DEPARTMENTAL PMS ASSIGNMENTS 2002-2003

TURBINES & AUXILIARIES


SN

1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
2
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
3
1.
2.
3.

ASSIGNMENT

RESPONSIBILITY

PREPARATION OF TECHNICAL SCHEDULES FOR


RIHAND 2X500 MW
LP CHEMICAL DOSING
S.MANDAL
BOILER FEED PUMP
SYSTEM
CEP SYSTEM
VACUUM PUMP SYSTEM
LUB OIL PUMPS
GLAND STEAM
EXHAUSTERS
VAPOUR EXTRACTION
FANS
LPHS, HPHS, DRAIN
COOLER, GSC
DEARATOR
CONDENSER
BARRING GEAR
PRIMING PUMP
GOVERNING SYSTEM
LPBP SYSTEM
OIL PURIFYING SYSTEM

S.MANDAL

DEC.2002
DEC.2002

S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL

DEC.2002
DEC.2002
DEC.2002
DEC.2002

S.MANDAL

DEC.2002

S.MANDAL

DEC.2002

S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL

DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002

PREPARATION OF COMMISSIONING SCHEDULES


FOR RIHAND 2X500 MW
STEAM BLOWING
SN MAITI
PRE-BOILER SYSTEM
CHEMICAL CLEANING
OIL FLUSHING OF TG
PIPING
VACUUM SYSTEM
ROLLING &
SYNCHRONISING
FRF FLUSHING
BARRING GEAR SYSTEM
REGENERATIVE SYSTEM
DEAERATOR SYSTEM
FUNCTIONAL TESTS

LAST DATE OF
SUBMISSION

SN MAITI

DEC.2002
DEC.2002

SN MAITI

DEC.2002

SN MAITI
SN MAITI

DEC.2002
DEC.2002

SN
SN
SN
SN
SN
SN

DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002

MAITI
MAITI
MAITI
MAITI
MAITI
MAITI

UNIT PROTECTIONS,
INTERLOCKS, ALARMS
PREPARATION OF COMMISSIONING PROCEDURES
FOR RIHAND 2X500 MW
HYD TEST & TURBINE
DK SHRIVASTAVA
OIL FLUSHING
HYD TEST & OIL
DK SHRIVASTAVA
FLUSHING OF CONTROL
& JOP LINES
STEAM BLOWING
SN MAITI
PROCEDURE OB
BOILERS &
ASSOCIATED STEAM
LINES INCLUDING AUX

DEC.2002
DEC.2002
DEC.2002

4.

5.
6.
7.
4
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.

STEAM LINES
ALKALI FLUSHING
SN MAITI
PROCEDURE FOR PRE
BOILER AND
CONDENSATE SYSTEM
CONDENSATE FLOOD
SN MAITI
TEST & VACUUM
TIGHTNESS TEST
LP BY PASS
DK SHRIVASTAVA
COMMISSIONING
FRF FLUSHING
DK SHRIVASTAVA
PREPARATION OF STANDARD PROTOCOLS
FOR RIHAND 2X500 MW
OIL FLUSHING
S.MANDAL
CHEMICAL CLEANING
S.MANDAL
OF PRE BOILER SYSTEM
CEP
S.MANDAL
BFP
BARRING GEAR
VALVE ACUATORSTURBINE AREA
GOVERNING SYSTEM
LPBP SYSTEM
EVACUATION SYSTEM
DUMPING
ROLLING
&SYNCHRONISATION
SGC OIL
SGC CONDENSATE
SGC EVACUATION
SGC TURBINE
FIRE PROTECTION
DC EOP
TURBINE PROTECTION
ATT
AUTO SYNCHRONISER
LOAD SHEDDING RELAY
CEP C&I
BFP C&I
SGC BFP
FGC BFP
EHTC
TURBOVISORY
LP HEATER 1 LEVEL
CONTROL
LP HEATER 2 LEVEL
CONTROL
LP HEATER 3 LEVEL
CONTROL
HP HEATER 5 LEVEL
CONTROL
HP HEATER 6 LEVEL
CONTROL
HOTWELL LEVEL

