You are on page 1of 6
MAT GAS/LP.G OIL (KEROSENE & CLASS D) BOILER/BURNER SITE VISITICOMMISSIONING REPORT IN ACCORDANCE WITH BSS750 REPORT SENT TO Y 2 INSTALLER: = bg | SITE VISIT (italics) COMMISSIONING | Y ‘SERMET (NI) LTD Date 21.01.08 ‘1 LISBURN ST, HILLSBOROUGH, BT25 648, 02892682591 | Signature: R. Petrie REPORT No-.... - ve - R & F Mechanical SITE ADDRESS: Comber High School ‘Comber 1.0 BOILER 4.0 | PRE-COMMISSIONING CHECKS {See Note)- 11 | Type: ‘rizona 600 kw @.1___| fs boiler house ventilation as per manual? | _Y 1.2 | No of Sections: 2 | Electric supplies fused, isolated & earthed? | Y 13 | Boller Ne/Position: na 43 _| Check external controls allow operation ¥ JRH/LH(Contre/1/2/3/ etc} “ga__| Check bollerisystem flooded and pumps ei 14 _| Serial No: (0722010209 cpertional and any isolation valves open 1.5 | Fuel: Nas, Class 28 sec Fuel OF ‘Check gas available t bumer 20__| BURNER : Check oll avaiable at burner ¥ 2i_| Type: Rielo RL 60 ‘Check gas meter sizing adequate 22 | Serial Number: 102456000467 ‘Check flue system clear 23 | Spec Number: “COMBUSTION | Piet | Low | High | Unit 24 Control Box Type: RMB ene 25 _| Electrical Supply: 24011160 td mbar 2.6" | Gas Train Type & Size: Sa _ | lotisation PrabarOV a 27 | Gas Train Soria No: ate ee ‘28° | Gas Booster Type & Size: * 11.0 : 2.9% | Gas Booster Serial No} 5.5]]_| Of Pump Pressure 41.0 Bar 3.0 | BURNER SETTINGS Sal cone on wos |? 1 * 3._| Draught Tube Diameter a Soe _[om |Fee Teo St ae 3.2 | Draught Tube Projection mm | og aha 3.3 Difluser Diameter (fappropriste)] rm Smoke Mumber aS 3a | Difser Setting (F appropriate) wr || 88._| Fite Gas Temperature nett | 29 “c (Oeanes tment eh 510 Anibiont Temperature aH tte) 5.11 | Flue Draught Mbar_ ‘35 | (appropriate) Piameter mn Talat Gas Pressure (high fre). F End io of Holes 5.12" | multi boiler installation, inlet gas Moar (appropriate) [Diameter mm | pressure al ol igh re Guicaee takers KO 5:18_| Combustion Chamber Resistance tam 5.14 | Bumer Fan Static Pressure Mer 3.59 [type tow Ewe) ize_| 6.50 X 60" NOTE: Normally 5.13 and 5.14 only recorded when tappings [Type provided. Postion of measurement to be in accordance with 3a | Blecrad Satings?™ 7) Bot andor burner manufacturers instructions. {to burner cardimanufacturers instructions?) eee Scuneation? + GAS FIRED INSTALLATIONS ONLY 2.7 [borer cratrenutecturers netuctions7)| Y__| {| _ OL-FIREDINSTALLATIONS ONLY [NOTE: itis the installers responsibility to eneure that the boiler is correctly mis veer and that this report is completed} SORE, Fie sales esonye at pes Conron' A asa ae We pooe ots mera. Won» Pate a ne, thi competed ior willbe sentt the Insta. ks the installers respensbiy to acon any pints ang. Commissioning Le, corameancers restric to equpmert of cur supply. No responebily is accepted forthe on se assemBy oF stallion ofthe equipment fo, oterton eneireeried aut by Pokaron, The Petal ust eneute tat te blett etaled in aoordanes wh the manufacturers insuctons| es escioee Hs Cours of Pracie and Regulations (sve manufactirers luton fo full deta). Nems 41 to 6 ae related to the bole Inatokation ad as such these pre-commissioning checks shoul be cated outin the presence ofthe instal. [Pafedon fsa Mamba ofthe Baler & Radiator Manufacturers Aesobton (GARMA), ad the fama of tis Commialoning Decumert flow the Poaetay ogeed codons cf tre Associaton, Porton, ne wth spoke of continous produc developmen, reserves the rt o ake and amend this Document ass deemed necessary at anytime. AT GASA.P.G/OIL KEROSENE & CLASS 0) BOILER/BURNER SITE VISIT/CONMISSIONING REPORT IN ACCORDANCE WITH BS5750 3.0 | OPERATIONAL SAFETY CHECKS $0 | COMMENTS ON ACCESSIBILITY FOR MAINTENANCE 