CASIANO P. DE GUZMAN
APPROVED :
GERARDO T. DE GUZMAN
RECOMMENDING APPROVAL :
BARRISTER J. REYES
GENERAL NOTES:
7. CONSTRUCTION STAKES
REL
EST
LA
ST.
M. N
NAVOTAS
EAST
T.
AS
AVA
QTY.
UNIT
NO
LEO
R
- 10
RO
AD
L ST
BANGKULASI
NTS
VICINITY MAP
SCALE :
DESCRIPTION
SUMMARY OF QUANTITIES
97.20
331.30
832.60
cu.m
cu.m
l. m
sq.m
cu. m
101(3a.1)
418.50
100.90
101 (4)b
cu. m
102(1)
STRUCTURE EXCAVATION
135.93
kg
sq. m
l. m
103(1a)
1,149.86
91.00
201
cu. m
311(4)a.4
140.33
l.m.
sq. m
18,535.00
7.00
591.80
405
500(1c)
600(3)
16.00
331.30
136.00
sq. m
l. m.
l. m.
SPL - 2
b. DPWH BILLBOARDS
a. COA BILLBOARDS
74.10
350.00
10.00
1.00
2.00
1.00
hr.
unit
job
pc.
pc
PROJECT BILLBOARDS
SPL - 3
DEWATERING
sq. m.
SPL - 4
TITLE SHEET
SHEET
1
6
GENERAL NOTES
SHEET CONTENTS
2
6
VICINITY MAP
SUMMARY OF QUANTITIES
GENERAL PLAN
TABLE OF CONTENTS
3
6
CROSS SECTION
ST.
CASIANO P. DE GUZMAN
SHEET NO. :
INLET DETAIL
TYPICAL SECTION
4
6
5
6
6
6
GERARDO T. DE GUZMAN
GENERAL NOTES
APPROVED :
BARRISTER J. REYES
RECOMMENDING APPROVAL :
SPL - 5
SPL - 1
605)
504(3)c
500(1a)
404-C
101-2b
100
ITEM NO.
BAGUMBAYAN
SOUTH
BAGUMBAYAN
NORTH
NIG
4.50
2.50
2.00
3500
3.37E + 06
635.55
SURVEYED BY :
ENGINEER -II
ULYSSES B. PEREGRINO
CADD BY :
DRAFTSMAN - I
EDWIN A. GARCIA
ENGINEER - II
OR
8. STANDARD DRAWING
THE NECESSARY DRAWING CONTAINED IN THE DPWH STANDARD FOR
ROAD SHALL BE UTILIZED FOR THE PROJECT UNLESS OTHERWISE
MORE DETAILED.
9. QUANTITY
=
=
=
=
=
=
SERVICEABILITY INDEX
INITIAL SERVICEABILITY INDEX, P i
TERMINAL SERVICEABILITY INDEX, P t
CONCRETE PROPERTIES
f'c ( psi )
MODULUS ELASTICITY ( E c )
MODULUS OF RUPTURE ( S' c )
SHEET CONTENTS :
GENERAL NOTES,
VICINITY MAP
DESIGN PAVEMENT ANALYSIS
SUMMARY OF QUANTITIES
TABLE OF CONTENTS
CAD
1. STANDARD SPECIFICATION
ALL WORKS SHALL COMPLY WITH DPWH STANDARD SPECIFICATION
FOR HIGHWAYS, BRIDGES AND AIRPORTS REVISED 2004 SPECIAL
PROVISION AND SUPPLEMENTAL SPECIFICATIONS PERTAINING TO
THIS PROJECT, CONDITIONS OF THE CONTRACT (INT'L) FOR WORKS OF
CIVIL ENGINEERS CONSTRUCTION, 2ND EDITION, PREPARED BY F.I.D.IC.
SHALL ALSO GOVERN.
2. DIMENSIONS
UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS WHICH INCLUDE
STATIONING, DISTANCES BETWEEN CONTROL POINTS AND
ELEVATIONS ARE MEASURED IN METERS.
10
4.00 %
51.30
15000.00
250.00
85.00 %
-1.037
0.45
2.50
1.00
1.00
=
=
=
=
=
=
=
=
=
=
=
DESIGN PARAMETERS
DESIGN LIFE ( YEARS ), n
ASSUMED TRAFFIC GROWTH RATE, i
DESIGN CBR
RESILIENT MODULUS, M r
EFFECTIVE MODULUS OF SUBGRADE, k
RELIABILITY (%)
STANDARD NORMAL VARIANT, Z r
OVERALL STANDARD DEVIATION, S o
LOAD TRANSFER COEFFICIENT, J
LOSS OF SUPPORT, L.S.
