Professional Documents
Culture Documents
A, AMP
AFF
APPROX
AT
ATS
AWG
AMPERE
ABOVE FINISHED FLOOR
APPROXIMATE
AMPERE TRIP
ACCEPTANCE TEST SPECIFICATIONS
AMERICAN WIRE GAUGE
BKR
BLDG
BREAKER
BUILDING
C
CAB
CB
CKT
CM
COB
COTR
CS
CT
CU
CONDUIT
CABINET
CIRCUIT BREAKER
CIRCUIT
CIRCULAR MILS
CORPORATE OFFICE BUILDING
CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE
CONTROL SWITCH
CURRENT TRANSFORMER
COPPER
DIA
DISC
DWG
DIAMETER
DISCONNECT
DRAWING
EA
EL, ELEV
ELEC
EMH
EMT
EQUIP
EX, EXIST
EPS
ETU
EACH
ELEVATION
ELECTRIC
ELECTRIC MANHOLE
ELECTRICAL METALLIC TUBING
EQUIPMENT
EXISTING
ELECTRONIC POWER SUPPLY
ELECTRONIC TRIP UNIT
F
FDR
FLA
FR
FT
FVR
FVNR
FUSE, FUSIBLE
FEEDER
FULL LOAD AMPERES
FRAME
FEET, FOOT
FULL VOLTAGE REVERSING
FULL VOLTAGE NON REVERSING
GFI
GFCI
GRD
HOA
HZ
HAND-OFF-AUTOMATIC
HERTZ
INT
IPC
INTERIOR
INDUSTRIAL PC
JUNCTION BOX
JB
KAIC
KCMIL
KV
KVA
KW
LSI
LSIG
LV
SYMBOL LIST
MAX
MCB
MCC
MCP
MDP
MIN.
MISC
MTD
MVA
N.C.
NEC
NEUT
N.O.
NO.
NTS
NEMA
NETA
MAXIMUM
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MOTOR CIRCUIT PROTECTOR
MAIN DISTRIBUTION PANEL
MINIMUM
MISCELLANEOUS
MOUNTED
MEGA VOLT AMPERE
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NEUTRAL
NORMALLY OPEN
NUMBER
NOT TO SCALE
NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
INTERNATIONAL ELECTRICAL TESTING
ASSOCIATION
P
PB
PH
PLC
PNL
PVC
POLE
PULL BOX,
PUSH BUTTON
PHASE
PROGRAMMABLE LOGIC CONTROLLER PANEL
POLYVINYL CHLORIDE
RGS
SCH
SPEC
STD
SUSP
SW
SWBD
SWGR
S/N
SCHEDULE
SPECIFICATION
STANDARD
SUSPENDED
SWITCH
SWITCHBOARD
SWITCHGEAR
SOLID NEUTRAL
TEMP
TERM
3/C
3/P 3 WAY
THRU
TP
TTB
TV
TVSS
TYP.
TEMPORARY
TERMINAL
THREE CONDUCTOR
THREE POLE THREE WAY
THROUGH
TRIP
TELEPHONE TERMINAL BOARD
TELEVISION
TRANSIENT VOLTAGE SURGE SUPPRESSOR
TYPICAL
U/G
UON
UNDERGROUND
UNLESS OTHERWISE NOTED
V
VA
VOLT
VOLT AMPERE
W
WXD
W/
W/O
WP
WATTS
WIDTH X DEPTH
WITH
WITHOUT
WATERPROOF, WEATHERPROOF
XFMR
TRANSFORMER
SYMBOL LIST
PUSHBUTTON MOMENTARY, 1 NORMALLY OPEN CONTACT
PUSHBUTTON MOMENTARY, 1 NORMALLY CLOSED
A-1,3
GROUND
SWITCH
TRIPPING RELAY
CIRCUIT BREAKER
FUSE
FUSED SWITCH
CONTROL SWITCH
PLC
UPS
TVSS
TRANSFORMER
DF1102
EL00.001
HGP
1 OF 1
DRH
FDH
3 of 28
File name:..\DF1102EL00001.dwg
1. SEE DWG. EL00.003 & EL00.004 FOR PHASING SEQUENCE OF CONSTRUCTION REQUIREMENTS.
SEE OTHER ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS.
2. FIELD SURVEY AND VERIFY EXACT LOCATION OF EXISTING EQUIPMENT AND CONTROL DEVICES
TO REMAIN. ALL EXISTING EQUIPMENT/SYSTEMS TO REMAIN SHALL BE PROTECTED DURING
CONSTRUCTION.
2. REMOVE ALL DEMOLISHED MATERIAL AND EQUIPMENT FROM SITE AND DISPOSE OF IN A
LAWFUL MANNER.
3. ALL PENETRATIONS OF WALLS, FLOORS, OR CEILINGS SHALL BE CORE DRILLED. SEAL AROUND
CORE-DRILL OPENINGS AND RACEWAY/SLEEVES.
4. SIZE AND QUANTITY OF WIRING AND CONDUIT INDICATED ON THE SWITCHGEAR
SCHEDULE/POWER CONDUIT SCHEDULE SHALL APPLY TO THE ENTIRE LENGTH OF THE BRANCH
CIRCUIT/FEEDER, THROUGH ANY SWITCHES/DISCONNECTS/JUNCTION BOXES OR OTHER
INTERMEDIATE POINTS, ALL THE WAY UP TO FINAL LOAD CONNECTION UON.
5. KEEP ALL CONTROL WIRING IN SEPARATE RACEWAYS FROM OTHER/POWER WIRING.
6. PROVIDE INDEPENDENT SUPPORTS FOR ALL FREE STANDING SWITCHGEARS/EQUIPMENT AS
PER MANUFACTURER'S REQUIREMENTS.
7. ADJUST EXACT LOCATIONS OF EQUIPMENT AND DEVICES TO SUIT FIELD CONDITIONS.
8. DO NOT COMBINE FEEDER WIRING FOR DIFFERENT LOADS IN THE SAME RACEWAY.
9. COORDINATE WITH ALL EXISTING FEEDERS ROUTING OVERHEAD/UNDERGROUND WITH NEW
EQUIPMENT FEEDERS CONNECTIONS BEFORE STARTING INSTALLATION OF SWITCHGEARS.
CONTRACTOR SHALL COORDINATE ALL UTILITY LOCATING WORK WITH THE COTR AT LEAST 72
HOURS PRIOR TO COMMENCING WORK.
10. RONALD REAGAN NATIONAL AIRPORT SHALL REMAIN OPERATIONAL BEFORE, DURING AND
AFTER CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH THE COTR THE POWER
OUTAGE SCHEDULE, MINIMUM 30 DAYS IN ADVANCE, AND SHALL NOT PROCEED WITHOUT
WRITTEN PERMISSION FROM THE COTR. CONTRACTOR SHALL BE ENTIRELY RESPONSIBLE FOR
TEMPORARY CONSTRUCTION POWER. CONTRACTOR SHALL PROVIDE ALL TEMPORARY
ELECTRICAL CONNECTIONS AND EQUIPMENT. CONTRACTOR SHALL PROVIDE TEMPORARY
GENERATORS, PANELS & LIGHTING AS REQUIRED FOR CONSTRUCTION.
11. ALL 34.5KV, 5KV AND 480V REPLACED SWITCHGEAR CUBICLE SECTIONS MUST MEET EXISTING
SWITCHGEAR SECTIONS FOOT PRINT.
