You are on page 1of 4
Enjobs.net ABHINEET BARUAH (08-2/702 * ONGC Colony + Poonam Nagar + Andheri (E) * Mumbai 400 093 + Maharashtra + Incia Conta: 8 % years’ experience / Oil & Gas Industry PROFILE * Dynamic professional with dual master’s degree in Applied Geology and Petroleum Technology. * Professional experience of more than 8 years in Oil & Gas industry. * In-depth knowledge of standard reservoir engineering principles & practices for reservoir ‘modelling & field development. * Competency in identifying additional opportunities to trap the bypass oil through multidisciplinary approach. * Broad-based competencies in spearheading, developing & implementing oll field re- development projects. * Capable of analyzing mature ol field under water flood; planning & monitoring of water flood patterns, * Technology savvy with aptitude and experience in adopting moder reservoir engineering technologies and software's to boost work efficiency. KEY COMPETENCIES + Reservoir Performance Surveillance * Oil Field Development » MDT Member ‘+ Water Injection + OFM * MBAL Software PROFESSIONAL EXPERIENCE OIL & NATURAL GAS CORPORATION LIMITED, Mumbai, India Jan 2011 - Till date, Executive Engineer (Reservoir) * Current assignment involves planning of Phase-III Re-development of giant Mumbai High Field in association with Gaffney, Cline & Associates (GCA). + Layer-wise reservoir analysis of Mumbai High Field for identifying inputs for Re-development project. * Input variant analysis of simulation runs to identify the best possible variant for Re- development project. * Performance monitoring of Mumt h field through MDT approach (geological, petro- physical, seismic, reservoir parameters, etc.) and taking corrective / remedial measures to arrest the production decline. * Review of water injection patterns, injector to producer relationship and adequacy of injection volume, Mailing Address: 5/4, 2nd Floor, Lantana Street, Iris Row, Vatika City, 1 Sector-49, Sohna Road, Gurgaon Haryana - 122001 Enjobs.net * Involved in decision making for drilling new development locations, sidetracking of existing wells, horizontal wells etc., * Continuous monitoring of pressure sinks and suggestive measure to jack up the reservoir pressure. ‘= Preparation of annual water injection buildup plan for better health of the field. + Preparation of performance and diagnostic plots (Decline curves, Halls, Chan, ABC plots etc.,) for well analysis by conventional as well as by reservoir management software ~ Oil Field Manager. + Material balance calculations using conventional spreadsheet methods and through MBAL software, * Selection of suitable wells for various well interventions e.g., work-over, stimulation jobs, CTU operations etc. + Involved in development of unconventional reservoirs like Basal Clastics and Basement of Mumbai High Field, * Constant interaction with surface team in order to enhance production and effective water injection management. OIL & NATURAL GAS CORPORATION LIMITED, Mumbai, India Jun 2007 - Jan 2011, Assistant Executive Engineer (Reservoir) + Responsible for performance surveillance and analysis of Mumbai High North Field. * Responsible for updating and validation of production and water injection database of Mumbai High North Field, = —— seassstin * First person responsible for performance monitoring and development of L-I reservoir of Mumbai High North Field, ssisusisunseaeearncess * Integral part of sub-surface mult-disc and enhancing recovery from the Field. * Assisting team leader in preparation of development proposal and presenting the same before the Asset Development Board for approvals. + Voidage calculations by conventional spreadsheet methods for the field under water flood. * Coordinating Reservoir Data Acquisition Group (RDAG) to ensure regular data acquisition and reservoir studies (build up, bean