Project : CADANGAN MEMBINA SEBUAH KILANG 1 TINGKAT,

Prepared by :

Hana

Date :

07-Jul-14

SEWERAGE RECTICULATION DESIGN

Hazen - Williams Coefficient, C

Sewer Pipe Material

Velocity, (m/sec)

Capacity (m3/s)

Length, L (m)

Ground Level, GL (m)

Invert Level (start), IL (m)

0.00065
0.00000
0.00000
0.00000

0.00065
0.00065
0.00065
0.00065

225
225
225
225

150
150
150
150

110
110
110
110

VC
VC
VC
VC

1.02
1.02
1.02
1.02

0.040
0.040
0.040
0.040

19.00
44.00
42.00
31.00

39.00
39.00
37.80
37.10

37.80
37.67
37.38
35.60

Remarks Sewer Pipe Materials :

VC (Vitrified Clay), C (Concrete), H (HDPE)

Check on capacity

Gradian (1:n)

6.755
6.755
6.755
6.755

Check on velocity

Diameter,(mm)

37.0
37.00
37.0
37.0

Fall (m)

Cumulative Design Flow (m3/s)

37.00
0.00
0.00
0.00

Depth, D (m)

Design Flow (m3/s)

2
3
4
EXISTING MH

CHECK

Invert Level (end), IL (m)

Peak Flow Factor, (m3/min/PE)

MANHOLES

Cumulative Population Equivalent, PE

to
to
to
to

PIPES

Population Equivalent, PE

1
2
3
4

DESIGN

Manhole (MH)

Manhole (MH)

LOCATION

37.67
37.38
37.10
35.39

1.20
1.33
0.42
1.50

0.13
0.29
0.28
0.21

OK!
OK!
OK!
OK!

OK!
OK!
OK!
OK!