B.

11KV NEW LINE : COMBINE MATERIAL QTY OF 7 SUBSTATIONS


ORILE-COKER FESTEC AGBARA AJANGBADI OJO ALABA INTL. IBA LASU GRAND TOTAL
off & On off & On off & On OFF-SHORE Off & On Off & On Off & On

1 Galvd Tie Straps(11kV) 280 1,105 1782 502 169 154 709 4,700.83
2 Pin Insulator (11kV) No 464 1,819 2927 843 284 258 1178 7,773.00
3 Spindle (11kV) No 420 1,657 2672 753 253 231 1063 7,049.00
4 Jumper Spindle (11kV) No 45 163 255 91 31 27 115 727.00
5 Disc Insulator(11kV) No 292 981 1527 609 210 166 723 4,508.00
6 Tension Clamp No 97 327 509 203 70 55 241 1,502.00
7 Socket Tongue No 97 327 509 203 70 55 241 1,502.00
8 J-Hook No 97 327 509 203 70 55 241 1,502.00
9 Clevis Adaptor - 0 0 0 0 0 0 -
10 Terminating Strap No 97 327 509 203 70 55 241 1,502.00
11 LV Stay Insulator No - 0 0 0 0 0 0 -
12 HV Stay Insulator No 94 296 467 159 54 57 204 1,331.00
13 5/8" Stay Wire(LV) metre - 0 0 0 0 0 0 -
14 7/8" Stay Wire(HV) metre 1,115 3,549 5599 1904 650 672 2454 15,943.00
15 6'Stay Rod(LV) No - 0 0 0 0 0 0 -
16 8'Stay Rod(HV) No 89 296 467 159 54 52 204 1,321.00
17 Stay Thimble No 89 296 467 159 54 52 204 1,321.00
18 Stay Block No 89 296 467 159 54 52 204 1,321.00
19 D/G Shackle Insulator No - 0 0 0 0 0 -
20 D-Iron with Pins No - 0 0 0 0 0 -
21 Extension Strap No - 0 0 0 0 0 -
22 16x51 B,N & W No 42 160 255 91 31 24 112 715.00
23 16 x152 B,N & W No 238 945 1527 411 138 130 597 3,986.00
24 16x200/275 B,N & W No 140 552 891 251 84 77 354 2,349.00
25 16x254 B,N & W No 91 299 467 192 66 50 222 1,387.00
26 16x280/305 B,N & W No 119 473 764 206 69 65 299 1,995.00
27 F/Washer for 22mm Dia No 602 2,322 3733 1115 377 331 1522 10,002.00
28 F/Washer for 18mm Dia No 600 2,320 3733 1093 369 329 1510 9,954.00
29 M20x2282 B,N & W No - 0 0 0 0 0 0 -
30 Eye Bolts N & W No 10 0 0 0 0 10 0 20.00
31 Pole Identification No 157 607 976 285 96 86 395 2,602.00
32 Barbed Wire metre 523 1,984 3182 956 323 267 1304 8,539.00
33 Danger Plate No 157 607 976 285 96 86 395 2,602.00
34 11kV Fiber Cross-arm No 119 473 764 206 69 65 299 1,995.00
Cross-arm - Galvd Angle Iron (4"x3"x
35 3/8 x 6ft) No 53 189 297 113 39 30 136 857.00
36 Aluminium Line Tap No 268 975 1527 543 186 160 687 4,346.00
37 Earthing Rod (6ft) No 76 269 424 158 54 42 192 1,215.00
38 Bare Copper Wire, 70mm2 (metre) metre 457 1,611 2545 949 326 253 1151 7,292.00
39 10.36 metre RC Pole No 181 663 1061 330 112 103 442 2,892.00
40 8.5 metre RC Pole No - 0 0 0 0 0 -
41 Channel Iron (4"x3/8"x3"x6ft) No - 0 0 0 0 0 -
42 Earth Mat No - 0 0 0 0 0 -
43 150mm2 AAC (metre) metre 19,845 78,750 127260 34272 11498 10868 49770 332,263.00
44 3x150mm2 11kV XLPE Underground Cable metre 2,600 0 0 0 0 400 0 3,000.00
45 11kV line isolator No - 0 0 0 0 0 0 -
46 Concrete foundation for RC Pole No 181 663.25 1061 330 112 102.56 442 2,892.19
47 Bush clearing/Tree cutting Lot Lot Lot LOT LOT LOT LOT LOT

Detailed Route Survey


complete with four(4) sets of
48 survey drawings Lot Lot Lot LOT LOT LOT LOT LOT
C.11KV TEE OFF ON NEW LINE : COMBINE MATERIAL QTY OF 7 SUBSTATIONS
GRAND
AGBARA INDUSTR FESTEC AJANGBADI OJO ORILE COKER ALABA IBALASU TOTAL

