PROJECT NAME / LOCATION :

REHABILITATION/ RECONSTRUCTION OF DAMAGED PAVED


NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT
MANAGEMENT - 4 (HDM-4) ( INTERMITTENT SECTION ) ALONG
NORTHBAY BLVD., NAVOTAS CITY
K 10 + 145.6 TO K 10 + 20.05
SECTION ID NO. S02182LZ

CASIANO P. DE GUZMAN

APPROVED :

GERARDO T. DE GUZMAN

OIC - DISTRICT ENGINEER

RECOMMENDING APPROVAL :

BARRISTER J. REYES

OIC - ASSISTANT DISTRICT ENGINEER

REVIEWED AND SUBMITTED :

CHIEF, PLANNING AND DESIGN SECTION

GENERAL NOTES:
7. CONSTRUCTION STAKES

REL
EST

LA

ST.
M. N

NAVOTAS
EAST
T.
AS

AVA

QTY.

UNIT

NO
LEO

R
- 10
RO
AD

L ST

NORTH BAY BLVD.

BANGKULASI

NTS

VICINITY MAP
SCALE :

DESCRIPTION

SUMMARY OF QUANTITIES

REMOVAL OF CONCRETE PAVEMENT

97.20

331.30

832.60

cu.m

cu.m

l. m

sq.m

cu. m

101(3a.1)

REMOVAL OF CURB & GUTTER

418.50

100.90

101 (4)b

ROADWAY EXCAVATION (Unsuitable )

cu. m

REMOVAL OF CONCRETE STRUCTURE

102(1)

STRUCTURE EXCAVATION

135.93

kg

sq. m

l. m

103(1a)

AGGREGATE BASE COURSE

1,149.86

91.00

201

PCCP (0.28 m thk- 3 days )

cu. m

311(4)a.4

140.33

l.m.

sq. m

18,535.00

7.00

591.80

REINFORCING STEEL BARS

CHB FOR LINED CANAL

STRUCTURAL CONCRETE CLASS " A"

910 mm dia. PIPE CULVERT ( 36" )

405

500(1c)

600(3)

CONSTRUCTION OF FIELD OFFICE/BODEGA

CURB & GUTTER ( TYPE " A " ) NATIONAL ROAD

16.00

331.30

136.00

sq. m

l. m.

l. m.

SPL - 2

RAISING OF REINFORCED CONCRETE MANHOLE

SAFETY AND HEALTH

b. DPWH BILLBOARDS

a. COA BILLBOARDS

74.10

350.00

10.00

1.00

2.00

1.00

hr.

unit

job

pc.

pc

PROJECT BILLBOARDS

SPL - 3

REFLECTORIZED THERMOPLASTIC PAVT. MARKINGS ( WHITE )

DEWATERING

sq. m.

SPL - 4

TITLE SHEET

SHEET

1
6

GENERAL NOTES

SHEET CONTENTS

DESIGN PAVEMENT ANALYSIS

2
6

VICINITY MAP

SUMMARY OF QUANTITIES

GENERAL PLAN

TABLE OF CONTENTS

3
6

CROSS SECTION

ST.

OIC - DISTRICT ENGINEER

CASIANO P. DE GUZMAN

SHEET NO. :

SHOWING FLARING OF EXISTING CONCRETE PAVEMENT

TYPICAL PLAN OF A TWO LANE PAVEMENT

INLET DETAIL

CHB LINED CANAL SECTIONAL VIEW ( RAISING )

DETAIL OF CURB AND GUTTER

DETAIL OF LINTEL BEAM & POST

DETAIL OF CHB LINED CANAL

DET. OF REINF. CONC. MANHOLE COVER

TYPICAL SECTION

PROFILE ALONG LEFT & RIGHT ELEVATION

4
6

5
6

6
6

DETAILS OF JOINT IN GRID PAVEMENT

DETAILS OF BAR SPACING ALONG CURVES

DETAILS OF EXPANSION JOINT (DOWELED) AT


CERTAIN INTERSECTIONS AND STRUCTURES

GERARDO T. DE GUZMAN

GENERAL NOTES

OIC - ASSISTANT DISTRICT ENGINEER

APPROVED :

BARRISTER J. REYES

RECOMMENDING APPROVAL :

CHIEF, PLANNING AND DESIGN SECTION

REVIEWED AND SUBMITTED :

SPL - 5

SPL - 1

605)

504(3)c

500(1a)

404-C

101-2b

100

ITEM NO.