3. SALVAGE EXISTING POWERLOGIC POWER MONITORS ALONG WITH WINDOW DISPLAY UNITS &
ASSOCIATED CABLES IN 34.5KV & 5KV SWITCHGEAR AND TURNOVER TO MWAA.
4. ALL INSTRUMENTATION, POWER AND CONTROL WIRING ASSOCIATED WITH SWITCHGEAR,
PANELS, DEVICES, EQUIPMENT, FIXTURES, ETC., INDICATED TO BE REMOVED, SHALL BE
REMOVED COMPLETELY UP TO SOURCE (SWITCHGEAR OR CONTROL PANEL) ALONG WITH
ASSOCIATED RACEWAYS. MARK ALL UNUSED CIRCUITS THAT ARE REMOVED FROM
SWITCHGEAR/PANELBOARD AS SPARE CIRCUITS. IF THE MOUNTING SUPPORTS (METAL
CHANNELS AND OTHER MOUNTING DEVICES) FROM WHICH THE REMOVED EQUIPMENT ARE
SUPPORTED, NO LONGER SERVE ANY PURPOSE, THEN THESE SUPPORTS SHALL ALSO BE
REMOVED.
5. ALL EXISTING EQUIPMENT TO REMAIN SHALL BE PROTECTED DURING CONSTRUCTION.
EXISTING EQUIPMENT DAMAGED DURING CONSTRUCTION SHALL BE REPLACED BY
CONTRACTOR AT NO COST TO THE AUTHORITY.
6. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CIRCUITS TO REMAIN AND LABEL THEM
WITH PROPER IDENTIFICATION PER SPECIFICATIONS BEFORE STARTING DEMOLITION.
7. KEEP EXISTING ELECTRICAL CIRCUITS CONTINUOUS FOR EXISTING EQUIPMENT TO REMAIN.
TRACE EACH CIRCUIT THAT IS TO BE REMOVED IN ORDER TO VERIFY THAT CIRCUITS
FEEDING EXISTING EQUIPMENT TO REMAIN ARE NOT AFFECTED DURING THE DEMOLITION.
CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY EXISTING CIRCUIT TO REMAIN THAT IS
DAMAGED OR REMOVED.
8. ALL EXISTING POWER AND CONTROL WIRING TO BE AFFECTED DURING CONSTRUCTION
SHALL BE LABELED PER SPECIFICATIONS AT EACH TERMINATION OR SPLICE POINT SO AS TO
PERMIT EASE OF RECONNECTION OR EXTENSION OF THE WIRING.
9. SEAL ANY OPENINGS IN CONDUIT BODIES, JUNCTION/PULL BOXES, ENCLOSURES, WALLS OR
CEILINGS CAUSED BY THE REMOVAL OF EXISTING RACEWAY AND/OR EQUIPMENT. PATCH
OPENINGS TO MATCH EXISTING CONDUIT BODIES, JUNCTION/PULL BOXES, ENCLOSURES,
WALLS OR CEILINGS. PAINT SURFACES TO MATCH EXISTING.
12. THE PHASING SEQUENCES FOR 34.5KV, 5KV AND 480V SWITCHGEAR ARE SCHEMATIC IN NATURE,
CONTRACTOR SHALL PROVIDE FINAL PHASING SEQUENCE FOR EACH SWITCHGEAR FOR
APPROVAL BY MWAA BEFORE STARTING THE WORK.
10. COORDINATE ELECTRICAL DEMOLITION WORK WITH THE COTR PER THE CONTRACT
DOCUMENTS. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO STARTING DEMOLITION
WORK.
13. STAGING AREA SHALL BE COORDINATED WITH THE COTR PRIOR TO CONSTRUCTION. STAGING
AREA IS SUBJECT TO CHANGE PER DIRECTION FROM THE COTR AND/ORAS DETERMINED BY THE
AIRPORT'S REQUIREMENTS.
11. PROVIDE TEMPORARY POWER, WIRING, CONDUIT, ETC. FOR CONTRACTOR'S CONSTRUCTION
REQUIREMENTS.
14. CONTRACTOR SHALL SUPPLY ALL HIGH VOLTAGE TESTING EQUIPMENT AND SAFETY EQUIPMENT
INCLUDING ITEMS REQUIRED FOR LOCK OUT/TAG OUT PROCEDURE.
DF1102
EL00.002
HGP
1 OF 1
DRH
FDH
4 of 28
File name:..\DF1102EL00002.dwg
PHASE 1:
PHASE 2:
1.
2.
3.
4.
5.
THIS PHASE OF THE CONSTRUCTION WILL REQUIRE A TOTAL SHUTDOWN OF 480 VOLT SWITCHGEAR FP FOR A
PERIOD REQUIRED TO DISCONNECT AND ISOLATE THE BUSES IN THE SWITCHGEAR TO ENABLE REPLACEMENT OF
ONE MAIN, THREE FEEDER BREAKERS AND THE TIE BREAKER.
BECAUSE TWO OF THE LOADS FED FROM THE SIDE TO BE REPLACED IN THIS PHASE HAVE NO OTHER SOURCE OF
POWER, TEMPORARY POWER SHALL BE PROVIDED TO THOSE LOADS FROM THE SIDE REMAINING ACTIVE DURING
THIS PHASE. PROVIDE TEMPORARY POWER AS SHOWN ON SHEET EL02.006 BEFORE REQUESTING THE OUTAGE.
COORDINATING WITH COTR FOR INTENDED POWER OUTAGE DATE AND TIME. OUTAGE WILL BE PERMITTED ONLY
BETWEEN 12:00 MIDNIGHT AND 4:00 AM. WORK REQUIRING OUTAGES, SUCH AS SWITCHING FEEDERS, EQUIPMENT
REMOVAL, DE-ENERGIZING PORTIONS OF SWITCHGEAR, SHALL OCCUR WITHIN THE ALLOWED TIME PERIOD.
CONTRACTOR SHOULD BE AWARE THAT THERE MAY BE OCCASIONS, DUE TO AIRPORT AND AIRLINE OPERATIONAL
REQUIREMENTS, SECURITY AND/OR EMERGENCIES WHEN THE SCHEDULED OUTAGE MAY HAVE TO BE CANCELED. IN
SUCH AN EVENT, RESCHEDULING OF WORK WILL BE NECESSARY AND SHOULD BE COORDINATED WITH THE COTR.
POWER OUTAGE FOR INCOMING 480 VOLT LINES FROM TRANSFORMERS T-3 AND T-4 WILL OCCUR IN THE
TRANSFORMER YARD OUTSIDE OF THE NORTH SUBSTATION AT THE AIRPORT'S PAD MOUNTED SWITCHES.
SWITCHES WILL BE OPERATED BY AIRPORT AUTHORITY.
AT LEAST 24 HOURS PRIOR TO THE 480 VOLT SHUTDOWN FOR PHASE 1, ARRANGE FOR THE TRANSFER OF ALL
LOADS TO THE SIDE OF THE 480 VOLT SWITCHGEAR THAT WILL REMAIN IN SERVICE DURING PHASE 1. THIS INCLUDES
THE TEMPORARY FEED FOR LOADS ON BREAKERS 2C AND 2D. THE COB SWITCHBOARD ALSO NEEDS TO BE
TRANSFERRED TO TRANSFORMER T-4, PRIOR TO THE OUTAGE. REQUEST THAT MWAA OPEN AND LOCK-OUT THE
INCOMING 480 VOLT FROM BREAKER 2A TO THE COB UPS.