DRAINAGE COEFFICIENT, C d
Wp = 6.40
D.W.
3.20
2.00
1.00
Flow
Flow
Wp = 6.20
1.30
K10 + (-080)
5.00
DIKE
D.W.
3.90
C R E E K
MECHANICAL
PUMP
3.90
D.W.
4.70
0.70
Wp = 6.30
D.W.
K10 + (-020)
Flow
Wp = 6.30
BARRISTER J. REYES
Flow
Flow
L= 7.00 I.m.
INSTALL CROSSPIPE
196.60
CHIEF, PLANNING AND DESIGN SECTION
CADORNIGA ST.
K10 + 020.05
Wp =15.30
7 - 11 STORE
Wp = 6.40
K 10
K10 + 000
Flow
Flow
Flow
Flow
K10 + (-040)
Flow
2.40
D.W.
Wp = 6.30
D.W.
2.80
DESIGN GRADE
RAISING OF EXISTING RC
MANHOLE W/ COVER
( 10 UNIT )
K10 + (-060)
1.50
4.40
D.W.
D.W.
8.00
BAUZA ST.
5.50
BANGKULASI
BRGY. HALL
PROVIDE PEDESTRIAN LANE
K10 + (-100)
Flow
Wp = 6.30
Flow
K10 + (-120)
Wp = 7.00
D.W.
4.10
Wp = 7.20
4.70
EXISTING PROFILE
ENGINEER - II
RECOMMENDING APPROVAL :
GERARDO T. DE GUZMAN
BM-1
Elev. 12.556
R-10 ROAD
C 4 ROAD
EXISTING
PRINZA
BANGKULASI BRIDGE
14.00
12.310
13.00
11.241
12.00
12.109
11.00
K 10 +(-020)
INVERT ELEVATION
12.355
11.268
10.00
SURVEYED BY :
12.155
CADD BY :
K 10 +(-040)
ALLEY
SHEET CONTENTS :
12.401
ENGINEER -II
11.296
ULYSSES B. PEREGRINO
12.144
DRAFTSMAN - I
K 10 +(-060)
EDWIN A. GARCIA
12.447
GENERAL PLAN
PROFILE ALONG CENTER LINE
11.323
ALLEY
ALLEY
12.076
14.00
12.493
13.00
11.350
12.00
12.060
11.00
K 10 +(-100)
11.377
10.00
12.113
E
L
E
V
A
T
I
O
N
E
L
E
V
A
T
I
O
N
K 10 +(-120)
Flow
12.312
12.312
K 10 + 020.05
11.391
12.347
12.264
12.264
11.214
K 10 + 000
STATIONING
12.584
REPUBLIC OF THE PHILIPPINES
K 10 +(-140)
ALLEY
K 10 +(-080)
ALLEY
PAGANAHAN ST.
13.308
12.584
K 10 +(-145.6)
CADORNIGA ST.
M.NAVAL ST.
APPROVED :
CONSTRUCT CHB
LINED CANAL
L = 91.40 l.m.
CASIANO P. DE GUZMAN
SHEET NO. :
-5
-4
0.70
-4
-3
0.36
-3
-2
-1
0
6.20
-1
STA. K 10 + ( - 080 )
-2
6.40
STA. K 10 + ( - 100 )
-1
-2
6.30
0
1
STA. K 10 + ( - 120 )
-1
-2
0.85
side walk
0.30
0.85
0.90
PAGANAHAN ST.
0.47
0.36
side walk
- 10
ELEV.13.00 m
C-4 ROAD
12.00 m
11.00 m
10.00 m
-6
12.00 m
ELEV.13.00 m
11.00 m
10.00 m
-6
12.00 m
ELEV.13.00 m
11.00 m
10.00 m
-6
12.00 m
ELEV.13.00 m
11.00 m
10.00 m
-6
ELEV.13.00 m
-9
-5
-5
-5
-5
-8
-4
0.80
-4
-4
0.83
1.70
-4
-7
-6
-5
-4
-3
-1
-1
6.40
6.30
-3
STA. K 10 + 000
-2
-1
6.30
-2
-1
15.30
1.32
side walk
1.23
side walk
0.90
side walk
0.82
side walk
0.47
0.45
0.42
0.33
STA. K 10 + 018.7
STA. K 10 + ( - 020 )
-2
-1
STA. K 10 + ( - 040 )
-2
6.30
-2
0.47
-3
0.50
-3
0.47
-3
0.66 0.44
5
6
10
C-4 ROAD
0.90
0.90
0.15
O.C.