BAGUMBAYAN
SOUTH

BAGUMBAYAN
NORTH

NIG

4.50
2.50
2.00

3500
3.37E + 06
635.55

SURVEYED BY :

ENGINEER -II

ULYSSES B. PEREGRINO

CADD BY :

DRAFTSMAN - I

EDWIN A. GARCIA

PAVEMENT DESIGNED / PREPARED/ ESTIMATED BY:

ENGINEER - II

MARK PETER C. RECTO

OR

A. THE CONTRACTOR WILL BE RESPONSIBLE FOR TRUE AND PROPER


SETTING-OUT OF THE WORK OR IMPROVEMENT AND FOR
CORRECTNESS OF POSITION, LEVEL, SLOPE AND CONTINUOUS
PROFILE GRADE IN ROAD WORK. HE WILL SET CONSTRUCTION
STAKES, ESTABLISHING LINES, SLOPE AND CONTINUOUS PROFILE
WORK AND OTHER LINE AND BENCH MARK FOR BRIDGE WORK, GRADE
IN ROAD PROTECTIVE AND NECESSARY STRUCTURES AND
APPURTENANCES CULVERT WORK, AS ARE DEEMED NECESSARY
FROM THE REFERENCE DATE TO BE FURNISHED BY THE ENGINEER IN
WRITING.
B. THE CHECKING OF CONSTRUCTION STAKES BY THE ENGINEER
SHALL NOT IN ANY WAY RELIEVE THE CONTRACTOR OF HIS
RESPONSIBILITY FOR THE CORRECTNESS THEREOF AND THE
CONTRACTOR SHALL CAREFULLY PROTECT AND PRESERVE ALL
BENCH MARK, PEGS AND OTHER THINGS USED IN SETTING-OUT THE
WORK.
C. IN THE CASE OF "CHANGES" OR CHANGE IN CONDITION "WHICH
INVOLVES ANY CHANGES IN STAKE OUT, THE CONTRACTOR SHALL
COOPERATE WITH THE ENGINEER AND FACILITATE THE PROMPT
RE-ESTABLISHMENT OF THE FIELD CONTRACT FOR THE ALTERNATIVE
OF ADJUSTED WORK.

8. STANDARD DRAWING
THE NECESSARY DRAWING CONTAINED IN THE DPWH STANDARD FOR
ROAD SHALL BE UTILIZED FOR THE PROJECT UNLESS OTHERWISE
MORE DETAILED.

9. QUANTITY

=
=
=

=
=
=

QUANTITY OF VARIOUS WORK ITEM INVOLVED ARE SUBJECT TO


DECREASE OR INCREASE DEPENDING ON THE ACTUAL FIELD
CONDITION.

SERVICEABILITY INDEX
INITIAL SERVICEABILITY INDEX, P i
TERMINAL SERVICEABILITY INDEX, P t

CONCRETE PROPERTIES
f'c ( psi )
MODULUS ELASTICITY ( E c )
MODULUS OF RUPTURE ( S' c )

SHEET CONTENTS :

GENERAL NOTES,
VICINITY MAP
DESIGN PAVEMENT ANALYSIS
SUMMARY OF QUANTITIES
TABLE OF CONTENTS

CAD

1. STANDARD SPECIFICATION
ALL WORKS SHALL COMPLY WITH DPWH STANDARD SPECIFICATION
FOR HIGHWAYS, BRIDGES AND AIRPORTS REVISED 2004 SPECIAL
PROVISION AND SUPPLEMENTAL SPECIFICATIONS PERTAINING TO
THIS PROJECT, CONDITIONS OF THE CONTRACT (INT'L) FOR WORKS OF
CIVIL ENGINEERS CONSTRUCTION, 2ND EDITION, PREPARED BY F.I.D.IC.
SHALL ALSO GOVERN.

2. DIMENSIONS
UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS WHICH INCLUDE
STATIONING, DISTANCES BETWEEN CONTROL POINTS AND
ELEVATIONS ARE MEASURED IN METERS.

3. ALIGNMENT AND GRADE


NO ALTERATION OR CHANGE IN ALIGNMENT AND GRADE SHALL BE
MADE UNLESS EXISTING FIELD CONDITION SO WARRANT AND ONLY
UPON WRITTEN ORDER BY THE ENGINEERS AND APPROVED BY THE
PROPER AUTHORITY CONCERNED.