OFF & ON OFF & ON OFF & ON OFF & ON OFF & ON OFF & ON OFF & ON

1 Galvd Tie Straps(11kV) No 319 1,223 176 72 NA 71 219 2,080.28


2 Pin Insulator (11kV) No 525 2,042 295 122 126 374 3,483.54
3 Spindle (11kV) No 479 1,834 263 109 107 329 3,120.93
4 Jumper Spindle (11kV) No 46 208 32 14 20 46 365.61
5 Disc Insulator(11kV) No 274 1,309 216 95 130 305 2,328.67
6 Tension Clamp No 91 436 72 32 43 102 776.22
7 Socket Tongue No 91 436 72 32 43 102 776.22
8 J-Hook No 91 436 72 32 43 102 776.22
9 Clevis Adaptor No 0 0 0 0 0 0 -
10 Terminating Strap No 91 436 72 32 43 102 776.22
11 LV Stay Insulator No 0 0 0 0 0 0 -
12 HV Stay Insulator No 84 364 56 24 36 82 645.62
13 5/8" Stay Wire(LV) metre 0 0 0 0 0 0 -
14 7/8" Stay Wire(HV) metre 1,003 4,362 671 287 423 977 7,723.46
15 6'Stay Rod(LV) No 0 0 0 0 0 0 -
16 8'Stay Rod(HV) No 84 362 56 24 34 80 639.62
17 Stay Thimble No 84 362 56 24 34 80 639.62
18 Stay Block No 84 362 56 24 34 80 639.62
19 D/G Shackle Insulator No 0 0 0 0 0 0 -
20 D-Iron with Pins No 0 0 0 0 0 0 -
21 Extension Strap No 0 0 0 0 0 0 -
22 16x51 B,N & W No 46 202 32 14 14 40 347.61
23 16 x152 B,N & W No 274 1,021 144 59 58 179 1,734.67
24 16x200/275 B,N & W No 160 611 88 36 36 110 1,040.64
25 16x254 B,N & W No 84 400 68 30 38 93 712.62
26 16x280/305 B,N & W No 137 510 72 29 29 90 866.84
27 F/Washer for 22mm Dia No 669 2,643 391 163 165 492 4,522.98
28 F/Washer for 18mm Dia No 669 2,611 383 159 161 482 4,464.98
29 M20x2282 B,N & W No 0 0 0 0 0 0 -
30 Eye Bolts N & W No 0 4 0 0 4 4 12.00
31 Pole Identification No 175 682 100 41 43 126 1,166.85
32 Barbed Wire metre 570 2,258 335 140 150 430 3,883.15
33 Danger Plate No 175 682 100 41 43 126 1,166.85
34 11kV Fiber Cross-arm No 137 510 72 29 29 90 866.84
Cross-arm - Galvd Angle Iron
35
(4"x3"x 3/8 x 6ft) No 53 246 40 17 21 54 431.21
36 Aluminium Line Tap No 274 1,249 192 83 118 275 2,190.67
37 Earthing Rod (6ft) No 76 344 56 24 28 74 602.02
38 Bare Copper Wire (70mm2) metre 456 2,061 335 146 168 443 3,609.12
39 10.36 metre RC Pole No 190 773 116 49 56 152 1,336.05
40 8.5 metre RC Pole No 0 0 0 0 0 0 -
41 Channel Iron (4"x3/8"x3"x6ft) No 0 0 0 0 0 0 -
42 Earth Mat No 0 0 0 0 0 0 -
43 150mm2 AAC (m) metre 21,720 81,000 11400 4650 4,575 14220 137,565.00
44 3x150mm2 11kV XLPE Underground Cable metre 0 0 0 0 0 0 -
45 11kV line isolator No 0 0 0 0 0 0 -
46 Concrete foundation for RC Pole No 190 773 116 49 56 152 1,335.74
47 Bush clearing/Tree cutting Lot Lot lot Lot Lot Lot Lot -
Detailed Route Survey
48 complete with four(4) sets of
survey drawings Lot Lot lot Lot Lot Lot Lot

GRAND TOTAL = 192,628


on new on new on new on new on new on new
construction construction construction construction construction construction
A.33KV LINE-NEW CONSTRUCTION : COMBINE MATERIAL QTY OF 7 SUBSTATIONS
AGBARA INDUST. AJANGABADI ORILE COKER IBA LASU FESTEC OJO ALABA GRAND TOTAL
ON & OFF ON & OFF ON & OFF ON & OFF ON & OFF ON & OFF ON & OFF

1 Galvd Tie Straps(11kV) No 1157 N/A N/A 139 130 N/A N/A 1,426.00
2 Pin Insulator (11kV) No 1946 228 213 2,387.00
3 Spindle (11kV) No 1735 208 194 2,137.00
4 Jumper Spindle (11kV) No 212 20 19 251.00
5 Disc Insulator(11kV) No 1215 119 111 1,445.00
6 Tension Clamp No 405 40 37 482.00
7 Socket Tongue No 405 40 37 482.00
8 J-Hook No 405 40 37 482.00
9 Clevis Adaptor No 0 0 0 -
10 Terminating Strap No 405 40 37 482.00
11 LV Stay Insulator No 0 0 0 -
12 HV Stay Insulator No 322 36 34 392.00
13 5/8" Stay Wire(LV) metre 0 0 0 -
14 7/8" Stay Wire(HV) metre 3861 437 407 4,705.00
15 6'Stay Rod(LV) No 0 0 0 -
16 8'Stay Rod(HV) No 322 36 34 392.00
17 Stay Thimble No 322 36 34 392.00
18 Stay Block No 322 36 34 392.00
19 D/G Shackle Insulator No 0 0 0 -
20 D-Iron with Pins No 0 0 0 -
21 Extension Strap No 0 0 0 -
22 16x51 B,N & W No 212 20 19 251.00
23 16 x152 B,N & W No 945 119 111 1,175.00
24 16x200/275 B,N & W No 578 69 65 712.00
25 16x254 B,N & W No 355 36 34 425.00
26 16x280/305 B,N & W No 473 60 56 589.00
27 F/Washer for 22mm Dia No 2484 291 272 3,047.00
28 F/Washer for 18mm Dia No 2430 291 272 2,993.00
29 M20x2282 B,N & W No 0 0 0 -
30 Eye Bolts N & W No 0 0 0 -
31 Pole Identification No 634 76 71 781.00
32 Barbed Wire metre 2068 248 232 2,548.00
33 Danger Plate No 634 76 71 781.00
34 11kV Fiber Cross-arm No 473 60 56 589.00
Cross-arm - Galvd Angle Iron
35 (4"x3"x 3/8 x 6ft) No 241 23 22 286.00
36 Aluminium Line Tap No 1269 119 111 1,499.00
37 Earthing Rod (6ft) No 323 33 31 387.00
38 Bare Copper Wire, 70mm2 (metre) metre 1935 198 185 2,318.00
39 10.36 metre RC Pole No 716 83 77 876.00
40 8.5 metre RC Pole No 0 0 0 -
41 Channel Iron (4"x3/8"x3"x6ft) No 0 0 0 -
42 Earth Mat No 0 0 0 -
43 150mm2 AAC (metre) metre 78750 9923 9261 97,934.00
44 3x150mm2 11kV XLPE Underground Cable metre 0 0 0 -
45 11kV line isolator No 0 0 0 -
46 Concrete foundation for RC No 716 83 77.18 876.18
47 Bush clearing/Tree cutting Lot LOT LOT LOT
Detailed Route Survey
complete with four(4) sets
48 of survey drawings Lot LOT LOT LOT
-
GRAND TOTAL =
E.DISTRIBUTION SUBSTATIONS-11KV LINE
11/0.415KV HVDS SS
GRAND
ORILE-COKER FESTEC AGBARA INDUSTRIAL AJANGBADI OJO ALABA IBALASU TOTAL
OFF & ON OFF & ON OFF & ON OFF & ON OFF & ON OFF & ON OFF & ON
NIPP NIPP NIPP NIPP NIPP NIPP