6.
7.
1.
AT THE BEGINNING OF THIS PHASE BOTH FEEDERS FROM TRANSFORMERS T-3 AND T-4 ARE ACTIVE, AND THE
PREVIOUS PHASE SWITCHGEAR IS OPTIONAL, THE NEW TIE BREAKER IS PRESENT AND TESTED, BUT NOT
OPERATIONAL OR CONNECTED TO THE EXISTING BUSES. ONLY A MOMENTARY OUTAGE SHOULD BE REQUIRED TO
TRANSFER ALL LOAD TO THE NEW SWITCHGEAR.
2.
PROVIDE TEMPORARY CONNECTIONS TO LOADS SERVED FROM BREAKERS 4B AND 4C TO NEW AVAILABLE SPARE
BREAKERS 1C AND 2B, RESPECTIVELY, ADJUST BREAKER SETTINGS TO MATCH EXISTING.
3.
COORDINATE WITH COTR TO ARRANGE FOR THE TRANSFER ALL LOADS TO THE TRANSFORMER T-3 (NEW) SIDE OF
THE 480 VOLT SWITCHGEAR FP, WHICH WILL REMAIN IN SERVICE DURING THIS PHASE.
4.
POWER OUTAGE FOR INCOMING 480 VOLT LINES FROM TRANSFORMER T-4 WILL OCCUR IN THE TRANSFORMER YARD
OUTSIDE OF THE NORTH SUBSTATION AT THE AIRPORT'S PAD MOUNTED SWITCHES. SWITCHES WILL BE OPERATED
BY AIRPORT AUTHORITY.
5.
6.
7.
DISCONNECT FEEDER CABLES FROM TRANSFORMER T-4 TO FP GEAR. PROVIDE INSULATED END CAPS SO
TRANSFORMER T-4 CAN BE RE-ENERGIZED TO PROVIDE POWER TO BOTH SIDES OF COB SWITCHBOARD DURING THE
REST OF THIS PHASE.
8.
PROCEED WITH REMOVAL OF EXISTING AND INSTALLATION AND TESTING OF NEW EQUIPMENT AND 480 VOLT
FEEDERS, CONNECTORS AND SPLICES.
9.
CONNECT NEW BUSES TO LOCKED OUT TIE BREAKER PROVIDED IN THE PREVIOUS PHASE.
10. RECONNECT FEEDER CABLES FROM TRANSFORMER T-4 TO FP GEAR. REPLACEMENT OF 480 VOLT FEEDER FROM
TRANSFORMER T-4 WILL BE DONE AFTER THIS PHASE, SEE SHEET EL06.007.
11. PROCEED TO ENERGIZE NEW EQUIPMENT WITHOUT LOAD TO TEST ALL OPERATIONS, THEN PROCEED TO TEST
SYSTEM IN STAGES TO MINIMIZE IMPACTS OR POSSIBLE OUTAGES.
12. REMOVE TEMPORARY FEEDS FROM 'A' SIDE OF SWITCHGEAR AND PROVIDE NEW FEEDS TO SPLICE BOX TO
CONNECT TO LOADS, PER SHEET EL02.007.
e. PROVIDE NEW INSULATED CAPS AND PHYSICAL BARRIER / PROTECTION FOR ENDS OF BUSES IN THE SIDE OF
THE 480 VOLT SWITCHGEAR THAT WILL RETURN TO LIVE STATUS DURING THIS PHASE.
f. PERFORM INSULATION RESISTANCE AND DIELECTRIC WITHSTAND VOLTAGE TESTS ON REMAINING 480 VOLT
BUSES PER NETA SPECIFICATIONS.
g. REQUEST THAT MWAA RESTORE POWER TO T-4 TO PROVIDE 480 VOLT FEEDER TO MAIN B FEEDERS IN FP AND
COB SWITCHBOARD. VERIFY THAT ALL EQUIPMENT IS FUNCTIONAL.
8.
DISCONNECT FEEDER CABLES FROM TRANSFORMER T-3 TO FP GEAR. PROVIDE INSULATED END CAPS SO
TRANSFORMER T-3 CAN BE RE-ENERGIZED TO PROVIDE POWER TO BOTH SIDES OF COB SWITCHBOARD DURING THE
REST OF THIS PHASE.
9.
PROCEED WITH REMOVAL OF EXISTING AND INSTALLATION AND TESTING OF NEW EQUIPMENT, INCLUDING NEW TIE
BREAKER AND 480 VOLT FEEDERS, CONNECTORS AND SPLICES.
10. ENERGIZE NEW EQUIPMENT WITHOUT LOAD TO TEST ALL OPERATIONS, THEN PROCEED TO TEST SYSTEM IN STAGES
TO MINIMIZE IMPACTS OR POSSIBLE OUTAGES.
11. RECONNECT FEEDER CABLES FROM FROM TRANSFORMER T-3 TO FP GEAR. REPLACEMENT OF 480 VOLT FEEDER
FROM TRANSFORMER T-3 WILL BE DONE AFTER THE NEXT PHASE, SEE SHEET EL06.007.
12. REMOVE TEMPORARY FEEDS FROM B SIDE OF SWITCHGEAR AND PROVIDE NEW FEEDS TO SPLICE BOX TO CONNECT
TO LOADS ON BREAKERS 2C AND 2D, PER SHEET EL02.007.
13. NEW BREAKERS IN COMPARTMENTS 1C AND 2B WILL BE USED IN THE NEXT PHASE TO PROVIDE TEMPORARY FEEDS
TO HANGAR 12 (BREAKER 4B) AND THE ATS (BREAKER 4C).
14. WHEN ALL EQUIPMENT HAS BEEN ACTIVATED AND ACCEPTED PROCEED TO NEXT PHASE.
DF1102
EL00.003
HGP
1 OF 1
DRH
FDH
5 of 28
File name:..\DF1102EL00003.dwg
PHASE 3:
PHASE 5:
1.
THIS CONSTRUCTION PHASE WILL REQUIRE A TOTAL SHUTDOWN OF THE NORTH SUBSTATION FOR THE PERIOD REQUIRED TO DISCONNECT AND ISOLATE THE SOLIDLY
CONNECTED BUSES IN THE 34.5 KV SWITCHGEAR TO ENABLE REPLACEMENT OF ONE MAIN, TWO FEEDER AND THE TIE BREAKER.
1.
THIS CONSTRUCTION WILL REQUIRE A TOTAL SHUTDOWN OF THE 5 KV SWITCHGEAR FOR THE PERIOD REQUIRED TO DISCONNECT AND ISOLATE THE BUSES IN
THE 5 KV SWITCHGEAR TO ENABLE REPLACEMENT OF ONE MAIN, TWO FEEDER AND THE TIE BREAKER.
2.
COORDINATE WITH THE COTR FOR INTENDED POWER OUTAGE DATE AND TIME. OUTAGE WILL BE PERMITTED ONLY BETWEEN 12:00PM (MIDNIGHT) AND 4:00AM. WORK
REQUIRING OUTAGES SUCH AS, SWITCHING FEEDERS, EQUIPMENT REMOVAL, DE-ENERGIZING PORTIONS OF SWITCHGEAR, SHALL OCCUR WITHIN THE ALLOWED TIME
PERIOD. CONTRACTOR SHOULD BE AWARE THAT THERE MAY BE OCCASIONS, DUE TO AIRPORT AND AIRLINE OPERATIONAL REQUIREMENTS, SECURITY AND/OR
EMERGENCIES WHEN THE SCHEDULED OUTAGE MAY HAVE TO BE CANCELED. IN SUCH AN EVENT, RESCHEDULING OF WORK WILL BE NECESSARY AND SHOULD BE
COORDINATED WITH THE COTR.