10
4.00 %
51.30
15000.00
250.00
85.00 %
-1.037
0.45
2.50
1.00
1.00

REHABILITATION / RECONSTRUCTION OF DAMAGED


PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED
ON PAVEMENT MANAGEMENT SYSTEM /HIGHWAY
DEVELOPMENT & MANAGEMENT - 4 (HDM-4)
(INTERMITTENT SECTIONS) ALONG NORTHBAY BLVD.,
NAVOTAS CITY

PROJECT TITLE AND LOCATION :

4. REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTIONS


A. ALL WORKS SHALL COMPLY WITH CLAUSE 39 "REQUIREMENTS AND
CONDITIONS OF CONTRACTS", VOLUME -1 OF THE STANDARD
SPECIFICATIONS FOR PUBLIC WORKS AND HIGHWAYS, 2004.
B. PORTION OF EXISTING UTILITIES, SUCH AS WATER MAINS,
IRRIGATION CHANNELS, TELEPHONE POST AND TRUNK LINES ETC.,
THAT MAY CAUSE OBSTRUCTIONS TO THE CONSTRUCTION OF THIS
PROJECT SHALL BE RELOCATED BY THE ENTITY OR OWNER
CONCERNED, EXTREME PRECAUTIONS SHALL BE EXERCISED.
DAMAGED THEREOF SHALL BE THE ACCOUNT OF THE CONTRACTOR.

5. SUB-GRADE, SUB-BASE AND BASE


A. UNSUITABLE SUB-GRADE MATERIAL SHALL BE EXCAVATED BELOW
THE GROUND SURFACE TO THE REQUIRED WIDTH AND DEPTH, THE
AREA TO BE EXCAVATED SHALL BE BACKFILL WITH APPROVED
MATERIAL.
B. NO EMBANKMENT MATERIALS SHALL BE PLACE UNTIL THE
FOUNDATION IS STABLE.

6. CONCRETE AND CONCRETE PAVEMENT


A. ALL CONCRETE TO BE USED IN THIS PROJECT SHALL BE CLASS "A"
UNLESS OTHERWISE INDICATED.( PCCP 300 mm - 3 days , 3500 psi )
B. NO ADMIXTURES OR ADDITIVES WILL BE ALLOWED FOR ALL
CONCRETE WORKS WITHOUT PRIOR APPROVAL FROM THE
SECRETARY OF DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OR
HIS DULY REPRESENTATIVE.

=
=
=
=
=
=
=
=
=
=
=

C. TRAFFIC SHALL BE REQUIRED TO REDUCE SPEED WHEN PASSING


THE VICINITY OF THE NEWLY LAID CONCRETE PAVEMENT UNTIL SUCH
TIME THAT IT HAS OBTAINED THE THREE (3) DAYS REQUIRED
STRENGTH.

DESIGN PARAMETERS
DESIGN LIFE ( YEARS ), n
ASSUMED TRAFFIC GROWTH RATE, i
DESIGN CBR
RESILIENT MODULUS, M r
EFFECTIVE MODULUS OF SUBGRADE, k
RELIABILITY (%)
STANDARD NORMAL VARIANT, Z r
OVERALL STANDARD DEVIATION, S o
LOAD TRANSFER COEFFICIENT, J
LOSS OF SUPPORT, L.S.
DRAINAGE COEFFICIENT, C d

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


NATIONAL CAPITAL REGION

MALABON - NAVOTAS DISTRICT ENGINEERING OFFICE


C-4 ROAD, BAGUMBAYAN NORTH, NAVOTAS CITY

Wp = 6.40

D.W.
3.20

2.00

1.00

Flow

Flow

Wp = 6.20

1.30

K10 + (-080)

5.00

DIKE

D.W.

3.90

C R E E K

MECHANICAL
PUMP

3.90

D.W.

4.70

0.70

Wp = 6.30

D.W.

K10 + (-020)

Flow
Wp = 6.30

BARRISTER J. REYES

Flow

Flow

L= 7.00 I.m.

INSTALL CROSSPIPE

196.60
CHIEF, PLANNING AND DESIGN SECTION

PROVIDE PEDESTRIAN LANE

CADORNIGA ST.

K10 + 020.05

Wp =15.30

7 - 11 STORE

Wp = 6.40

K 10

K10 + 000

Flow

Flow

SAN MARCUS ST.

Flow

PCCP ( 0.28 m thk.- 3 days )


FROM K10 + (-145.6 ) to K 10 + 020.05
LENGTH = 165.65 I.m

CONSTRUCT CHB LINED CANAL


FROM K10 + (-145.6 ) to K 10 + 020.05
LENGTH = 331.30 I.m ( BOTHSIDES )

Flow

K10 + (-040)

Flow

2.40

D.W.

Wp = 6.30

D.W.
2.80

DESIGN GRADE

FROM K10 + (-062.20 ) to K 10 + 020.05


LEFT SIDE , L = 53.65 l.m.
RIGHT SIDE , L = 82.25 l.m.

RAISING OF EXISTING RC
MANHOLE W/ COVER
( 10 UNIT )

K10 + (-060)

1.50

PROVIDE REFLECTORIZED THERMOPLASTIC


PAVEMENT MARKINGS ( WHITE )
FROM K10 + (-145.6 ) to K10 + 20.05
LENGTH = 165.65 I.m

4.40

D.W.