Supply and installation of 50kVA


transformer complete with No 90 30 34 69 122
Distribution Board, essential spares,
the H-pole and all substation fittings
1 as specified. 90 242 677.00

Supply and installation of 25kVA


transformer complete with No 0 0
Distribution Board, essential spares,
the H-pole and all substation fittings
2 as specified. 30 66 96.00

Retilens’ XLPE insulated bundled


conductor (4 core x 25mm2)
complete with all accessories and METER
fittings as specified in Distribution
3 Equipment & Material Spec Vol. 2 14400 36,960 10,800 3,600 4,080 8,280 14,640 92,760.00

93,533.00
F.INJECTION SUBSTATION(A)
ELECTRO MECHANICAL WORKS
ORILE-COKER FESTEC AGBARA INDUST. AJANGBADI OJO ALABA IBALASU GRAND TOTAL

Preliminaries including Engineer's


site office,site security and
1
storage as indicated in sections
5.10 and 7 lot lot lot lot lot lot lot
Substation design and
2 construction drawing as specified
(3sets). Ref section 7.1.7 lot lot lot lot lot lot lot
Installation of 1X15MVA 33/11kV
3
injection transformer lot lot lot lot lot lot lot
Disconection and repackaging
and transportation to PHCN
4
Distribution Stores of 1X2.5MVA
33/11kV transformer. N/A N/A N/A N/A N/A N/A N/A
Disconection and repackaging
and transportation to PHCN
5
Distribution Stores of 1X7.5MVA
33/11kV transformer. N/A N/A N/A N/A N/A N/A N/A
Installation of 33kV Indoor
6 Switchgear units (Single Bus
arrangement for 33kV). N/A N/A N/A N/A N/A N/A N/A
Installation of 33kV outdoor
7 circuit breaker complete with the
support structure 2 No 4 No 3 No 2 No N/A 4 No 4 No
Supply and installation of 33kV 3-
8a.
phase isolator) 2 No 10 No 5 No 2 No N/A 9 NO 10 No 38
Supply and installation of isolator
b.
support structure 4 No 10 No 5 No 4 No N/A 9 NO 10 No 40

Supply and installation of 33kV 3-


9a. N/A 1 NO 1 NO N/A 2 NO 1 NO
phase isolator/Earthing Switch
N/A 5
Supply and installation of isolator
b. N/A 1 NO 1 NO N/A 2 NO 1 NO
support structure N/A 5
Supply and installation of 33kV
double bus gantry and other
10 N/A LOT N/A N/A
gantries with galvanised steel
lattice structures N/A LOT LOT
Reconstruction of the existing
11 33kV bus gantry with galvanised lot N/A lot lot
steel lattice structures N/A N/A N/A
Installation of 33/0.11kV outdoor
12a. voltage transformer (A set of N/A 1 SET 1 SET N/A
3No.) N/A 2 SETS 1 SETS
Supply and installation of VT
b. N/A 1 NO 1 NO N/A
support structure N/A 2 NO 1 NO 5
Installation of 33kV 4x300/1/1/1A
13a. 2sets 4 SETS 3 SETS 2 SETS
outdoor CT (A set of 3No.)
N/A 4 SETS 4 SETS
Supply and installation of CT
b. 2No 4 No 3 No 2 No
support structure N/A 4 NO 4 NO 19
Supply and Installation of 33kV
14 1set 3 set 2 set 1 SET
Surge Arrester (A set of 3No.) N/A 3 SETS 3 SETS 12
Supply and Installation of Sky
shield wire and lightning spike
15 Lot Lot Lot Lot
complete with Steel lattice column
as applicable N/A lot lot
Installation of Transformer
16 1No N/A 1 NO 1 NO
control/relay panel N/A N/A N/A
Installation of 33kV Line
17 N/A N/A 1 NO N/A
control/relay panel N/A N/A N/A
Installation of 33kV bus coupler
18 1No. N/A 1 NO 1 NO
control/relay panel N/A N/A N/A

Supply and Installation of battery


19 bank and Charger unit complete 1set 2 SET 1 SET 1 SET 1 SET 2 SETS 2 SETS
with the rack. Ref section 7.3.6
10
Supply, laying and termination of
20 pvc/swa/pvc control cables as
follows:
a Control cable 4x4mm2 lot lot lot lot lot lot lot
b Control cables 7X2.5mm2 lot lot lot lot lot lot lot
c Control cables, 12x2.5mm2 lot lot lot lot lot lot lot
d Control cables 19x2.5mm2 lot lot lot lot lot lot lot
Supply and installation of
Substation earthing complete with
21 earthing pit, earthing mat, rods, lot lot lot lot lot lot lot lot
clamps and copper conductor. Ref
section 7.1.26
Supply and Installation of AC
Distribution Board and 1No.
22 N/A lot N/A N/A N/A lot lot lot
battery room extractor fan
(Section 7.3.5)

Supply and Installation of DC


23 Distribution Board and emergency N/A lot N/A N/A N/A lot lot lot
lighting system (section 7.3.6)

Supply and lay HV insulating


24 lot lot lot lot lot lot lot lot
rubber mat (11kV side)

Supply and installation of 1No.


200kVA 33/0.415kV Transformer
25a. complete with J&P fuse assembly, N/A lot N/A N/A N/A lot lot
isolator for Station Auxiliary power
supply. Ref section 7.3.5

Supply and lay 4x95mm2


b. N/A lot N/A N/A N/A lot lot
PVC/SWA/PVC cable
TP&N switch, Distribution
c. Board,Three-pole Change-over Lot Lot Lot Lot Lot Lot Lot
switch
Disconection and repackaging
and transportation to PHCN
26
Distribution Stores of Existing
11kV switchgear Panels.
a Incomer Panels N/A N/A 3 NO N/A 3 NO N/A N/A
b Bus Sections N/A N/A 2 NO N/A 2 NO N/A N/A
c Feeder Panels N/A N/A 10 NO N/A 6 NO N/A N/A
Transportation to site and
27 installation of replacement 11kV
switchgears
a Incomer Panels N/A N/A 3 NO N/A 3 NO N/A N/A
b Bus Sections N/A N/A 2 NO N/A 2 NO N/A N/A
c Feeder Panels N/A N/A 10 NO N/A 6 NO N/A N/A
Disconection and repackaging
and transportation to PHCN
28
Distribution Stores of Existing
33kV indoorswitchgear Panels.
a Line Panels N/A N/A N/A N/A 4 NO N/A N/A
b Bus Sections N/A N/A N/A N/A 2 NO N/A N/A
c Transformer Panel N/A N/A N/A N/A 3 NO N/A N/A
Transportation to site and
29 installation of replacement 33kV
indoor switchgears
a Line Panels N/A N/A N/A N/A 4 NO N/A N/A
b Bus Sections N/A N/A N/A N/A 2 NO N/A N/A
c Transformer Panel N/A N/A N/A N/A 3 NO N/A N/A
Installation of additional 11kV
indoor switchgear panels made up
30 of 1No. Transformer incomer, lot lot lot lot lot lot lot
1No. Bus coupler and 3No.
Feeder panels

Supply and install 3x150mm2


11kV XLPE Underground Cable
31 complete with jointing/terminating lot lot lot lot lot lot lot
kits/lugs etc (from feeder panel to
11kV terminal pole).

Supply and install Marshalling


kiosk for the termInation of all
32 control cables from Transformers, Lot Lot Lot Lot N/A lot lot
Outdoor CB, CT, VT and linking
same to control/relay panels
Supply and install 1core 150mm2
11kV XLPE underground cable
complete with jointing/terimination
33 kits/lugs etc to connect injection Lot Lot Lot Lot Lot Lot Lot
transformer and 11kV indoor
switchgear (two lengths of cable
to be laid per phase)

Supply and install 33kV


switchyard overhead connections
to link outdoor equipment
34 complete with clamps, Lot Lot Lot Lot N/A lot lot
connectors, line taps, fittings, disc
& post insulators, aluminum
conductor etc

Supply and stringing of the 33kV


bus complete with Bear conductor
35 Lot Lot Lot Lot N/A lot lot
(250mm2 ACSR), disc insulator,
tension sets, clamps etc

Supply and install Switchyard


illumination complete with all
36 lot lot lot lot lot lot lot
cabling, fittings, galvanised poles
etc
Supply and installation of 1 No
27kVA Diesel generating set with
37 lot lot lot lot lot lot lot
spares for 3 years. Ref section
7.3.5.7

Design, Manufacture, Supply,


Installation of station Automation
38 N/A N/A N/A N/A N/A lot lot
system and essential spares. Ref
section 7.3

Supply and installation of


Motorola GM 160 VHF radio
system with accessories and
39 N/A lot lot lot N/A lot lot
complete with 100ft mast as
specified in VHF and HF Radio
System Spec.
Supply of 1No. Electrical Tool
40 Box, 1No. Mechanical Tool Box lot lot lot lot lot lot lot
and 1No. First Aid Box
Testing and commissioning of the
41 entire substation works. Ref lot lot lot lot lot lot lot
section 7.2.9

“As Built” drawings, operation and


maintenance manuals including
42 lot lot lot lot lot lot lot
electronic copy as specified
(6sets). Ref section 7.1.7.3
Training – foreign/Local as
43 lot lot lot lot lot lot lot
specified. Ref section 5.3
F.INJECTION SUBSTATION(B)
CIVIAL WORKS (SPECIFIED)
ORILE-COKER FESTEC AGBARA INDUST AJANGBADI OJO ALABA IBALASU

Clearing, excavation, backfilling.


1
Ref section 7.7.2 lot lot lot lot lot lot lot
Cable trenches ,Slabs,ducts,
drainage system & earthing
2
inspection chambers etc. Ref
section 7.7.14 lot lot lot lot lot lot lot
Transformer foundation (design
3a
and construction) 1 NO 2 NO 1 NO 1 NO N/A 2 NO 2 NO
Foundations for all equipment
b support structures (design and
construction) lot lot lot lot lot lot lot
Foundations for all gantries
c
(design and construction) lot lot lot lot lot lot lot
Auxillary transformer foundation
4
(design and construction) N/A lot N/A N/A N/A lot lot
Control Building complex as
5
specified, N/A lot N/A N/A N/A lot lot

6 Fire protection for the substation.


Ref section 7.1.16 as follows: 0 lot 0 0 0 0 0
Supply and installation of fire
a. protection system within the
control builing lot lot lot lot lot lot lot
b. 10kg fire extinguisher bottles 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO
50kg fire extinguisher cylinder on
c.
castor wheel 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO
7 Road network as follows:
Access road (50m) complete with
site kerbs. Ref section 7.7.16 (bid
a for 50m but payment shall be
made for measured work not
exceeding 50m.) N/A lot N/A N/A N/A lot lot
b Switchyard road network N/A lot N/A N/A N/A lot lot
Gateman/security house. Ref
8
section 7.7.17 N/A lot N/A N/A N/A lot lot
Perimeter fence with block wall
9 complete with iron gate. Ref
section 7.7.17 N/A lot N/A N/A N/A lot lot
Switchyard Gravelling (150mm
10 thick using 25mm maximum
diameter chippings) lot lot lot lot N/A lot lot
Landscaping including laying of
interlocking stone within the open
11
space in the premises as
specified in 7.7.16.2 lot lot lot lot N/A lot lot
Control building furniture as
12
specified as follows lot lot lot lot lot lot lot
a. Refrigerator (medium size) 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO
b 17" Television 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO
c Office Table 2 NO 2 NO 2 NO 2 NO 2 NO 2 NO 2 NO
d Office Chair 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO
e 4-drawer filing cabinet 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO
Air conditioning of the control
13 building as per specifications. Ref
section 7.3.5.5 lot lot lot lot lot lot lot
Borehole complete with overhead
14 Tank and water piping. Ref
section 7.7.12 lot lot lot lot lot lot lot
F.INJECTION SUBSTATION(A)
ELECTRO MECHANICAL WORKS
ORILE-COKER FESTEC AGBARA INDUST. AJANGBADI OJO ALABA IBALASU GRAND TOTAL

