332.51
75.56
26.09

54,954.54
1,795.99
9,704.50
4,613.04
6,039.72
28,642.45
665.02
4,533.60
1,565.40

59,008.76

66,446.06

122,345.29

Pgina 7

S10

PRESUPUESTO REFERENCIAL
"REMODELACION Y AMPLIACION DE LA GRAN UNIDAD ESCOLAR
MARIANO MELGAR"
MINISTERIO DE EDUCACION
LIMA - LIMA - BREA
Item

Costo al:
Descripcin

Unidad Metrado

38.10
PAPELERA DE CERAMICA
38.11
ESPEJO SEMI DOBLE EMPOTRADO EN PARED
39
VARIOS
39.01
SISTEMA DE RIEGO
39.01.01
SISTEMA DE RIEGO
39.02
PRUEBA HIDRAULICA
39.02.01
PRUEBA HIDRAULICA EN TUBERIA DE DESAGUE
39.02.02
PRUEBA HIDRAULICA EN TUBERIA DE AGUA
39.03
EQUIPO DE BOMBA
39.03.01
SUMINISTRO E INSTALACION DE EQUIPO DE BOMBEO PRESION CONSTANTE
39.04
EQUIPO DE RECIRCULACION PARA PISCINA
39.04.01
DESNATADOR DE DIAMETRO 8"
39.04.02
BOQUILLAS PARA RETORNOS DE AGUA
39.04.03
DRENAJE DE FONDO DIAMETRO 16"
39.04.04
SUMIDERO DE SUPERFICIE DE BRONCE DIAMETRO 8"
39.04.05
VALVULA COMPUERTA DE BRONCE PESADA DE 3"
39.04.06
TANQUE FILTRO CON CAPACIDAD DE FILTRADO DE 40 M3/HORA
39.04.07
ELECTROBOMBA CON TRAMPA PARA PELOS Pot= 7 HP
39.04.08
SISTEMA DE CLORINADOR CON TANQUES DE CLORO 02 DE RECAMBIO
39.04.09
ELECTROBOMBA DE SUMIDEROS POTENCIA 1/2 HP
39.04.10
INSTALACION DE EQUIPOS DE RECIRCULACION

u
u

109.00
121.00

Precio (S/.)
30.47
53.80

Parcial (S/.)

5/31/2009
Total (S/.)

3,321.23
6,509.80
89,306.34

873.97

18.65

glb
glb

1.00
1.00

2,195.74
2,462.41

1.00

28,500.00

u
u
u
u
u
u
u
u
u
u

6.00
8.00
1.00
8.00
16.00
3.00
2.00
1.00
1.00
1.00

512.03
382.03
461.20
242.88
299.81
1,479.00
4,270.00
2,956.00
963.36
9,622.67

16,299.54
16,299.54
4,658.15
2,195.74
2,462.41
28,500.00
28,500.00
39,848.65
3,072.18
3,056.24
461.20
1,943.04
4,796.96
4,437.00
8,540.00
2,956.00
963.36
9,622.67
9,405,358.47
1,175,669.81
705,401.89
------------------11,286,430.17
2,144,421.73
==========
13,430,851.90

COSTO DIRECTO (C.D.) :


Gastos Generales ( 12.5 % del C.D.)
Utilidad ( 7.5 % del C.D. )
COSTO DE OBRA :
Impuesto General a las Ventas 19% (I.G.V.)
COSTO TOTAL:

Pgina 8