D.W.
8.00

BAUZA ST.

5.50

BANGKULASI
BRGY. HALL
PROVIDE PEDESTRIAN LANE

K10 + (-100)

Flow
Wp = 6.30

Flow

K10 + (-120)

Wp = 7.00

D.W.

4.10

CENTER LINE MARKINGS

EDGE LINE MARKINGS

Wp = 7.20

4.70

SCALE HOR. 1 : 300 m, VERT. NTS

EXISTING PROFILE

PAVEMENT DESIGNED / PREPARED/ ESTIMATED BY:

ENGINEER - II

MARK PETER C. RECTO

RECOMMENDING APPROVAL :

GERARDO T. DE GUZMAN

OIC - ASSISTANT DISTRICT ENGINEER

BM-1
Elev. 12.556

R-10 ROAD

C 4 ROAD

K10 + (-145.6) K10 + (-140)

EXISTING
PRINZA

BANGKULASI BRIDGE

14.00

12.310

13.00

11.241

12.00

12.109

11.00

K 10 +(-020)

INVERT ELEVATION

12.355

REVIEWED AND SUBMITTED :

11.268

10.00

SURVEYED BY :

12.155

SCALE (HOR. 1: 300, VERT. 1:100)

CADD BY :

K 10 +(-040)

ALLEY

PROFILE ALONG CENTER LINE

SHEET CONTENTS :

12.401

ENGINEER -II

11.296

ULYSSES B. PEREGRINO

12.144
DRAFTSMAN - I

K 10 +(-060)
EDWIN A. GARCIA

12.447
GENERAL PLAN
PROFILE ALONG CENTER LINE

11.323

ALLEY

ALLEY

12.076

14.00

12.493

13.00

11.350

12.00

12.060

11.00

K 10 +(-100)

SCALE (HOR. 1: 300, VERT. 1:100)


12.538

INVERT ELEVATION PROFILE

11.377

10.00

12.113

E
L
E
V
A
T
I
O
N

E
L
E
V
A
T
I
O
N

K 10 +(-120)

Flow

12.312

12.312

K 10 + 020.05

DESIGN GRADE ELEVATION

11.391

PROJECT TITLE AND LOCATION :

12.347

REHABILITATION / RECONSTRUCTION OF DAMAGED


PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED
ON PAVEMENT MANAGEMENT SYSTEM /HIGHWAY
DEVELOPMENT & MANAGEMENT - 4 (HDM-4)
(INTERMITTENT SECTIONS) ALONG NORTHBAY BLVD.,
NAVOTAS CITY

12.264

12.264

11.214

K 10 + 000

DESIGN INVERT ELEVATION

EXISTING PROFILE ALONG


CENTER LINE

C-4 ROAD, BAGUMBAYAN NORTH, NAVOTAS CITY

MALABON - NAVOTAS DISTRICT ENGINEERING OFFICE

NATIONAL CAPITAL REGION

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

STATIONING

12.584
REPUBLIC OF THE PHILIPPINES

K 10 +(-140)

ALLEY
K 10 +(-080)

ALLEY
PAGANAHAN ST.
13.308

12.584
K 10 +(-145.6)

CADORNIGA ST.

SAN MARCUS ST.

M.NAVAL ST.

APPROVED :

CONSTRUCT CHB
LINED CANAL
L = 91.40 l.m.

OIC - DISTRICT ENGINEER

CASIANO P. DE GUZMAN

SHEET NO. :

-5

-4

0.70

-4

-3

0.36

-3

-2

-1
0

6.20

PCCP ( 0.20 m. thk. 3 - days )


AGGREGATE SUBBASE COURSE ( Variable)
CURB AND GUTTER
CHB LINED CANAL

-1

STA. K 10 + ( - 080 )

-2

6.40

STA. K 10 + ( - 100 )

-1

PCCP ( 0.20 m. thk. 3 - days )


AGGREGATE SUBBASE COURSE ( Variable)
CURB AND GUTTER
CHB LINED CANAL

-2

6.30

0
1

STA. K 10 + ( - 120 )

-1

PCCP ( 0.20 m. thk. 3 - days )


AGGREGATE SUBBASE COURSE ( Variable)
CURB AND GUTTER
CHB LINED CANAL

-2

0.85

side walk

0.30

0.85

0.90

PAGANAHAN ST.