Installation of 33kV outdoor


7 circuit breaker complete with the
support structure 2 No 4 No 3 No 2 No N/A 4 No 4 No 19
Supply and installation of 33kV 3-
8a.
phase isolator) 2 No 10 No 5 No 2 No N/A 9 NO 10 No 38
Supply and installation of isolator
b.
support structure 4 No 10 No 5 No 4 No N/A 9 NO 10 No 40

Supply and installation of 33kV 3-


9a. N/A 1 NO 1 NO N/A 2 NO 1 NO
phase isolator/Earthing Switch
N/A 5
Supply and installation of isolator
b. N/A 1 NO 1 NO N/A 2 NO 1 NO
support structure N/A 5
Supply and installation of 33kV
double bus gantry and other
10 N/A LOT N/A N/A
gantries with galvanised steel
lattice structures N/A LOT LOT LOT
Supply and installation of VT
b. N/A 1 NO 1 NO N/A
support structure N/A 2 NO 1 NO 5
Supply and installation of CT
b. 2No 4 No 3 No 2 No
support structure N/A 4 NO 4 NO 19
Supply and Installation of 33kV
14 1set 3 set 2 set 1 SET
Surge Arrester (A set of 3No.) N/A 3 SETS 3 SETS 12
Supply and Installation of Sky
shield wire and lightning spike
15 Lot Lot Lot Lot
complete with Steel lattice column
as applicable N/A lot lot lot

Supply and Installation of battery


19 bank and Charger unit complete 1set 2 SET 1 SET 1 SET 1 SET 2 SETS 2 SETS
with the rack. Ref section 7.3.6
10
Supply, laying and termination of
20 pvc/swa/pvc control cables as
follows:
a Control cable 4x4mm2 lot lot lot lot lot lot lot lot
b Control cables 7X2.5mm2 lot lot lot lot lot lot lot lot
c Control cables, 12x2.5mm2 lot lot lot lot lot lot lot lot
d Control cables 19x2.5mm2 lot lot lot lot lot lot lot lot
Supply and installation of
Substation earthing complete with
21 earthing pit, earthing mat, rods, lot lot lot lot lot lot lot lot
clamps and copper conductor. Ref
section 7.1.26
Supply and Installation of AC
Distribution Board and 1No.
22 N/A lot N/A N/A N/A lot lot lot
battery room extractor fan
(Section 7.3.5)

Supply and Installation of DC


23 Distribution Board and emergency N/A lot N/A N/A N/A lot lot lot
lighting system (section 7.3.6)

Supply and lay HV insulating


24 lot lot lot lot lot lot lot lot
rubber mat (11kV side)
Supply and installation of 1No.
200kVA 33/0.415kV Transformer
25a. complete with J&P fuse assembly, N/A lot N/A N/A N/A lot lot lot
isolator for Station Auxiliary power
supply. Ref section 7.3.5

Supply and lay 4x95mm2


b. N/A lot N/A N/A N/A lot lot lot
PVC/SWA/PVC cable
TP&N switch, Distribution
c. Board,Three-pole Change-over Lot Lot Lot Lot Lot Lot Lot lot
switch
a Incomer Panels N/A N/A 3 NO N/A 3 NO N/A N/A 6
b Bus Sections N/A N/A 2 NO N/A 2 NO N/A N/A 4
c Feeder Panels N/A N/A 10 NO N/A 6 NO N/A N/A 16
a Incomer Panels N/A N/A 3 NO N/A 3 NO N/A N/A 6
b Bus Sections N/A N/A 2 NO N/A 2 NO N/A N/A 4
c Feeder Panels N/A N/A 10 NO N/A 6 NO N/A N/A 16
a Line Panels N/A N/A N/A N/A 4 NO N/A N/A 4
b Bus Sections N/A N/A N/A N/A 2 NO N/A N/A 2
c Transformer Panel N/A N/A N/A N/A 3 NO N/A N/A 3
a Line Panels N/A N/A N/A N/A 4 NO N/A N/A 4
b Bus Sections N/A N/A N/A N/A 2 NO N/A N/A 2
c Transformer Panel N/A N/A N/A N/A 3 NO N/A N/A 3

Supply and install 3x150mm2


11kV XLPE Underground Cable
31 complete with jointing/terminating lot lot lot lot lot lot lot lot
kits/lugs etc (from feeder panel to
11kV terminal pole).

Supply and install Marshalling


kiosk for the termInation of all
32 control cables from Transformers, Lot Lot Lot Lot N/A lot lot lot
Outdoor CB, CT, VT and linking
same to control/relay panels

Supply and install 1core 150mm2


11kV XLPE underground cable
complete with jointing/terimination
33 kits/lugs etc to connect injection Lot Lot Lot Lot Lot Lot Lot lot
transformer and 11kV indoor
switchgear (two lengths of cable
to be laid per phase)

Supply and install 33kV


switchyard overhead connections
to link outdoor equipment
34 complete with clamps, Lot Lot Lot Lot N/A lot lot lot
connectors, line taps, fittings, disc
& post insulators, aluminum
conductor etc

Supply and stringing of the 33kV


bus complete with Bear conductor
35 Lot Lot Lot Lot N/A lot lot lot
(250mm2 ACSR), disc insulator,
tension sets, clamps etc
Supply and install Switchyard
illumination complete with all
36 lot lot lot lot lot lot lot lot
cabling, fittings, galvanised poles
etc
Supply and installation of 1 No
27kVA Diesel generating set with
37 lot lot lot lot lot lot lot lot
spares for 3 years. Ref section
7.3.5.7

Design, Manufacture, Supply,


Installation of station Automation
38 N/A N/A N/A N/A N/A lot lot lot
system and essential spares. Ref
section 7.3

Supply and installation of


Motorola GM 160 VHF radio
system with accessories and
39 N/A lot lot lot N/A lot lot lot
complete with 100ft mast as
specified in VHF and HF Radio
System Spec.
Supply of 1No. Electrical Tool
40 Box, 1No. Mechanical Tool Box lot lot lot lot lot lot lot lot
and 1No. First Aid Box