2.
COORDINATE WITH THE COTR FOR INTENDED POWER OUTAGE DATE AND TIME. OUTAGE WILL BE PERMITTED ONLY BETWEEN 12:00PM MIDNIGHT AND 4:00AM.
WORK REQUIRING OUTAGES SUCH AS, SWITCHING FEEDERS, EQUIPMENT REMOVAL, DE-ENERGIZING PORTIONS OF SWITCHGEAR, SHALL OCCUR WITHIN THE
ALLOWED TIME PERIOD. CONTRACTOR SHOULD BE AWARE THAT THERE MAY BE OCCASIONS, DUE TO AIRPORT AND AIRLINE OPERATIONAL REQUIREMENTS,
SECURITY AND/OR EMERGENCIES WHEN THE SCHEDULED OUTAGE MAY HAVE TO BE CANCELED. IN SUCH AN EVENT, RESCHEDULING OF WORK WILL BE
NECESSARY AND SHOULD BE COORDINATED WITH THE COTR.
3.
TOTAL POWER OUTAGE FOR INCOMING LINES OF VIRGINIA POWER CIRCUITS 697 AND 698 WILL OCCUR AT THE AIRPORT'S PAD MOUNTED SWITCHES LOCATED NEAR THE
SHOPS BUILDING. SWITCHES SHALL BE OPERATED BY AIRPORT AUTHORITY.
3.
POWER OUTAGE FOR INCOMING 5 KV LINES FROM TRANSFORMER T-1 AND T-2 WILL OCCUR IN THE TRANSFORMER YARD OUTSIDE OF THE NORTH SUBSTATION AT
THE AIRPORT'S PAD MOUNTED SWITCHES. SWITCHES SHALL BE OPERATED BY AIRPORT AUTHORITY.
4.
AT LEAST 24 HOURS PRIOR TO TOTAL SHUTDOWN FOR THIS PHASE, ARRANGE FOR THE TRANSFER OF ALL LOADS TO FEEDER 698 AND THE SIDE OF THE 34.5 KV
SWITCHGEAR THAT WILL REMAIN IN SERVICE DURING THIS PHASE. REQUEST THAT MWAA OPEN AND LOCK-OUT THE INCOMING 34.5 KV EQUIPMENT IN EACH LOAD SERVED
BY FEEDER 697.
4.
AT LEAST 24 HOURS PRIOR TO THE 5 KV SHUTDOWN FOR PHASE 3, ARRANGE FOR THE TRANSFER ALL LOADS TO THE SIDE OF THE 5 KV SWITCHGEAR THAT WILL
REMAIN IN SERVICE DURING PHASE 3. REQUEST THAT MWAA OPEN AND LOCK-OUT THE INCOMING 5 KV EQUIPMENT IN EACH LOAD SERVED BY THE PHASE 3 SIDE
OF THE SWITCHGEAR.
5.
5.
6.
ARRANGE FOR TEMPORARY POWER FOR WORKING DURING TOTAL POWER OUTAGE PERIOD.
6.
7.
REQUEST THAT MWAA OPEN INCOMING POWER SWITCHES FROM VIRGINIA POWER CIRCUITS 697 AND 698.
7.
8.
a. OPEN INCOMING 5 KV MAIN CIRCUIT BREAKERS 0402, 0404, 0406 AND THE TIE BREAKER IN THE SWITCHGEAR.
a. OPEN INCOMING 34.5 KV MAIN CIRCUIT BREAKERS 3501, 3502 AND THE TIE BREAKER IN THE NORTH SUBSTATION.
c. CUT MAIN 5 KV BUS TO ISOLATE THE SIDE OF THE SWITCHGEAR CONTAINING MAIN CIRCUIT BREAKERS 0402, AND FEEDER BREAKERS 0406 AND 0406.
c. CUT MAIN 34.5 KV BUS TO ISOLATE SIDE OF SWITCHGEAR CONTAINING MAIN CIRCUIT BREAKER 3501, AND FEEDER BREAKERS 3505 AND 3507.
d. REMOVE 5 KV TIE BREAKER AND OTHER EQUIPMENT NECESSARY TO ISOLATE ALL EQUIPMENT TO BE REPLACED IN THIS PHASE.
d. REMOVE 34.5 KV TIE BREAKER AND OTHER EQUIPMENT NECESSARY TO ISOLATE ALL EQUIPMENT TO REPLACED IN THIS PHASE.
e. PROVIDE NEW INSULATED CAPS AND PHYSICAL BARRIER/PROTECTION FOR ENDS OF BUSES IN THE SIDE OF THE 5 KV SWITCHGEAR THAT WILL RETURN TO LIVE
STATUS DURING THIS PHASE.
9.
e. PROVIDE NEW INSULATED CAPS AND PHYSICAL BARRIER/PROTECTION FOR ENDS OF BUSES IN THE SIDE OF THE 34.5 KV SWITCHGEAR THAT WILL RETURN TO LIVE
STATUS DURING THIS PHASE.
f. PERFORM INSULATION RESISTANCE AND DIELECTRIC WITHSTAND VOLTAGE TESTS ON REMAINING 5 KV BUSES PER NETA SPECIFICATIONS.
f. PERFORM INSULATION RESISTANCE AND DIELECTRIC WITHSTAND VOLTAGE TESTS ON REMAINING 34.5 KV BUSES PER NETA SPECIFICATIONS.
g. REQUEST THAT MWAA RESTORE POWER TO 5 KV FEEDER 0401 AND VERIFY THAT ALL EQUIPMENT IS FUNCTIONAL.
g. REQUEST THAT MWAA RESTORE POWER TO NORTH SUBSTATION FEEDER 698 AND VERIFY THAT ALL EQUIPMENT IS FUNCTIONAL.
8.
PROCEED WITH REMOVAL OF EXISTING AND INSTALLATION AND TESTING OF NEW EQUIPMENT INCLUDING NEW TIE BREAKER AND 5 KV FEEDERS AND
CONNECTORS/SPLICES.
PROCEED WITH REMOVAL OF EXISTING AND INSTALLATION AND TESTING OF NEW EQUIPMENT INCLUDING NEW TIE BREAKER AND 34.5 KV FEEDERS AND
CONNECTORS/SPLICES.
9.
PROCEED TO ENERGIZE NEW EQUIPMENT WITHOUT LOAD TO TEST ALL OPERATIONS, THEN PROCEED TO TEST SYSTEM IN STAGES TO MINIMIZE IMPACTS OR
POSSIBLE OUTAGES.
10. REPLACEMENT OF EXISTING ELECTRICAL ALARM ANNUNCIATOR WITH NEW HMI SYSTEM CAN PROCEED DURING THIS PHASE OR PRIOR SINCE NO AUTOMATIC CONTROLS
NEED TO BE IN PLACE TO OPERATE THE SYSTEM.
10. WHEN ALL EQUIPMENT HAS BEEN ACTIVATED AND ACCEPTED, PROCEED TO NEXT PHASE.
11. PROCEED TO ENERGIZE NEW EQUIPMENT WITHOUT LOAD TO TEST ALL OPERATIONS, THEN PROCEED TO TEST SYSTEM IN STAGES TO MINIMIZE IMPACTS OR POSSIBLE
OUTAGES.