DEC.2002

DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002

S.MANDAL
S.MANDAL
S.MANDAL

DEC.2002
DEC.2002
DEC.2002
DEC.2002

S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL

DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002

S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
S.MANDAL
SN MAITI

DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002

SN MAITI

DEC.2002

SN MAITI

DEC.2002

SN MAITI

DEC.2002

SN MAITI

DEC.2002

SN MAITI

DEC.2002

CONTROL

34. DEAERATOR LEVEL

SN MAITI

CONTROL
35. DEAERATOR PRESSURE
SN MAITI
CONTROL
36. LP HEATER
SN MAITI
PROTECTION
37. HP HEATER
SN MAITI
PROTECTION
PREPARATION OF
CHECKLISTS FOR
S.MANDAL
5 RIHAND 2X500 MW
SN MAITI
(AS REQD)
COMMISSIONING PROCEDURES FOR
6 ADITYA BIRLA 23MW
1. ALKALI FLUSHING
DK SHRIVASTAVA
PROC
2. STEAM BLOWING
DK SHRIVASTAVA
PROCEDURES
3. LUBE OIL FLUSHING
DK SHRIVASTAVA
FOR STG
COMMISSIONING PROCEDURES
7 FOR DHUVARAN
1. ALKALI FLUSHING
DK SHRIVASTAVA
PROC
2. STEAM BLOWING
DK SHRIVASTAVA
PROCEDURES
3. LUBE OIL FLUSHING
DK SHRIVASTAVA
FOR STG
COMMISSIONING PROCEDURES
8 FOR SRI LANKA 57 MWSTG
1. ALKALI FLUSHING
DK SHRIVASTAVA
PROC
2. STEAM BLOWING
DK SHRIVASTAVA
PROCEDURES
3. LUBE OIL FLUSHING
DK SHRIVASTAVA
FOR STG
COMMISSIONING PROCEDURES FOR
9 BANNERI AMMAN SUGAR 20 MWSTG
1. ALKALI FLUSHING
DK SHRIVASTAVA
PROC
2. STEAM BLOWING
DK SHRIVASTAVA
PROCEDURES
3. LUBE OIL FLUSHING
DK SHRIVASTAVA
FOR STG

DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002

JULY 2002
JULY 2002
JULY 2002

JULY 2002
JULY 2002
JULY 2002

AUG.2002
AUG.2002
AUG.2002

JULY 2002
JULY 2002
JULY 2002

10 PREPARATION OF

DK SHRIVASTAVA

MARCH.2003

11

DK SHRIVASTAVA

DEC.2002

DK SHRIVASTAVA

SEPT 2002

DK SHRIVASTAVA

JULY 2002

DK SHRIVASTAVA

MARCH 2003

KALYANSUNDARAM

DEC.2002

12

16

25

29

COMM. DOCS FOR


NPC, TARAPUR
STG VIZ.TS, CS,
CHECKLISTS,
PROCEDURES
ETC.
STANDARD
PROTOCOLS FOR
500 MW
TURBINES
QP REVALIDATION
FOR 500 MW
TURBINES
COMMISSIONING
PROCEDURE FOR
DC EOP & DC JOP
IN VIEW OF
REPEATED
FAILURES
PREPARATION OF
TROUBLE
SHOOTING DOCS
STANDARDISATION
& PREPARATION
OF
COMMISSIONING
DOCS FOR FR6 &
FR9 GTS

BOILER & AUXILIARIES


TECHNICAL SCHEDULES (TESTING SCHEDULE)

FOR RIHAND 2X500 MW


SN

5.

DESCRIPTION
ID FAN & ITS LUBE OIL
SYSTEM
FD FAN & ITS LUBE OIL
SYSTEM
PA FAN SYSTEM & ITS
LUBE OIL
SCANNER AIR FAN
SYSTEM
AIR HEATERS

6.

ESP MECHANICAL

1.
2.
3.
4.

8.

CONTROLLED
CIRCULATION PUMPS
COALMILL

9.

COAL FEEDER

7.

10.
11.
12.
13.
14.

MILL REJECT HANDLING


SYSTEM
SOOT BLOWER SYSTEM
SOOT BLOWER
SEQUENCE
AUX STEAM SYSTEM
PLANT AIR
COMPRESSURE

RESPONSIBILITY

TARGET DATE

V.NAVNEETKRISHNAN

DEC.2002

V.NAVNEETKRISHNAN

DEC.2002

V.NAVNEETKRISHNAN

DEC.2002

V.NAVNEETKRISHNAN

DEC.2002

V.NAVNEETKRISHNAN
V.NAVNEETKRISHNAN
V.RAJARAMAN

DEC.2002
DEC.2002
DEC.2002

V.S.MAHAMUNI
V.S.MAHAMUNI
V.RAJARAMAN

DEC.2002
DEC.2002
DEC.2002

V.N.BHARASHANKAR
V.N.BHARASHANKAR

DEC.2002
DEC.2002

V.N.BHARASHANKAR
V.RAJARAMAN

DEC.2002
DEC.2002

16.