0.47

0.36

side walk

- 10

ELEV.13.00 m
C-4 ROAD
12.00 m
11.00 m
10.00 m

-6

12.00 m

ELEV.13.00 m

11.00 m
10.00 m

-6

12.00 m

ELEV.13.00 m

11.00 m
10.00 m

-6

12.00 m

ELEV.13.00 m

11.00 m
10.00 m

-6

ELEV.13.00 m

-9

-5

-5

-5

-5

-8

-4

0.80

-4

-4

0.83

1.70

-4

-7

-6

-5

-4

PCCP ( 0.20 m. thk. 3 - days )

-3

-1

-1

6.40

6.30

-3

STA. K 10 + 000

-2

-1

6.30

-2

-1

15.30

1.32

side walk

1.23

side walk

0.90

side walk

0.82
side walk

0.47

0.45

0.42

0.33

STA. K 10 + 018.7

STA. K 10 + ( - 020 )

-2

-1

STA. K 10 + ( - 040 )

-2

6.30

PCCP ( 0.20 m. thk. 3 - days )


AGGREGATE SUBBASE COURSE ( Variable)
CURB AND GUTTER

PCCP ( 0.20 m. thk. 3 - days )


AGGREGATE SUBBASE COURSE ( Variable)
CURB AND GUTTER
CHB LINED CANAL

PCCP ( 0.20 m. thk. 3 - days )


AGGREGATE SUBBASE COURSE ( Variable)
CURB AND GUTTER

-2

AGGREGATE SUBBASE COURSE ( Variable)

0.47

-3

0.50

-3

0.47

-3

0.66 0.44

5
6

10

C-4 ROAD

0.90

0.90

0.15
O.C.

0.90

CONCRETE WALL

CHB LINED CANAL

CURB AND GUTTER

0.15

1: 50 m.

0.90

0.90

3.00

4.00

THERMOPLASTIC PAINT CENTER LINE


0.15 m X 3.00 m X 3.20 mm THICK
(SOLID WHITE)

0.67

SCALE :

3.00

PEDESTRIAN LANE

4.00

3.00

SHEET NO. :

NTS

DET. OF PAVEMENT MARKINGS

5.00

THERMOPLASTIC PAINT EDGE LINE


0.10 m X 3.20 mm THICK
(SOLID WHITE)

0.17

8 % SLOPE

OIC - DISTRICT ENGINEER

CASIANO P. DE GUZMAN

O.C.

TOP AND BOTTOM

EMBANKMENT (Sel. Borrow) (Variable )

AGGREGATE SUBBASE COURSE ( Variable)

PCCP ( 0.28 m. thk. 3 - days )

Width = VARIABLE

CHB LINED CANAL

CURB AND GUTTER

EMBANKMENT (Sel. Borrow) (Variable )

AGGREGATE SUBBASE COURSE ( Variable)

PCCP ( 0.28 m. thk. 3 - days )

Width = VARIABLE

DET. FOR DRIVEWAYS & ALLEYS

SCALE :

TYPICAL SECTION

1 :5 m

GERARDO T. DE GUZMAN

SCALE :

DET. OF CURB & GUTTER

OIC - ASSISTANT DISTRICT ENGINEER

APPROVED :

BARRISTER J. REYES

RECOMMENDING APPROVAL :

CHIEF, PLANNING AND DESIGN SECTION

REVIEWED AND SUBMITTED :

0.15

-6

ELEV.13.00 m
12.00 m
11.00 m
10.00 m

-5

1.76

-3

0.90 0.48

-4

0.45

-3

7.00

7.20

PCCP ( 0.20 m. thk. 3 - days )


AGGREGATE SUBBASE COURSE ( Variable)

-1

STA. K 10 + ( - 140 )

-2

BRIDGE

STA. K 10 + ( - 060 )

PCCP ( 0.20 m. thk. 3 - days )


AGGREGATE SUBBASE COURSE ( Variable)
CURB AND GUTTER
CHB LINED CANAL

SURVEYED BY :

ENGINEER -II

ULYSSES B. PEREGRINO

CADD BY :

DRAFTSMAN - I

EDWIN A. GARCIA

PAVEMENT DESIGNED / PREPARED/ ESTIMATED BY:

ENGINEER - II

MARK PETER C. RECTO

0.21

-6

12.00 m

ELEV.13.00 m

11.00 m

-5

0.90

-4

-3

BRIDGE

12.00 m
11.00 m
10.00 m

SHEET CONTENTS :

CROSS SECTION
TYPICAL SECTION
DET. OF DRIVEWAYS & ALLEYS
DET. OF CURB & GUTTER
DET. OF PAVEMENT MARKINGS

0.30

0.30

10.00 m

-6

12.00 m

ELEV.13.00 m

-5

-4

ALLEY

-5
S.W.