PHASE 6:
12. WHEN ALL EQUIPMENT HAS BEEN ACTIVATED AND ACCEPTED PROCEED TO THE NEXT PHASE.
1.
AT THE BEGINNING OF THIS PHASE BOTH FEEDERS FROM TRANSFORMER 1 AND 2 ARE ACTIVE, AND THE NEW 5KV SWITCHGEAR IS OPERATIONAL, THE NEW TIE
BREAKER IS PRESENT AND TESTED, BUT NOT OPERATIONAL OR CONNECTED TO THE EXISTING BUSES. ONLY A MOMENTARY OUTAGE SHOULD BE REQUIRED TO
TRANSFER ALL LOAD TO THE NEW SWITCHGEAR.
2.
COORDINATE WITH THE COTR TO ARRANGE FOR THE TRANSFER ALL LOADS TO THE NEW SIDE OF THE 5 KV SWITCHGEAR, WHICH WILL REMAIN IN SERVICE DURING
THIS PHASE.
3.
REQUEST THAT MWAA OPEN AND LOCK-OUT THE EQUIPMENT SERVED BY FEEDERS 0405, 0407 AND 0409.
4.
5.
PROCEED WITH REMOVAL OF EXISTING AND INSTALLATION AND TESTING OF NEW EQUIPMENT AND 5 KV FEEDERS AND CONNECTORS/SPLICES.
6.
CONNECT NEW BUSES TO LOCKED OUT TIE BREAKER PROVIDED IN THE PREVIOUS PHASE.
7.
PROCEED TO ENERGIZE NEW EQUIPMENT WITHOUT LOAD TO TEST ALL OPERATIONS, THEN PROCEED TO TEST SYSTEM IN STAGES TO MINIMIZE IMPACTS OR
POSSIBLE OUTAGES.
PHASE 4:
1.
2.
3.
4.
AT THE BEGINNING OF THIS PHASE BOTH FEEDERS 697 AND 698 ARE ACTIVE, AND THE NEW 34.5KV SWITCHGEAR IS OPERATIONAL, THE NEW TIE BREAKER IS PRESENT AND
TESTED, BUT NOT OPERATIONAL OR CONNECTED TO THE EXISTING BUSES. ONLY A MOMENTARY OUTAGE SHOULD BE REQUIRED TO TRANSFER ALL LOAD TO THE NEW
SWITCHGEAR.
AT LEAST 24 HOURS PRIOR TO SHUTDOWN FOR THIS PHASE, COORDINATE WITH THE COTR TO ARRANGE FOR THE TRANSFER ALL LOADS TO FEEDER 697 AND THE NEW
SIDE OF THE 34.5 KV SWITCHGEAR THAT WILL REMAIN IN SERVICE DURING PHASE 2.
REQUEST THAT MWAA OPEN AND LOCK-OUT THE INCOMING 34.5 KV EQUIPMENT IN EACH LOAD SERVED BY FEEDER 698.
TEST FEEDERS #698 & 3506 PER DWG EL02.003
5.
PROCEED WITH REMOVAL OF EXISTING AND INSTALLATION AND TESTING OF NEW PHASE 2 EQUIPMENT AND 34.5 KV FEEDERS AND CONNECTORS/SPLICES.
6.
7.
PROCEED TO ENERGIZE NEW EQUIPMENT WITHOUT LOAD TO TEST ALL OPERATIONS, THEN PROCEED TO TEST SYSTEM IN STAGES TO MINIMIZE IMPACTS OR POSSIBLE
OUTAGES.
DF1102
EL00.004
HGP
1 OF 1
DRH
FDH
6 of 28
File name:..\DF1102EL00004.dwg
1/8"=1'-0"
HGP
RDK
AGE
EL02.001
HGP
1 OF 1
DRH
FDH
8 of 28
File name:..\DF1102EL02001.dwg
NORTH SUBSTATION
34.5KV SWITCHGEAR
27
47
59
27
47
59
51N
51
51
1200A
86
GENERAL NOTES
2.
3.
4.
86
3502
34.5KV
51N
1200A
3501
1.
3503
1200A
1200A
50
51
50
51
50N
51N
1200A
50N
51N
50
51
1200A
3507
1200A
3505
3504
50
51
50N
51N
DRAWING NOTES
50N
51N
1200A
REMOVE EXISTING 34.5KV FEEDER TO SWITCH. SEE DWG. EL06.001 FOR NEW
FEEDER REQUIREMENT. SEE EL04.005 FOR LOCATION.
3506
TO MANHOLE
ED-105
TO 34.5 KV
SWITCH SW-1
MAIN-A
BKR 3501
FEEDER
BKR 3505
FEEDER
BKR 3507
BUS-A
RELAYS
TIE
BKR 3503
MAIN-B
BKR 3502
2
EL02.002
FEEDER
BKR 3504
BUS-B
RELAYS
FEEDER
BKR 3506
DF1102
EL02.002
HGP
1 OF 1
DRH
FDH
9 of 28
File name:..\DF1102EL02002.dwg
NORTH SUBSTATION
34.5KV SWITCHGEAR
27
47
59
51N
GENERAL NOTES
27
47
59
51
51
1200A
4
86
1.
2.
3.
4.
51N
1200A
3501
86
3502
34.5KV
3503
1200A
1200A
50
51
50
51
50N
51N
1200A
50
51
50N
51N
1200A
3507
1200A
3505
50
51
50N
51N
1200A
3504
TO 34.5 KV
SWITCH SW-2
3506
2
5
DRAWING NOTES
50N
51N
8
TO MANHOLE
ED-105
MAIN-A
BKR 3501
FEEDER
BKR 3505
FEEDER
BKR 3507
2
EL02.003
TIE
BKR 3503
MAIN-B
BKR 3502
FEEDER
BKR 3504
BUS-B
RELAYS
FEEDER
BKR 3506
DF1102
EL02.003
HGP
1 OF 1
DRH
FDH
10 of 28
File name:..\DF1102EL02003.dwg
FROM TRANSFORMER
T-2. SEE DWG.
2
EL06.004
FROM TRANSFORMER
T-1. SEE DWG.
EL06.004 3
1.
27
47
59
2.
51N
3.
4.
27
47
59
51N
51
51
1200A
86
GENERAL NOTES
1200A
0402
86
0401
4160V
0403
50
51
1200A
50
51
50N
51N
1200A
50N
51N
1200A
0406
50
51
1200A
1200A
0404
50
51
50N
51N
50
51
50N
51N
1200A
0407
50N
51N
1200A
0405
0409
DRAWING NOTES
1
SPACE
1
EL02.004
0409
0406
MAIN-2
TIE
MAIN-1
0407
0404
0402
0403
0401
0405
2
EL02.004
DF1102
EL02.004
HGP
1 OF 1
DRH
FDH
11 of 28
File name:..\DF1102EL02004.dwg
FROM
TRANSFORMER T-1.
SEE DWG. EL06.004
3
27
47
59
51N
GENERAL NOTES
FROM
TRANSFORMER T-2.
4
SEE DWG. EL06.004
27
47
59
51
51
1200A
2
86
50
51
1200A
50N
51N
50
51
1200A
50
51
50N
51N
1200A
0404
50
51
50N
51N
1200A
0407
50
51
50N
51N
1200A
0405
0409
0411
50N
51N
DRAWING NOTES
1200A
SPACE
3.
1200A
0406
86
0401
50
51
50N
51N
2.
51N
0403
1200A
1200A
0402
4160V
1.
0406
MAIN-2
TIE
MAIN-1
0407
0409
0404
0402
0403
0401
0405
DF1102
EL02.005
HGP
1 OF 1
DRH
FDH
12 of 28
File name:..\DF1102EL02005.dwg
GENERAL NOTES
FROM TRANSFORMER T-3
SEE DWG NO. EL06.004
1
BUS A
480Y/277V
2000A BUS
SYSTEM SHORT CIRCUIT
RATING 30KA
DPM
MAIN-A
1600AT
1600AF
GFP
1B
1A
1C
1D
2A
2B
GFP
2D
2C
3A
MAIN BUS
METERING
SPACE CPT
300AT
800AF
GFP
1200AT
1600AF
10
3B
AUTO
CONTROLS
BUS B
480Y/277V
2000A BUS
SYSTEM SHORT CIRCUIT
RATING 30KA
TIE
1600AT
1600AF
3C
CONTROL
FUSES
3D
4A
4B
NO LABEL
RECEPT.
AND
POWER
CONNECTOR
DPM
5D
800AT
800AF
GFP
300AT
800AF
1200AT
1600AF
4
SPARE
5
COB
UPS
DRAWING NOTES
MAIN BUS
GFP
800AT METERING
1600AF
SPARE
5B
MAIN-A
221" CONDUIT WITH
3#1/0 & #1/0 GROUND
5A
5C
CPT
800AT
800AF
1600AT
1600AF
GFP
4D
4C
5B
MAIN-B
1B
6
300A
600A
EXIST.
JUNCTION
BOX
COB
UPS
HANGER 12
USAIR 400HZ
ATS
150A
MAIN-B
5
PANELS - PHALS,
PHARS, LIGHT CONTROL
PANEL
1
EL02.006
TV-6A
SWITCHGEAR
10
2
EL02.006
DF1102
EL02.006
HGP
1 OF 1
DRH
FDH
13 of 28
File name:..\DF1102EL02006.dwg
FROM GENERATOR
FUTURE CONNECTION
4
3
1B
CPT-G
1C
SPACE
BUS A
480Y/277V
2000A BUS
SYSTEM SHORT CIRCUIT
RATING 30KA
DPM
MAIN-A
1600AT GFP
1600AF
MAIN-G
1200AT GFP
1600AF
1D
1B
2B
DPM
1A
2B
GENERATOR
POWER
METERING
2A
GENERAL NOTES
2D
2C
3A
3B
GFP
3D
3C
CPT-A
MAIN BUS
METERING
800AT
800AF
800AT
800AF
150AT
800AF
GFP
GFP
GFP
BUS B
480Y/277V
2000A BUS
SYSTEM SHORT CIRCUIT
RATING 30KA
4A
4B
AUTO
TIE
CONTROLS 1600AT
1600AF
600AT
800AF
300AT
800AF
GFP
4C
CONTROL
FUSES
4D
4A(OLD)
CONTROL
POWER
RECEPT.
AND
CONNECTOR
4B(OLD)
DPM
GFP
4C(OLD) 4D(OLD)
5D(OLD)
5A(OLD)
2.
3.
5B
MAIN-B
1600AT
1600AF
5B(OLD)
800AT
800AF
800AT
800AF
GFP
300AT
800AF
1200AT
1600AF
GFP
800AT METERING
1600AF
GFP
DRAWING NOTES
1
10
11
12
MAIN BUS
SPARE
MAIN-A
5C(OLD)
1.
SPARE
800AT
1600AF
MAIN-B
6
EXISTING JUNCTION BOX
8
TEMPORARY
FEED
HANGAR 12 (4B)
2
COB
UPS
7
TEMPORARY
FEED
ATS 150A (4C)
PANELS
TV-6A
PHALS SWITCHGEAR
PHARS
LIGHT CONTROL
PANEL
1
EL02.007
11
11
12
COB
UPS
HANGER 12
USAIR 400HZ
ATS
150A
1 10
2
EL02.007
DF1102
EL02.007
HGP
1 OF 1
DRH
FDH
14 of 28
File name:..\DF1102EL02007.dwg
1/8"=1'-0"
HGP
RDK
AGE
EL04.001
HGP
1 OF 1
DRH
FDH
15 of 28
File name:..\DF1102EL04001.dwg
GENERAL NOTES
DRAWING NOTES
1
1
EL04.002
EL04.002
DF1102
EL04.002
HGP
1 OF 1
DRH
FDH
16 of 28
File name:..\DF1102EL04002.dwg
GENERAL NOTES
REFER TO DWG EL00.001 AND EL00.002
FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
1
REFER TO DWG EL00.004 FOR PHASE-5 & PHASE-6
CONSTRUCTION PHASING SEQUENCE.
REFER TO EL06.002 FOR NEW SINGLE LINE DIAGRAM.
COORDINATE WITH COTR TO RECONNECT OUTGOING FEEDERS
FROM 5KV SWITCHGEAR.
5KV SWITCHGEAR DESIGN IS BASED ON SIEMENS 'GM-SG 5KV
METAL-CLAD, INDOOR TYPE' SWITCHGEAR. CONTRACTOR
SHALL BE RESPONSIBLE TO PROVIDE SWITCHGEAR WITH
EXACT FOOTPRINT & DIMENSIONS REQUIREMENTS AS PER
EXISTING.
DRAWING NOTES
EL04.003
1
ELEVATION
EL04.003
DF1102
EL04.003
HGP
1 OF 1
DRH
FDH
17 of 28
File name:..\DF1102EL04003.dwg
GENERAL NOTES
1
1
EL04.004
DRAWING NOTES
1
EL04.004
DF1102
EL04.004
HGP
1 OF 1
DRH
FDH
18 of 28
File name:..\DF1102EL04004.dwg
EXIST.
S&C
SWITCH
GENERAL NOTES
EXIST.
S&C
SWITCH
DRAWING NOTES
EXIST.
MANHOLE
ED105
EXIST.
MANHOLE
ED105
LA
LA
120V/34.5KV CPT
34.5KV/120V CPT
PQM
PQM
83
SIEMENS
7SJ64
RELAY
PLC
1200A
3501
SIEMENS
7SJ64
RELAY
1200:5A
(TYP.)
UPS
1200A
3502
PLC
34.5KV/120V
(TYP.)
1
34.5KV
2000A
G
3503
1200A
SIEMENS
7SJ80
RELAY
1200A
3507
SIEMENS
7SJ80
RELAY
1200A
3505
SIEMENS
7SJ64
RELAY
SIEMENS
7UT613
RELAY
SIEMENS
7SJ80
RELAY
SIEMENS
7SJ80
RELAY
1200A
1200A
3504
3506
7
TERM.
(SPLICE AT ED-105)
SW-1
SW-2
6
TERM.
(SPLICE AT ED-105)
EL06.001
DF1102
EL06.001
HGP
1 OF 1
DRH
FDH
21 of 28
File name:..\DF1102EL06001.dwg
GENERAL NOTES
FROM TRANSFORMER
T-1
FROM TRANSFORMER
T-2
PQM
SIEMENS
7SJ64
RELAY
120V/5KV CPT
0402
4160V
2000A
SIEMENS
7SJ64
RELAY
PLC
1200A
3.
4.
5KV/120V PT (TYP.)
1200A
0401
PLC
2.
PQM
1200:5A
(TYP.)
