HARDROCK FABRICATION PVT. LTD.

PREVENTIVE MAINTENANCE CHECKLIST


DATE

SHIFT & TIME

M/C No. HFPL/EOT/


SL. No.
A

MAINT. DONE BY

CHECK POINTS FOR MAINTENANCE

MARK AS PER
LEGEND

L.T. PART
1

Check the LT gear

Check the anticolletion

Check the limit switch

Check all bolts, nuts and tighten it

C.T. PART
1

Check the break coil

Check the limit switch

Check the pressure rollers

Check all bolts, nuts and tighten it

HOIST
1

Check the break coil

Check the motor connections

Check the limit switch

Check the wire rope and apply grease

Check the guide rope

Check the friction air gap

ELECTRICAL (PANEL)
Check the pendent wiring
Check the panel for any loose connections

LEGEND
OK : CHECKED OK
MnP : MINOR PROBLEM

MP : MAJOR PROBLEM

ND : PREVENTIVE MAINT. NOT DONE ON SCHEDU

MAINT. IN-CHARGE

Prepared By: Ravi Kant Pandey


Rec. No. : HF/MN/R-01

Format No.: HF/MN/RF-01

Approved By : Balbinder Singh


Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST

REMARKS

MP : MAJOR PROBLEM
ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE DATE

Approved By : Balbinder Singh


Format No.: HF/MN/RF-01

Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2010

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST
DATE

SHIFT & TIME

M/C No. HFPL/HBM/


SL. No.
A

MAINT. DONE BY

MARK AS PER
LEGEND

CHECK POINTS FOR MAINTENANCE

PNEUMATIC
1

Check and Cleaned Pneumatic filters

PUMP UNIT
1

Operation Status of fan cooler

Is there any abnormal heat

SPINDLE R & L
1

Measure the clearance between fron cap and


spindle (0.06-0.13)mm

Check the spindle cap

OIL / AIR LUBRICATION UNIT


1

Check and clean the filter elements

Check and refill the all lubricants

ELECTRICAL
1

Check and retighten the power cable

Check the limit switches and proximity


switches

AXIS
1

Check the axis X,Y, & Z square guide

Check the axis X,Y, & Z Ball Screw

COOLANT UNIT
1

Check and clean the coolant filter

Check is there any coolant leakage

LEGEND
OK : CHECKED OK
MnP : MINOR PROBLEM

MP : MAJOR PROBLEM

ND : PREVENTIVE MAINT. NOT DONE ON SCHEDU

MAINT. IN-CHARGE

Prepared By: Ravi Kant Pandey


Rec. No. : HF/MN/R-01

Format No.: HF/MN/RF-01

Approved By : Balbinder Singh


Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST

REMARKS

MP : MAJOR PROBLEM
ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE DATE

Approved By : Balbinder Singh


Format No.: HF/MN/RF-01

Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2010

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST
DATE

SHIFT & TIME

M/C No. HFPL/TOS/


SL. No.
A

MAINT. DONE BY

CHECK POINTS FOR MAINTENANCE

MARK AS PER
LEGEND

PNEUMATIC
1

Check and Cleaned Pneumatic filters

PUMP UNIT
1

Operation Status of fan cooler

Is there any abnormal heat

SPINDLE & ROTARY BED


1

Check the spindlae movement & rotation

Check the rotary bed movement and rotation

OIL / AIR LUBRICATION UNIT


1

Check and clean the filter elements

Check and refill the all lubricants

ELECTRICAL
1

Check and retighten the power cable

Check the limit switches and proximity


switches

AXIS
1

Check the axis X,Y, & Z square guide

Check the axis X,Y, & Z Ball Screw

Check the DRO reading with vernier

COOLANT UNIT
1

Check and clean the coolant filter

Check is there any coolant leakage

LEGEND
OK : CHECKED OK
MnP : MINOR PROBLEM

MP : MAJOR PROBLEM

ND : PREVENTIVE MAINT. NOT DONE ON SCHEDU

MAINT. IN-CHARGE

Prepared By: Ravi Kant Pandey


Rec. No. : HF/MN/R-01

Format No.: HF/MN/RF-01

Approved By : Balbinder Singh


Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST

REMARKS

MP : MAJOR PROBLEM
ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE DATE

Approved By : Balbinder Singh


Format No.: HF/MN/RF-01

Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2010

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST
DATE

SHIFT & TIME

M/C No. HFPL/MIG/


SL. No.
A

MAINT. DONE BY

CHECK POINTS FOR MAINTENANCE

MARK AS PER
LEGEND

POWER SOURCE
1

Check Power supply - 3 Ph.