PCCP ( 0.20 m. thk. 3 - days )


AGGREGATE SUBBASE COURSE ( Variable)

STA. K 10 + ( - 145.6 )

1.100 m

CROSS SECTION
SCALE :

PROJECT TITLE AND LOCATION :

REHABILITATION / RECONSTRUCTION OF DAMAGED


PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED
ON PAVEMENT MANAGEMENT SYSTEM /HIGHWAY
DEVELOPMENT & MANAGEMENT - 4 (HDM-4)
(INTERMITTENT SECTIONS) ALONG NORTHBAY BLVD.,
NAVOTAS CITY

0.15

11.00 m
10.00 m

-6

12.00 m

ELEV.13.00 m

11.00 m
10.00 m

-6

ELEV.13.00 m
12.00 m
11.00 m
10.00 m

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


NATIONAL CAPITAL REGION

MALABON - NAVOTAS DISTRICT ENGINEERING OFFICE


C-4 ROAD, BAGUMBAYAN NORTH, NAVOTAS CITY

0.10

0.36

0.15
+ / - 0.60

SCALE :

0.15

1 : 10 m

0.15

0.30

spaced @ 0.30 m OC

150 mm thick CHB WALL

0.15

spaced @ 0.30 m OC

1 : 5m

0.50

DET. SECTION OF CHB LINED CANAL


INLET DETAIL
DET. OF LINTEL BEAM AND POST
DET. OF CHB LINED CANAL
CHB LINED CANAL SECTIONAL VIEW

SHEET CONTENTS :

SCALE :

DETAIL OF LINTEL
BEAM & POST

LINTEL BEAM

0.15

POST

DRAFTSMAN - I

SCALE :

EDWIN A. GARCIA

1 : 10 m

LINTEL BEAM

SURVEYED BY :

ENGINEER -II

ULYSSES B. PEREGRINO
PAVEMENT DESIGNED / PREPARED/ ESTIMATED BY:

ENGINEER - II

MARK PETER C. RECTO

3.00

6" thick CHB WALL

FIXED CONCRETE COVER

0.25

REMOVABLE CONCRETE COVER

POST

3.00

0.25

LINED CANAL CONCRETE FLOORING

OIC - DISTRICT ENGINEER

CASIANO P. DE GUZMAN

1 : 15 m

CHB LINED CANAL NEW CONST. SECTIONAL VIEW

GERARDO T. DE GUZMAN

SCALE :

OIC - ASSISTANT DISTRICT ENGINEER

APPROVED :

BARRISTER J. REYES

RECOMMENDING APPROVAL :

CHIEF, PLANNING AND DESIGN SECTION

REVIEWED AND SUBMITTED :

POST

DETAIL OF CHB LINED CANAL

0.90

0.90

LINTEL BEAM

0.90

CONCRETE GUTTER

CADD BY :

0.10
0.10
0.20
+ / - 0.80

DETAIL SECTION OF CHB LINED CANAL (NEW)

0.30

1 : 15 m

0.20
REHABILITATION / RECONSTRUCTION OF DAMAGED
PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED
ON PAVEMENT MANAGEMENT SYSTEM /HIGHWAY
DEVELOPMENT & MANAGEMENT - 4 (HDM-4)
(INTERMITTENT SECTIONS) ALONG NORTHBAY BLVD.,
NAVOTAS CITY

PROJECT TITLE AND LOCATION :

0.90

0.10

0.70

CURB INLET ELEVATION


SPACED BETWEEN 10 TO 12 METERS

SCALE :

INLET DETAIL

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


NATIONAL CAPITAL REGION

MALABON - NAVOTAS DISTRICT ENGINEERING OFFICE


C-4 ROAD, BAGUMBAYAN NORTH, NAVOTAS CITY

0.25

0.10

0.10
0.20
+ / - 0.80
0.10
CONCRETE CURB
& GUTTER

0.15 0.20

SHEET NO. :

375

750

4500

1D
F-7

750

750

750

TYPICAL BAR LAYOUT FOR 230mm THICK PAVEMENT

750

DEFORMED TIE BARS

750

4500

1B
F-7

750

750

750
375

1500

MINIMUM

1E
F-7

1F
F-7

NOTE:

PLAIN DOWEL BARS


LANE SHOWING TRANSVERSE CONSTRUCTION
JOINT AT LOCATION OF WEAKENED PLANE JOINT

TRANSVERSE CONSTRUCTION JOINT

LANE SHOWING TRANSVERSE CONSTRUCTION JOINT


AT MIDDLE THIRD OF NORMAL JOINT INTERVAL

SEE
DETAIL "B"

CONTACT JOINT
(HALF LANE PAVING)

500

EXISTING
PAVEMENT

500

BAR SUPPORT

SCALE :

500

b
600

500

500

500

500

1L
F-7

500
VARIABLE

500

DOWEL BARS

500

PLAN

GROUT

500

FORMED GROOVE WITH KEYWAYS


FILL WITH POURED JOINT FILLER

CONST. JOINT TO BE
MOPPED W / ASPHALT

LONGITUDINAL JOINT

NTS:

500

5.

