ENGINEERING & PROJECT MANAGEMENT Soli
SITE PROJECTS DEPARTMENT Zale:
7 ae REQUEST FOR INSPECTION
Project Tite | IMPLEMENT BBP RECOMMENDATION FOR SHP BOILER
ProjectNo.: | AF-1215017 | Project Type: | 17K | Affliate: | KEMVA Rev.: [0
Contractor Contact Person ADEEL MUKHTAR Tel: 054-6616192 RFINo | E-006_
Inspection Date [SOF | Time 10.0AM | Place of npecton AL-KHOBAR
SSRS No. Network No: at i
Discipline: cv OO MECH. a ELECT. wW INSTR. a
No item tobe Inapested Quantily | Drawings No. / Remarks
7 FACTORY ACCEPTANCE TEST(FAT) OF MCB 3
BREAKERS T6A-3PHS 4€0V OOHZ
J
a Satisfactory
Results
T__| Unsatisfactory
| Comments a
QAIQC Engineer
Inspector Name Signature Date
Construction Supervisor /
Project Engineer Signature Date
Giseace ADEEL MUKHTAR Signature At Date 14-04-2015
EPM.SPD.PC.F.008 Rev. No. 00
Ref Dac.: EPM-SPD-PC-P.004__j{___ ie
IY
To Khobar P SE
rand] | oho)
roe (oe) he Mee HL =
EG OSHS
& o B gC l5| lz 2
3 z 2-205 3
aL 1ELIMEL 1®{_leCiel iar
3 mange 5 a
| Hi
ce
Pi
a
SCOSA SBU Factory)
nd WIS0 Building