Check Gas Supply

Check Amp. & Volt meter

Check Thyrister

Check all transformer

Check Main PCB

Check Crater PCB

Check Gas Valve

Check Power connector

10

Check and ensure the operation

WIRE FEEDER
1

Check DC motor

Check the remote unit

Check the hub nut of spool

Check the all connections

Check any leakage of gas

Check all the fastners

Check and ensure the operation

REGULATOR AND FLOW METER


1
2
3
4
5
6

Check the inlet and outlet cons


Check the meter
Check the diaphragm
Check other related fitments
Check heater - if any
Check and ensure the operation

WELDING TORCH

1
2
3
4
5
6
LEGEND

Check the euro connections


Check the cable for any damage
Clean the liner with air
Clean the nozzel and others
Check the triger
Check and ensure the operation
OK : CHECKED OK
MnP : MINOR PROBLEM

MP : MAJOR PROBLEM

ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE

MAINT. IN-CHARGE

Prepared By: Ravi Kant Pandey


Rec. No. : HF/MN/R-01

Format No.: HF/MN/RF-01

Approved By : Balbinder Singh


Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST

REMARKS

MP : MAJOR PROBLEM
ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE DATE

Approved By : Balbinder Singh


Format No.: HF/MN/RF-01

Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2010

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST
DATE

SHIFT & TIME

M/C No. HFPL/JIB/


SL. No.

MAINT. DONE BY

CHECK POINTS FOR MAINTENANCE

Check Power supply - 3 Ph.

Check the condition of gears

Check and lubricate the wire rope

Check the hoist function

Check the pendent cable

Check and test the limit switches

Chech the all nut bolts and tighten it.

MARK AS PER
LEGEND

LEGEND
OK : CHECKED OK
MnP : MINOR PROBLEM

MP : MAJOR PROBLEM

ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE

MAINT. IN-CHARGE

Prepared By: Ravi Kant Pandey


Rec. No. : HF/MN/R-01

Format No.: HF/MN/RF-01

Approved By : Balbinder Singh


Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST

REMARKS

MP : MAJOR PROBLEM
ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE DATE

Approved By : Balbinder Singh


Format No.: HF/MN/RF-01

Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2010

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST
DATE

SHIFT & TIME

M/C No. HFPL/PUG/

MAINT. DONE BY

MARK AS PER
LEGEND

SL. No.

CHECK POINTS FOR MAINTENANCE

Check the electrical connections for there any


loose connection

Check the stability of M/c on AL. Rail

Check the gas hoses for there any leakages


and arrest it.

Check and clean the nozzle.

LEGEND
OK : CHECKED OK
MnP : MINOR PROBLEM

MP : MAJOR PROBLEM

ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE

MAINT. IN-CHARGE

Prepared By: Ravi Kant Pandey


Rec. No. : HF/MN/R-01

Format No.: HF/MN/RF-01

Approved By : Balbinder Singh


Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST

REMARKS

MP : MAJOR PROBLEM
ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE DATE

Approved By : Balbinder Singh


Format No.: HF/MN/RF-01

Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2010

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST
DATE

SHIFT & TIME

M/C No. HFPL/OFC/


SL. No.

MAINT. DONE BY

CHECK POINTS FOR MAINTENANCE

Check All Bearing

Check Drive motor

Check Drive Belt

Check Solonoide Valve

Check Rail & Penion lubricate it if required

Check Cutting Bed Level

Check Gas Pressure Meter

Check for any Gas leakage

Check for any Loose electrical connection

10

Check Parallelity of the Machine

11

Check Nozzle Unit

MARK AS PER
LEGEND

LEGEND
OK : CHECKED OK
MnP : MINOR PROBLEM

MP : MAJOR PROBLEM

ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE

MAINT. IN-CHARGE

Prepared By: Ravi Kant Pandey


Rec. No. : HF/MN/R-01

Format No.: HF/MN/RF-01

Approved By : Balbinder Singh


Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST

REMARKS

MP : MAJOR PROBLEM
ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE DATE

Approved By : Balbinder Singh


Format No.: HF/MN/RF-01

Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2010

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST
DATE

SHIFT & TIME

M/C No. HFPL/HP/


SL. No.