1. | Check conta stat operation Y oe 62 _ | Check limit stat operation ¥ 6.3 _ | Check highfow stat operation ‘34 | Check for gas leaks 7 3.5 | Check for gas leakage past valve assembly 8.8f7 | Check foro leaks NOTES & COMMENTS BY COMMISSIONING 90 | ENGINEER heck boiler locks out on Toss of flame 88" | signal M 7 | Check baller locks out on air pressure Ne 7 _| Switch operation 1 aaa itis imperative forthe warranty that the boilers are not | Chae sow le arrears oH 1 sow tempura alee rn Such —calinge- TOW flow requirement ofthe boleris achieved at all times ast OVERPRESSURE | G10" | Check gas booster interlocks operational 11 | Record switch stings: INLET: ‘OUTLET, 70. | BOLERISYSTEM CHECK UST 7A | Control stat et at wo |e 72_| Limit stt lot at ReFadtory [°C 7.3 | Highvow stat et at *c 7.4 | Maximum fow temperature recorded | 70_[ °C 7.5 | Maximum return temperature recorded °c 7.8 _| Boller water pressure Bar 7.7-__| Are pipework connections as per manual? Ts safety valve fitted? ¥ 78 | Iso, SIZE PRESSURE RATING:|____ Unknown 78 | Are water isolating valves fied? v| 7-40] Are water fo switches fied? N Fi | Are retum water shut off or verter vates ited? |N | FaNDINGS™ FA2_ [is shunt pum fited? = ES NS 743_| Is pump overrun fitted? >| He es Tectataton sa tor usar * 4 Flue type and diameter of connection to boler= Hee ee aris NO, hes a warniig labo! Dood TYPE, Stainless Stee! raised? DIAMETER (mm: 160mm Ts any remedial work required? ‘Where appropriate and for mult boiler installations Have warning labels been fitted? 7.14 | Motch delat of fue system showing length ofruns | { Has RIDDOR form beon raised? and diameters, ; . Conventional fue Daaion [] Customer Signature: ‘Approximate overall height (m) . Approve oe easamnteboler? YES /No_| Print Name: Fae | Ae ue dampers ted? NO t'so,irteriocked? yes/no_| Date: 75 Fan assisted venation? NO +78 | Fan assisted ventilation interlocked? — YES7NO_| 77 Any evidence of condensate formation? NO ENGINEER DETAILS 7Fi8| Any evidence of wator leakage? NO. 748 | Any evidence of flue gas leakage? NO | WAME R Petrie. 7.20" | Has boler been bul and cased corectiy? VES To | Bae service cook ntaled? YESINO Trtpower Environmental Eneray Lid 21° | ipso, accessible? YESINO 7224 | Is of iter ited? vesmaaa| 7234 | Is ire valve fed? Yes Gi'supply. | Single Pipe 7289 Two Pipe van] Ring Main — ‘Document ID Ref: PCF/029/3 Baxi Heating Ltd, Regetered Ofce: Sceptre Way, Bamber Bridge, __NAT GASIL.P.G/OIL (KEROSENE & CLASS D) BOILER/BURNER SIT LVISITICOMMISSIONING REPORT IN ACCORDANCE WITH BS$750 REPORT SENT TO Y INSTALLER: Le = SITE VISIT (italics) COMMISSIONING ag SERMET (NI) LTD Date 21.01.08 ‘11 LISBURN ST, HILLSBOROUGH, BT25 688, 02862882501 | Signature: Ri Pete REPORT No: ee = R & F Mechanical SITE ADDRESS: Comber High Schoo! Comber 70 | BOER —] [io PRE-COMMMISSIONING CHECKS (See Note) 11 | Type ‘izona 500 kw “4.1 _| Is boller house ventilation as per manua? | Y 1.2 _| No of Sections: 42. | Electric supplies fused, isolated & earthed? | Y Boiler NoPPosiifon: 43 | Check external controls allow operation Y 13 No.2 RHILHIContre/ 12/3 etc “za | Check Bollersystem flooded and pumps Fi 14 _| Seria! no: 722010208 operational and any isolation valves open 15 __| Fuel: Nas, Class D, etc] 28 seo Fuel Ol “4S | Check gas available at burner 20 _| BURNER ASA_| Check ol available at bumer ¥ Bi | Type! Rielo RL 50 [-45"—| Check gas meter sizing adequate 22 _| Serial Number: 02456000468 “47 _ | Check flue system cloar _| 23. | Spec Number: 30 | COMBUSTION] Pilot [Low [High | Unit 24 | Control Box Type: RMB om Ga 25 | Electrical Supply: 240/1750 62 reas ‘mbar 26° _| Gas Train Type & Size: z ea*_| lonisation ProbarUV | = Cell Current 277 _| Gas Train Sorial No: te : Sa | Air Shutter Postion |e fe 28° | Gas Booster Type & Size: a 2S _| Gas Booster Serial No! fees] OF Pimp Pressure 11.0. a 3.0 | BURNER SETTINGS = 5B -| coz or 02 at | [s itso Ome To Dene As ee _[ nm | eae feo 1s ee 32 __| Draught Tube Projection wmm| Fe sane ah 3.3___| Diffuser Diameter (f appropriate)| mm = — 3.4 | Diffuser Seng (i appropriate ) a || 88__| Fite Gas Temperature nett | 4a c (Orton om endo rau tbe 50" | Arbient Temperature ~ [sesNezte: Sk Ho of Hotes | tage 3.5 | lf appropriate) Piameter cu} inlet Gas Pressure (high fire). if End No of Holes 5.12° | mult Bolter installation, inlet gas Moar (appropiate) Piameter mm | Dprossure al boilers high fire. OlNozzles: High Fre ‘Sze | 650X60° SES | Combustion Chamber Resttance Menws F 5.14 | Bummer Fan Static Pressure Mm aL ‘me | _ 2 LowFire Bize_| 4.50 X 60" NOTE: Normally 5.13 and 5.14 only recorded when tappings: ilype provided. Postion of measurement to be in accordance with Sa | Electrode Setings? S77] Bote andor bumermanutatrers instructions, {to burner cardmenufacturrs instructions?) ee one 37 to Specification’ Y OIL FIRED INSTALLATIONS LY (to burner cardimanufacturers instructions?) Tou rALLATIONS ON [NOTE: itis the installers responsibilty to ensure that the boiler is correctly ri is eer and that this: is completed] LORE Se ale cero cine aks tm Potent Hosa La o8 We Ea page oth mann, When a oterton lenginer commiccions, the completed report willbe sert othe installer. isthe nsaler responsi fo acton any pos ating. Commissioning cr Poueion engnearsis rested to equipment of cust. No esponstbllyescceped fr the onsite assembyor installation ofthe equpment Ltioss opeciicaly cared of by Peteron, “Te stale must encure thatthe bol i installed in accordance withthe manufacturers instuctons Lind ak elevent BS Codes of Practice and Regulations (coe manufacturers insu for Tul deta) Hems 41 to 46 are related to the bole nstatlaton and os such these pre-commissonng checks sould be cared aut the presence ofthe instal. [Poteron is @ Womber of he Baler & Radiator Manufacturers Assolalion (BARNA), and the ferme of tie Commissioning Document flow the| generally agreed condtons othe Assocation. Patertn, in line vith Rs pokey of continous product development eserves the right to aller ana mend ths Document ass deemed necessay at any time. NAT GASILP.G/OIL (KEROSENE & CLASS D) BOILER/BURNER SITE VISIT/COMMISSIONING REPORT IN ACCORDANCE WITH BS5750 3.0 _ | OPERATIONAL SAFETY CHECKS 8.0 | COMMENTS ON ACCESSIBILITY FOR MAINTENANCE 8.1 | Check contra stat operation Y on 2 | Check limit stat operation ¥ 63 _ | Check higvow stat operation &.#_| Check for gas leaks ‘6.5 | Check for gas leakage past valve assembly 6.511 _| Check for olf leaks Go | NOTES COMMENTS BY COMMISSIONING Check boiler locks out on loss of flame ENGINEER “ 68 Y signet NB aq | Check boiler Tks out on air pressure »7_| switeh operation pert aaa ttis imperative for the warranty thatthe bolers are not or_| Cheek gos low lk & overpressure out are ree atiow tow temperatres a alo the mun — i eh tinge TOW ‘Row requirement of the Bole is achieved at allies. Sa OVERPRESSURE: 6.10" | Check gas booster interlocks operational o1yr | Record swich setings= INLET: ‘OUTLET: | 7.0. _ | BOLERISYSTEM CHECK LIST 7A._| Control stat eft at #_[e 72_| Limit stati at As Factory [°C [73 _| Hichfow state at *c 7.4 | Maximum flow temperature recorded [70 | °C 7.5 | Maximum return temperature recorded °c 7.8. Boller water pressure Bar 7.7__| Are pipework connections as permanual? | ¥ Ts safety valve fited? Y 78 Ifso, SIZE: PRESSURE RATING | __Unknown 79 | Are water isolating valves fitted? ¥ 7.10 _| Are water flow switches fitted? N 7:41 | Are retum water shut off or dverior vaves ted? | N_| FENDINGS ——__———— TA2_[ Is shunt pump fied? eee 7.43_| 1s pump overrun fitted? 