INSTRUMENT AIR
COMPRESSOR
AIR DRYING PLANT

17.

ASH WATER PUMP

18.

ASH SLURRY PUMP

19.

SEAL WATER PUMP

20.

HFO UNLOADING PUMP

21.

HFP STORAGE TANK

15.

23.

HFO DRAIN OIL


SYSTEM
HFO PRESSURE LINES

24.

HFO PRESSURING PUMP

22.

25.
26.
27.
28.
29.
30.

EQUIPMENT COOLING
WATER SYSTEM
HP CHEMICAL DOSING
SYSTEM
SEAL AIR FAN
LDO UNIT LOADING
EQUIPMENT
HEAVY FUEL OIL
BURNER
HPBP SYSTEM

V.RAJARAMAN

DEC.2002

V.RAJARAMAN
V.RAJARAMAN
V.RAJARAMAN
V.RAJARAMAN
V.S.MAHAMUNI
V.S.MAHAMUNI
V.S.MAHAMUNI

DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002

V.S.MAHAMUNI
V.S.MAHAMUNI
V.RAJARAMAN

DEC.2002
DEC.2002
DEC.2002

V.RAJARAMAN

DEC.2002

V.NAVNEETKRISHNAN
V.S.MAHAMUNI

DEC.2002
DEC.2002

V.S.MAHAMUNI

DEC.2002

V.NAVNEETKRISHNAN

DEC.2002

COMMISSIONING SCHEDULES

FOR RIHAND 2X500 MW


SN
DESCRIPTION
1. BOILER LIGHTUP
2. BOILER CHEMICAL
CLEANING
3. SAFETY VALVE
FLOATING
4. BOILER GAS
TIGHTNESS TEST
5. ESP AIR LEAK TEST &
AIR LOAD TEST
6. FUEL PIPE LINE
FLUSHING
7. TRIAL OPERATION
8. PG TESTS BOILER
9. PG TESTS ESP
10. BOILER AIR & GAS
SYSTEM-INTERLOCK
OPERATION
11. FUNCTIONAL TESTS
12. UNIT PROTECTIONS,
INTERLOCKS, ALARMS

RESPONSIBILITY

TARGET DATE

V.NAVNEETKRISHNAN
V.RAJARAMAN

DEC.2002
DEC.2002

V.RAJARAMAN

DEC.2002

V.RAJARAMAN

DEC.2002

V.RAJARAMAN

DEC.2002

V.S.MAHAMUNI

DEC.2002

V.N.BHARASHANKAR
V.N.BHARASHANKAR
V.N.BHARASHANKAR
V.NAVNEETKRISHNAN

DEC.2002
DEC.2002
DEC.2002
DEC.2002

V.N.BHARASHANKAR
M SADAGOPAN

DEC.2002
DEC.2002

COMMISSIONING PROCEDURES
FOR RIHAND 2X500 MW
SN

DESCRIPTION

RESPONSIBILITY

TARGET DATE

1. OIL FLUSHING OF
ROTATING EQUIPMENTS
2. STEAM BLOWING & OIL
FLUSHING OF FO
SYSTEM
3. PROCEDURE FOR
BOILER HYDRAULIC
TEST & PRESERVATION
4. HP BY PASS
COMMISSIONING
5. AIR & GAS TIGHTNESS
TEST OF FURNACE &
DUCTS.
6. GAS DISTRIBUTION
TEST OF ESP
7. AIR IN LEAK TEST OF
ESP
8. CLEAN AIR FLOW TEST
OF COAL PIPES
9. BOILER ALKALI BOIL
OUT & ACID CLEANING
10. COLD AIR VELOCITY
TEST