4.

3.

2.

1.

500

500

500

1 : 50

500

NEW PAVEMENT

3.00

2.50

SECTION

12

500

EDGE OF EXISTING
CONCRETE PAVEMENT

500

3.00

SCALE :

SLIDING

1K
F-7

NOTE:

BAR @ 500mm O.C.

25

WHERE :

Te - THICKNESS OF EXISTING PAVEMENT


Tn - THICKNESS NEW PAVEMENT

HALF OF THE BAR ON THE SIDE OF THE


METAL DOWEL CAP SHALL BE PAINTED
W/ RED LEAD AND THEN GREASED

SHEET NO. :

THE EXISTING CONCRETE PAVEMENT SHALL BE CHIPPED


OFF PERPENDICULARLY TO THE EXISTING BASE ABOUT 300mm
WIDE TO A DISTANCE WHERE THE FLARE IS LESS THAN 1000mm
AND NECESSARY DOWEL BARS SHALL BE PROVIDED TO
CONNECT THE NEW PAVEMENT WITH THE EXISTING PAVEMENT.

OUTLINE OF CHIPPED OFF


EXISTING CONCRETE PAVEMENT

50

NTS:

METAL DOWEL CAP GAUGE NO. 18 28mm


INSIDE DIAMETER BE PLACED ON EACH
DOWEL BAR ON ALTERNATE END

30-50 PENETRATION ASPHALT SEAL OR COLD


APPLIED LIQUID RUBBER BASE SEALING COMPOUND

NTS:

CONSTRUCTION JOINT TO BE USED FOR FLARING


EXISTING CONCRETE PAVEMENT

FIXED

GENERAL NOTES:

SCALE :

DETAIL OF EXPANSION JOINT (DOWELED) AT


CERTAIN INTERSECTIONS AND STRUCTURES

20mm PREMOLDED
EXPANSION FILLER

PLAIN DOWEL BAR

1L
F-7

EXISTING PAVEMENT

1J (SHOWING FLARING OF EXISTING CONCRETE PAVEMENT)


F-7

500

EXISTING CONCRETE PAVEMENT

12

NEW
PAVEMENT

SECTION

DEFORMED TIE BAR

NTS:

TRANSVERSE AND LONGITUDINAL CONSTRUCTION


JOINT TO BE USED ONLY FOR CONNECTIONS
SCALE :

7.

6.

8.

9.

APPROVED :

OIC - DISTRICT ENGINEER

CASIANO P. DE GUZMAN

MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE "DPWH STANDARD SPECIFICATIONS
FOR HIGHWAYS, BRIDGES AND AIRPORTS, 2004".
CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE JOINT
IS POURED AHEAD AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE.
AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN THAT NO
CONCRETE FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE FIRST SLAB.
TIE BARS SHOULD BE DEFORMED STEEL BARS, ALL DOWEL BARS SHALL BE SMOOTH ROUND
STEEL BAR FREE FROM RUST AND OTHER DEFECTS WHICH NIGHT RESTRICT THEIR MOVEMENT.
TYPE OF WEAKENED PLANE JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY
ONE TYPE SHALL BE USED FOR THE WHOLE PROJECT.
MATERIAL FOR THE METAL SIDE FROM SHALL BE BRAND NEW SHEET METAL GAUGE NO. 18 OF
BLACK IRON FREE FROM RUST AND LINKS.
AT LEAST SIX (6) SUCCESSIVE DOWELED BUTT JOINTS AT NORMAL JOINT SPACING SHALL BE
PROVIDED BEFORE OR AFTER AN EXPANSION JOINT.
THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE SEALED
WITH 30-50 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER COMPOUND AFTER
THE CONCRETE HAD BEEN CURED AND BEFORE OPENING PAVEMENT TO TRAFFIC.
ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT, SHALL BE CONTINUOUS FROM EDGE
TO EDGE.
ALL LONGITUDINAL JOINTS SHALL MEET AT INTERSECTIONS WITH NO GAPS OR OFFSET.
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
AVOID STOPPAGE OF FORM WORKS ALONG CURVES.

OIC - ASSISTANT DISTRICT ENGINEER

GERARDO T. DE GUZMAN

RECOMMENDING APPROVAL :

10.
11.
12.

Tn

TRANSVERSE CONSTRUCTION ( CONTACT ) JOINT


SHALL BE PROVIDED AT THE END OF ANY RUN WHERE
LAYING OF CONCRETE HAS BEEN STOPPED FOR THIRTY
( 30 ) MINUTES OF LONGER.
TRANSVERSE CONSTRUCTION JOINTS WHICH
OCCUR AT LOCATION WEAKENED PLANE JOINT SHOULD
BE BUTT JOINTS WITH DOWELS. IF JOINT OCCURS IN THE
MIDDLE THIRD OF THE WEAKENED JOINT INTERVAL
( 1500 - 3000mm ) IT SHOULD BE KEYED JOINTS WITH TIE
BARS.