UPS
DRAWING NOTES
5KV/120V CPT
1.
0403
1200A
1200A
SIEMENS
7SJ80
RELAY
SIEMENS
7SJ80
RELAY
1200A
SIEMENS
7SJ64
RELAY
SIEMENS
7UT613
RELAY
0404
1200A
SIEMENS
7SJ80
RELAY
1200A
SIEMENS
7SJ80
RELAY
SIEMENS
7SJ80
RELAY
1200A
0405
1200A
SIEMENS
7SJ80
RELAY
0411
0409
0407
0406
SPARE
7
EXISTING PULL
BOX IN NORTH
SUBSTATION
EXISTING PULL
BOX IN NORTH
SUBSTATION
ED-105
ED-105
EL06.002
DF1102
HGP
RDK
AGE
HGP
1 OF 1
DRH
FDH
22 of 28
File name:..\DF1102EL06002.dwg
GENERAL NOTES
2
FROM TRANSFORMER
T-3
SEE DWG. NO. EL06.004
4
FROM GENERATOR
FUTURE CONNECTION
FROM TRANSFORMER
T-4
SEE DWG. NO. EL06.004
DRAWING NOTES
83
CPT-G
480V/120V
CPT-A
480V/120V
CPT-B
480V/120V
UPS
PT
480V/120V
SIEMENS
27
59
7SJ80
UPS
SIEMENS
25
27
47
PT
480V/120V
59
25
27
PLC
47
7SJ80
59
2
47
7SJ80
PT
480V/120V
480V/120V
PT(TYP.)
PQM
MAIN-A
1600AT
1600AF
LSIG
1A
GENERATOR
POWER
METERING
1C
SPACE
1D
2B
CPT-G
MAIN-B
1600AT
1600AF
LSIG
86
BUS A
480Y/277V, 3P, 4W, WITH GROUNDING BUS
2000A BUS
SYSTEM SHORT CIRCUIT RATING 65KA
TVSS
1B
PQM
PQM
MAIN-G 4
1200AT
1600AF
LSIG
SIEMENS
PLC
25
600A:5A
(TYP.)
2A
2C
MAIN BUS-A
METERING
2D
3A
3B
3C
BUS B
480Y/277V, 3P, 4W, WITH GROUNDING BUS
2000A BUS
SYSTEM SHORT CIRCUIT RATING 65KA
3D
4A
AUTO
CONTROLS
CPT-A
1200AT
1600AF
LSIG
800AT
800AF
LSIG
800AT
800AF
LSIG
300AT
800AF
LSIG
600AT
800AF
LSIG
4B
TIE
1600AT
1600AF
LSIG
4C
4D
5A
CONTROL CONTROLS
FUSES
RECEPT.
& POWER
CONNECTOR
5B
TVSS
5D
5C
6D
6C
800AT
800AF
LSIG
150AT
800AF
LSIG
800AT
800AF
LSIG
6B
MAIN BUS-B
METERING
1200AT
1600AF
LSIG
CPT-B
800AT
800AF
LSIG
6A
3
SPARE
SPARE
MAIN-A
MAIN-B
COB UPS
TO BE USED
FOR COB SEE
DWG. NO. EL06.007
TV-6A
PANELS
SWITCHGEAR
PHALS
PHARS
LIGHTING
CONTROL
PANEL
COB UPS
HANGAR 12
USAIR
400HZ
ATS 150A
TO FEED
PANEL EPHA
TO BE USED FOR
COB SEE DWG.
NO. EL06.007
EL06.003
DF1102
EL06.003
HGP
1 OF 1
DRH
FDH
23 of 28
File name:..\DF1102EL06003.dwg
NORTH SUBSTATION
35KV SWITCHGEAR
27
47
59
51N
27
47
59
51
51N
51
1200A
86
1200A
3501
86
3502
35KV
3503
1200A
50
51
50
51
50N
51N
1200A
50
51
50N
51N
1200A
3507
50
51
50N
51N
1200A
3505
50N
51N
1200A
3504
3506
REFER TO DWG.
EL06.006 FOR
CONTINUATION
SWITCH NO. 1
EMH-10N
EMH-9N
ED-105
EMH-10N
EMH-9N
SWITCH NO. 2
ED-105
ED-105
ED-105
300E
50E
ED-106
ED-107
ED-106
ED-108
ED-107
ED-110
ED-108
ED-111
ED-110
ED-112
ED-111
ED-112
EMH
50E
300E
300E
T-3
1500 KVA
35KV-480V
Z = 7.93%
T-4
1500 KVA
35KV-480V
Z = 7.80%
T-2
1500 KVA
35KV-4160V
Z = 5.34%
MAIN B
1600AT
1600AF
REFER TO DWG.
EL06.005 FOR
CONTINUATION
TO 5KV SWITCHGEAR
MAIN-A
MAIN B
A1600AT
1600AF
T-1
1500 KVA
35KV-4160V
Z = 5.49%
MAIN A
1600AT
1600AF
1600AT
1600AF
FP GEAR
TIE
300E
T-MNPSA
2500 KVA
35KV-480V
Z = 5.72%
T-MNPSB
2500 KVA
35KV-480V
Z = 5.69%
MAIN A
3200AT
3200AF
MAIN A
1600AT
1600AF
REFER TO DWG.
EL06.005 FOR
CONTINUATION
MAIN B
3200AT
3200AF
TIE
3200AT
3200AF
TO 5KV SWITCHGEAR
MAIN-B
1600AT
1600AF
0401
EMH
0402
COB SWITCHBOARD
EL06.004
DF1102
EL06.004
HGP
1 OF 1
DRH
FDH
24 of 28
File name:..\DF1102EL06004.dwg
FROM TRANSFORMER
T-2
REFER TO DWG.
EL06.004 FOR
CONTINUATION
FROM TRANSFORMER
T-1
REFER TO DWG.
EL06.004 FOR
CONTINUATION
NORTH SUBSTATION
4160V SWITCHGEAR
27
47
59
51N
27
47
59
51
51
1200A
86
51N
1200A
0402
86
0401
4160V
0403
1200A
50
51
50N
51N
50
51
1200A
50N
51N
1200A
0406
50
51
1200A
50N
51N
50
51
1200A
0404
1200A
0407
0405
50N
51N
50
51
1200A
0409
50N
51N
50
51
50N
51N
1200A
0411
EXIST.
PULL
BOX
300KVA
4160V-480V
Z = 5.33%
TV-100
ED-105
ED-106
ED-106
ED-107
ED-107
ED-108
ED-108
ED-109
ED-109
35E
100E
500KVA
4160V-2400V
Z = 5.94%
ED-105
300KVA
4160V-208V
Z = 4.8%
TV-150
300 HP
NORTH FIRE PUMP
NORTH SEWER
PUMP HOUSE
EL06.005
DF1102
EL06.005
HGP
1 OF 1
DRH
FDH
25 of 28
File name:..\DF1102EL06005.dwg
REFER TO DWG.
