Analisa Harga Satuan Pekerjaan Beton


NO
D-17r2

URAIAN

SAT

VOLUME

HRG.SAT

JUMLAH

1 M3 Sloof Beton Tulang 15/20 (180 kg besi +


bekisting) 4dia. 12 ring 8-15
Kayu papan terentang

M3

0.2700

2,850,000

769,500

Paku Biasa 2" - 5"

Kg

2.0000

23,400

46,800

Besi Beton

Kg

180.0000

16,500

2,970,000

Kawat Beton

Kg

3.0000

27,700

83,100

Semen Portland

Kg

323.0000

1,200

387,600

Pasir Beton

M3

0.5200

225,000

117,000

Koral Beton 2/3

M3

0.7800

200,000

156,000

Pekerja

Oh

4.8500

55,000

266,750

Tukang Batu

Oh

0.3500

70,000

24,500

Tukang Kayu

Oh

1.5600

70,000

109,200

Tukang Besi

Oh

1.4000

70,000

98,000

Kepala Tukang

Oh

0.3310

80,000

26,480

Mandor

Oh

0.1700

85,000

14,450

Jumlah

5,069,380

Dibulatkan

5,069,380

1 M3 Kolom Beton Tulang 15/20 (180 kg besi


+ bekisting) 4dia.12 8-15
Kayu papan terentang

M3

0.4000

2,850,000

1,140,000

Paku Biasa 2" - 5"

Kg

4.0000

23,400

93,600

Minyak Bekisting

Ltr

40,500

Besi Beton

Kg

180.0000

16,500

2,970,000

Kawat Beton

Kg

1.8000

27,700

49,860

Semen Portland

Kg

323.0000

1,200

387,600

Pasir Beton

M3

0.5200

225,000

117,000

Koral Beton 2/3

M3

0.7800

200,000

156,000

Kayu Balok Terentang

M3

0.1500

2,640,000

396,000

Dolken -8-10/4m

Btg

20.0000

15,000

300,000

Pekerja

Oh

7.3000

55,000

401,500

Tukang Batu

Oh

0.3500

70,000

24,500

Tukang Kayu

Oh

3.3000

70,000

231,000

Tukang Besi

Oh

2.1000

70,000

147,000

Kepala Tukang

Oh

0.5700

80,000

45,600

Mandor

Oh

0.2500

85,000

21,250

Jumlah

6.480.910

Dibulatkan

6.481.000

1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring


balk + balok poratl (180 kg besi + bekisting)
4dia. 12, 8-15
Kayu papan terentang

M3

0.3200

2,850,000

912,000

Paku Biasa 2" - 5"

Kg

3.2000

23,400

74,880

Besi Beton

Kg

180.0000

16,500

2,970,000

Kawat Beton

Kg

2.2500

27,700

62,325

Semen Portland

Kg

323.0000

1,200

387,600

Pasir Beton

M3

0.5200

225,000

117,000

Koral Beton 2/3

M3

0.7800

200,000

156,000

Kayu Balok Terentang

M3

0.1400

2,640,000

369,600

Dolken -8-10/4m

Btg

16.0000

15,000

240,000

Pekerja

Oh

5.9600

55,000

327,800

Tukang Batu

Oh

0.3500

70,000

24,500

Tukang Kayu

Oh

2.8000

70,000

196,000

Tukang Besi

Oh

1.4000

70,000

98,000

Kepala Tukang

Oh

0.4550

80,000

36,400

Mandor

Oh

0.2080

85,000

17,680

Jumlah

6.412.865

Dibulatkan
D-29

6,413,000

1 M3 Tangga Beton Tulang (90 kg besi +


bekisting)
Kayu papan terentang

M3

0.2500

2,850,000

712,500

Paku Biasa 2" - 5"

Kg

3.0000

23,400

70,200

Minyak Bekisting

Ltr

1.2000

40,500

48,600

Besi Beton

Kg

90.0000

16,500

1,485,000

Kawat Beton

Kg

3.0000

27,700

83,100

Semen Portland

Kg

323.0000

1,200

387,600

Pasir Beton

M3

0.5200

225,000

117,000

Koral Beton 2/3

M3

0.7800

200,000

156,000

Kayu Balok Terentang

M3

0.1050

2,640,000

277,200

Dolken -8-10/4m

Btg

14.0000

15,000

210,000

Pekerja

Oh

5.6000

55,000

308,000

Tukang Batu

Oh

0.3500

70,000

24,500

Tukang Kayu

Oh

2.3000

70,000

161,000

Tukang Besi

Oh

1.4000

70,000

98,000

Kepala Tukang

Oh

0.4050

80,000

32,400

Mandor

Oh

0.2020

85,000

17,170

Jumlah

4,188,720

Dibulatkan

4,189,000

1 M3 Membuat Plat Lantai Tb. 10 Cm Beton


Bertulang ( 90 Kg Besi + Bekisting )

Kayu Terentang

M3

0.4000

2,850,000

1,140,000

Paku Biasa 2" - 5"

Kg

4.0000

23,400

93,600

Minyak Bekisting

Ltr

2.0000

40,500

81,000

Besi Beton Polos

Kg

90.0000

16,500

1,485,000

Kawat Beton

Kg

3.0000

27,700

83,100

Kayu Balok Terentang

M3

0.1050

151,100

15,866

Plywood Tebal 9 mm

Lbr

3.5000

151,100

528,850

Dolken kayu Galam o - 8-10/4 m

Btg

60.0000

15,000

900,000

Semen Portland

Kg

323.0000

1,200

387,600

Pasir Beton

M3

0.5200

225,000

117,000

Koral Beton 2/3

M3

0.7800

200,000

156,000

Pekerja

Oh

5.2000

55,000

286,000

Tukang Batu

Oh

0.3500

70,000

24,500

Tukang Kayu

Oh

3.3000

70,000

231,000

Kepala Tukang

Oh

0.3650

80,000

29,200

Mandor

Oh

1.0600

85,000

90,100

Jumlah

5,648,816

Dibulatkan

5,649,000

Materi Terkait :
Analisa Harga Satuan Pekerjaan Konstruksi
Analisa Pekerjaan Tanah
Analisa Pekerjaan Pondasi
Analisa Pekerjaan Beton

Analisa Pekerjaan Dinding


Analisa Pekerjaan Plesteran-Acian
Analisa HArga Satuan Pekerjaan Penutup Atap
Analisa Harga Satuan Pekerjaan Tutup Plapond
Analisa Harga Satuan Pekerjaan Lantai
Analisa Harga Satuan Pekerjaan Kayu

C opyright 2015 | Softwa re R AB R um a h All R ights R e se rve d | XHTML | G+ | G++ | Va lid RSS | Priva cy

www.softwarerab.com

You might also like