0.90
CONCRETE WALL
0.15
1: 50 m.
0.90
0.90
3.00
4.00
0.67
SCALE :
3.00
PEDESTRIAN LANE
4.00
3.00
SHEET NO. :
NTS
5.00
0.17
8 % SLOPE
CASIANO P. DE GUZMAN
O.C.
Width = VARIABLE
Width = VARIABLE
SCALE :
TYPICAL SECTION
1 :5 m
GERARDO T. DE GUZMAN
SCALE :
APPROVED :
BARRISTER J. REYES
RECOMMENDING APPROVAL :
0.15
-6
ELEV.13.00 m
12.00 m
11.00 m
10.00 m
-5
1.76
-3
0.90 0.48
-4
0.45
-3
7.00
7.20
-1
STA. K 10 + ( - 140 )
-2
BRIDGE
STA. K 10 + ( - 060 )
SURVEYED BY :
ENGINEER -II
ULYSSES B. PEREGRINO
CADD BY :
DRAFTSMAN - I
EDWIN A. GARCIA
ENGINEER - II
0.21
-6
12.00 m
ELEV.13.00 m
11.00 m
-5
0.90
-4
-3
BRIDGE
12.00 m
11.00 m
10.00 m
SHEET CONTENTS :
CROSS SECTION
TYPICAL SECTION
DET. OF DRIVEWAYS & ALLEYS
DET. OF CURB & GUTTER
DET. OF PAVEMENT MARKINGS
0.30
0.30
10.00 m
-6
12.00 m
ELEV.13.00 m
-5
-4
ALLEY
-5
S.W.
STA. K 10 + ( - 145.6 )
1.100 m
CROSS SECTION
SCALE :
0.15
11.00 m
10.00 m
-6
12.00 m
ELEV.13.00 m
11.00 m
10.00 m
-6
ELEV.13.00 m
12.00 m
11.00 m
10.00 m
0.10
0.36
0.15
+ / - 0.60
SCALE :
0.15
1 : 10 m
0.15
0.30
spaced @ 0.30 m OC
0.15
spaced @ 0.30 m OC
1 : 5m
0.50
SHEET CONTENTS :
SCALE :
DETAIL OF LINTEL
BEAM & POST
LINTEL BEAM
0.15
POST
DRAFTSMAN - I
SCALE :
EDWIN A. GARCIA
1 : 10 m
LINTEL BEAM
SURVEYED BY :
ENGINEER -II
ULYSSES B. PEREGRINO
PAVEMENT DESIGNED / PREPARED/ ESTIMATED BY:
ENGINEER - II
3.00
0.25
POST
3.00
0.25
CASIANO P. DE GUZMAN
1 : 15 m
GERARDO T. DE GUZMAN
SCALE :
APPROVED :
BARRISTER J. REYES
RECOMMENDING APPROVAL :
POST
0.90
0.90
LINTEL BEAM
0.90
CONCRETE GUTTER
CADD BY :
0.10
0.10
0.20
+ / - 0.80
0.30
1 : 15 m
0.20
REHABILITATION / RECONSTRUCTION OF DAMAGED
PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED
ON PAVEMENT MANAGEMENT SYSTEM /HIGHWAY
DEVELOPMENT & MANAGEMENT - 4 (HDM-4)
(INTERMITTENT SECTIONS) ALONG NORTHBAY BLVD.,
NAVOTAS CITY
0.90
0.10
0.70
SCALE :
INLET DETAIL
0.25
0.10
0.10
0.20
+ / - 0.80
0.10
CONCRETE CURB
& GUTTER
0.15 0.20
SHEET NO. :
375
750
4500
1D
F-7
750
750
750
750
750
4500
1B
F-7
750
750
750
375
1500
MINIMUM
1E
F-7
1F
F-7
NOTE:
SEE
DETAIL "B"
CONTACT JOINT
(HALF LANE PAVING)
500
EXISTING
PAVEMENT
500
BAR SUPPORT
SCALE :
500
b
600
500
500
500
500
1L
F-7
500
VARIABLE
500
DOWEL BARS
500
PLAN
GROUT
500
CONST. JOINT TO BE
MOPPED W / ASPHALT
LONGITUDINAL JOINT
NTS:
500
5.