“As Built” drawings, operation and


maintenance manuals including
42 lot lot lot lot lot lot lot lot
electronic copy as specified
(6sets). Ref section 7.1.7.3

F.INJECTION SUBSTATION(B)
CIVIAL WORKS (SPECIFIED)
ORILE-COKER FESTEC AGBARA INDUSTR AJANGBADI OJO ALABA IBALASU GRAND TOTAL

6 Fire protection for the substation.


Ref section 7.1.16 as follows: 0 lot 0 0 0 0 0
Supply and installation of fire
a. protection system within the
control builing lot lot lot lot lot lot lot
b. 10kg fire extinguisher bottles 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO
50kg fire extinguisher cylinder on
c.
castor wheel 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO
Control building furniture as
12
specified as follows lot lot lot lot lot lot lot
a. Refrigerator (medium size) 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 7
b 17" Television 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 7
c Office Table 2 NO 2 NO 2 NO 2 NO 2 NO 2 NO 2 NO 14
d Office Chair 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO 28
e 4-drawer filing cabinet 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 7
F.INJECTION SUBSTATION(A)
ELECTRO MECHANICAL WORKS
ORILE- FESTEC AGBARA AJANG OJO ALABA IBALA TOT VARIAT GRAND REMARK
COKER INDUST. BADI SU AL ION TOTAL S comments
1 2NO.OF 1 NO.OF 1 NO.OF 1 NO.OF 1 NO.OF 2NO.O
NO.OF MVA 15MVA 15MVA 15MVA 15MVA F MVA
15MVA
Supply and installation of 33kV 3-
8a.
phase isolator) 2 No 10 No 5 No 2 No N/A 9 NO 10 No 38 0 38 Enquiry sent to Crompton
Supply and installation of isolator
b.
support structure 4 No 10 No 5 No 4 No N/A 9 NO 10 No 40 2 42 Enquiry sent to Crompton
Supply and installation of 33kV 3-
9a. N/A 2 SETS 1 SET N/A 2 SETS 2 SET
phase isolator/Earthing Switch N/A 5 2 7 Enquiry sent to Crompton
Supply and installation of isolator
b. N/A 2 SETS 1 SET N/A 2 SETS 2 SET
support structure N/A 5 2 7 Enquiry sent to Crompton

Supply and installation of 33kV


10 double bus gantry and other gantries N/A 2 SETS N/A N/A 1 SET 2 SET
with galvanised steel lattice structures SET
N/A S 5 5
Reconstruction of the existing 33kv As per Mr. Shukla , We should construct new gantries to avoid
11 bus gantry with galvanised steel 1 SET 2 SETS 1 SET 1 SET 1 SET 1 SET 2 SET having any warranty related problems
lattice structure 0 9 9
the location of VT in substation is to be finalized ,NIPP to inform us
Installation of 33/0.11kV outdoor the delivery schedule of VT and free issue the VT to PAC for
12 a 1 SET 2 SETS 1 set 1 SET 1 SET 2 SET installation .Issue regarding scope of work in installation to be
voltage transformer (A set of 3No.)
2 SETS 5 5 10 discussed and finalized with NIPP.
We need type , make and mounting arrangement of VT from NIPP ,
Supply and installation of VT support location for mounting of VT in substation to be finalized in
b. 1 SET 2 sets 1 SET 1 SET 1 SET 2 SET consultation with NIPP, the support structure can be designed
structure(33/0.11KV VT)
2 SETS 6 4 10 thereafter
the location of CT in substation is to be finalized , NIPP to inform us
Installation of 33kV 4x300/1/1/1A the delivery schedule of CT and free issue the CT to PAC for
13 2 sets 4 sets 3 SET 2 set 1 SET installation .Issue regarding scope of work in installation to be
outdoor CT (A set of 3No.)
4 set 4 set 19 1 20 discussed and finalized with NIPP
Supply and installation of CT support We need type , make and mounting arrangement of CT from NIPP ,
b. 2 sets 4 sets 3 SET 2 set 1 SET
structure 4 set 4 set 19 1 20 to design the support structure
Supply and Installation of 33kV Surge 3
14 1set 3 set 2 set 1 SET 1 SET
Arrester (A set of 3No.) 3 SETS SETS 13 1 14 Enquiry to Crompton sent
the length of sky wire can be finalized after equipment layout in
Supply and Installation of Sky shield outdoor switch yard is finalized
15 wire and lightning spike complete with 1 SET 1 SET 1 SET 1 SET 1 SET 1 SET
Steel lattice column as applicable
N/A 6 6
the location of Line control / relay panel to be substation is to be
finalized , NIPP to inform us the delivery schedule of Line control /
Installation of Transformer relay panel, free issue the same to PAC for installation . Issue
16 1No N/A 1 NO 1 NO regarding scope of work in installation to be discussed and finalized
control/relay panel
with NIPP , NIPP to provide PAC with details of cable termination
required in line / relay control panels
N/A N/A N/AON SHORE
the location of Line control / relay panel to be substation is to be
finalized , NIPP to inform us the delivery schedule of Line control /
Installation of 33kV Line control/relay relay panel, free issue the same to PAC for installation . Issue
17 N/A N/A 1 NO N/A regarding scope of work in installation to be discussed and finalized
panel
with NIPP , NIPP to provide PAC with details of cable termination
required in line / relay control panels
N/A N/A N/AON SHORE

Page 17 of 21
the location of Line control / relay panel to be substation is to be
finalized , NIPP to inform us the delivery schedule of Line control /
Installation of 33kV bus coupler relay panel, free issue the same to PAC for installation . Issue
18 1No. N/A 1 NO 1 NO regarding scope of work in installation to be discussed and finalized
control/relay panel
with NIPP , NIPP to provide PAC with details of cable termination
required in line / relay control panels
N/A N/A N/AON SHORE
Supply and Installation of battery
2
19 bank and Charger unit complete with 1set 2 SET 1 SET 1 SET 1 SET 2 SETS
SETS
the rack. Ref section 7.3.6 10 10

