These laboratory results are the percentage of passing cumulated of hydrocyclone feed,
overflow (product) and underflow (rejects).
Calculation of the circulating load on each sieve with the formula:
We observe that the efficiency is decreasing with higher sieves, it is absolutely normal.
Calculation of the Tromp Curve with the
formula:
We define the fraction sizes,
here:
between 0 and 38, between 38 and 53, between 53 and 106, between 106 and 150,
between 150 and 212 and finally between 212 and
300.
For all these fraction sizes, we calculate the percentage of passing.
For example, for hydrocyclone feed, between 0 and 38, we have 18,9% of passing,
http://www.thecementgrindingoffice.com/mining/expltrompminexample.html
1/3
16 10 2014
hydrocyclone
feed
hydrocyclone
overflow
hydrocyclone
underflow
hydrocyclone
feed
hydrocyclone
overflow
hydrocyclone
underflow
0-38
38-53
53-106
106-150
150-212
212-300
18,9,0
21,2-18,9
29,2-21,2
35,2-29,2
42,7-35,2
51,8-42,7
47,1,0
52,7-47,1
69,5-52,7
80,3-69,5
90-80,3
97,8-90
9,6,0
10,9-9,6
15,6-10,9
20,5-15,6
27,5-20,5
36,4-27,5
0-38
38-53
53-106
106-150
150-212
212-300
18,9,0
2,3
7,5
9,1
47,1,0
5,6
16,8
10,8
9,7
7,8
9,6,0
1,3
4,7
4,9
7,0
8,9
1/4,037
0,247709
Vr =
and:
1-0,247709
0,752291
Now, for each value of T, we have to calculate the average size of the fraction size.
It means, for example, we choose (0+38)/2 = 19 for the 0-38 fraction
size.
We will have:
0-38
(0 + 38)/2=
19
38-53
(38+53)/2=
45,5
53-106 (53+106)/2=
79,5
106-150 (106+150)/2=
128
150-212 (150+212)/2=
181
212-300 (212+300)/2=
256
The next step is to plot the chart with the dimension () in x-axis
and the T values in y-axis,
like that:
Dimension
19
45,5
79,5
128
181
256
Tromp
38,19
41,35
45,94
57,95
68,67
77,61
http://www.thecementgrindingoffice.com/mining/expltrompminexample.html
2/3
16 10 2014
Dimension
19
45,5
79,5
128
181
256
Tromp %
38,19
41,35
45,94
57,95
68,67
77,61
Tromp
reduced %
0
5,11
12,54
31,97
49,31
63,78
hydrocyclone
evaluation
Cut size
(D50%):
D limit:
by-pass:
Imperfection:
with the
formula:
100
< 20
> 30%
In conclusion, this hydrocyclone has a abominable imperfection, a poor efficiency and a high by-pass.