4.
3.
2.
1.
500
500
500
1 : 50
500
NEW PAVEMENT
3.00
2.50
SECTION
12
500
EDGE OF EXISTING
CONCRETE PAVEMENT
500
3.00
SCALE :
SLIDING
1K
F-7
NOTE:
25
WHERE :
SHEET NO. :
50
NTS:
NTS:
FIXED
GENERAL NOTES:
SCALE :
20mm PREMOLDED
EXPANSION FILLER
1L
F-7
EXISTING PAVEMENT
500
12
NEW
PAVEMENT
SECTION
NTS:
7.
6.
8.
9.
APPROVED :
CASIANO P. DE GUZMAN
MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE "DPWH STANDARD SPECIFICATIONS
FOR HIGHWAYS, BRIDGES AND AIRPORTS, 2004".
CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE JOINT
IS POURED AHEAD AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE.
AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN THAT NO
CONCRETE FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE FIRST SLAB.
TIE BARS SHOULD BE DEFORMED STEEL BARS, ALL DOWEL BARS SHALL BE SMOOTH ROUND
STEEL BAR FREE FROM RUST AND OTHER DEFECTS WHICH NIGHT RESTRICT THEIR MOVEMENT.
TYPE OF WEAKENED PLANE JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY
ONE TYPE SHALL BE USED FOR THE WHOLE PROJECT.
MATERIAL FOR THE METAL SIDE FROM SHALL BE BRAND NEW SHEET METAL GAUGE NO. 18 OF
BLACK IRON FREE FROM RUST AND LINKS.
AT LEAST SIX (6) SUCCESSIVE DOWELED BUTT JOINTS AT NORMAL JOINT SPACING SHALL BE
PROVIDED BEFORE OR AFTER AN EXPANSION JOINT.
THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE SEALED
WITH 30-50 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER COMPOUND AFTER
THE CONCRETE HAD BEEN CURED AND BEFORE OPENING PAVEMENT TO TRAFFIC.
ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT, SHALL BE CONTINUOUS FROM EDGE
TO EDGE.
ALL LONGITUDINAL JOINTS SHALL MEET AT INTERSECTIONS WITH NO GAPS OR OFFSET.
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
AVOID STOPPAGE OF FORM WORKS ALONG CURVES.
GERARDO T. DE GUZMAN
RECOMMENDING APPROVAL :
10.
11.
12.
Tn
NTS:
1K
F-7
150
750
25
1 : 50
SEE
DETAIL "A"
SAWED JOINT
(2 - LANE PAVING)
SCALE :
SECTION - I
SEE
DETAIL "D"
CONSTRACTION JOINT
NTS:
25
SCALE :
250
375
SCALE :
1G
F-7
SCALE :
(TRANSVERSE JOINT)
S E C T I O N - II
25
NTS:
230
BARRISTER J. REYES
CHIEF, PLANNING AND DESIGN SECTION
Te
SEE
DETAIL "C"
1H
F-7
CONSTRACTION JOINT
25
ROOFING NAIL
@ 750mm O.C.
SCALE :
ENGINEER -II
ULYSSES B. PEREGRINO
SURVEYED BY :
DRAFTSMAN - I
CADD BY :
Tn
BEGINNING OF
FLARING
EDWIN A. GARCIA
ENGINEER - II
Tn-Te
1C
F-7
750
NTS:
NTS:
FIRST SLAB
NTS:
SHEET CONTENTS :
1I
F-7
Te
1/2 Te
T - 1/2 Te
25
1A
F-7
SCALE :
NTS:
FIRST SLAB
1B D E T A I L "A"
F-7
SCALE :
SCALE :
D E T A I L "C"
1C D E T A I L "B"
F-7
1D
F-7
SCALE :
FIRST SLAB
1000
MINIMUM
25
1 / 3T 1 / 3T 1 / 3T
1E D E T A I L "D"
F-7
12
25
300 (230mm)
NTS:
1 / 3T 1 / 3T 1 / 3T
300
300
300
300
300
300
300 (230mm)
SCALE :
SECTION
11
11
11
11
600
1 / 3T 1 / 3T 1 / 3T
T/2
T/2
600
600
50
1 / 3T 1 / 3T 1 / 3T
50
25
25
SECTION - I
1F
F-7
T
T
5
5
5
5
1 / 3T 1 / 3T 1 / 3T