V.NAVNEETKRISHNAN

DEC.2002

V.S, MAHAMUNI

DEC.2002

V.RAJARAMAN

DEC.2002

V.NAVNEETKRISHNAN

DEC.2002

V.RAJARAMAN

DEC.2002

V.NAVNEETKRISHNAN

DEC.2002

V.NAVNEETKRISHNAN

DEC.2002

V.S.MAHAMUNI

DEC.2002

V.RAJARAMAN

DEC.2002

V.S.MAHAMUNI

DEC.2002

OTHER COMMISSIONING PROCEDURES


SN
A
1
2
B
1
2
C
1
D
1
2
E
1

DESCRIPTION

RESPONSIBILITY

TARGET DATE

COMMISSIONING PROCEDURES FOR ADITYA BIRLA


ALKALI BOIL OUT
PROCEDURES
HYDRO TEST FOR
BOILER

S.JANGDE
S.JANGADE

JULY 2002
JULY 2002

COMMISSIONING PROCEDURES FOR DHUVARAN


ALKALI BOIL OUT
PROCEDURES
HYDRO TEST FOR
BOILER

C.N.CHANDRAMOULI
C.N.CHANDRAMOULI

AUG 2002
AUG 2002

COMMISSIONING PROCEDURES FOR BASL


ALKALI FLUSHING PROC

V.S.MAHAMUNI

JULY 2002

COMMISSIONING PROCEDURES FOR MADHUKARAI


ALKALI BOIL OUT
JULY 2002
V.RAJARAMAN
PROCEDURES
HYDRO TEST FOR
JULY 2002
V.RAJARAMAN
BOILER
COMMISSIONING PROCEDURES FOR TAPP 3 & 4, SECONDARY PIPING
MASS & ALKALINE
V.RAJARAMAN
FLUSHING PIPING
STANDARD CHECKLIST ELECTRICAL

FOR 500 MW

SN.

2.

DESCRIPTION
132 KV, 400 KV CLASS
- TRASFORMERS
11 KV / 3.3 KV CLASS
TRANSFORMER

RESPONSIBILITY
NIRANJAN RAY

TARGET DATE
DEC.2002

NIRANJAN RAY

DEC.2002

3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.

15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.

3.3 KV / 415 CLASS


TRANSFORMER
EARTHING
TRANSFORMER
D. C. MOTOR
HV SQUIRREL CAGE
INDUCTION MOTOR
415 SQUIRREL CAGE
INDUCTION MOTOR
MOTOR OPERATED
ACTUATORS
SOOT BLOWER
(DESLAGER)
SOOT BLOWER (LONG
RETRACTABLE)
SOOT BLOWER (AIR
HEATER)
SWITCHGERE ROOM
HT BREAKER
STANDARD
CHECKLISTS FOR ALL
TYPES OF RELAYS
USED IN
SWITCHGEARS
PROTECTION SYSTEM
HT EARTHING TRUCK
ISOLATOR LINK
CARRIAGE & CUBICLE
METAL CLAD
SWITCHGERE BUSBAR
PT CARRIAGE AND
CUBICLE
BUS DUCT / CABLE TO
SWITCHBOARD
BUS DUCT
CONTACTOR MODULE
SWITCH FUSE MODULE
MASTER PANEL OF
LUBE OIL PANEL
FEEDER PANEL OF LUBE
OIL PANEL
SPACE HEATER AND
CABLE MODULE
D. C. BATTERY
D.C. BATTERY
CHARGER
D.C. DISTRIBUTION
BOARD
POWER CABLE
AUXILIARY CABLE
D. C. CABLE
132 KV CABLE
CIRCUIT BREAKER
HORIZONTAL CENTRE
BREAK ISOLATOR
MAIN BUS
BUS EARTH SWITCH
MOTOR OPERATING
MECHANISM FOR

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

KJ PRABHU
NIRANJAN RAY

DEC.2002
DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

A.A. KHAN

DEC.2002

A.A. KHAN

DEC.2002

A.A. KHAN

DEC.2002

NIRANJAN RAY
NIRANJAN RAY
NIRANJAN RAY

DEC.2002
DEC.2002
DEC.2002

NIRANJAN RAY
NIRANJAN RAY

DEC.2002
DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

A.A. KHAN

DEC.2002

A.A. KHAN
NIRANJAN RAY
NIRANJAN RAY
NIRANJAN RAY

DEC.2002
DEC.2002
DEC.2002
DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

KJ PRABHU
KJ PRABHU

DEC.2002
DEC.2002

KJ PRABHU

DEC.2002

NIRANJAN RAY
NIRANJAN RAY
NIRANJAN RAY
NIRANJAN RAY
NIRANJAN RAY

DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002

NIRANJAN RAY
NIRANJAN RAY
NIRANJAN RAY

DEC.2002
DEC.2002
DEC.2002

38.
39.
40.
41.
42.
43.
44.
45.
46.