Supply, laying and termination of


20
pvc/swa/pvc control cables as follows:
0
a Control cable 4x4mm2 100 M 250 M 100 M 100 M 100 M 100 M 250 M ### 1000 LUGS
b Control cables 7X2.5mm2 100 M 250 M 100 M 100 M 100 M 100 M 250 M ### 1000 LUGS
c Control cables, 12x2.5mm2 100 M 250 M 100 M 100 M 100 M 100 M 250 M ### 1000 LUGS
d Control cables 19x2.5mm2 100 M 250 M 100 M 100 M 100 M 100 M 250 M ### 1000 LUGS
1, for existing substations , we need from NIPP following
Supply and installation of Substation a ) the earthing grid layout , to identify the point to extend from ,
earthing complete with earthing pit, b) Measurement of Earth Resistance as Built
21 earthing mat, rods, clamps and 1 SET 2 SET 1 SET 1 SET 1 SET 1 SET 2 SET 0 2) For new substation : we need
copper conductor. Ref section 7.1.26 a) Soil resitivity measurement
(HOLD) b) design the network giving grid and earthing and electrode layout
9 9
the quantities required can be finalized after studying the earthing
BARE COPPER CONDUCTOR 70 250 250 250 500 arrangements in existing substations , and deciding the Take over
A 500 MTR 250 MTR 250 MTR 2,250 point for connecting the earth connections for new equipment to be
MM2 MTR MTR MTR MTR
2250 installed
a) for new substations the quantities required can be finalized after
mesuring the soil resistivity and desiging the eartrhing layout
COPPER COATED EARTH ROD 8 b) for existing substations , after deciding the take over point for
B 10 NO 20 NO 10 NO 10 NO 10 NO 10 NO 20 NO connecting the earth connections for new equipment to be installed ,
FT 22MM2
and the earth resistance value as of now ( NIPP ) to be requested to
mesure the same and inform us .
90 90
C WIRE MESH MS-2X4 MTR 6 NO 12 NO 6 NO 6 NO 6 NO 6 NO 12 NO 54 54 the quantities can be finalized after design of earthing network
D EARTHING CLAMP 10 NO 20 NO 10 NO 10 NO 10 NO 10 NO 20 NO 90 90 the quantities can be finalized after design of earthing network

To order the AC distribution panel , we need to design the LV power


distribution for the substation , encompassing the following
Supply and Installation of AC a) Lighting indoor
Distribution Board and 1No. battery b) Lighting outdoor
22 N/A 8 FANS N/A N/A N/A 4 FANS N/A 16 c) small power distribution ( sockets 415/230V)
room extractor fan (Section 7.3.5)
HOLD d) Ventilation
e) Power distribution to battery charger , and
F) Interface to D.G set
0 16
Supply and Installation of DC To design the DC distribution board , we need to know the DC load
23 Distribution Board and emergency N/A 2 SET N/A N/A N/A 2 SETS N/A 10 and points to which we have to feed
lighting system (section 7.3.6) 10
Supply and lay HV insulating rubber
24 6 NO 12 NO 6 NO 6 NO 6 NO 6 NO 12 NO 54
mat (11kV side)-2X4 MTR 20MM 54

Supply and installation of 1No.


200kVA 33/0.415kV Transformer
25a. complete with J&P fuse assembly, N/A 1 NO N/A N/A N/A 1 NO 1 NO
isolator for Station Auxiliary power
supply. Ref section 7.3.5
7 7
Supply and lay 4x95mm2 100
b. 100 mtr 100 mtr 100 mtr 100 mtr 100 mtr 100 mtr 0
PVC/SWA/PVC cable mtr 700 700

Page 18 of 21
TP&N switch, Distribution
c. Lot Lot Lot Lot Lot Lot Lot lot
Board,Three-pole Change-over switch
### On Shore
25a J & P FUSE Assembly 33kv N/A 1 no N/A N/A N/A 1 no 1 no 3 3
b Isolator -33kv N/A 1 no N/A N/A N/A 1 no 1 no 3 3
c Earthing Material 1 no 1 no 1 no 1 no 1 no 1 no 1 no 7 7
d change over-200 Amps 1 no 1 no 1 no 1 no 1 no 1 no 1 no 7 7
e Distribution Board 1 no 1 no 1 no 1 no 1 no 1 no 1 no 7 7
a Incomer Panels N/A N/A 3 NO N/A 3 NO N/A N/A 6 6 On Shore
b Bus Sections N/A N/A 2 NO N/A 2 NO N/A N/A 4 4 On Shore
c Feeder Panels N/A N/A 10 NO N/A 6 NO N/A N/A 16 16 On Shore
a Incomer Panels N/A N/A 3 NO N/A 3 NO N/A N/A 6 6 On Shore
b Bus Sections N/A N/A 2 NO N/A 2 NO N/A N/A 4 4 On Shore
c Feeder Panels N/A N/A 10 NO N/A 6 NO N/A N/A 16 16 On Shore
a Line Panels N/A N/A N/A N/A 4 NO N/A N/A 4 4 On Shore
b Bus Sections N/A N/A N/A N/A 2 NO N/A N/A 2 2 On Shore
c Transformer Panel N/A N/A N/A N/A 3 NO N/A N/A 3 3 On Shore
a Line Panels N/A N/A N/A N/A 4 NO N/A N/A 4 4 On Shore
b Bus Sections N/A N/A N/A N/A 2 NO N/A N/A 2 2 On Shore
c Transformer Panel N/A N/A N/A N/A 3 NO N/A N/A 3 3 On Shore

Supply and install 3x150mm2 11kV


XLPE Underground Cable complete 800
4000 650
31 with jointing/terminating kits/lugs etc 1750 mtr 600mtr 250 mtr 300 mtr 450 mtr 0
mtr mtr
(from feeder panel to 11kV terminal mtr
pole).
###
a Rechem/termination kit 150 sqmm 20 no 20 no 20 no 20 no 20 no 20 no 20 no 140 140
b Lugs 25 no 25 no 25 no 25 no 25 no 25 no 25 no 175 175
c Jointing Kit 10 no 10 no 10 no 10 no 10 no 10 no 10 no 70 70
25
d Insulation tape-11 kv 25 rolls 25 rolls 25 rolls 25 rolls 25 rolls 25 rolls
rolls 140 140