EL06.004 FOR
CONTINUATION
EMH-8N
EMH-8N
EMH-7N
EMH-7N
65E
65E
T-1A
2500 KVA
35KV-480V
Z = 6.08%
MAIN A
4000AT
4000AF
EMH-6N
EMH-5N
65E
T-1B
2500 KVA
35KV-480V
Z = 6.15%
65E
T-2A
2500 KVA
35KV-480V
Z = 6.18%
MAIN B
4000AT
4000AF
EMH-4N
EMH-5N
EMH-6N
65E
T-2B
2500 KVA
35KV-480V
Z = 6.11%
MAIN A
4000AT
4000AF
65E
T-4A
2500 KVA
35KV-480V
Z = 5.99%
MAIN B
4000AT
4000AF
EMH-4N
65E
T-4B
2500 KVA
35KV-480V
Z = 6.11%
MAIN A
4000AT
4000AF
65E
T-3A
2500 KVA
35KV-480V
Z = 6.03%
MAIN B
4000AT
4000AF
T-3B
2500 KVA
35KV-480V
Z = 6.06%
MAIN A
4000AT
4000AF
MAIN B
4000AT
4000AF
TIE
4000AT
4000AF
TIE
4000AT
4000AF
TIE
4000AT
4000AF
TIE
4000AT
4000AF
SUBSTATION
NUMBER 1
SUBSTATION
NUMBER 2
SUBSTATION
NUMBER 4
SUBSTATION
NUMBER 3
EL06.006
DF1102
EL06.006
HGP
1 OF 1
DRH
FDH
26 of 28
File name:..\DF1102EL06006.dwg
34.5KV
SWITCHGEAR
5KV
SWITCHGEAR
120V AC
120V AC
120V AC
480V SWITCHGEAR
BACK-UP PLC
UPS
PLC
RELAY
PLC
UPS
MAIN BKR A
RELAY
TIE BKR
RELAY
BACK-UP PLC
UPS
PLC
RELAY
PLC
BACK-UP PLC
UPS
UPS
RELAY
MAIN BKR A
RELAY
RELAY
MAIN BKR B
RELAY
MAIN BKR B
RELAY
FEEDER BKR
RELAY
FEEDER BKR
PM-ADR
FEEDER BKR
RELAY
FEEDER BKR
RELAY
FEEDER BKR
RELAY
FEEDER BKR
RELAY
FEEDER BKR
RELAY
FEEDER BKR
RELAY
FEEDER BKR
RELAY
FEEDER BKR
PROTECTIVE
RELAY
(TYP.)
RELAY
FIBER OPTIC
(MODBUS/PROFIBUS/IEC 61850)
OR COPPER (TYP.)
HMI
PANEL
IPC
PLC
1.
EACH SWITCHGEAR SHALL BE EQUIPPED WITH REDUNDANT (WARM STANDBY) PROGRAMMABLE LOGIC
CONTROLLER (PLC). THIS PLC SHALL PROVIDE AUTOMATIC FAILOVER MAIN-TIE-MAIN BREAKER
OPERATION WHEN UTILITY FEEDER FAILS. EACH PLC IS PROVIDED WITH UNINTERRUPTIBLE POWER
SUPPLY (UPS). INPUT POWER FOR PLC OPERATION SHALL BE 120V AC PROVIDED BY UPS, POWERED BY
DUAL SOURCE IN SWITCHGEAR. (REFER TO SWITCHGEAR SINGLE LINE DIAGRAMS FOR DETAILS.)
2.
EACH SWITCHGEAR BREAKER SHALL BE EQUIPPED WITH INTELLIGENT PROTECTIVE RELAYS. RELAYS
SHALL HAVE BUILT-IN COMMUNICATION CAPABILITY. THE PROTECTIVE RELAYS SHALL BE CONNECTED
TOGETHER ON SAME COMMUNICATION NETWORK AS THE CONTROL PLC AND BREAKERS, UTILIZING
MODBUS OR OTHER NON-PROPRIETARY, SECURE COMMUNICATIONS PROTOCOL. INPUT POWER FOR
THE PROTECTIVE RELAYS AND TO OPERATE BREAKERS SHALL BE 120 VAC, PROVIDED BY SWITCHGEAR
CONTROL POWER UPS.
3.
ALL PLCS AND ALL INTELLIGENT RELAYS AND ALL BREAKERS IN EACH OF THREE SWITCHGEARS (34.5KV,
5KV, 480V SHALL ) SHALL RESIDE ON SAME COMMUNICATION NETWORK.
4.
A SEPARATE ENCLOSURE IN THE SUBSTATION SHALL CONTAIN HUMAN MACHINE INTERFACE (HMI)
PANEL, PLC, NETWORK SWITCH AND DUAL INPUT POWER SUPPLY THAT POWERS TO ALL EQUIPMENT IN
THE ENCLOSURE. INPUT POWER TO ENCLOSURE SHALL BE 120 VAC, PROVIDED BY EXISTING PANEL
'EPA' IN THE SUBSTATION, A DUAL INPUT (120VAC & UPS) PROVIDES 120V AC POWER FOR ALL
EQUIPMENT IN THE PANEL. HMI AND PLC IN THIS PANEL SHALL BE ON SAME NETWORK AS THE PLCS
AND BREAKERS AND RELAYS IN THE SWITCHGEARS. THE NETWORK SWITCH IN THIS ENCLOSURE SHALL
ALSO PROVIDE FIBER OPTIC CONNECTION POINT FOR FUTURE SITE-WIDE SCADA SYSTEM, (SCADA =
SUPERVISORY CONTROL AND DATA ACQUISITION). EXISTING TRANSFORMERS LOCATED OUTSIDE THE
SUBSTATION ARE EQUIPPED WITH SENSORS TO MONITOR TRANSFORMER OIL SYSTEMS. THESE
EXISTING SIGNALS ARE CONNECTED AS INPUTS AND OUTPUTS (I/O) TO THE PLC IN THE HMI
ENCLOSURE. EXISTING INCOMING SENSOR-SIGNAL WIRES SHALL REMAIN DURING DEMOLITION & BE
RECONNECTED TO NEW HMI PANEL.
5.
PROVIDE SHOP DRAWING FOR COMPLETE HMI SYSTEM FOR REVIEW AND APPROVAL PRIOR TO
ASSEMBLY/FABRICATION. SHOP DRAWING SHALL INCLUDE BILL OF MATERIAL, WIRING DIAGRAMS,
EQUIPMENT LAYOUT DRAWINGS, CATALOG CUT SHEETS FOR ALL EQUIPMENT IN THE HMI PANEL. REFER
SPECIFICATIONS FOR DETAILS.
TIE BKR
MAIN BKR B
PQM
RELAY
UPS
MAIN BKR A
PQM
RELAY
PLC
MAIN BKR G
PQM
TIE BKR
RELAY
PLC
ETU
FEEDER BKR
ETU
FEEDER BKR
ETU
FEEDER BKR
ETU
FEEDER BKR
ETU
FEEDER BKR
ETU
FEEDER BKR
ETU
FEEDER BKR
ETU
FEEDER BKR
ETU
FEEDER BKR
ETU
FEEDER BKR
SWITCH
HMI
120V AC
POWER SUPPLY
ETHERNET TO
BUSINESS
COMPUTER
ION NETWORK
FUTURE CONNECTION TO
SITE SCADA NETWORK
(FIBER OPTIC)
T1 TRANSFORMER
TEMP. LEVEL, PRESSURE
T4 TRANSFORMER
TEMP. LEVEL, PRESSURE
UPS
TRANSFORMER
MONITORING
I/O
T2 TRANSFORMER
TEMP. LEVEL, PRESSURE
T3 TRANSFORMER
TEMP. LEVEL, PRESSURE
EL10.001
DF1102
HGP
RDK
AGE
HGP
1 OF 1
DRH
FDH
28 of 28
File name:..\DF1102EL10001.dwg