47.

48.
49.
50.
51.
52.
53.
54.
55.
56.
57.

58.

ISOLATOR AND EARTH


SWITCH
VOLTAGE
TRANSFORMER
CURRENT
TRANSFORMER
LIGHTNING ARRESTER
GAS INSULATED
SWITCHGERE (IF
APPLICABLE)
EARTH CONNECTION
EARTHING
CONNECTIONS SWITCHYARD
BUS BAR & OVERHEAD
CONNECTION
WAVE TRAPS
STANDARD CHECKLIST
FOR ALL TYPES OF
RELAYS USED IN
SWITCHYARD
EQUIPMENT
PROTECTION SYSTEM
TEST PROCEDURES
FOR SWITCHYARD
EQUIPMENT, LINES,
TRANSFORMERS
(POWER /
INSTRUMENT) AND
PROTECTION SCHEMES
VIZ. BUS DIFFERTIAL
AND LBB ETC.
EXPLOSION PROOF
ELECTRICAL
EQUIPMENT
ELECTROLISER CELL
RECTIFIER CHUTE FOR
ELECTROLISER
JUNCTION BOX
CONTROL
TRANSFORMER
MODULE
SOOT BLOWER
SEQUENCE PANEL
OUTDOOR MOUNTED
PANEL
BRUSH GEAR
ASSEMBLY
AUX. CONTROL AND
RELAY PANEL DESK
BRUSH GEAR
(GENERATOR SLIP
RING BRUSH GEAR
ASSEMBLY (IF
APPLICABLE)
CHECKLIST FOR ALL
TYPES OF RELAYS,
MODULES AND
SCHEMES OF
GENERATOR

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY
NIRANJAN RAY

DEC.2002
DEC.2002

NIRANJAN RAY
NIRANJAN RAY

DEC.2002
DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY
NIRANJAN RAY

DEC.2002
DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY
NIRANJAN RAY

DEC.2002
DEC.2002

NIRANJAN RAY
NIRANJAN RAY

DEC.2002
DEC.2002

A.A. KHAN

DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

59.
60.
61.
62.

PROTECTIONS SYSTEM
& GENERATOR
EXCITATION SYSTEM
415V GENERATOR (D.G.
SET)
INDICATING
INSTRUMENT
RECORDING
INSTRUMENT
INTEGRATING
INSTRUMENT

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

NIRANJAN RAY

DEC.2002

OTHER ELECTRIAL DOCOMENTS


SN.
1.

2.
3.

4.
5.
6.

DESCRIPTION
PREPARATION OF 500
MW -ELECTRICAL
SYSTEM -ERECTION &
COMMNG MANUAL
PREPARATION OF
500MW GENERATOR
COMMNG MANUAL
PREPARATION OF FR VI
FA GENERATOR
COMMNG MANUAL
(INDUCTION MOTOR
START)
STANDARD PROTOCOL
FOR 500MW-THERMAL
STANDARD PROTOCOL
FOR CCPP- ELECTRICAL
SYSTEM
PREPARATION OF 500
MW GENERATOR
COMMNG MANUAL FOR
TAPS

RESPONSIBILITY

TARGET DATE
DEC.2002

T. LAL

KJ PRABHU

DEC.2002
DEC.2002

N.ROY

KJ PRABHU
MADANLAL

DEC.2002
DEC.2002
DEC.2002

KJ PRABHU

STANDARD CHECKLIST C & I


FOR 500 MW

SN.
DESCRIPTION
1. CONDUCTIVITY
MEASURING
EQUIPMENT INCLUDING
TEST PROCEDURE TEST
PROCEDURES
2. PH ANALYSER
INCLUDING TEST
PROCEDURE
3. SILICA ANALYSER
4. DISSOLVED OXYGEN
ANALYSER
5. LEVEL SWITCH (FLOAT
ACTUATED)
6. LEVEL SWITCH
(ELECTRODE TYPE)