NTS:

1K
F-7

150

750

25

WEAKEND PLANE JOINT

1 : 50

SEE
DETAIL "A"

SAWED JOINT
(2 - LANE PAVING)

SCALE :

SECTION - I

SEE
DETAIL "D"

CONSTRACTION JOINT

NTS:

25

TRANSVERSE CONTACT JOINT


OF WEAKENED PLANE JOINT

SCALE :

DETAIL OF BAR SPACING ALONG CURVES

250

375

SCALE :

1G
F-7

SCALE :

(TRANSVERSE JOINT)

S E C T I O N - II

25

METAL SIDE FORM

NTS:

230

REVIEWED AND SUBMITTED :

BARRISTER J. REYES
CHIEF, PLANNING AND DESIGN SECTION

Te

TYPICAL PLAN OF A TWO LANE PAVEMENT

SAWED GROOVE WITH


POURED JOINT FILLER

SEE
DETAIL "C"

1H
F-7

CONSTRACTION JOINT

25

WOODEN / METAL SIDE FORM

ROOFING NAIL
@ 750mm O.C.

WOODEN SIDE FORM

SCALE :

DETAILS OF JOINT IN GRID PAVEMENT

ENGINEER -II

ULYSSES B. PEREGRINO

SURVEYED BY :

DRAFTSMAN - I

CADD BY :

Tn

BEGINNING OF
FLARING

EDWIN A. GARCIA

PAVEMENT DESIGNED / PREPARED/ ESTIMATED BY:

ENGINEER - II

Tn-Te

1C
F-7

750

NTS:

NTS:

SAWED GROOVE WITH


POURED JOINT FILLER

FIRST SLAB

NTS:

SHEET CONTENTS :

1I
F-7

Te

MARK PETER C. RECTO

1/2 Te

T - 1/2 Te

25

1A
F-7

SCALE :

SAWED GROOVE WITH POURED JOINT FILLER


(@4.5m INTERVAL OR AS DIRECTED
BY THE ENGINEER)

NTS:

FIRST SLAB

SAWED GROOVE WITH KEYWAYS


FILL WITH POURED JOINT FILLER

1B D E T A I L "A"
F-7

SCALE :

SCALE :

D E T A I L "C"

1C D E T A I L "B"
F-7

1D
F-7

SCALE :

FIRST SLAB

1000
MINIMUM

25

1 / 3T 1 / 3T 1 / 3T

STANDARD PORTLAND CEMENT


CONCRETE PAVEMENT

PROJECT TITLE AND LOCATION :

TYPICAL PLAN OF A TWO LANE PAVEMENT


SHOWING FLARING OF EXISTING CONCRETE PAVEMENT
DETAILS OF JOINT IN GRID PAVEMENT
DETAILS OF BAR SPACING ALONG CURVES
DETAILS OF EXPANSION JOINT (DOWELED) AT
CERTAIN INTERSECTIONS AND STRUCTURES
GENERAL NOTES

FORMED GROOVE WITH KEYWAYS


FILL WITH POURED JOINT FILLER

1E D E T A I L "D"
F-7
12

25
300 (230mm)

NTS:

1 / 3T 1 / 3T 1 / 3T

300
300
300

300
300
300

REHABILITATION / RECONSTRUCTION OF DAMAGED


PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED
ON PAVEMENT MANAGEMENT SYSTEM /HIGHWAY
DEVELOPMENT & MANAGEMENT - 4 (HDM-4)
(INTERMITTENT SECTIONS) ALONG NORTHBAY BLVD.,
NAVOTAS CITY

DEFORMED TIE BAR

DEFORMED TIE BAR

ONE HALF OF THE LENGTH SHALL BE


PAINTED WITH APPROVED RE LEAD
AND THEN GREASED.

DEFORMED TIE BAR

300 (230mm)

SCALE :

SECTION

NATIONAL CAPITAL REGION

MALABON - NAVOTAS DISTRICT ENGINEERING OFFICE


C-4 ROAD, BAGUMBAYAN NORTH, NAVOTAS CITY

11

11
11

11

600

1 / 3T 1 / 3T 1 / 3T

T/2
T/2

600
600

50
1 / 3T 1 / 3T 1 / 3T
50
25
25

SECTION - I

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REPUBLIC OF THE PHILIPPINES

1F
F-7

T
T

5
5
5
5
1 / 3T 1 / 3T 1 / 3T

WIDTH AS SHOWN ON PLANS

You might also like