7 _| [is the installation safe for use? Y Flue hype and diameter of connection to bole | irate answer is NO, has a warning Tabol Boer TYPE, Stainless Stee! raised? DIAMETER (mms 180mm is any remedial work required? ‘Where appropriate and for mult bole instalations || Have warming labels been fitted? 7.14 | sketch details of flue system showing length of runs ‘Has RIDDOR form been raised? and diameters, Conventional | YFan Assisted [ | Flue Ditton [| |CUStomer Signature: ‘Approximate overall eight (m) tthe fan interlocked with the boiler? __YES/No_| Print Name Fae [Ale fue dampers fted?” NO If so, interlocked? yes /No_|\Date: TAB Fan assisted ventiaton? NO —— _ “T6| Fan assisted ventilation interlocked? — YES 7NO - Tar_| Any evidence of condensate formation? NO ENGINEER DETAILS 748~| Any evidence of water leakage? ‘NO. _ 719 Any evidence of flue gas leakage? NO WE Petrie 720 _| Has boller been bult and cased correct? YES on | I 988 service cock instalod? YESINO—| COMPANY Trkpower Environmental Energy Ltd itso, accessible? YESINO 7.2241 [1s ol iter fitea? YES IGNATURE 7.234 | is fire valve fitted? 8 | FJ Oil supply: ‘Single Pipe Te 21.01.08 2 ioe |" ing Wi mane Document ID Ref: PCF/029/3 Bani Heating Ltd, Registered Office Sco NAT GAS/LP.G.OIL (KEROSENE & CLASS D) BOILER/BURNER SITE VISIT/COMMISSIONING REPORT IN ACCORDANCE WITH BSS750_ REPORT SENT TO Y 2 INSTALLER: nee A SITE VISIT (Italfes) COMMISSIONING | Y SERMET (NI) LTD Date 21.01.08 ‘1 ussuRw sr, HLLSBOROUGH Bases. czeeze2531 | Signature: ae REPORT No:. seven R & F Mechanical SITE ADDRESS: Comber High Schoo! Comber +0 ~] [Ao | PRE-COMMISSIONING CHECKS (See Note) 1 ‘iizona 500 bw “4.1 fs boler house ventilation as per manual? [_¥ 12 42 __| Electric supplies fused, isolated & earthed? | V 18 ras “43 | Check extemal controls allow operation Y ‘Check boieraystem flooded and purnps 14 (0722010210 || 44 _| operational and any isolation valves open u 18 28 sec Fuel Ol 4E_| Check gas available at burner 20 “BAL | Check ol avalabie at burner Y 2A Riel RL 60 “40%_| Check gos meter sizing adequate 22 02037000588 47. | Check fue system clear | ee 50 -COMBUSTION-—-] Pit [Low | High _| Unit 1 | Gas rato ine 2a RMB 2 a 25 72407175 sz. | pumer mbar 26° = | lonisation PrOBSIOV 2h 83° | cell Curent WA = Ga | Air Shutter Postion | om ]- ae 5.59 | Oil Pump Pressure Pr 3:0 | BURNER SETTINGS 56 | cozeroz tno |? | Siig] Dal Te Da fa Seo [om | Too ae 3.2 _ | Draught Tube Projection men | Fag S a 3.3 _| Diffuser Diametor ( appropriate)| mm moke Meunier Tao “34 | DifuserSeting (Fappropriate ) re || 88 _| ve ae Temperature rot | seo 0 *c (Distance fom end of dawg ube) 5:10_| Ambient Temperature *c setae ote feos [| Saree 7 a5 | Cepproptte) Peruster = Tnlet Gas Pressure (high fire). 1 End No of Holes 5.12* | multi bolle installation, inlet gas Moar (if appropriate) Biameter mam pressure al boilers high fre. Sites highrise TOS XOP 5.13 _| Combustion Chamber Resistance taewa F 5.14 | Bummer Fan Static Pressure Mew) 359 = . z LowFire ize _| 4.50 X 60" NOTE: Normally 5.13 and 5.14 only recorded when tappings Hype provided. “Postion of measurement to be in accordance with Je | Elesode Satings? 7] eter anor bumer mater instructions ito bumer cardimanufacturers i 2) 37 _| (rotamer eardmanufacturersintructona7)| ‘| | _ OILFIRED INSTALLATIONS ONLY Faw a gay are al ale rey ran at is Topon sco eden a record. A commissioning sence avaliable rom Patton a te ages bled on age ofthis manual, When a Ptefon enainecr commission, tis completed repo wi be sent tothe installa. Risto instlesresponsblty to acon any points sing, Commissiening| Sr Poreton engneorss ested fo equipment of our supply. No responsibly e accepted fr te on te assembly or taliaton of the equpmer ect epectiouy cared cu by Potton, The instal must ensure tat he bole setalod in accordance wih the mankfochurrsisucton| lent an lcvant Bs Codes of Practice ari Regulations (eoe mantfactures nstucons fr Tull etl) ems 4.1 to 46 are related tothe bole Iretafaton anc os such these pe-commsesonng check shoud be caled out the presence ofthe stale. [Potion a Member af the Boler & Radiator Mandfacurere Accokaton (GARNA), and the tems ofthis Commissioning Document Yalow fe lgensraly agreed condtons of he Associaton. oterton, in ne wth Ks polcy of continuous product development, eserves the ght to ater and amend thie Document ass deemed necessary at any time. AT GASIL-P.GJOIL (KEROSENE & CLASS 0) BOILERIBURNER SITE VISIT/COMMISSIONING REPORT IN ACCORDANCE WITH BSS7S0 0 _ | OPERATIONAL SAFETY CHECKS ‘8,0 | COMMENTS ON ACCESSIBILITY FOR MAINTENANCE 1 | Chesk control stat operation Y i {62 _ | Check limit stat operation Y 6.3 _ | Check highviow stat operation Ga*_| Check for gas leaks 5° | Check for gas leakage past valve assembly E.aff_| Chock for of feaks Tol [oo [NOTES COMMENTS BY COMMISSIONING Ga | Check boller locks out on Toss of flame | ENGINEER, signal a7 | Check Baller ocks outon airpressure |_| NB ‘switch operation ec inl & overpressure O Its imperative forthe waranty thatthe bollers are not ar | Check ge ow met 8 overpressure ou peat stow flow temperteres and aso the minimum Sultchs—oh catnge= LOW: ‘ow requirement of the boiler is achieved at allies. Se OVERPRESSURE: &.10* | Cheok gas booster interlocks operational “| Record switch settings INLET: Set ‘OUTLET: 70 | BOWLERISYSTEM CHECK LIST 7.4 | Control stat let at a [°c 72_| Limit stat let at As Factory [°C 7.3_| Highfow stat left at °C 7.4 | Maximum flow temperature recorded [70 _| °C 7.5 _| Maximum return temperature recorded °C 7.6 _| Boller water pressure Bar 7.7__| Are pipework connections as per manual? Y Te safety valve fitted? Y 7.8 | itso, SIZE: — PRESSURE RATING:| ___Unknown 7.8 _| Are water isolating valves fitted? % 710. | Are water flow switches fitted? N 7.11_| Are return water shut off or diverter valves fitted? | NV FINDINGS 7.42 [fe shunt pump ited? YES [NO 7.43_| ts pump overrun fitted? 2 _| [is the installation safe for use? ¥ | Flue type and diameter of connection to boiler TF the answer Is NO, has a warning label besr| TYPE: Stainless Steel raised? DIAMETER (mm) 180 mm ‘Is any remedial work required? Where appropriate and for multi boiler installations Have warning labels been fitted? 7.14 | sketch details of flue system showing length of runs ‘Has RIDDOR form been raised? nd dmeters. Conventional [fan Assisted [] Fue Otuton [_} Approximate overall height (mn) Is the fan interlocked with the boller?_ YES/NO Tas) | Afe fue dampers fitted? NO Iso, interlocked? YES/NO, 776_| Fan assisted ventilation? NO. 7-16 _| Fan assisted ventilation interlocked? YES7NO_ 7.47_| Any evidence of condensate formation? NO. ENGINEER DETAILS 74@_| Any evidence of water leakage? ‘NO 718 | Any evidenee of flue gas loakage? NO as 7.20 | Has boiler been built and cased correctly? YES 21. | gas sorvice cock installed? YESINO | (COMPANY Tri:power Environmental Energy Ltd itso, accessible? YES/NO 7224 | Is ol fiter fitted? Yes |SIGNATURE 7.2341 | Is fire valve fitted? YES Gilsupply. | Single Pipe: PA ere 7.2841 “Two Pipe x2 Ring Main Document ID Ref: PCF/029/3 Baxi Heating Ltd. Registered Office: Sceptre Way, Bamber Bridge.

You might also like