RESPONSIBILITY
Kuhikar

TARGET DATE
DEC 2002

Kuhikar
DEC 2002
Kuhikar
Kuhikar
Suresh Sharma
Suresh Sharma

DEC 2002
DEC 2002
DEC 2002
DEC 2002

7. LEVEL SWITCH
(DISPLACED
ACTUATED)
8. TRANSMITTER (FLOAT
OPERATED PNEUMATIC
OUTPUT) INCLUDING
TESTING PROCEDURES
9. LEVEL INDICATOR
(FLOAT/PULLEY TYPE)
10. LOCAL TEMPERATURE
INDICATORS
INCLUDING TEST
PROCEDURE
11. BI-METALLIC
TEMPERATURE GAUGE
12. RESISTANCE
THERMOMETER
ELEMENT INCLUDING
TEST PROCEDURE
13. THERMOCOUPLE
ELEMENT AND
CONNECTING CABLE
14. THERMOCOUPLE AND
RESISTANCE
THERMOMETER
CONVERTOR/
TRANSMITTER
INCLUDNG TEST
PROCEDURES
15. TEMPERATURE SWITCH
INCLUDING TEST
PROCEDURES
16. COLD JUNCTION BOXES
17. ZENER BARRIER
18. O2 & FLUE GAS
ANALYSER
19. SMOKE DENSITY
EQUIPMENT
20. O2 IN HYDROGEN
INCLUDING TEST
PROCEDURES
21. PRESSURE AND
VACUUM SWITCH
INCLUDING TEST
PROCEDURE
22. DIFFERENTIAL
PRESSURE
TRANSMITTER
INCLUDING TEST
PROCEDURE
23. DIFFERENTIAL
PRESSURE SWITCH
INCLUDING TEST
PROCEDURE
24. FLOW INDICATOR
(VARIABLE AREA)
25. ORIFICE PLATE
26. TURBINE FLOW
TRANSMITTER
27. FLOW SWITCH

Suresh Sharma

DEC 2002

Suresh Sharma
DEC 2002
Suresh Sharma

DEC 2002

Suresh Sharma
DEC 2002
Suresh Sharma

DEC 2002

Chakraborthy
DEC 2002
Chakraborthy
DEC 2002
Chakraborthy
DEC 2002

Chakraborthy
DEC 2002
Bagul
Bagul
Kuhikar
Kuhikar
Swain

DEC 2002
DEC 2002
DEC 2002
DEC 2002
DEC 2002

Bagul
DEC 2002
Bagul
DEC 2002
Bagul
DEC 2002
Bagul

DEC 2002

Kuhikar
Suresh Sharma

DEC 2002

Suresh Sharma

DEC 2002

DEC 2002

28. WEIR ( Pressure Gauge)


29. NOZZLE (Flow)
30. FLOW INDICATOR
(PNNEUMATIC INPUT)
INCULUDING TEST
PROCEDURE
31. FLOW INTEGRATOR
(PNNEUMATIC INPUT)
INCULUDING TEST
PROCEDURE
32. FLOW INDICATOR
(FLOAT OPERATED)
INCULUDING TEST
PROCEDURE
33. VENTURI (FLUID)
34. FLOW SWITCH
(MAGNETIC TYPE)
35. AVERAGING INLET
36. LIMIT SWITCHES
37. TURBINE SUPERVISORY
DETECTOR
38. POSITION
MEASUREMENT &
INDICATION
INCLUDING TEST
PROCEDURES
39. TACHOMETER
40. VIBRATION
MEASUREMENT
41. DIGITAL INDICATOR
42. MOVING COIL
INDICATOR INCULDING
TEST PROCEDURE
43. RECORDER
(PNEUMATIC INLET)
INCLUDING TEST
PROCEDURE
44. RECORDER INCLUDING
TEST PROCEDURE
45. FLAME SCANNER
46. ELECTRICAL
AUTOMANUAL CONTROL
STATION
47. PUSH BUTTON MODULE
48. ALARM ANNUNCIATOR
EQUIPMENT INCLUDING
TEST PROCEDURE
49. TEST PROCEDURE FOR
ELECTRONIC MODULES
OF DDCMIS
50. PNEUMATIC
CONTROLLER /
INDICATOR INCLUDING
TEST PROCEDURE
51. PNEUMATIC LEVEL
CONTROLLER
52. THERMO CONTROL
VALVE
53. TEST PROCEDURES FOR