To design and order Marshalling Kiosks we need following


Supply and install Marshalling kiosk information from NIPP
for the termination of all control cables a) Details of the signals (type and quantity ) from Transformers ,
32 from Transformers, Outdoor CB, CT, 1 NO 2 NO 1 NO 1 NO 1 NO 1 NO 2 NO 9 Outdoor CT,VT,CB,Isolator,Earthing Switch
VT and linking same to control/relay b) Termination details in Transformer control panel/ Bus bar control
panels ( HOLD) panel / Protection Panel
9

Supply and install 1core 150mm2


11kV XLPE underground cable
complete with jointing/termination
150 150 150 300
33 kits/lugs etc to connect injection 300 MTR 150 MTR 150 MTR ###
MTR MTR MTR MTR
transformer and 11kV indoor
switchgear (two lengths of cable to be
laid per phase)
1350
a Rechem/termination kit 150 sqmm 20 no 20 no 20 no 20 no 20 no 20 no 20 no 140 140
b Lugs 25 no 25 no 25 no 25 no 25 no 25 no 25 no 175 175
c Jointing Kit 10 no 10 no 10 no 10 no 10 no 10 no 10 no 70 70
25
d Insulation tape-11 kv 25 rolls 25 rolls 25 rolls 25 rolls 25 rolls 25 rolls
rolls 140 140
Supply and install 33kV switchyard the quantities required for this can be worked out after the
overhead connections to link outdoor arrangment for tapping the 33 kV supply ( construction of new Gantry
equipment complete with clamps, / reconstruction of existing gantry ) is finalized with NIPP
34 Lot Lot Lot Lot N/A lot lot lot
connectors, line taps, fittings, disc &
post insulators, aluminum conductor
etc ###
A CLAMPS-150 sq mm 170 no 170 no 170 no 170 no 170 no 170 no 170 no 1190 1,190

Page 19 of 21
b Line Tape- 150 sq mm 170 no 170 no 170 no 170 no 170 no 170 no 170 no 1190 1,190
c Disc Insulators 170 no 170 no 170 no 170 no 170 no 170 no 170 no 1190 1,190
d Post Insulators 170 no 170 no 170 no 170 no 170 no 170 no 170 no 1190 1,190
150
e Aluminum conductors-150 sqmm 150 mtr 150 mtr 150 mtr 150 mtr 150 mtr 150 mtr
mtr 1050 1,050
Supply and stringing of the 33kV bus
complete with Bear conductor
35 Lot Lot Lot Lot N/A lot lot lot
(250mm2 ACSR), disc insulator,
tension sets, clamps etc
a CLAMPS-250 sq mm 50 no 100 no 50 no 50 no 50 no 50 no 100 no 450 450
b Line Tape- 250 sq mm 50 no 100 no 50 no 50 no 50 no 50 no 100 no 450 450
c Disc Insulators 50 no 100 no 50 no 50 no 50 no 50 no 100 no 450 450
d Post Insulators 100 no 100 no 100 no 100 no 100 no 100 no 100 no 700 700
200
e Aluminum conductors-250 sqmm 100 mtr 200 mtr 100 mtr 100 mtr 100 mtr 100 mtr
mtr 700 700
f Tension Clamp 50 no 50 no 50 no 50 no 50 no 50 no 50 no 350 350
g Underground cable 50 mtr 50 mtr 50 mtr 50 mtr 50 mtr 50 mtr 50 mtr 350 350
Gantry structure need to be designed , the design would be based on
h Gantry 4 sets 4 sets 4 sets 4 sets 4 sets 4 sets 4 sets the arrangement for tapping 33kV supply from exiting gantries
42 42
Supply and install Switchyard Lighting layout design needed to be done , to estimate the BOQ , to
36 illumination complete with all cabling, 8 no 8 no 8 no 8 no 8 no 8 no 8 no 56 order .
fittings, galvanized poles etc 56
a Fixtures-MERCURY VAPOR LAMP 8 no 8 no 8 no 8 no 8 no 8 no 8 no 56
b Gear Switches 1 no 1 no 1 no 1 no 1 no 1 no 1 no 7

c Distribution Board-200 amps-8 WAYS n/a 1 no n/a n/a n/a 1 no 1 no


3
500
d 4 x 10 sq mm pvc/pvc flexible cable 500 mtr 500 mtr 500 mtr 500 mtr 500 mtr 500 mtr
mtr 3500

Supply and installation of 1 No 27kVA


37 Diesel generating set with spares for 1 set 1 set 1 set 1 set 1 set 1 set 1 set 7
3 years. Ref section 7.3.5.7
7
Design, Manufacture, Supply, To design the automation system we need the details of interface
Installation of station Automation with NIPP supplied equipment ( Indoor & Outdoor switchgear ,
38 N/A N/A N/A N/A N/A 1 set 2 set 3 metering signals( type and quantity) in digital form
system and essential spares. Ref
section 7.3 3
Supply and installation of Motorola
GM 160 VHF radio system with
39 accessories and complete with 100ft N/A lot N/A N/A N/A N/A lot lot-3
mast as specified in VHF and HF
Radio System Spec. on shore
Supply of 1No. Electrical Tool Box,
40 1No. Mechanical Tool Box and 1No. lot lot lot lot lot lot lot lot
First Aid Box
“As Built” drawings, operation and
maintenance manuals including
42 lot lot lot lot lot lot lot lot
electronic copy as specified (6sets).
Ref section 7.1.7.3 To be supplied after completion of site activity

F.INJECTION SUBSTATION(B)
CIVIL WORKS (SPECIFIED)
ORILE- FESTEC AGBARAAJANGBADI
I OJO ALABA IBALASU
GRAND TOTAL

Page 20 of 21
Fire protection for the substation. Ref
6
section 7.1.16 as follows: 0 lot 0 0 0 0 0
Supply and installation of fire
a. protection system within the control
building lot lot lot lot lot lot lot
b. 10kg fire extinguisher bottles 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO
50kg fire extinguisher cylinder on
c.
castor wheel 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO
Control building furniture as specified
12
as follows lot lot lot lot lot lot lot
a. Refrigerator (medium size) 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 7
b 17" Television 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 7
c Office Table 2 NO 2 NO 2 NO 2 NO 2 NO 2 NO 2 NO 14
d Office Chair 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO 4 NO 28
e 4-drawer filing cabinet 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 1 NO 7

Page 21 of 21