MAINT. DONE BY

CHECK POINTS FOR MAINTENANCE

Check all over oil & pressure level

Check Hydraulic oil level

Check T.H. Valve

Check Cylinder Study

Check all Nuts & Bolts

Check Electrical Connection

Check for any oil Leakage

Check frontape and bottom die

MARK AS PER
LEGEND

LEGEND
OK : CHECKED OK
MnP : MINOR PROBLEM

MP : MAJOR PROBLEM

ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE

MAINT. IN-CHARGE

Prepared By: Ravi Kant Pandey


Rec. No. : HF/MN/R-01

Format No.: HF/MN/RF-01

Approved By : Balbinder Singh


Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST

REMARKS

MP : MAJOR PROBLEM
ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE DATE

Approved By : Balbinder Singh


Format No.: HF/MN/RF-01

Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2010

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST
DATE

SHIFT & TIME

M/C No. HFPL/RM/


SL. No.

MAINT. DONE BY

CHECK POINTS FOR MAINTENANCE

Check Roller Level

Check Oil & Greasing

Check all Nuts & Bolts

Check motor for any vibration / heat

Check Oil level

Check for any electrical loose connection

MARK AS PER
LEGEND

LEGEND
OK : CHECKED OK
MnP : MINOR PROBLEM

MP : MAJOR PROBLEM

ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE

MAINT. IN-CHARGE

Prepared By: Ravi Kant Pandey


Rec. No. : HF/MN/R-01

Format No.: HF/MN/RF-01

Approved By : Balbinder Singh


Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST

REMARKS

MP : MAJOR PROBLEM
ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE DATE

Approved By : Balbinder Singh


Format No.: HF/MN/RF-01

Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2010

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST
DATE

SHIFT & TIME

M/C No. HFPL/RCM/


SL. No.

MAINT. DONE BY

CHECK POINTS FOR MAINTENANCE

Check Movement of robo arm

Check solonoide valve

Check the nozzle unit

Check all gas hoses for lekage / damage

Check gas pressure meter

Check for any electrical loose connection

MARK AS PER
LEGEND

LEGEND
OK : CHECKED OK
MnP : MINOR PROBLEM

MP : MAJOR PROBLEM

ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE

MAINT. IN-CHARGE

Prepared By: Ravi Kant Pandey


Rec. No. : HF/MN/R-01

Format No.: HF/MN/RF-01

Approved By : Balbinder Singh


Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST

REMARKS

MP : MAJOR PROBLEM
ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE DATE

Approved By : Balbinder Singh


Format No.: HF/MN/RF-01

Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2010

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST
DATE

SHIFT & TIME

M/C No. HFPL/PB/


SL. No.

MAINT. DONE BY

CHECK POINTS FOR MAINTENANCE

Check & Clean Bottom Net

Check & Clean Air Suck unit

Check motor & Belt

Check Air Pipe & Valve

Check & Clean Compressure filter

Check Compressure unit

MARK AS PER
LEGEND

LEGEND
OK : CHECKED OK
MnP : MINOR PROBLEM

MP : MAJOR PROBLEM

ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE

MAINT. IN-CHARGE

Prepared By: Ravi Kant Pandey


Rec. No. : HF/MN/R-01

Format No.: HF/MN/RF-01

Approved By : Balbinder Singh


Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2

HARDROCK FABRICATION PVT. LTD.


PREVENTIVE MAINTENANCE CHECKLIST

REMARKS

MP : MAJOR PROBLEM
ND : PREVENTIVE MAINT. NOT DONE ON SCHEDULE DATE

Approved By : Balbinder Singh


Format No.: HF/MN/RF-01

Issue No./Date : 01/01.04.2010

Rev. No./Date : 01/01.04.2010

HARDROCK FABRICATION PVT. LTD.


MACHINE HISTORY CARD
MACHINE NAME

HISTORY CARD No.

MACHINE MAKE

INSTALLED ON

MACHINE CAPACITY

MACHINE No.

DATE

DETAILS OF BREAK DOWN / MAJOR MAINT.


ACTIVITIES CARRIED OUT

Rec. No.: HF/MN/R-02

DURATION OF MACHINE STOPPED (DATE & TIME)


FROM

Format No.: HF/MN/RF-02

Prepared By: Ravi Kant Pandey

TO

TOTAL HRS.

REASON FOR MACHINE


BREAK DOWN

Issue No / Date : 01/10.04.2010

ACTION TAKEN AND SPARY


PARTS REPLACED (IF ANY)

INT. PROBLEM / EXT.


PROBLEM

Rev. No./Date : 00/10.04.2010

Approved By: Balbinder Singh

ATTENDED BY &
SIGNATURE

You might also like