Bagul
Bagul
Suresh Sharma

DEC 2002
DEC 2002
DEC 2002

Chakraborthy
DEC 2002
Bagul
DEC 2002
Bagul
Bagul

Bagul
Swain

DEC 2002
DEC 2002
DEC 2002
DEC 2002
DEC 2002

Bagul
DEC 2002
Bagul
Suresh Sharma

DEC 2002

Kuhikar
Chakraborthy

DEC 2002

DEC 2002

DEC 2002

Chakraborthy
DEC 2002
Chakraborthy

DEC 2002

Suresh Sharma
Bagul

DEC 2002

Chakraborthy
Chakraborthy

DEC 2002

DEC 2002

DEC 2002

Kuhikar
DEC 2002
Kuhikar
DEC 2002
Kuhikar
Kuhikar
Suresh Sharma

DEC 2002
DEC 2002
DEC 2002

ADJUSTMENT OF
MODULATING
CONTROLLER PID
TERMS
54. ELECTRONIC
CONTROLLER (SELF
CONTAINED)
INCLUDING TEST
55. TEST PROCEDURE
INDICATING
CONTROLLER
ELECTRICAL INPUT &
PNEUMATIC OUTPUT

Suresh Sharma
DEC 2002
Chakraborthy
DEC 2002

OTHER C&I DOCUMENTS


SN.
1.

2.

3.

4.

5.

6.

DESCRIPTION
COMMISSIONING
PROCEDURES FOR FLUE
GAS ANALYSERS
COMMISSIONING
PROCEDURES FOR
SWAS
COMMISSIONING
PROCEDURES FOR
HYDROGEN DRIER
COMMISSIONING
PROCEDURES FOR H2
MOISTURE ANALYSER
COMMISSIONING
PROCEDURES FOR
GROUND BRUSH
MONITOR
COMMISSIONING
PROCEDURES FOR
BENTLY NEVADA
TURBOVISORY SYSTEM

RESPONSIBILITY

Kuhikar
Kuhikar
Tarsemlal
Swain

TARGET DATE
DEC 2002
DEC 2002
DEC 2002
DEC 2002

Tarsemlal
DEC 2002

Swain
DEC 2002

STANDARD C & I PROTOCOLS TO BE JOINTLY SIGNED DURING COMMISSIONING.


FOR 500 MW
SL NO.
1.

2.

3.

DESCRIPTION
OIL FLUSHING

RESPONSIBILITY

LAST DATE OF
SUBMISSION
DEC.2002

CHEMICAL
CLEANING OF PRE
BOILER SYSTEM

DEC.2002

CEP

DEC.2002

4.

BFP

5.

BARRING GEAR

DEC.2002
DEC.2002

6.

VALVE ACUATORS

7.

GOVERNING SYSTEM

8.

LPBP SYSTEM

9.

PROTECTIONS

DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002

10.

EVACUATION
SYSTEM

11.

DUMPING

12.

ROLLING
&SYNCHRONISATION

DEC.2002

SGC OIL

DEC.2002

SGC CONDENSATE

DEC.2002

SGC EVACUATION

DEC.2002

13.
14.
15.
16.
17.

SGC TURBINE
FIRE PROTECTION

18.

DC EOP

19.

TURBINE
PROTECTION

20.

CYCLIC TEST

21.

ATT

DEC.2002

DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002

22.

AUTO
SYNCHRONISER

DEC.2002

23.

LOAD SHEDDING
RELAY

DEC.2002

24.

CEP C&I

25.

BFP C&I

26.

SGC BFP

27.

FGC BFP

28.

LP BYPASS

29.

EHTC

30.

TURBOVISORY

DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002
DEC.2002

31.

LP HEATER 1 LEVEL
CONTROL

DEC.2002

32.

LP HEATER 2 LEVEL
CONTROL

DEC.2002

33.

LP HEATER 3 LEVEL
CONTROL

DEC.2002

34.

HP HEATER 5 LEVEL
CONTROL

DEC.2002

35.

HP HEATER 6 LEVEL
CONTROL

DEC.2002

36.

HOTWELL LEVEL
CONTROL

DEC.2002

37.

DEAERATOR LEVEL
CONTROL

DEC.2002

38.

DEAERATOR
PRESSURE CONTROL

DEC.2002

39.

LP HEATER
PROTECTION

DEC.2002

40.

HP HEATER
PROTECTION

DEC.2002

41.

BOILER C& I

DEC.2002

OTHER DOCUMENTS
1. Procedure for Chemical Cleaning for Boilers of Korba (East) R&M Project