ISTU Sugar Projects Tasks

Sugar Factory Basic Design

Project Manager

Client

Modify Client
Requirements/
Management Action

NO

11
Client Approval

YES

27

Modify Client
Requirements/
Management Action

NO

YES

Management Action
2

P.Manager
Approv al ??

End

Client Approval

26

NO

NO

Management Action

YES

P. Manager
Approv al

YES

Mechanical Eng.

Process Eng.

Start

25
Process
Operation
Philosophy

1
Technology
Selection

Duration
Duration

3
Energy & Mass
Balanc e E MB

29

Duration

20
Operation
Philosophy

Technology
Selection

Duration

29

10

Design Ba sis

Duration

Sta tion
Engineering

18

Duration

Design Ba sis
Report

PFDs

32

Duration

20

Process Flow
Dia grams

34

Duration

Collect & Format


Documents

Process
Equipment List

26

Duration

Sta tion
Engineering

Duration

12
SLDs
Process
SLDsDisc ipline
Doc um ents/
Deliverables

Equipment
List

12

11

EMB
Calculations

Design Ba sis

EMB

Duration

13

Equipment List

General Layout

Duration

Duration

15

14
Specifications

Duration

20

Mechanic al
SLDs
SLDs
Dis cipline
Doc um ents/
Deliverables

15
EMB Drawing
& Result s

Design Ba sis
Report

Equipment
List

Specifications

Automation Eng.

15
Modifications/
Recommendations

Aut om ation
Review

YES
16

YES

17

18

Duration
Duration

Duration

21

Duration

Mot or List

Duration

Inst ruments Datashee ts

23

Duration

SLDs
Electrical
SLDs
Dis cipline
Doc um ents/
Deliverables

Sizing Sheet

PFDs

General
Layout

SLDs
SLDs
SLDs

24
Master La yout

PFDs
Duration

25
SLDs
Dra
ft O ffic e
SLDs
Doc um ents/
Deliverables

General/Master La yout
General/Master
LaLa
yout
General/Master
yout
Dra wings

PROCESS: ISTU

Process Discipline

Mechanical Discipline

CODE: XXX
REVISION: 0.0

SLDs
Aut
om ation
SLDs
Dis cipline
Doc um ents/
Deliverables

Single Line
Dia gram (SLD)

P&IDs

Draft Office

Sys tem Architecture

22

Sizing
BBs,CBs,Ts,
Cables

Sta rters, Cables


Sizing

Inst ruments Datashee ts

Inst rument & Valve List

Control
Narratives

Electrical Eng.

Inst rument & Valve List

Sys tem Architecture


& Network Diagram

Control
Narratives

P&IDs

Duration

Duration

20

19

NO

The Duration is Per Document/Drawing

C&I Discipline

Electrical Discipline

Quality Control

Draft Office