study, drawdown, pressure fall off, influx study etc.) for better understanding of the field. ‘+ Involved in identifying key wells for pressure transient analysis and assisting RDAG for updating the isobaric map of the field. + Real Time Monitoring of LWD/SRDH wells in Third Eye Center for better placement of drainholes. wary (MDT) team for arresting production decline OIL & NATURAL GAS CORPORATION LIMITED, Dehradun, India Nov 2006 = Jun 2007 Graduate Trainee (Reservoir) * Induction training for six month at ONGC Academy, Dehradun. * Field familiarization training at Ahmedabad Asset (Western onshore field) + Specialized reservoir engineering training at Institute of Reservoir Studies (IRS), Ahmedabad. * On the job training at Ankleshwar Asset (Western onshore field) Mailing Address: 5/4, 2nd Floor, Lantana Street, Iris Row, Vatika City, 2 Sector-49, Sohna Road, Gurgaon Haryana - 122001 Enjobs.net OIL FIELD INSTRUMENTATION (OFI), Gulf of Khambat, Western Offshore, NE India April 2003 ~ Feb 2004 Mud Logging Geologist = Real-time monitoring of driling and mud parameters of exploratory and development wells using kick indicating sensors & sophisticated electronic panels which facilitates data acquisition and storage for formation correlation studies. = Responsible for sample collection & descriptions, drawing of master logs by using software like RIS-info, log plotter. ‘+ Handling gas detection equipment (TCD & FID), and gas show evaluation, ‘= Assumed responsibility for well stability monitoring, pressure evaluation, mud/hydraulic report etc., + Preparation of well completion and geological report writing, EDUCATIONAL & PROFESSIONAL CREDENTIALS + Master of Technology in Petroleum Exploration & Production, 2005 Dept. of Petroleum Technology, Dibrugarh University, Assam, India + Master of Science in Applied Geology, 2002 Dept. of Applied Geology, Dibrugarh University, Assam, India = Bachelor of Science in Geology, 1999 3.8, College, Dibrugarh University, Jorhat, Assam, India PROFESSION TRAINING = Advance Artificial Lift Technology; ONGC Academy, Dehradun. "Well logging & production logging techniques; ONGC Academy, Dehradun. * Latest Trend in Enhanced Oil Recovery Techniques; ONGC Academy, Dehradun. + OFM ~ Production Surveillance & Monitoring Software; Schlumberger, New Delhi. + ROXAR RMS Software (Geo-model & Geo-steering); ROXAR Kuala lumpur, Mumbai = Petroleum Geology of Deepwater Depositional System; Dr. Octavian Catuneanu; Andaman & Nicobar Island. PUBLICATIONS & ACADEMIC PROJECT + M, Tech. Dissertational Project (Reservoir Engineering) - Assam Asset, ONGC. Feasibility Study For Application Of Microbial Enhanced Oil Recovery Technology In Oil Fields of Upper Assam’; R K Vij, M P Sarabhai, M Das, Abhineet Baruah; Published in 7* International Petroleum Conference PETROTECH-2007, New Delhi + M.Sc, Dissertational Project (Applied Geology) - Oil India Limited, Duliajan. "A study on Fluvio-Geomorphological & Neo-tectonic Features of Some Parts of Dibrugarh & Tinsukia District” PROFESSIONAL MEMBERSHIP Mailing Address: 5/4, 2nd Floor, Lantana Street, Iris Row, Vatika City, 3 Sector-49, Sohna Road, Gurgaon Haryana - 122001 Enjobs.net + Society of Petroleum Engineers COMPUTER PROFICIENCY findows OS, MS Office, Internet and Email Applications + Real-Time Monitoring Software: InterACT - Schlumberger + Reservoir Engineering Software: Oil Field Manager (OFM), MBAL + Mud logging Software: RIS-info (Reservoir Integrated System Information) OTHER INFORMATION Nationality Indian Date of Birth October 1977 Marital Status + Married Valid Passport Yes Permanent Address : Flat 2C, Aastha Residency, Zoo-Narengi Rd, Geetanager, Guwahati 781020, Assam, India Willing to Relocate Mailing Address: 5/4, 2nd Floor, Lantana Street, Iris Row, Vatika City, 4 ‘Sector-49, Schna Road, Gurgaon Haryana - 122001

You might also like