Department:

Job Safety
Analysis

Job Description:

Environment Change

Yes

No

Standard
Non-standard
Date:

Excavation, Backfilling and Compaction

Plant:

Type of JSA.

Equipment:
Implementation sheet

No.

Job Steps

Potential Hazards

Mitigation Plan

Responsibility

Tool box talk prior to start of work.

Mobilization,
preparation and
handling of tools

Barricade the work area.


Personal injury like hand injury,
Obtain cold work permit for light duty work.
body injury.
Use of PPE like leather gloves, safety hat, safety
goggles, safety shoes.
Fall down of tools and materials Use proper manual handling technique.
while unloading at site
Follow Saudi Kayan traffic rules and regulations.
Underground cables drawings will be checked
PTW to be followed
Underground cables can be
damaged

Separate excavation certifiate to be achieved from


operations as approved from Civil,Electrical &
Mechanical Department of SAUDI KAYAN, before start
any excavation.
Hard barrication will be provided

Excavation of soil

Place the safety sign board


Personal injury due to falling of
Slope should be proper
person
Safety officer will ensure the proper hard barrication
and foreman will supervise the job
Ensure that workers properly inducted about the proper
positioning
Personal injury during excavation Use all required PPE's
Perform the job in proper way with safety point of view
Use only those equipments which are in good condition
Soil collapse during the work
execution

Backfilling &
compaction

Unsafe conditions

Proper side slope must make


Working during rain will not be allowed.

Tripping from loose earth/stones. Proper housekeeping and safety signs

All potential hazards

Where a situation presents a hazardous condition, the


exposed employee will be removed from the hazardous
area until all necessary precautions have been taken to
eliminate the hazard and ensure their safety.

Required PPE:
Agreement for execution that I understand the criticality of task and all hazards related to job steps. I am expected & obliged to take all measures in
job step hazards control to mitigate risk level associated with this task.
Approved by: Maintenance specialist/Supervisor:
Name:
Badge #
Signature: